Loading...
Special Insp Report 20171436.pdf0 l.l) 20v-1 14 3 G Earth Solutions NWLLC Field Rep. MJD 1805 13611 Place NE, FAX. Time On Site Suite 201 (425) 449-4711 Bellevue, WA 98005 2:15PM (425) 449-4704 DAILY FIELD REPORT Travel Time 1.25 Hr. RT Project Name Job Location 7"' Ave Short Plat 612 7th Ave S., Edmonds, WA General Contractor General Contractor's Superintendent Grading Contractor Grading Foreman Project No. Page of Report No. ES4937.02 1 of 1 2 Time Off Site Date Day of Week 2:45PM 4/9/2018 Monday Weather 55°F, Partly Cloud Client / Owner Select Homes Inc. Received Onsite By Checked By 4,411, Are approved Plans/Permits onsite ® YES ❑ NO Project No Permit No. As requested, ESNW rep. was onsite to observe and probe footing excavation, as well as confirm suitable offset of the footing. While onsite, ESNW rep. used a '/2" steel T-probe to probe the subgrade of the footings, as well as probe the remainder of the subgrade for the onsite housing lot. ESNW rep. observed the foundation subgrade to be dense, and is considered suitable for support of the proposed structure. While onsite, ESNW rep. observed the offset of the footing to be low enough to be out of the 1:1 slope behind pre-existing rockery. ESNW rep. will return when requested. Mitchell Dodo ESNW Field Technician COPY TO: CONTINUED ON NEXT PAGE