Loading...
elig. facilities req (2)1505 Westlake Ave N Phone: (206) 336-3204 CROWN Seattle, WA 98109 Fax: CC CASTLE www crowncastle.com March 24, 2020 City of Edmonds Development Services Building Division 121 51' Ave N . Edmonds, WA 98020 RE: Eligible Facilities Request to modify equipment on a communications tower located at: 8505 Bowdoin Way, Edmonds, WA, 98026 Crown Site Number: 824070 / Crown Site Name: Five Corners -Fire Station Customer Site Number: SN64 / Application Number: 511796 Crown Castle USA Inc. ("Crown Castle") on behalf of New Cingular Wireless PCS, LLC ("AT&T Mobility") is submitting the attached Eligible Facilities Request application to modify transmission equipment on a telecommunications tower located at 8505 Bowdoin Way, Edmonds, WA 98026 in CITY OF EDMONDS, WA (the "Five Corners -Fire Station Tower"). Section 6409 of the Middle Class Tax Relief and Job Creation Act of 2012, commonly known as the "Spectrum Act" (Pub. Law No. 112-96, 126 Stat 156), mandates that state and local governments "may not deny, and shall approve, any eligible facilities request for a modification of an existing wireless tower or base station that does not substantially change the physical dimensions of such tower or base station." Additionally, if "the reviewing State or local government determines that the application is incomplete" [they] "must provide written notice to the applicant within 3o days of receipt of the application, clearly and specifically delineating all missing documents or information." Under federal law, an Eligible Facilities Request is deemed granted with written notification in sixty (60) days after an application is filed with a local jurisdiction, excluding tolling. AT&T Mobility proposes to modify the "Five Corners -Fire Station Tower" as follows: Replace (3) antennas; remove (6) TAIA's; and install (3) RRH's on existing tower. AT&T also proposes to install (1) converter system, (2) rectifiers, (1) Flexair hex door upgrade, and (4) modules within existing compound. Itemized list of submittal documents: • (1) Cover Letter • (1) Building Permit Application • (2) Structural Analysis stamped by Washington State engineer • (2) Construction Drawings stamped by Washington State engineer The Foundation for a Wireless world. CrownCastlexorn RO. w `� 1505 Westlake Ave N Phone: (206) 336-3204 YV Seattle, WA98109 Fax: CC CASTLE - www.crowncastle.com AT&T Mobility is committed to working cooperatively with all jurisdictions around the country to secure expeditious approval of requests to modify existing personal wireless service facilities. If you should require more information regarding the Spectrum Act, please do not hesitate to contact me with your questions. Sincerely, Sarah Baird Sarah.Baird@crowneastle.com (206) 336-3204 The Foundation for a Wireless Worm. CrownCastfe,com