Loading...
Building Permit•M MERCIAL BLDG PermitCity • • • • PERMITNUM 1[7 98020BLD2021-0553 www.edmondswa.gov Type: COMMERCIAL BLDG Owner/ Business: RUSSELL ARBUCKLE Status: ISSUED Subtype: COM ALTERATION OR REPAIR Parcel No: 00610600300700 Site Address: 10119 EDMONDS WAY EDMONDS,WA 98020 Applied: 4/16/2021 Subdivision: 003899, 006106, IOOF CEMETERY Lot: 0 Issued: 5/19/2021 Fire Sprinklers: Lot Area: Zoning: WMU Final: Valuation: $300,000.00 Occupancy Type: B Construction Type: VB Expiration Date: 5/14/2022 Code Edition: 2018 No. Stories: 0 # of Dwelling Units: 0 Issued by: NED Scope of Work: TACO BELL- INT/EXT REMODEL * SEP. PERMITS: SIGNS, P & M WA State Contractor L & I #: City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT RUSSELL ARBUCKLE 2416 WASHINGTON STREET C3, (309)663-7111 RUSS@EA-AD.NET BLOOMINGTON IL 61704 CONTACT EA ARCHITECTURE & DESIGN, 2416 WASHINGTON STREET C3, (309)663-7111 Russ@EA-AD.net INC. BLOOMINGTON IL 61704 CONTRACTOR DA BENTLEY CONSTRUCTION, 10709 N.E. COXLEY DRIVE, (360)695-9234 Dan@dabentley.net LLC VANCOUVER WA 98662 OWNER 9323 LLC 111 W 39TH ST, VANCOUVER WA 98660 OTECHNOLOGY DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # CITY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 4/16/21 R11722 PER PERMIT COMMERCIAL STATE SURCHARGE 001.000.237.150 $25.00 $25.00 5/19/21 R12373 ENGINEERING INSPECTION FEE 001.000.341.82.000.00 $220.00 $220.00 5/19/21 R12373 PERMIT FEE - COMMERCIAL 001.000.322.10.000.00 $2,740.00 $2,740.00 5/19/21 R12373 PLAN REVIEW FEE - COMMERCIAL 001.000.345.83.000.00 $2,329.00 $2,329.00 4/16/21 R11722 TOTALS: $5,354.00 $5,354.00 CONDITION TYPE STATUS NOTES Printed: Wednesday, May 19, 2021 1:48:12 PM 1 of 2 • Permit PERMIT NUM City of Edmonds . •:� i 1 1 www -. •. • JIL 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. It is the owner's responsibility to repair/replace all damage of utilities or frontage DAMAGE TO FRONTAGE FOR improvements in City right of Ways or Easements to City Standards caused by or IMPROVEMENTS INFORMATION occurring during the permitted project. FOR Maintain erosion and sedimentation control per City and SWMMW standard ESC REQ INFORMATION requirements. Installation, use and maintenance of equipment and components shall be per MANUFACTURER SPECS FOR manufacturers specifications, installation instructions, and applicable state codes. INFORMATION Provide manufactures installation instructions on site for Building Inspector. Nothing in this permit approval process shall be interpreted as allowing or permitting the maintenance of any currently existing illegal, nonconforming or unpermitted building, FOR structure or site condition which is outside the scope of the permit application, regardless NONCONFORMING DISCLAIMER INFORMATION of whether such building, structure or condition is shown on the site plan or drawing. Such building, structure or condition may be the subject of a separate enforcement action. INSPECTIONS - -. •https://Inspection.MyBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE B-4 CEILING GRID B-4 FRAMING B-7 BUILDING OTHER INSP X-3 BUILDING FINAL" B-2 FOOTINGS A-1 TESC AND MOBILIZE X-2 ENGINEERING FINAL Printed: Wednesday, May 19, 2021 1:48:12 PM 2 of 2