Loading...
Sunset Ave - 620_Echelbarger SFR_BLD20080408.pdf City of Edmonds TH 121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Engineering Plan Review Comments Application :Date: # BLD20080408 06/25/08 Project Name/Address: Echelbarger SFR / 620 Sunset Avenue Contact Person/Address, Fax or E-mail: Mike Echelbarger / MIKE@ECHELBAREGER.COM Reviewer: Edward Sibrel Division:Engineering During review of the civil drawings for the proposed subdivision it was found that the following information, corrections, or clarifications will need to be addressed. Please resubmit 3 copies of the revised civil drawings and associated documents with a written response to each item to an Engineering Technician. Please contact me at 425-771-0220 or by e-mail at sibrel@ci.edmonds.wa.us if you have specific questions regarding these plan corrections. SEWER PLAN__________________________________ 1.The sewer plan is undergoing outside review. The costs associated with said review will be passed through to applicant. STORM PLAN__________________________________ 1.Please show cause why the storm line must be installed along the centerline of the road, causing extensive traffic impacts during construction. There is an existing CB in the gutterline in the vicinity of the existing CBMH that can be connected to. If the SW IE of 23.28 of this CB is too shallow, that line may by removed and relaid. The ~255 LF of storm line may be installed in front of the curb/gutter, minimizing frontage repair/replacement and likewise minimizing impact to traffic during construction. 2.Since the drainage is directly discharged rather than detained, there will be a net increase of runoff volume to the BNSF drainage ditch prior to discharge to Puget Sound. An approval letter from BNSF will be required for this. Please include such letter in your next submittal. FRONTAGE IMPROVEMENTS / DETAILS_________ 1.Installing the storm line will require the demo of the driveway cut, portions of the existing sidewalk and curb and gutter, as well as asphalt saw cuts, CB installation, and trench backfilling within the City ROW. Include with the civils all details needed to accomplish the work. City of Edmonds Standard Details may be found online at: http://www.ci.edmonds.wa.us/engr_toc_std_details.stm. Also include details covering required erosion control, side sewer installation, and water service line installation with the plans. DATE E-MAILED 6/25/08 PAGE(s) 1 of 2 City of Edmonds TH 121 5 AVENUE NORTH EDMONDS, WA 98020 • (425) 771-0220 FAX(425) 771-0221 Website: www.ci.edmonds.wa.us PUBLIC WORKS DEPARTMENT Engineering Division Engineering Plan Review Comments UTILITIES_____________________________________ 1.Please show water main on civils. 2.Show other utilities that may be buried within the ROW that could also impact construction. TRAFFIC CONTROL______________________________ 1.Since extensive work will be done within a busy right-of-way, a comprehensive Traffic Control Plan is required for the work and shall be incorporated into the associated Right-of-Way Construction Permit. Please include a TCP with your next submittal. FYI: the City strongly discourages road closures as a traffic control method. SITE PLAN_______________________________________ 1. Please include the civil improvements on the site plan for reference. Also note the amount of new impervious surface on the site plans. DATE E-MAILED 6/25/08 PAGE(s) 2 of 2