Shoreshire Vault Special insp agree.pdfCITY OF EDMONDS -- ENGINEERING DIVISION
SPECIAL INSPECTION AND TESTINGAGREEMENT
PERMIT 4 PLN20'080046 DATE
PROJECT SITE ADDRE(SS:_,,_,__24223 76"' Avg.)Xj E (monds MA,.98026
PROJECT NAME: Shoreshire 7lot nlnt
SPECIAL INSPECTION AGENCy Earth Solutions NW, LLC
..
-One form must be completed by each SpecialInspection Agency or Inspector . ........
SPECIAL INSPECTIONS REQUIRED: Special inspections are required for this project, as
applicable, in accordance with Title 18 Edmonds CornillUnily Development Code (ECDC). When
required, the project must be installed/constructed per approved plans and specifications. The owner or
the registered design professional in charge shall employ an independent testing/inspection agency/special
inspector to perform required special inspections. The special inspector shall be a qualified person with
competence for inspecting the specific type of construction or operation requiring special inspection. The
owner, registered professional, contractor and special inspector/agency shall provide a special inspection
report detailing compliance with approved plans and specifications directly to the Engineering Division,
WORKS REQUIZING SPECIAL INSPE CTION: Special inspections will be required for the following
categories of work: FOR SPECIFIC INFORMATION REGARDING REQUIRED SPECIAL
INSPECTIONS SEE THE STATEMENT OF SPECIAL INSPECTION NOTED AS, A CONDITION ON
THE BUILDING PERMIT AND/OR ON THE APPROVED PLANS.
El Grass road paver installation — subgrade inspections
n Road subgrade placement and compaction
n Erosion and Sediment Control
JA Detention Vault:
0 Cast in Place Concrete
BEFORE A PERMIT CAN BE ISSUED: The owner and contractor and special inspector shall
complete this agreement and return to a Permit Coordinator prior to permit issuance.
APPROVAL OF SPECIAL INSPECTORS: Each special inspector shall be approved by the
Engineering Division prior to performing any duties or inspections. The credentials of the specific person
performing the inspection shall be submitted. When applicable, the company performing inspections
must be accredited by the American Association of State Highway and Transportation Officials
(AA S VITO) R18,
Page t of 3
A. Dutiesand R )inaisibilities ofth
_L_e Special bis )eetor
I . OBSERVE WORK
The special inspector shall observe the site work for conformance with the approved (stamped)
plans an([ specifications. Special inspections are to be performed as needed, to, confirm that the
Nvork being completed meets specifications and approved plans.
2. REPORTNONCONFORMI[NG ITEMS
The special inspector shall bring non -conforming items to the irrunediate attention of the
contractor and engineer of record. The special inspector shall provide a report to the Engineering
Division notifying of any items, not resolved and/or not installed per the approved plans and
Specifications,
Items not constructed per the approved plans and specifications will result in a review of the plans
to determine what requirements will be needed for the project to meet the necessary storrnwater
requirements; such as removal and reconstr=uction, re -design of the stormwater management
systern(s), etc.
Final approval for the project will not occur until installation of all required improvements is
complete and accepted by the Special Inspector and the City,
The special inspector or inspection agency shall SUbinit a final signed report or Certificate of
Compliance to the City stating that all items requiring special inspection and testing were fulfilled
and reported. The report shall also include a statement from the inspector stating to the best of
his/her Imowledge the project is in conformance with the approved plans, specifications, and
approved plan revisions, if any. Items not in conformance, unresolved items or any discrepancies
in inspection coverage (ie., missed inspections, periodic inspection when continuous inspections
were required, etc.) shall be specifically addressed in this report.
I. NOTIFY THE SPECIAL INSPECTOR OF ALL REQUIRE D SPECIAL INSPECTIONS
It is the duty of the contractor to notify the special inspector when work is ready for special
inspection. Note, the items listed under the statement of special inspection on the building permit
and as noted on the approved plans and specifications are required to have special inspections.
Adequate notice shall be provided by the contractor so that the special inspector has time to
become familiar with the project. All work requiring special inspection must be approved prior to
concealing or covering said work,
2. PROVIDE ACCESS TO APPROVE' D PLANS
The contractor is responsible for providing the special inspector access to approved plans at the
jobsite.
3. RETAIN SPECIAL INSPECTION RECORDS
The contractor is responsible to retain at the jobsite all special inspection records submitted by the
special inspector. These records are to be provided to the City Engineering inspector upon request
and upon completion of work.
Min
I. APPROVE SPECIAL INSPECTION
The, Engineering Division shall approve all Special Inspectors and special inspection requii,ements.
Page 2 of:
1 MONITOR SPECIAL INSPECTIONS AND APPROVE REPORTS
Work requiring special inspection and perforniance ofspecial inspectors shall be rnonitored by the
Engineering Division Inspector. Engineering hispector approval rnust be obtained prior to
placerrient of concrete orother siffdicir aIcfivities in addition to that of the special i"S'Pector.
3. FINAL APPROVAL
The E-ngincering Division may provide final inspection approval after the special inspection
report(s) bave been subinitted and accepted by the City.
D.
i. "The project owner or the engineer or architect of record actin as the o \v ier" s agent shall fu ad
special inspection services,
E. En r or Architect of Reeqrd,,R'cS,p!. �y
1, Prepare Statern,ent of Special Inspections.
2. Review the special inspection reports and provide corrective action for work that may not conforni
to the approved plans,
ACKNOWLEDGEMENT'S
I have read and digree to comply wills die Yerups arid condidophs of this agreement.
General Contractor
sigwk i I I I
Special Inspector/Al cnc*r,, 11,011 fail
sigualure
Date
or type)
Date
Engineer of Recond miinv
priAl no- Yoe)
7,
te
sigplatu re.Da
..
Return the original signed agreeinent to:
City of Edmondq Development Services Depairfinent
12151" Avenue Nor(h, City Hall Second Floor
Edmonds, WA 98020
ACCEPTED BY CITY OV ED ND ENGINEERING DIVISION;
City Official SignaturDale
Kim
3 4yf3