Loading...
Building Permit'S IDENTIAL BLDG Permit PERMIT NUM of Edmonds EdmondsCity 98020BLD2021-044311 wwm www.edmondswa.gov Type: RESIDENTIAL BLDG Owner/ Business: SAMORA MICHAEL & AMY Status: ISSUED Subtype: ALTERATION OR REMODEL Parcel No: 00513100013909 Site Address: 7330 172ND ST SW EDMONDS,WA 98026-5121 Applied: 3/25/2021 Subdivision: 005135, 005131, SP S-38-88 Lot: 0 Issued: 4/13/2021 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $90,000.00 Occupancy Type: Construction Type: Expiration Date: 4/13/2022 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: WAC Scope of Work: SAMORA-INT REMODEL-WK DONE PRIOR TO PERMIT BY PRIOR OWNER WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT SAMORA MICHAEL & AMY 7330 172ND ST SW, EDMONDS mikesamora@hotmail.com WA 98026 CONTRACTOR SAMORA MICHAEL & AMY 7330 172ND ST SW, EDMONDS mikesamora@hotmail.com WA 98026 OWNER SAMORA MICHAEL & AMY 7330 172ND ST SW, EDMONDS mikesamora@hotmail.com WA 98026 FEE INFORMATION DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT# CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 4/13/21 R11633 PER PERMIT PERMIT FEE - RESIDENTIAL 001.000.322.10.000.00 $1,030.00 $1,030.00 4/13/21 R11633 PLAN REVIEW FEE - RESIDENTIAL 001.000.345.83.000.00 $875.50 $875.50 3/30/21 R11321 RESIDENTIAL STATE SURCHARGE 001.000.237.150 $6.50 $6.50 4/13/21 R11633 TOTALS: $1,952.00 $1,952.00 • • CONDITION TYPE STATUS NOTES Printed: Tuesday, April 13, 2021 3:17:09 PM 1 of 2 'SIDENTIAL: Permit PERMIT NUM City of Edmonds Edmonds •:� iJIL 1 141 -. •. • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. FOR Provide combustion air for gas fires equipment per IFGC Chapter 3 for commercial and COMBUSTION AIR INFORMATION multifamily residential installations, and IRC chapter 24 for one and two family dwellings. ELECTRICAL PERMIT FOR Obtain Electrical Permit from State Department of Labor and Industries 425-290-1309. NFORMATION Approval of this permit is not an assurance of full compliance of the Building Code. Work FOR was completed prior to obtaining this permit, and verification of code compliance is LIFE SAFETY INSPECTION INFORMATION limited to the elements of construction visible to the City Inspector. Portions of work may need to be exposed at the discretion of the building inspector. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION provide manufactures installation instructions on site for Building Inspector. INSPECTIONS - -. •nline at: https://Inspection.MyBuildingPermit.co COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE B-3 EXT WALL SHEATHING B-4 FRAMING B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" B-3 RETROFIT ANCHORAGE APPROVED B-3 MECH ROUGH IN B-3 PLUMB ROUGH IN A-1 BUILDING PRECON Printed: Tuesday, April 13, 2021 3:17:09 PM 2 of 2