Loading...
Soundview Pl - 19018_SFR_BLD20080123 Jeffries 3.doc City of Edmonds TH 121 5 AVENUE NORTH • EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us DEVELOPMENT SERVICES DEPARTMENT Planning • Building • Engineering Plan Review Corrections Plan Check : Date: # 2008-0123 June 26, 2008 Project Name/Address: Jeffries/19018 Sound View Pl Contact Person/Address/Fax: Ben Jeffries 19018 Sound View Pl Edmonds, WA 98020 Reviewer: JoAnne ZulaufDivision:Engineering During review of the subject submittal, it was found that the following information, corrections, or clarifications would need to be addressed. Our handouts can be found online at the City of Edmonds web site www.ci.edmonds.wa.us under City Government/Development Services/Engineering Division. Please note that site plan and drainage plan must match. May note on site plan “see drainage plan” for the drainage details, cb invert #s etc. but basic info should be on all plans. 1.6/26/08 Impervious surface calculations on site plan do not match new calculations submitted on drainage plans. Please revise site plan. Provide a thorough breakdown of the existing and proposed impervious surface on the site plan, for example;  Existing Impervious: Roof outline: xxxxx Year built: xxxx Driveway: xxxx xxxx Decks: xxxx xxxx Total: xxxxx  Proposed Impervious: Roof outline: xxxx Deck: xxx Walkway: xxx Total: xxx 2. 06/26/08 Site plan still shows storm drain line to be used, please revise site plan to show changes submitted on drainage plan for storm drainage (at least “to be abandon or removed” and “see drainage plan”) It is not permitted to build structures over a city storm drain line. In order to build in the location indicated by the submitted plans, the storm drain pipe will need to be rerouted around the west side of the new structure. It will be required that a new utility easement be granted the City of Edmonds to access pipe for DATE MAILED/FAXED 6/28/2017 PAGE ____ OF ___ 12 maintenance and repair. Please submit a site plan showing a proposed route with all relevant invert and rim elevations, structures, ditch lines, etc. for review. 3.06/26/08 Your drainage report is being reviewed by our Storm Water Engineering Consultant. 4. 06/26/08 Done. 5.. 06/26/08 Done 6. 06/26/08 Done. 7. 06/26/08 A 6” clean out with locking 12” cast iron lamphole cover is required at the property line and a 6 – 4” clean out is required at the house for the side sewer. Please add a note to plans “existing side sewer lateral will be TV’d by Public Works to determine if in good working condition for reuse” 8.06/26/08 Not Done. Clearly label all areas on site plan. For example, it is difficult to tell if the area between the garage and driveway is pavement/concrete area or something else. 9.06/26/08 Not Done. If removing concrete area, walk, driveway, and stairs near existing house, please label “to be removed”. 10.06/26/08 Done. 11.06/26/08 Not Done. Existing fence and gate shown on site plan are in the right of way. Please remove from right of way or apply for Encroachment Permit. Handout E#26 explains requirements for Encroachment permit application. This handout can be found on our website following the instructions above. 12.06/26/08 Not Done. Please indicate that existing access from Water St. will be removed with demolition of existing house after new construction complete. 13. 06/26/08 Done. 14.06/26/08 New Comment: Show on all plans new proposed driveway access from Water St to garage in rear of new home. Add impervious surface to impervious surface calculations. Please resubmit 3 copies of the revised plans/documents to a Development Services Coordinator. Please contact me at 425-771-0220 if you have specific questions regarding these plan corrections. DATE MAILED/FAXED 6/28/2017 PAGE ____ OF ___ 22