Loading...
Sunset 121 Haul Route Plan - Cover Letter (2).pdfForensic Architecture & Engineering Building Enclosure Consulting 2200 1 st Avenue South, Suite 200, Seattle, WA 98134 206.285.4300 main 206.285.4371 fax www.oacsvcs.com August 13, 2019 To: City of Edmonds From: Jeff Dideon OAC Services RE: Application #: BLD20190672 Project: 121 Sunset Project Address: 121 Sunset Ave. N In response to City of Edmonds review comments, dated 7/9/2019, OAC Services respectfully submits the following haul route plan. This project involves the repair/replacement of ADA ramp to three buildings. Project includes the driving of pin -piles to support a poured concrete ramp which will provide access to residences. Anticipated schedule for this project is 3-5 weeks. Proposed working hours are 8 am to 4 pm Monday through Friday. For this project, during working hours, we expect one 1-ton truck with a tow behind trailer. During the concrete pour we anticipate a concrete pump and mixer truck. Truck parking will be in the spaces immediately in front of the project. Signage will be posted identifying closure areas. The following routes will be used for material and general deliveries: Haul route to the project will be via: Highway 104 off of Interstate 5. Sunset Avenue to Main street Main Street to 1" or 2nd Ave. VY or 2nd Ave. to Bell Street Bell Street to Sunset Ave North Haul route from the project will be via: Sunset Ave. North Highway 104 Highway 104 to Interstate 5. Materials will be unloaded from trucks parked in the parking spaces immediately in front of the project, carried across closed walkway and delivered to private property. Concrete will be pumped from the truck parked in the parking spaces immediately in front of the project, pumped over closed walkway and delivered to private property, concrete pour will occur over a period of 2 days. Contact information is as follows: Howard Clark Advanced Foundation Supports 206-852-2450 Davison Custom Concrete 425-487-1677 Scott McClellan McBride Construction Co. 206-432-3206 Regards, Jeff Dideon Sr. Building Enclosure Specialist Project Name Document Type — DRAFT 2 R2019XX.01 Month XX, 2019