Loading...
White Addition 17808 Talbot.DOC EDMONDS FIRE DEPARTMENT MEMORANDUM Date: March 12, 2010 To: File From: Mike Smith Fire Inspector 425-775-7720 Subject: Plan Check 2009-0043 White Addition 17808 Talbot Road The following comments are referenced from the 2006 IFC Appendices B and C “Fire Flow Requirements for Buildings”. Based on the size of the existing house and the proposed addition the FD requires one of the following be installed: 1) a 13D residential fire sprinkler system OR 2) A fire hydrant installed on the SE corner of the easement road on the North boundary of your property. March 16, 2010 After talking with Henry Byam from Wesco Construction and obtaining distances from the three closest hydrants the addition does not require either of the two above conditions. Fire Flow and Hydrant Spacing is adaquate per the 2006 IFC Appendicies B and C.