Loading...
Response to ENG Comments 1.pdf;�e SPOK Fe- 7Z) L--Yj? SCRIArchitects 1916 Pike Place, Suite 12-367 Seattle, WA. 98101 206.458.7517 www. scr-arch.com October 5, 2017 Mitch Boyd Stantec Consulting Services Mitch. Boyd(cDedmondswa.gov 425.771.0220 Re: BLD2017-0718 — 18111 84' Ave W Dear Mr. Boyd This is a reply to the Plan Review Comments, June 26, 2017 General 1. Include construction sequence. Refer to sample on City website. Sheet A1.00 has been added. 2. Include General Construction Notes. Refer to sample on City website. Sheet A1.00 has been added. RECEIVED OCT 0 6 2017 DEVELOPMENT SERVICES COUNTER 3. Per the short plat drainage report (PLN20080030), a maximum of 5,000 SF of impervious area is allowed. Per the impervious area breakdown on the architectural half sheet, the proposed impervious surface is 5,286 SF of impervious area. Per the drainage report, the impervious surface is 4,657 SF. Please clarify the total proposed impervious surface area and ensure it is below 5,000 SF. Include the impervious area calculation table on the site plan. The impervious areas are shown on the site plan. The area of new proposed impervious is 4,907 sq. ft. Site Plan 1. Show filter fence on the plans and reference City standard detail E1.1. See A1.00 & A1.01, Silt Fence has been renamed Filter Fence on plan. 2. Show construction entrance on the plans and reference City standard detail E1.2. See A1.00 & A1.01 3. Please show and add a note to the plans that filter socks will be added to any catch basins downstream from the construction site. Incorporate and reference City standard detail E1.3. See A1.00 & A1.01 4. Please provide the location of the temporary stockpile. Add a note that the stockpile is to be covered within 24 hours See A1.01, Note #3 added. BLD2017-0718 — 18111 84t" Ave W 5 Please add a note to the plans that all disturbed soils will be compost amended per BMP T5.13 See A1.01, Note #1 added 6 Add note: Install and maintain all TESC measures according to approved plans, City of Edmonds standard details, and all other measures that may be required during construction. See A1.01, Note #2 added. 7. As indicated by the Fire Department, a fire sprinkler system is required for this property. a. Please add a note that a 1" meter is to be installed b. Please label the pipe material and note tracer wire to be installed on the water service line See A0.01, General Note #13 added. See A1.01 for meter, pipe and tracer wire 8 A minimum of 10' of horizontal separation is required between water and sewer lines. See A1.01, Note #4 added. 9. Add a note to the plans: A minimum of 1' of vertical separation is required between water and storm lines. See A1.01, Note #5 added. 10 Show a 6" sewer cleanout at the property line. Please add a note that the 6" cleanout at the property line shall have a 12" cast iron lamphole cover with '/" hexbolts See A1.01, Note #6 added. 11 Show a cleanout located within 2' of the house Provide the IE of the cleanout. See A1.01, cleanout added to plan 12 Provide invert elevations at the cleanout at the property line and at the house so that a minimum 2% slope and minimum 2' pipe coverage can be verified IE elevations added to the plan 13. Show all dry utilities and required utility separation. Please add a note that a minimum of 3' separation is required between the dry utilities (power, gas, phone, cable, etc.) and wet utilities (sewer, water, and storm). See A1.01, dry utility area shown to the north of the house. 14 Add a callout to the plans that specifically addresses footing drain discharge location Callout for footing drains sown on plan, they discharge into storm water system at NW corner of house. 15 Add a callout to the plans that specifically addresses roof drain discharge location. Roof drains are shown discharging into storm water system at NW corner of house. 16 Show the retaining wall on the plans Indicate where the retaining wall drainage will discharge to Retaining walls are shown on plan, footing drainage in a 4" perforated footing drain and directed to storm water system. 17. Please show the driveway on the plan set and show how the driveway will be graded to have stormwater tributary to the catch basin Provide elevation callouts. The driveway is shown, the driveway slopes to the west and water is captured by a catch basin in the middle of the driveway. BLD2017-0718 — 18111 84t" Ave W 18. Please add a note to the plans that all final restoration shall be completed by the contractor not the City of Edmonds. See A1.01, Note #8 If you have any questions, please do not hesitate to contact us. Since Chris Principal SCRIArchitects BLD2017-0718 — 18111 841h Ave W