Loading...
SEPA Checklist (2).pdf(3) Completed and Signed Environmental Checklist The State Environmental Policy Act (SEPA), Chapter 43.21C RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Ins&uctions for Applicants: This environmental checklist asks you to describe some basic information about your proposal. Governmental agencies use this checklist to determine whether the environmental impacts of your proposal are significant, requiring the preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the question from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or "does not apply". Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the governmental agencies can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or to provide additional information reasonably related to determining if there may be significant adverse impact. Use of checklist for nonprojectproposals: Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (Part D). For nonproject actions, the references in the checklist to the words "project," "applicant," and "property or site" should be read as "proposal," "proposer," and "affected geographic area," respectively. 11 A. BACKGROUND 1. Name of proposed project, if applicable: Harbor Square Redevelopment Master Plan -An Amendment to the Port of Edmonds Master Plan 2. Name of applicant: Port of Edmonds 3. Address and phone number of applicant and contact person: 336 Admiral Way, Edmonds, WA 98020 425-774-0559 Robert McChesney, Executive Director 4. Date checklist prepared: July 1, 2012 5. Agency requesting checklist: City of Edmonds for the Comprehensive Plan Amendment 6. Proposed timing or schedule (including phasing, if applicable): Adoption by the City of Edmonds by summer 2012 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. Yes, the non -project action represents the third phase of a multi - phased program to amend both the Port's Master Plan and the City's Comprehensive Plan. The Port of Edmonds Commission adopted the Harbor Square Redevelopment Plan on June 25, 2012. If the City considers and favorably acts on the Port's request for an amendment to the Comprehensive Plan and a subsequent rezone enabled by the amendment, the Port will then entertain development proposals that will substantially implement the vision and design concepts set out in the Redevelopment Plan. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. Environmental documents that have been prepared that directly relate to this proposal include the City of Edmonds EIS on the original Contract Rezone -1980; the City of Edmonds Comprehensive Plan EIS- 2004; City of Edmonds Storm and Surface Water Management Comprehensive Plan, DNS -2010; and The Soil Remediation Summary Report for the Harbor Square Complex, Landau Associates -2005. Additional environmental documents will be prepared commensurate with a future zoning code amendment and subsequent applications for specific development proposals. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. The City of Edmonds will be updating the City's Shoreline Master Plan (SMP) to identify Edmonds Marsh and adjacent uplands as a Shoreline of the State and thus subject to jurisdiction under the Shoreline Management Act. At such time that the draft SMP is completed, it will require environmental review under RCW 43.21C and WAC 197.11. 10. List any government approvals or permits that will be needed for your proposal, if known. Adoption of an amendment to the Port of Edmonds Master Plan by the Port of Edmonds Commission was executed on June 25, 2012. Adoption of an amendment to the City of Edmonds Comprehensive Plan by the City of Edmonds Council, following a public hearing by the City of Edmonds Planning Board. Upon approval by the City Council of the Comprehensive Plan amendment, it is anticipated that a future development application would include a concurrent rezone or amendment to the existing contract rezone for the site. In addition, the City may utilize a development agreement pursuant to RCW 36.70B to address the rezone and other related development issues. 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. (Lead agencies may modify this form to include additional specific information on project description.) The proposal is the adoption of amendments to the City Comprehensive Plan for a conceptual redevelopment plan for the Port of Edmonds Harbor Square property. The body of the amendments to the City's Comprehensive Plan is contained within 3 the Harbor Square Redevelopment Master Plan. An Amendment to the Port of Edmonds Master Plan, dated June 2012. The site is 11 acres in size and is situated directly north of the 3.6 acre Edmonds Marsh. The overarching vision for the site is to enable phased redevelopment of existing buildings that will be economically feasible, environmentally responsible and designed to the high quality standards consistent with the community and City Comprehensive Plan. The concept plan is designed as a "transit oriented" mixed use development composed of seven low to mid -rise buildings separated by internal pedestrian -scaled streets and open space view corridors to the Edmonds Marsh. The plan maintains the existing use and location of the Best Western Hotel and relocates the athletic club to the western edge of the site adjacent to the BNSF rail road tracks. The mixed-use element of the plan include 340 to 358 residential units, 50,400 SF of retail, 9,784 SF of office, 123,410 SF of recreational health club uses (including tennis courts), 3.8 acres of public open space and 1,091 off-street parking stalls. Building heights range from two stories fronting SR -104 near Dayton Street, to four stories fronting Dayton Street to a maximum of five stories on the south edge of the site adjacent to the Edmonds Marsh. The private athletic club/parking garage is planned as a three story structure. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any applications related to this checklist. The non -project action is specifically applicable to the Port of Edmonds Harbor Square property. It is located in the Southwest quadrant of the SR -104 and Dayton Street intersection and bounded on the west by the BNSF railroad right of way. The site is located in Section 23 Township 27North Range 3 East. Please see attached vicinity map. 4 B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other... The site is relatively flat. b. What is the steepest slope on the site (approximate percent slope)? 2% to 3%. c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. Organic silt overlain with sand and gravel (fill) beneath the existing buildings. The soils located in existing parking and driveways and spaces between buildings have been removed and replaced with clean gravel in 2000-2001. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. The soils on the site are generally composed of soft organic soils and fill underlain by dense sand and gravel which is further underlain by glacier till. Due to the flat topography of the site, the soils are stable. Implementation of the non -project proposal with buildings will most likely require engineered deep foundations/pilings common in the Puget Sound area. e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. No filling or grading is expected as a direct result of this non - project action. Development proposal submitted subsequent to the adoption of the redevelopment plan would be subject to additional environmental review where specific quantities of any filling or grading would be known related to an individual project. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. This is a non -project action. At such time that the Port's Master Plan and City Comprehensive Plan are amended and entitlements (rezoning) approved, proposed development applications would include construction documents consistent with the City, state and federal 5 requirements for erosion control and best management practices. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? The proposal is a non- project actions and does not relate to a specific development project. The redevelopment plan estimates approximately 90% of the site will be covered with impervious surfaces although the final percentage will be calculated at such time that a specific development proposal is submitted to the City for review. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: This is a non -project action. Specific measures to reduce or control erosion would be presented at such time that a clearing and grading application is submitted as part of the construction documents required by the City of Edmonds for the specific project. F•w:V, a. What types of emissions to the air would result from this proposal (i.e. dust, automobile, odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. None will be generated from this non -project action. Future development will need to conform to current local, state and federal air quality standards. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. None that will affect the non -project action of the adoption of the redevelopment plan as amendments to the Port's Master Plan and City's Comprehensive Plan. At such time that the amendments are approved and entitlements implemented; IE rezoning, future development applications will consider the off-site emissions generated by train traffic on the adjacent BNSF rail road tracks. H. c. Proposed measures to reduce or control emissions or other impacts to air, if any: Future development applications will need to conform to current local, state and federal air quality standards. 3. Water a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. Immediately adjacent to the site is the Edmonds Marsh. It is 3.6 acres in size and has recently been determined by the State Department of Ecology that the Marsh is classified as a shoreline of the State and a Natural shoreline environment and subject to the provisions of the State Shoreline Management Act. In addition, Willow Creek flows downstream from the Marsh through existing culverts beneath the BNSF railroad tracks and Admiral Way to Puget Sound. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. This is a non -project action for the adoption of amendments to the City of Edmonds Comprehensive Plan. Following entitlements (zoning) to implement the Plan, the redevelopment plan may be implemented in whole or in part via a separate development application to the City of Edmonds. If the site plan for the eventual development application mirrors' the redevelopment plan, portions of buildings as well as landscaping and shoreline restoration work would be located within the 200 foot boundary of the ordinary high water mark. 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of the fill material. This is a non -project action. At such time that a development application is submitted, the City of Edmonds will review and evaluate the application for determination of any fill and or dredge material. If the eventual development application mirror's the redevelopment plan, no fill nor dredge material would be placed or removed from surface water or wetlands. It is possible that any shoreline restoration work; such as shoreline and buffer enhancement plantings may include the distribution of mulch and other material compatible with restoration and vegetation enhancement best practices. 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No surface water withdrawal or diversions are contemplated by this non -project action. 5) Does the proposal lie within a 100 -year floodplain? If so, note location on the site plan. The Edmonds Marsh located to the south of the site is in the 100 year floodplain. Please see attached Flood Insurance Rate Map. 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No this is a non -project action. b. Ground: 1) Will groundwater be withdrawn, or will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. No, this is a non -project action. Specific construction documents will be submitted to the City of Edmonds commensurate with a development application. Stormwater management will include LID techniques and BMPs to ensure that all, if any, discharges to groundwater are consistent with 0 the City of Edmonds Surface and Stormwater Comprehensive Plan. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals...; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number animals or humans the system(s) are expected to serve. This is a non -project action and implementation of the Master Plan and Comprehensive Plan amendments following entitlements with a development application does not anticipate any discharges of waste material into the ground. c. Water runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. This is a non -project action. The redevelopment plan prescribes that future development proposals to implement the plan result in the improvement of site ecology by reducing existing impervious surfaces and designing site stormwater infrastructure to best technology standards and consistent with the City of Edmonds Surface and Stormwater Comprehensive Plan. 2) Could waste material enter ground or surface waters? If so, generally describe. No. This is a non -project action. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: This is a non -project action and does not relate to a specific project. Future development reviews will address water - related impacts pursuant to the City's current development regulations. No erosion would result from the adoption of this non -project proposal. Development proposal that are proposed subsequent to the adoption of the plan and consistent with related entitlements would be evaluated for consistency with the amended City of Edmonds Comprehensive Plan and applicable local, state and federal regulations on an individual project level basis. 0 4. Plants a. Check or circle types of vegetation found on the site: X deciduous tree: alder, maple, aspen, other x evergreen tree: fir, cedar, pine, other X shrubs X grass X pasture crop or grain x wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other X other types of vegetation e. What kind and amount of vegetation will be removed or altered? No vegetation will be removed with this non -project proposal. c. List threatened or endangered species known to be on or near the site. No threatened or endangered species are known to be on the site. f. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: This is a non -project action. At such time that the Master and Comprehensive Plans are implemented with specific development proposals, detailed landscaping plans will be submitted as part of the development application materials. The redevelopment plan envisions extensive landscaping improvements throughout the site including street trees along external and internal streets and around all proposed buildings, and native restorative vegetation along the Edmonds Marsh buffer. 10 5. Animals a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, songbirds, other: mammals: deer, bear, elk, beaver, other: coyote fish: bass, salmon, trout, herring, shellfish, other: b. List any threatened or endangered species known to be on or near the site. Puget Sound Chinook, Bull Trout and Orca were listed as threatened species under the Endangered Species Act in 2001. Willow Creek runs into Puget Sound and may be a documented salmonid use stream. c. Is the site part of a migration route? If so, explain. The site is located within the Pacific Flyway which is a flight corridor for migrating waterfowl and other birds. d. Proposed measures to preserve or enhance wildlife, if any: Given the site's location adjacent to the Edmonds Marsh, the redevelopment plan envisions building setbacks, building mechanical equipment and landscaping enhancements, especially in the shoreline buffer, to preserve and enhance area wildlife. Night time building and site lighting is planned to incorporate direct cut-off lights that will not reflect to the Marsh. Native buffer vegetation will be installed within the building setbacks to attract and protect area wildlife. 6. Energy and Natural Resources a. What kinds of energy (electrical, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. This is a non -project action. If implemented, a future development proposal would use standard heating and cooling systems however, building orientation of several of the planned building is conducive to solar energy gain and the application of passive/active systems. 11 b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. This is a non -project action. If implemented with a site plan that mirrors the redevelopment plan, the potential for solar energy use of adjacent sites will not be impacted by the building layout of the subject site. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: This is a non -project action. Energy conservation features incorporated into the redevelopment site plan include building placement for maximum solar gain and breezeway cooling, mixed uses, sidewalks and site location adjacent to transit facilities to minimize the need to drive to necessary services. 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste that could occur as a result of this proposal? If so, describe. This is a non -project action. At such time that the redevelopment plan is implemented with a specific development, geotechnical excavations and soil logs will indicate if there are any toxic materials on the site. A 2001 soil survey of the site conducted by Landau Associates and a 2005 Soil Remediation Summary Report indicated low levels of petroleum residue caused by the Union Oil depot that was located on the northwest portion of the site and operated between 1924 and the 1940's. Toxic soils were removed pursuant to a DOE Removal Action Plan and replaced with construction grade sand and gravel. 1) Describe any emergency services that might be required. N/A 2) Propose measures to reduce or control environmental health hazards, if any: If any environmental health hazards are uncovered during site investigations or construction associated with a specific development proposal, City, state and federal regulations governing clean-up and /or handling of toxic materials must be adhered to consistent with the specific conditions of each related permit. 12 b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? This is a non -project action that will not be affected by any existing noise levels in the community. If implemented, noise associated with the operation of trains on the adjacent BNSF rail road tracks would affect future development. 2) What types and levels of noise would be created by or associated with the project on a short-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. This is a non -project action and will not create noise levels. 3) Proposed measures to reduce or control noise impacts, if any: This is a non -project action. Future development proposals will be evaluated for their respective noise generation and mitigation measures will be employed at the project review level. The redevelopment site plan has planned for the relocation of the athletic facility and a parking garage adjacent to the BNSF railroad to help attenuate train -related noise to the interior of the project. 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties The site is currently used as an office park including a hotel and a private athletic facility. Surrounding land uses include the BNSF railroad tracks together with retail, office and marina facilities to the west; Sound Transit commuter rail station and retail to the north; WSDOT Ferry stacking lanes and the Edmonds Wastewater Treatment facility to the east; and the Edmonds Marsh to the south. b. Has the site been used for agriculture? If so, describe. No c. Describe any structures on the site. Structures include eleven buildings with uses including: office, warehousing, restaurant, hotel, an athletic facility and a variety of facilities. Most of the buildings were constructed in the 1980's, except the hotel that was constructed in the 1990's. Surface parking takes up a large portion of the site to serve day time uses. 13 d. Will any structures be demolished? If so, what? When implemented in a phased scenario, the concrete tilt -up structures that house many of the offices/warehouse uses will be demolished and replaced with the buildings and uses approved by the City of Edmonds consistent with the underlying zoning and approved development plan. e. What is the current zoning classification of the site? The current zoning district is General Commercial with a contract rezone referred to as R-1979-4. f. What is the current comprehensive plan designation of the site? Downtown Master Plan within the Waterfront Activity Center District. g. If applicable, what is the current shoreline master program designation of the site? Currently, there is no Shoreline designation. However, the City and DOE have concluded that the Edmonds Marsh is a "shoreline of the state" and the new designation that will affect the Harbor Square property will be Urban Mixed Use 3 upon adoption of the 2012 Shoreline Master Program Update. h. Has, any part of the site been classified as an "environmentally sensitive" area? If so, specify. The parcel situated to the south of the site is the Edmonds Marsh and is designated on the City Critical Areas Map Approximately how many people would reside or work in the completed project? The conceptual master plan estimates that an approximate population range of between 612-644 people will live at the site based on 340 — 358 multi -family units and an average household size of 1.8. j. Approximately how many people would the completed project displace? None, as the site zoning currently prohibits residential uses and there are no non -conforming residential uses on the site. k. Proposed measures to avoid or reduce displacement impacts, if any: N/A 14 1. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: The intent of the proposal is to amend both the Port's Master Plan and the City of Edmonds comprehensive plan with a conceptual redevelopment plan that will provide a framework for the preparation of specific development plans that when submitted to the City will be compatible with City plans and policies. 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle or low-income housing. The redevelopment plan will accommodate between 340 and 358 multiple family residential units. No housing tenure has been anticipated with the redevelopment plan. Specific housing tenure will be addressed at such time that a development proposal is submitted to the City for review. b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. None, as existing residential uses are prohibited with the current CG contract zone. c. Proposed measures to reduce or control housing impacts, if any: The proposal is for a non -project action and is not related to a specific project. Future development will be evaluated to address the housing policies and conform to applicable development regulations. 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? There are several maximum building heights proposed by the redevelopment plan based on a 2010 detailed view shed analysis conducted by the University of Washington. Please see attached to sheet number 4 "Description of the Proposal". Buildings located on the southern and southwestern edges of the site are proposed to be five stories and no higher than is 55'. Buildings proposed adjacent to the northeastern edge of the site are to be no more than two stories and no higher than is 35' and buildings proposed along Dayton Street are to be four stories and no higher than 45' the top floor to be "stepped back" from the edge of the ROW so that the first three floors are no more than 35' ' high. Existing view corridors of Puget Sound and the Olympic Mountains from public streets, sidewalks and plazas to the east will not be detrimentally impacted by the proposed placement of buildings and associated building heights. Exterior building materials are to be long-lasting such as brick and/or CMU while the architecture is intended to reflect a "Northwest Style" and be compatible with existing downtown Edmonds character. b. What views in the immediate vicinity would be altered or obstructed? As addressed in (a.) above, the view shed analysis was conducted during the preparation of the redevelopment plan. Based on the outcome of the analysis together with comments by the Harbor Square Steering Committee, that was created to guide the development of the plan, building heights were adjusted to ensure that existing views from the public realm of streets, sidewalks, plazas and public buildings located east of the site would not be detrimentally impacted by the proposed redevelopment plan. Important images in the view corridors that help define Edmonds and the waterfront area are the Olympic Mountains, Puget Sound, and the distinctive masts of sailboats moored in the Port of Edmonds marina. Existing views of these important iconic features are not detrimentally altered or obstructed by the proposal. c. Proposed measures to reduce or control aesthetic impacts, if any: The Design Principles of the redevelopment plan focus on creating attractive street frontages, pedestrian -friendly facades, pedestrian connections to the waterfront, downtown and the Edmonds Marsh. Buildings will be articulated to break-up building mass and provide for tasteful and attractive architectural elements, landscaping and pedestrian spaces. When implemented, the Square Harbor redevelopment plan will be a dramatic aesthetic improvement to the existing concrete tilt -up buildings, large expanse of surface parking and lack of pedestrian friendly spaces. 16 11. Light and Glare a. What kind of light or glare will the proposal produce? What time of day would it mainly occur? This is a non -project action. No light and glare will be produced by the proposal. b. Could light or glare from the finished project be a safety hazard or interfere with views? Upon implementation of the plan amendment with a specific development proposal, review of a building and site illumination plan will be conducted by the City. To be consistent with the redevelopment's plan design principles of pedestrian -friendly aesthetics, all exterior lighting should be cut-off and non -glare fixtures. c. What existing off-site sources of light or glare may affect your proposal? None d. Proposed measures to reduce or control light and glare impacts, if any: The eventual specific development proposal that will be submitted to the City for review will include an illumination plan to assess specific on and off-site light and glare impacts. Any fight/glare "spillage" will be mitigated with reduced voltage and/or hooded and shielded fixtures. 12. Recreation a. What designated and informal recreation opportunities are in the immediate vicinity? Numerous pedestrian pathways are available for walking and bicycling activities adjacent to and within the site, especially adjacent to and within portions of the Edmonds Marsh. There is an existing private athletic club located within the site. b. Would the proposed project displace any existing recreational uses? If so, describe. No, the proposal intends to relocate the existing athletic facility to the western portion of the site. c. Proposed measures to reduce or control impacts on recreation, including recreational opportunities to be provided by the 17 project or applicant, if any: The redevelopment plan is proposed to add passive recreational opportunities for pedestrian use such as public open spaces, pathways and sidewalks. The existing athletic facility plans to maintain the current level of recreational opportunities with the potential relocation to the western portion of the site. 13. Historic and Cultural Preservation a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. The Edmonds Marsh is a significant local ecological feature of great importance to the community. It is located south of the site, encompasses approximately 3.6 acres in size and is an intertidal salt marsh with connections to Puget Sound. The Marsh is an extensive wildlife habitat that supports a diversity of aquatic and near -shore wildlife species. d. Generally describe any landmarks or evidence of historic, archeological, scientific, or cultural importance known to be on or next to the site? The Edmonds Marsh as described above. e. Proposed measures to reduce or control impacts, if any: The redevelopment plan proposes to set buildings back an appropriate distance from the OHWM of the Edmonds Marsh pursuant to the new Shoreline designation of UMU-3. Land situated within the setback/buffer will be field investigated and determinations made for specific measures to ensure that the Marsh is protected and preserved. 14. Transportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans if any. The site is served by Dayton Street to the north and Edmonds Way (State Route 104) to the east. Existing access to the site is provided by driveways at both adjacent roadways. This non - project action does not include proposed access streets; internal access roads will be proposed as part of project -specific proposals. M b. Is the site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? The site area is served by bus and rail public transit services, which are accessed from Edmonds Station, located one block north of the site, and by ferry, which is accessed two blocks north of the site. Bus service is provided by Community Transit, with Routes 110 (Lynnwood), 116 (Lynnwood, Mill Creek), 131 (Shoreline, Lynnwood), and 416 (Downtown Seattle) serving the site vicinity. Sounder commuter rail service, provided by Sound Transit, operates between Seattle and Everett with stops in Edmonds and Mukilteo. Edmonds also serves as a stop along the Seattle— Vancouver Amtrak Cascades route, with two northbound trains and two southbound trains stopping in Edmonds each day. The Amtrak Empire Builder provides cross-country service between Seattle and Chicago, with one eastbound train departing from Edmonds each evening and one westbound train arriving in Edmonds each morning. Washington State Ferries operates the Edmonds -Kingston route, which connects the northern portion of the Kitsap Peninsula and the Olympic Peninsula with northern King and southern Snohomish Counties. There are 26 daily departures from the Edmonds Ferry Terminal on weekdays and 23 daily departures on weekend days. c. How many parking spaces would the completed project have? How many would the project eliminate? This non -project action does not include proposed parking. When implemented at the project level, full build -out of the proposed land use is estimated to include approximately 1,090 off-street parking spaces; this would replace the 425 parking spaces that currently exist on the site. d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). 19 This non -project action does not require new roads or road improvements. When implemented at the project level, internal access roads will be constructed, and roads along the site's frontage will be improved where needed to meet City of Edmonds standards. Build -out of new development implemented under the proposed land use designation is not expected to trigger a need for additional roadway improvements (additional information about potential transportation impacts is provided in Attachment Z, Traffic Impact Analysis). e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. This non -project action would not use water, rail, or air transportation. When implemented at the project level, new development is expected to generate passenger trips on Washington State Ferries' Edmonds -Kingston Route and on Sounder and Amtrak trains that stop immediately north of the site. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. This non -project action would not generate project trips. When implemented at the project level, full build -out of the proposed land use is estimated to generate up to 8,030 total vehicle trips per day, with about 405 trips occurring during the AM peak hour (typically one hour between 6 and 8 A.M.) and 770 trips occurring during the PM peak hour (typically one hour between 4 and 6 P.M.). Trips associated with existing uses on the site would be removed from the roadway network. After accounting for the removal of the existing site uses and their associated traffic, the planned uses are projected to generate up to 3,310 net new trips per day, with about 100 net new trips occurring in the AM peak hour and 270 net new trips occurring in the PM peak hour (additional information about trip generation is provided in Attachment Z, Traffic Impact Analysis). g. Proposed measures to reduce or control transportation impacts, if any New development projects implemented with the proposed land use designation would contribute funding towards roadway improvements that are planned to support city-wide 20 development through the City's concurrency management and traffic impact fee programs. The development projects would also make frontage improvements where needed to meet City of Edmonds standards. New development implemented consistent with the proposed land use designation is not expected to trigger a need for additional roadway improvements (additional information about potential transportation impacts is provided in Attachment Z, Traffic Impact Analysis). (Note: Comments made by the City in its June 6, 2012 response to the Port of Edmonds environmental checklist associated with its amendment to the Port Master Plan will be addressed in the Transportation Impact Analysis Report and submitted to the City pursuant to a subsequent project -level application.) 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. This is a non -project action. Although implementation of the redevelopment plan with a specific development proposal will require additional environmental review, no increases in public services are anticipated. d. Proposed measures to reduce or control direct impacts on public services, if any. N/A this is a non -project action. 16. Utilities a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other: N/A b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. 21 N/A this is a non -project action. Although detailed information on utility use and construction activities will be available upon submittal of a development application commensurate with entitlements, the following general information is provided from the City's comments on the Port of Edmonds environmental checklist dated June 6, 2012. Current water and sewer services to the Harbor Square property are provided by the City of Edmonds off of West Dayton Street. These services will also be available to the property in the foreseeable future. Stormwater runoff from the Harbor Square property currently discharges to and underground drainage system on the property owned by the City of Edmonds. This system, also collects runoff from West Dayton St. North of the harbor Square property, as well as a portion of the "Antique Mall" property north of West Dayton Street. There are currently easements for water and stormwater lines on the property granted to the City of Edmonds by the Port of Edmonds. Water The existing water system on the Harbor Square property is subject to an easement granted by the Port to the City of Edmonds. As such, the City is responsible for the operation, maintenance, and repair of this system. Any future changes to the site that necessitate a change in the existing system will need to be negotiated with the City as well as a likely revision or relinquishing of the current easement. Due to the magnitude of the development it will be necessary that the developer pay the city to verify that the City's current potable/fireline infrastructure piping is adequate for supplying water for both potable purposes and fire protection. If it is determined that there are deficiencies, improvements to the City's system to address the deficiencies will be paid by the developer. Sewer. The existing sewer system on the Harbor Square property belongs to the Port of Edmonds and connects to the sewer main located on West Dayton. The sewer main discharges into the City of Edmonds' lift station #7,located across from the Harbor Square property. The lift station and associated piping is currently sized to handle a limited amount of sewage effluent. The developer will be required to pay the costs borne by the City to verify that the City's current sewer infrastructure is adequate for the proposed development. If it is determined that 22 there are deficiencies, improvement to the City's system to address the deficiencies will be paid by the developer. Stormwater. The existing stormwater system on the harbor Square property is subject to and easement granted by the Port to the City of Edmonds. As such, the City is responsible for the operation , maintenance and repair of the system. Any future changes to the site that necessitate a change in the existing system will need to be negotiated with the City as well as a likely revision or relinquishing of the current easement. The current parking lot areas provide some storage of runoff when the water level in the Edmonds Marsh is above the invert elevation of the site's outfall pipes. If a future redevelopment project reduces the amount of existing "parking lot storage", all things being the same as existing, this may result in flooding of other areas in the vicinity that currently do not flood or may worsen the flooding in area that currently flood a little. The City is currently conduction an engineering evaluation of the frequent flooding in the area in and around Dayton Street and SR -104. Past flooding in this area has impacted the Harbor Square site. The City plans to work closely with the Port on the selection and implementation of alternative actions to reduce the frequency of flooding in this area, including the Harbor Square property. Any future changes to surface and stormwater infrastructure as a result of action implemented from the City's engineering study or future studies may change the extent of the 100 year flood plain for the Edmonds Marsh that, in turn, may need to be considered in the future development of the Harbor Square site. C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: Date Submitted: ar'" 23 D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (Do not use this sheet for project actions) Because these questions are very general, it may be helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in general terms. 1. How would the proposal be likely to increase discharge to water; emissions to air; production, storage, or release of toxic or hazardous substances; or production of noise? The proposal would not directly increase discharges to water; emissions to air; production, storage, or release of toxic or hazardous substances. The production of noise affecting the site from the BNSF railroad may increase with the addition of train traffic over the longevity of the project All development and redevelopment on the site would be subject to applicable local, state, and federal regulatory requirements, including building code, fire code, and surface water design standards. In addition, the conditions and provisions imposed by any future development permit approved by the City of Edmonds would serve to further ameliorate the discharge of water, emissions, toxic substances and noise. Proposed measures to avoid or reduce such increases are: The redevelopment plan includes design principles and organization of site features to avoid and reduce potential increase mentioned above. For example, sustainable development standards such as low impact development techniques are included in design principles and policies in the Master Plan amendments. Water management will occur through on-site systems such as rain gardens, drainage swales and infiltration trenches. Noise caused by the off-site train traffic has been addressed through the planned placement of a parking structure and athletic uses between the railroad tracks and residential, office and retail uses onsite. 24 2. How would the proposal be likely to affect plants, animals, fish or marine life? The proposed amendment to the Port Master Plan and City Comprehensive Plan has been developed, in part, to enhance natural vegetation and protect animals, fish and marine life and to meet the goal of "no net loss" of shoreline ecological functions. Given that the existing condition of the site will be improved by the reduction of pervious surface with the proposed redevelopment plan, the area most affected will be the buffer of the Edmonds Marsh. As development occurs in accordance with the redevelopment plan, impacts to shoreline ecological functions of the Edmonds Marsh will be avoided, minimized, or compensated for. Specific policies in the redevelopment plan address sustainability and the enhancement of the Marsh buffer vegetation to increase wildlife diversity and better protect the function and values of the Marsh. Additionally, it is anticipated that the City's revised SMP will include a shoreline restoration plan with the goal of improving shoreline ecological functions that have been degraded over time from past development activities. Proposed measures to protect or conserve plants, animals, fish, or marine life are: The redevelopment plan will be implemented by a separate development application that is consistent with the City's Comprehensive Plan and Development Regulations including the City's Critical Area Ordinance and updated Shoreline Master Program. City policies and regulations will be applied to the specific development proposal with the purpose of preserving ecological functions of the Edmonds Marsh and restoring degraded wildlife habitats and open space corridors that occur throughout the site. Protective measures that may be applied to the future development application could include removal of invasive species in the buffer area of the Edmonds Marsh, enhancement of site vegetation with species indigenous to the Northwest that provide natural habitat protection and on- site infiltration of stormwater through rain gardens to prevent uncontrolled run-off to the Marsh and Puget Sound. 3. How would the proposal be likely to deplete energy or natural resources? The subsequent development of the site made possible by the adoption of the proposed Master Plan amendment and Comprehensive Plan amendment would result in additional residential and commercial uses that will require energy in the form of natural gas, transportation fuels and electricity. Since 25 the proposal is to enable new buildings, public spaces, transportation facilities on the existing footprint of the current site, the depletion of land resources will not occur although the depletion of air and water resources could result from increased population and transportation use. Proposed measures to protect or conserve energy and natural resources are: Measures to conserve energy resources include locating uses (residential, office, retail, recreational) within close proximity to each other to minimize auto use, providing easy access to public transportation opportunities such as Sound Transit and Community Transit facilities and incorporating low energy and water conservation facilities throughout the site. 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? The environmentally sensitive area that may be affected by a subsequent development made possible by the proposal is the Edmonds Marsh. Impacts to the Marsh could include stormwater runoff that could adversely affect fish habitat and human intrusion into sensitive buffers. Proposed measures to protect such resources or to avoid or reduce impacts are: Application of comprehensive plan policies and specific critical area regulations and policies and regulations of the City's updated SMP will be applied to the specific development application submitted to the City for review and approval. Application of the development regulations together with the increased buffer setback to the Marsh, removal of invasive vegetative species and replacement with natural indigenous vegetative species, and low impact stormwater management facilities are intended to protect the Marsh and other sensitive areas designated for protection. 5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with existing plans? Implementation of the proposed master plan would add new residential, retail, public open spaces and recreational uses to the site. Human activities related to these uses would affect the land area of the site and the adjacent shoreline area of the Edmonds Marsh. 26 The proposed redevelopment plan has been prepared to be consistent with the City's updated SMP and the draft Urban Mixed Use 3 shoreline designation. Uses proposed by the redevelopment plan will be allowed by the amendment to the City Comprehensive Plan and commensurate zoning. The proposal does not project new uses in the subject site or shorelines jurisdiction area that are inconsistent with the proposed UMU-3 SMP shoreline designation. Proposed measures to avoid or reduce shoreline and land use impacts are: Avoidance or reduction of land and shoreline uses would occur through application of the City's development regulations together with specific mitigation measures set forth in a development agreement enabled by RCW 36.70B. Examples of mitigation measures that could be applied to the project include design standards intended to reduce building bulk and improve aesthetics, increased building setbacks adjacent to the Edmonds Marsh, landscaping improvements throughout the site and adjacent streetscapes and low impact development techniques. 6. How would the proposal be likely to increase demands on transportation or public services and utilities? Implementation of the proposal may increase the demands on transportation facilities, police and fire protection and public utilities as a result of new population associated the potential of 358 new residential units together with new retail and office uses. Proposed measures to reduce or respond to such demand(s) are: Transportation impact fees for described impacts to the City's transportation network and the availability of public transit options including the Washington State Ferry system, Sound Transit commuter rail and Community Transit bus service facilities located with '/a mile of the site. For public service demands the City may choose to seek specific capital facility improvements as a component of a development agreement at such time that a project is proposed. 7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the protection of the environment. The proposal will not conflict with any known federal, state or local laws related to the protection of the environment. 27 0 LL. @ F zx s - 2 ) _. Lu � g / �k �3 _+a cm LLA 2 ( - §� � / \ ) \ -C ( § U ! m � x qC2|§ \j \ B - o o :t 7 • 2 \k) _ // e g! ® @ R\/ »+\ § § . zx -- « ) 4 zx -- ° )H° _+a .+ 2 ( x \