RESPONSE TO JZ ENG COMMENTS RND 2.pdfCity of Edmonds Dave Earling, Mayor 121 5TH AVENUE NORTH - EDMONDS, WA 98020 ® (425) 771-0220 FAX(425) 771-0221 Website: www.edmondswa.gov PUBLIC WORKS DEPARTMENT Engineering Division Plan Cheek #: BLD20131341 N Plan Review C-lomments Date: October -7., 2014 Project Name/Address: Spray Park City Project 600 Yd Ave S - Contact Person/Address/Fax: Carrie Hite Parks Department qarrie.hite@edmondswa.,gov Reviewer: JoAnne Zulauf Division: 11juring review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. All Handouts and Standard Details referred to in these comments can be accessed at our website: www.edmondswa 1.gov by choosing Permit Assistance: Utilit I I iraeer Comments. Plans Sheets C2.0 & M4.00 — o Provide grades so that tank inverts/connection points are known. Detail 2 on M4,00 has dimensions from top of grade, but site is sloped. At least one NAVD88 reference grade needs to be supplied. Also detail 2 on M4.00 shows a step between finish grade and the concrete collar, but detail 3 shows it flush. What is the depth of the slab, thi ckness, etc. so that contractor knows how much concrete to pour, with what dimensions, how to tie it in and what straps are made of? RESPONSES: (Jesse Barksdale, 201/4/10/10) Collar for tank lid should be flush installation. See attached revised M4.00 sheet. Grades for site will be shown on civil and/or landscape plans, will not be shown on mechanical sheets to prevent conflicts ofinformation. Sheet M1.01 — o Material type for all piping not shown. Please supply so that city can verify that city standard materials are being used. RESPONSES: (,Jesse Barksdale, 2014/10/10) Pipe materials are called OL11 in tl-)(- specifications. Refer to spec section(s) 221113 Facility Water Distribution Piping, 221316 Sanitary Waste and Vent Piping, and 225313 Spray Park Piping for pipe materials for all systerns sbown on mechanical drawings. Sheet M2.00 — o All cleanouts need to have locking lids and be per COE std. E6.2. RESPONSES: (Jesse Barksdale, 2014/10/10) Ty1>ical installation detail has bccnadde.d to drawings. ROcr to revised shec( M4 .00 (attached). DATE FAXED/E-MAII..,ED 11/18/2014 PAGE 1 OF 2 Michele (Mike) F. De Lilla, P.E., LEED AP Senior Utilities Engineer Engineering Division I City of Edmonds 121 5111 Ave N. I Edmonds, WA 98020 425-771-0220 x 1320 1 Fax: 425-672-5750 mike.delilla@edmondswa.gov Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE EA ED/E.-MAILED 11/13/2014 PAGE 2 OF 2