Loading...
PLN20130073-Echelbarger-Bond Worksheet.pdfSite Improvement Bond Quantity Worksheet Web date: 11/21/2005 King County Department of Development & Environmental Services 900 Oakesdale Avenue Southwest Renton, Washington 98055-1219 For alternate formats, call 206-296-6600. 206-296-6600 TTY 206-296-7217 Project Name: ECHELBARGERS 2-LOT SHORT PLAT Date: 7/11/2014 Location: EDMONDS Project No.: Activity No.: Clearing greater than or equal to 5,000 board feet of timber? yes If yes, Forest Practice Permit Number: (RCW 76.09) X no PLN20130073 Note: All prices include labor, equipment, materials, overhead and profit. Prices are from RS Means data adjusted for the Seattle area or from local sources if not included in the RS Means database. inVa:[c -V -1�6tA) � -76j 03. 17 rZow f+ l8 � 3g Cg �r vat G t-- RD VJ f vvtr (V VC v C-rvf S # 76j q 33 . / 7 X .3 , 3 Roy lvv�roJ�vne� 18r738 �8 1 �o - ,� Zz� �B� •zz P'�b tvp Am 014 Page 1 of 9 5436 Bond Quantity Worksheet 07-11-2014 Z, 3zq• 3v 1ws?er-noAr FeE.5 JUL 15 � � 2011, ENGINEERING DIVISION Unit prices updated: 02/12/02 AF'P D SNOT D Version: 04/22/02 Date: `l I Report Date: 7/11 /2014 Site Improvement Bond QUantity Worksheet Web date:11/21/2005 _..... .. .... ....; `... .. ... ` ....Deference # .. unit Price :: , : ,,. :::. �init..:: "'Quanta #.� :.:...•.'':, : Appllnatians .'. _. :' :::;': ' ' ':'` ; ;:• Cost.` ERt3S1QN1SEDIMENT CONTROL (dumber Sackfill & compaction -embankment ESC-1 $ 5.62 CY Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 $ 67.51 Each Crushed surfacing 1 1/4" minus ESC-3 WSDOT 9-03.9(3) $ 85.45 CY Ditching ESC-4 $ 8.08 CY Excavation -bulk ESC-5 $ 1.50 CY Fence, silt ESC-6 SWDM 5.4.3.1 $ 1.38 LF 620 1 856 Fence, Temporary (NGPE) ESC-7 $ 1.38 LF _ Hydroseeding ESC-8 SWDM 5.4.2.4 $ 0.59 SY 850 1 502 Jute Mesh ESC-9 SWDM 5.4.2.2 $ 1.45 SY _ Mulch, by hand, straw, 3" deep ESC-10 SWDM 5.4.2.1 $ 2.01 SY Mulch, by machine, straw, 2" deep ESC-11 SWDM 5.4.2.1 $ 0.53 SY Piping, temporary, CPP, 6" ESC-12 $ 10.70 LF Piping, temporary, CPP, W ESC-13 $ 16,10 LF Piping, temporary, CPP, 12" ESC-14 $ 20.70 LF Plastic covering, 6mm thick, sandbagged ESC-15 SWDM 5.4.2.3 $ 2.30 SY 100 1 230 Rip Rap, machine placed; slopes ESC-16 WSDOT 9-13.1(2) $ 39.08 CY Rock Construction Entrance, 50'xl5'x1' ESC-17 SWDM 5.4.4.1 $ 1,464.34 Each 1 1 1464 Rock Construction Entrance, 100'x15'xl' ESC-18 SWDM 5.4.4.1 $ 2,928.68 Each Sediment pond riser assembly ESC-19 SWDM 5.4.5.2 $ 1,949.38 Each Sediment trap, 5' high berm ESC-20 SWDM 5.4.5.1 $ 17.91 LF Sed. trap, 5' high, riprapped spillway berm section ESC-21 SWDM 5.4.5.1 $ 68.54 LF Seeding, by hand Sodding, 1" deep, level ground ESC-22 SWDM 5.4.2.4 $ 0.51 SY ESC-23 SWDM 5.4.2.5 $ 6,03 SY Sodding, 1" deep, sloped ground ESC-24 SWDM 5.4.2.5 $ 7.45 SY TESC Supervisor ESC-25 $ 74.75 HR 8 1 598 Water truck, dust control ESC-26 SWDM 5.4.7 $ 97.75 HR 8 1 782 WRI7E.IN. IT-19M"M see Tree Protection $ 300.00 Each 5 1 1500 _ Inlet Protection $ 50.00 9 1 450 ESC SUBTOTAL: $ 6,381.44 30% CONTINGENCY & MOBILIZATION: $ 1,914.43 ESC TOTAL: $ 8,295.87 COLUMN: A Page 2 of 9 5436 Bond Quantity Worksheet 07-11-2014 Unit prices updated: 02/12/02 Version: 04/22/02 Report Date: 7/11/2014 Site Improvement Bond Quantity Worksheet Web date: 1112112005 Existing Future Public Private Quantity.Compieted Right of Way R oad I 'p.rove entr is to provemt ens n d Reduction (Bo ion)* �. .._.., - .. ..... • ...� & D`ralnae'Facifities ..Quart Un!t t?rrce. Unit .. Quart.'.` '. Cost Quailt. Cost Quart..... Cost Com ete Cost i Backfill & Compaction- embankment Gt - 1 $ 5,62 CY 200 1,124.00 Backfill & Compaction- trench G1 - 2 $ 8.53 CY Clear/Remove Brush, by hand G1 - 3 $ 0.36 SY Clearing/Grubbing/Tree Removal GI - 4 $ 8,876,16 Acre 0.425 3,772.37 Excavation - bulk GI - 5 $ 1.50 CY 350 525.00 Excavation - Trench GI-61 $ 4.06 CY 25 101.50 Fencing, cedar, 6' hi h GI-7 $ 18,55 LF Fencing, chain fink, vinyl coated, 6' hi GI-8 $ 13.44 LF Fencing, chain fink, gate, vinyl coated, GI - 9 $ 1,271.81 Each Fencing, split rail, 3' hi h GI - 10 $ 12.12 LF Fill & compact - common barrow GI - 11 $ 22,57 CY 200 4,514.00 Fill & compact - gravel base GI - 12 $ 25.48 CY Fill & compact - screened topsoil GI - 13 $ 37.85 CY Gabion, 12" deep, stone filled mesh GI - 14 $ 54.31 SY Gabion, 18" deep, stone filled mesh GI - 15 $ 74.85 SY Gabion, 36" deep, stone filled mesh G1 - 16 $ 132.48 SY Grading, fine, by hand GI - 17 $ 2,02 SY 250 505.00 Grading, fine, with grader GI - 18 $ 0.95 SY 2060 1,957,00 Monuments, T Ion GI - 19 $ 135.13 Each Sensitive Areas Sin GI - 20 $ 2.88 Each Sodding, 1"deep, sloped ground GI -21 $ 7.46 SY Surveying, fine & grade GI - 22 $ 788,26 Da Surveying, lot location/lines GI - 23 $ 1,556.64 Acre Traffic control crew 2 ff aggers GI - 24 $ 85,18 HR 40 3,407.20 Trail, 4" chied wood GI - 25 $ 7.59 SY Trail, 4" crushed cinder GI - 26 $ 8.33 SY Trail, 4" top course GI - 27 $ 8.19 SY Wall, retaining, concrete GI - 28 $ 44.16 SF Wall, rockery Page 3 of 9 SUBTOTAL 3,407.20 12,498.87 Unit prices updated: 02/12102 'KCC 27A authorizes only one bond reduction. Version: 4/22/02 5436 Bond Quantity Worksheet 07-11-2014 Report Date: 7/1112014 Site Improvement Bond Quantity Worksheet Web date: 11/21/2005 ExlstEng Future Puh11c ` Prlvate Bond Re. mction'. t3fght of way !toad ]mprovements lihMvements .. Unit?nce .. '. �in�t - 'Quant : : host Qiient. Gost '' iluant.. - Cnst Com'lete Cost -' ROA6,1IMPROUEMEN7 .. _:.. ;...E14 AC Grindin , 4'wide machine < 1000s $ 23.00 SY AC Grindin , 4'wide machine 1000-200 $ 5.75 SY AC Grindin , 4'wide machine > 2000s $ 1.38 SY AC Removal/Dis osal/Re air $ 41.14 SY 24 987.36 Barricade, type I RI - 5 $ 30.03 LF Barricade, type III Permanent RI - 6 $ 45.05 LF Curb & Gutter, rolled RI - 7 $ 13.27 LF Curb & Gutter, vertical RI - 8 $ 9.69 LF 100 969.00 Curb and Gutter, demolition and dis os IRI - 9 $ 13.58 LF Curb, extruded asphalt RI - 10 $ 2.44 LF Curb, extruded concrete RI - 11 $ 2,56 LF Sawcut, asphalt, 3" depth RI - 12 $ 1.85 LF 120 222.00 Sawcut, concrete, per 1" depth RI - 13 $ 1.69 LF Sealant, asphalt RI - 14 $ 0.99 LF 120 118.80 Shoulder, AC, see AC road unit price RI - 15 $ - SY Shoulder, gravel, 4" thick RI - 16 $ 7.53 SY Sidewalk, 4" thick Rl - 17 $ 30,52 SY Sidewalk, 4" thick, demolition and dis o RI - 18 $ 27.73 SY Sidewalk, 5.5" thick RI - 19 $ 37.15 SY 51 1,894.65 Sidewalk, 6" thick, at driveway Rl - 20 $ 39,36 SY 7 275.52 Sign, handicap RI - 21 $ 85,28 Each Striping, per stall RI - 22 $ 5,82 Each Striping, thermoplastic, for crosswalk RI - 23 $ 2.38 SF Striping, 4" reflectorized line RI - 24 $ 0.25 LF Page 4 of 9 SUBTOTAL 4,467.33 Unit prices updated; 02/12/02 "KCC 27A authorizes only one bond reduction. Version: 4/22/02 5436 Bond Quantity Worksheet 07-11-2014 Report Date: 7/11/2014 Site Improvement Bond Quantity Worksheet Web date: 11/21/2005 Existing Right-of-way Future Public Road Improvements & Drainage Facilities Private Improvements Bond Reduction* Quant. Com fete Cost Unit Price I Unit Quant. Cost Quant. I Cost Quant. Cost ROAD SURFACING (4" Rock = 2.5 base & 1.5" top course) For'93 KCRS (6.5" Rock= 5" base & 1.5" top course) For KCRS '93, additional 2.5" base ad RS - 1 $ 3.60 SY AC Overlay, 1.5" AC RS - 2 $ 7.39 SY AC Overlay, 2" AC RS - 3 $ 8.75 SY AC Road, 2", 4" rock, First 2500 SY RS - 4 $ 17.24 SY AC Road, 2", 4" rock, Qty. over 2500SY RS - 5 $ 13.36 SY AC Road, 3", 4" rock, First 2500 SY RS - 6 $ 19.69 SY AC Road, 3", 4" rock, Qty. over 2500 S RS - 7 $ 15.81 SY AC Road, 5", First 2500 SY RS - 8 $ 14.57 SY AC Road, 5", Qty. Over 2500 SY RS - 9 $ 13.94 SY AC Road, 6", First 2500 SY RS - V $ 16.76 SY AC Road, 6", Qty. Over 2500 SY RS - 1 $ 16.12 SY Asphalt Treated Base, 4" thick RS - 1 $ 9.21 SY Gravel Road, 4" rock, First 2500 SY RS - 1 $ 11.41 SY Gravel Road, 4" rock, Qty. over 2500 S S - 1 $ 7.53 SY PCC Road, 5", no base, over 2500 SY :RS-ld $ 21.51 SY PCC Road, 6", no base, over 2500 SY RS - 1 $ 21.87 SY Thickened Edge RS - 1 $ 6.89 LF 0 1,233.50 j0 Page 5 of 9 SUBTOTAL 1_033.50 Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 4/22/02 5436 Bond Quantity Worksheet 07-11-2014 Report Date: 7/11/2014 Web date: 11/2112006 Access Road, RID D - 1 $ 16.74 1 SY Bollards -fixed D - 2 $ 240.74 Each Bollards - removable D - 31 $ 4.52,341 Each CBs include frame and lid CB jXRe l D- 4 $ 1,257.64 Each 3 3,772,92 CB Type IL D - 5 $ 1,433.59 Each CB Type Il, 48" diameter D - 6 $ 2,033.57 Each for additional depth over 4' 0-7 $ 436.52 FT CB Type Il, 54" diameter D - 8 $ 2,192.54 Each for additional dej± over 4' D - 9 $ 486.53 FT CB Type Il, 60" diameter D - 10 $ 2,351.52 Each for additional depth over 4' 0 - 11 $ 536.54 FT CB Type 11, 72" diameter D - 12 $ 3,212.64 Each for additional depth over 4' D - 13 $ 692.21 FT Yard Drain D - 14 $ 400.00 Each 8 3,200.00 Cleanout, PVC, 4" D - 15 $ 130.55 Each 8 1,044.40 Cleanout, PVC, 6" D - 16 $ 174.90 Each 5 874.50 Cleanout, PVC, 8" D - 17 $ 224.19 Each Culvert, PVC, 4" D - 18 $ 8.64 LF 250 2,160.00 Culvert, PVC, 6" D - 19 $ 12.60 LF 59 743.40 Culvert, PVC, 8" D - 20 $ 13.33 LF Culvert, PVC, 12" 0 - 21 $ 21.77 LF Culvert, CMP, 8" 0 - 22 $ 17.25 LF Culvert, CMP, 12" D - 23 $ 26.45 LF Culvert, CMP, 15" D - 24 $ 32.73 LF Culvert, CMP, 18" D - 25 $ 37.74 LF Culvert, CMP, 24" D- 26 $ 53.33 LF Culvert, CMP, 30" D - 27 $ 71.45 LF Culvert, CMP, 36" D - 28 $ 112.11 LF Culvert, CMP, 48" D - 29 $ 140,83 LF Culvert, CMP, 60" D - 30 $ 235.45 LF Culvert, CMP, 72" D - 31 $ 302.58 LF Page 6 of 9 SUBTOTAL 11.795.22 Unit prices updated: 02/12/02 `KCC 27A authorizes only one bond reduction. Version: 4122102 5436 Bond Quantity Worksheet 07-11-2014 Report Date: 7/11/2014 FITOTOMM Web dale: 11121/2005 Culvert, Concrete, 8" D - 32 $ 21.02 LF Culvert, Concrete, 12" D - 33 $ 30.05 LF Culvert, Concrete, 15" D - 34 $ 37.34 LF Culvert, Concrete, 18" D - 35 $ 44.51 LF Culvert, Concrete, 24" D - 36 $ 61.07 LF Culvert, Concrete, 30" D - 37 $ 104.18 LF Culvert, Concrete, 36" D - 38 $ 137.63 LF Culvert, Concrete, 42" D - 39 $ 158.42 LF Culvert, Concrete, 48" D - 40 $ 175.94 LF Culvert, CPP, 6" D - 41 $ 10,70 LF Culvert, CPP, 8" D - 42 $ 16.10 LF Culvert, CPP, 12" D - 43 $ 20.70 LF Culvert, CPP, 15" D - 44 $ 23,00 LF Culvert, CPP, 18" D - 45 $ 27.60 LF Culvert, CPP, 24" D - 46 $ 36.80 LF Culvert, CPP, 30" D - 47 $ 48.30 LF Culvert, CPP, 36" D - 48 $ 55.20 LF Ditching D - 49 $ 8.08 CY Flow Dispersal Trench 1,436 base+ D - 50 $ 25.99 LF French Drain T depth) D - 51 $ 22.60 LF Geotextile, laid in trench, polypropylene D - 52 $ 2.40 SY Infiltration pond testing D - 53 $ 74.75 HR Mid -tank Access Riser, 48" dia, 6' dee D - 54 $ 1,605.40 Each Pond Overflow Spillway D - 55 $ 14,01 SY Restrictor/Oii Separator, 12" D - 56 $ 1,045.19 Each Restrictor/Oil Separator, 15" D - 57 $ 1,095.56 Each Restrictor/Oil Separator, 18" D - 58 $ 1,146,16 Each Riprap, placed D - 59 $ 39.08 CY Tank End Reducer 36" diameter D - 60 $ 1,000.50 Each Trash Rack, 12" D - 61 $ 211.97 Each Trash Rack, 15" D - 62 $ 237.27 Each Trash Rack, 18" D - 63 $ 268.89 Each Trash Rack, 21" D - 64 $ 306,84 Each Page 7 of 9 SUBTOTAL Unit prices updated: 02/12/02 "KCC 27A authorizes only one bond reduction. Version: 4/22/02 6436 Bond Quantity Worksheet 07-11-2014 Report Date: 7/11/2014 Site Improvement Bond Quantity Worksheet Web date: 11/21/2005 Existing Right-of-way Future Public Road Improvements & Drainage Facititles Private Improvements Bond Reduction* Quant. Com fete Cost Unit Price Unit Quant. Price Quant. Cost Quant. F Cost PARKING LOT SURFACING No. 2" AC, 2" top course rock & 4" borrow PL - 1 $ 15.84 SY 10 158.4 485 7682.4 2" AC, 1.5" top course & 2.5" base cou PL - 2 $ 17.24 SY 4" select borrow PL - 3 $ 4.55 SY 1.5" top course rock & 2.5" base course PL-4 $ 11.41 SY WRITE -IN -ITEMS Such as detention/water quality vaults. No. Infiltration Trench Installed WI - 1 $ 45.00 CY 139 6,255.00 Cluster Box Units CBU's WI - 2 $ 500.00 Each 1 500.00 WI-3 WI-4 WI-5 WI-6 WI-7 WI-8 WI-9 wi-10 SUBTOTAL 158.40 SUBTOTAL (SUM ALL PAGES): '3A3Z -� 3"66X3 30% CONTINGENCY & MOBILIZATION: IJ01 .8b a,719.93 GRANDTOTAL: (v �Z• 8 11, .86.36 COLUMN: B Page 8 of 9 C 14,437.40 38;739.49 11) 9Z1• 1;6 11,619.45 50,350.93 D Unit prices updated: 02/12/02 *KCC 27A authorizes only one bond reduction. Version: 4/22/02 5436 Bond Quantity Worksheet 07-11-2014 Report Date: 7/11/2014 Site Improvement Bond Quantity Worksheet Web date: 11/21/2005 Original bond computations prepared by: Name: ECHELBARGERS 2-LOT SHORT PLAT Date: 7/11/2014 PE Registration Number: Tel. #: 425-775-1591 Firm Name: LSA ENGINEERS Address: 19217 36th Ave. W. Suite 106 Lynnwood, WA. 98036 Project No: PLN20130073 ROAD IMPROVEMENTS & DRAINAGE FACILITIES FINANCIAL GUARANTEE REQUIREMENTS PERFORMANCE BOND* PUBLIC ROAD & DRAINAGE AMOUNT BOND* AMOUNT MAINTENANCE/DEFECT BOND* Stabilization/Erosion Sediment Control (ESC) Existing Right -of -Way Improvements Future Public Road Improvements & Drainage Facil Private Improvements Calculated Quantity Completed Total Right -of Way and/or Site Restoration Bond*/** (First $7,500 of bond* shall be cash. Performance Bond* Amount (A+B+C+D) = TOTAL Reduced Performance Bond* Total *** Maintenance/Defect Bond* Total NAME OF PERSON PREPARING BOND* REDUCTION: (A) (B) (C) (D) REQUIRED AT RECORDING OR $ 8,295.9 TEMPORARY OCCUPANCY *** $ fU�N42,81 11;786.4 $ 51 04- 49 54.,350.9 " (A+B) $ IS, i38. to ,2a,082.2 (T) $ 70,433.2 Minimum on amount is JOHN YUEN (E) T x 0.30 $ 24;429:9 OR (T-E) $ P70;433.2-. Use larger of Tx3 a or (TT.-_ Date: (B+C) x 0.25 = $ 2;946.6 7/11/2014 * NOTE: The word 'bond" as used in this document means any financial guarantee acceptable to King County. ** NOTE: KCC 27A authorizes right of way and site restoration bonds to be combined when both are required. The restoration requirement shall include the total cost for all TESC as a minimum, not a maximum. In addition, corrective work, both on- and off -site needs to be included. Quantities shall reflect worse case scenarios not just minimum requirements. For example, if a salmonid stream may be damaged, some estimated costs for restoration needs to be reflected in this amount. The 30% contingency and mobilization costs are computed in this quantity. *** NOTE: Per KCC 27A, total bond amounts remaining after reduction shall not be less than 30% of the original amount (T) or as revised by major design changes. SURETY BOND RIDER NOTE: If a bond rider is used, minimum additional performance bond shall be r$ ..50,350.9 (C+D)-E REQUIRED BOND* AMOUNTS ARE SUBJECT TO REVIEW AND MODIFICATION BY DDES Page 9 of 9 Unit prices updated: 02/12/02 Check out the DDES Web site at www.metrokc.gov/ddes Version: 4/22/02 5436 Bond Quantity Worksheet 07-11-2014 Report Date: 7/11/2014