Loading...
Traffic Impact.pdfCity of Edmonds 17t, t•�fJ(�'J di ms f Traffic Irripact Ar',ialysis Worksheet J" r„ c, ""0 Name of Proposed Project: KV-Imw oL Owner/Applicant Name 179(91 M i k OR, Street/Mailing Address M KD W A 96W City State Zip Telephone: ,, G °- `Z/ q Applicant Contact Person: Name Street/Mailing Address City State Zip Telephone: Traffic Engineer who prepared the Traffic Impact Analysis (if applicable): Firm Name Telephone: Contact Name E-mail: ew a. Location -Street address: /�/ %F— , tom'®M&A/lJ, 1A1 --926a (Attach a vicinity snap and site plan.) b. Specify existing land use: wi kS ki J [� -t_..� C � , "a w tM-GM c. Specify proposed type and size of development: 0_1 LT fit" /?!c° r�F-Et (.S: 0vl65 76 gds t t (# of residential units and/or square footage of building) Cep"-4 Revised 017 6/24/10 E82 - Traf,fic Impactftnahvsis Worksheet Page 1 of 5 p 0 -/ -1 d. Date construction will begin and be completed: ?-/ � e. Define proposed access locations: No G 6 d :5 f. Define proposed sight distance at site egress locations: do e-/ (a 5 2. TRIP GENERATION Source shall be the Eighth Edition of the Institute of Transportation Engineers (ITE) Trip Generation manual. For independent fee calculations, the current edition of the ITE manual may be used. ADT = Average Daily Traffic PM Peak -hour trips (AM, noon or school peak may also apply as directed by. the City Engineer) a. Existing Site Trip Generation Table: PM Peak -Hour Trips Land Use Daily (ADT) IN OUT AKT 64W, r V,\ b. Proposed Project Trip Generation Table: Land Use Daily (ADT) PM Peak -Hour Trips IN OUT c. Net New Project Trip Generation Table: PM Peak -Hour Trips Land Use Daily (ADT) IN OUT d. State assumptions and methodology for internal, link -diverted or passby trips: Revised on 6/24/10 E82 - Traffic Impact Analysis Worksheet Page 2 of 5 7. MITIGATION RECOMMENDATIONS State recommended measures and fees required to mitigate project specific traffic impacts. Traffic impact fee shall be calculated from the Edmonds Road Impact Fee Rate Study Table 4 (attached) and as identified in ECDC 18.82.120, except as otherwise provided for independent fee calculations in ECDC 18.82.130. ? CHANGE IN USE Fee for prior use shall be based on fee established at the time the prior use was permitted. If the previous use was permitted prior to the adoption of Ordinance 3516 (effective date: 09/12/04), the 2004 ECDC 18.82.120 impact fee shall be used. ITE Land Use Category New Use�tGP i i, Prior Use I A A _®1 Units in Per Unit square feet, Fee Rate # of dwelling, ___of , etc. New Use Fee: $ Prior Use Fee: $ _ $ Units in ITE Land Use Category Per Unit square feet, Fee Rate 4 of dwelling, of , etc. New Use $ X = City of Ed1n6n , Engineering Division Approval Date ' No impact fees will be due, nor will a credit be given, for an impact fee calculation resulting in a net negative. Remised on 6/24/10 E82 - Traffic hnpactAnalysis Worksheet Page 5 of 5