Loading...
PLN20150036 SEPA DNS.pdfCITY OF EDMONDS 121 5TH AVENUE NORTH, EDMONDS, WA 98020 (425) 771-0220 WAC 197-11-970 Determination of Nonsignificance (DNS) DETERMINATION OF NONSIGNIFICANCE Description of proposal: File No. PLN20150036. The applicant is proposing to construct a 9-unit residential building on the western portion of the site and make architectural improvements to the existing mixed -use building (containing 4 residential units and approximately 1,800 square feet of commercial space) on the eastern portion of the site. The proposed building will be approximately 8,500 square feet. The site is approximately 7,050 square feet and is located in the Downtown Business (BD2) zone. Proponent: GBH Holdings, LLC (rep. Steve Butterfield) Location of proposal, including street address if any: 303 & 311 Edmonds St., Edmonds, WA Tax Parcel No. 00434202600102 Lead agency: City of Edmonds The lead agency has determined that the requirements for environmental analysis and protection have been adequately addressed in the development regulations and comprehensive plan adopted under chapter 36.70A RCW, and in other applicable local, state, or federal laws or rules, as provided by RCW 43.21C.240 and WAC 197-11-158 and/or mitigating measures have been applied that ensure no significant adverse impacts will be created. An environmental impact statement is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. XX There is no comment period for this DNS. This DNS is issued under 197-11-340(2); the lead agency will not act on this proposal for 14 days from the date below. Comments must be submitted by N/A . Project Planner: Jennifer Machuga, Associate Planner Responsible Official: Robert Chave, Planning Manager Contact Information: City of Edmonds 1 121 5th Avenue North, Edmonds, WA 98020 1 425-771-0220 Date: October 20, 2015 Signature: XX You may appeal this determination to Robert Chave, Planning Manager, at 121 5th Avenue North, Edmonds, WA 98020, by filing a written appeal citing the specific reasons for the appeal with the required appeal fee, adjacent property owners list and notarized affidavit form no later than November 3, 2015 . You should be prepared to make specific factual objections. Contact the project planner to read or ask about the procedures for SEPA appeals. XX Posted on October 20, 2015 at the subject site, Edmonds Public Library and Edmonds Public Safety Building. Published in the Everett Herald. Emailed to the Department of Ecology (SEPAunit(a-,)ecy.wa.gov). Mailed to property owners within 300 feet of the site. The SEPA Checklist, project plans, location map, and DNS are available at www.edmond-swa.gov through the "Online Permits" link. Search for file number PLN20150036. These materials are also available for viewing at the Planning Division — located on the second floor of City Hall: 121 5th Avenue North, Edmonds WA 98020. Office hours are 8:00 A.M. to 4:30 P.M. Mon., Tues, Thurs, and Fri. (closed on Wednesdays). Page 1 of 2 Mailed to the following: XX COMCAST XX M.L. Wicklund Outside Plant Engineer, North Region Snohomish Co. PUD 1525 75th St SW Ste 200 PO Box 1107 Everett, WA 98203 Everett, WA 98206-1107 XX Tulalip Tribal Council XX Department of Archaeology & Historic 6700 Totem Beach Road Preservation Marysville, WA 98270 P.O. Box 48343 Olympia, WA 98504-8343 XX Snohomish County Fire District No. 1 Headquarters Station No. 1 Attn.: Director of Fire Services 12310 Meridian Avenue South Everett, WA 98208-5764 XX Edmonds School District No. 15 Attn.: Stephanie Hall 20420 68th Avenue West Lynnwood, WA 98036-7400 XX Puget Sound Energy Attn: David Matulich PO Box 97034, M/S BOT-1 G Bellevue, WA 98009-9734 david.matulich(a se.com cc: File No. PLN20150036 / SEPA Notebook XX Owner: GBH Holdings LLC Attn: Glenn Safadago P.O. Box 1509 Langley, WA 98260 XX Applicant: Steve Butterfield TGB Architects 21911 76'h Ave. W, Suite 210 Edmonds, WA 98026 Page 2 of 2