Loading...
Building PermitPermitMECHANICAL PERMIT NU of Edmonds EdmondsCity 98020 BLD2021-0515 www.edmondswa.gov Type: MECHANICAL Owner/ Business: CARMEN GRAY Status: ISSUED Subtype: RESIDENTIAL MECHANICAL Parcel No: 00756500000500 Site Address: 808 ALOHA PL EDMONDS,WA 98020-3160 Applied: 4/9/2021 Subdivision: 007565, SP S-26-81, SP S-16-89 Lot: 0 Issued: 4/9/2021 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 10/6/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: JOK Scope of Work: MECHANICAL - REPLACE AIR HANDLER, ADD HEAT PUMP WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT CARMEN GRAY 10733 47TH PL WEST, (425)493-5353 PERMITS@BELRED.COM MUKILTEO WA 98275 CONTACT BEL RED ENERGY SOLUTIONS 10733 47TH PL WEST, (425)493-5353 permits@belred.com MUKILTEO WA 98275 CONTRACTOR BEL-RED ENERGY SOLUTIONS 10733 47TH PL WEST, (425)493-5353 permits@belred.com LLC MUKILTEO WA 98275 808 ALOHA PL, EDMONDS WA OWNER FORREST INSLEE 98020 7PERMDESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # ASE FEE FOR MECHANICAL 001.000.322.10.000.00 $50.00 $50.00 4/9/21 R11561 ITS AIR CONITIONING SYSTEM OR HEAT 001.000.322.10.000.00 $50.00 $50.00 4/9/21 R11561 PUMP - 1.75 BTU OR LESS AIR HANDLERS - 10,000 CFM OR 001.000.322.10.000.00 $30.00 $30.00 4/9/21 R11561 LESS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 4/9/21 R11561 PER PERMIT TOTALS: $170.00 $170.00 • • CONDITION TYPE STATUS NOTES Printed: Friday, April 09, 2021 3:23:29 PM 1 of 2 PermitMECHANICAL PERMIT NUM City of Edmonds 121 . •:01 1 -. •. � • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. Installation, use and maintenance of equipment and components shall be per EQUIPMENT USAGE FOR manufacturer's specifications, installation instructions, and applicable state codes. INFORMATION Provide manufacture's installation instructions on site for Building Inspector. FOR Heat pumps, AC units and similar equipment greater than 36 inches in height are not SIDE YARD EQUIPMENT INFORMATION allowed within required building setbacks. IL INSPECTIONS - Schedule Online at: https://Inspection.MvBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE X-0 MECH FINAL" B-3 GAS PIPING TEST B-3 MECH ROUGH IN Printed: Friday, April 09, 2021 3:23:29 PM 2 of 2