Loading...
Building PermitPLUMBING PERMIT NUM City of Edmonds ' 121 5th Ave N, Edmonds WA 98020 1 1 • www.edmondswa.gov Type: PLUMBING Owner/ Business: JAMES DURNIN Status: ISSUED Subtype: COMMERCIAL PLUMBING Parcel No: 00843300120200 Site Address: 404 3RD AVE S A-202 EDMONDS,WA 98020-8422 Applied: 6/9/2021 Subdivision: 008433 Lot: 0 Issued: 6/15/2021 Fire Sprinklers: Lot Area: Zoning: Final: Valuation: $0.00 Occupancy Type: Construction Type: Expiration Date: 12/15/2021 Code Edition: 0 No. Stories: 0 # of Dwelling Units: 0 Issued by: WAC Scope of Work: PLUMBING -SWITCH OUT TUB FOR SHOWER WA State Contractor L & I #: DURNIP901DZ City of Edmonds Business License #: 602454996-001-0001 CONTACTS NAME TYPE NAME ADDRESS PHONE EMAIL APPLICANT JAMES DURNIN 23701 102 PLACE WEST, (206)546-4940 JAMES.DURNIN@FRONTIER.COM EDMONDS WA 98020 CONTACT JAMES DURNIN 23701 102ND PL W, EDMONDS (206)546-4940 JAMES.DURNIN@FRONTIER.COM WA 98020 CONTRACTOR DURNIN PLUMBING INC 23701 102 PLACE WEST, (206)546-4940 james.durnin@frontier.com EDMONDS WA 98020 404 3RD AVE S A-202, OWNER RALPH SANDERS EDMONDS WA 98020 •' • DESCRIPTION ACCOUNT AMOUNT PAID PAID DATE RECEIPT # 1 -BASE FEE FOR PLUMBING 001.000.322.10.000.00 $50.00 $50.00 6/13/21 R12787 PERMITS CITY TECHNOLOGY FEE CHARGED 001.000.321.99.100.00 $40.00 $40.00 6/13/21 R12787 PER PERMIT EACH PLUMBING FIXTURE ON ONE 001.000.322.10.000.00 $15.00 $15.00 6/13/21 R12787 TRAP TOTALS: $105.00 $105.00 CONDITION TYPE STATUS I NOTES Printed: Tuesday, June 15, 2021 9:27:18 AM 1 of 2 PLUMBING PERMIT NUM City of Edmonds . •:� 1 1 • www.edmondswa.gov • 1- HOLD HARMLESS - Applicant on behalf of his or her spouse heirs assigns and successors in interests, agrees to indemnify defend and hold harmless the City of Edmonds, Washington, its officials, employees, and agents from any and all claims for damages of whatever nature, arising directly or indirectly from the issuance of this permit. Issuance of this permit shall not be deemed to modify, waive or reduce any requirements of any City ordinance nor limit in any way the City's ability to enforce any ordinance provision. 2 - PERMIT DISCLOSURE - Any request for alternate design, modification, variance or other administrative deviation from adopted codes ordinances or policies must be specifically requested in writing and be called out and identified. Processing fees for such requests shall be established by Council and shall be paid upon submittal and are nonrefundable. 3- SOUND OR NOISE - Sound/Noise originating from temporary construction sites as a ALL BUILDING PERMITS FOR result of construction activity are exempt from the noise limits of ECC Chapter 5.30 only INFORMATION during the hours of 7:00am to 6:00pm on weekdays and 10:00am to 6:00pm on Saturdays, excluding Sundays and Federal Holidays. At all other times the noise originating from construction sites/activities must comply with the noise limits of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120. 4 - OCCUPANCY - Final approval on a project or final occupancy approval must be granted by the Building Official prior to use or occupancy of the building or structure. Check the job card for all required City inspections including final project approval and final occupancy inspections. 5 - PLUMBING - Plumbing contractor license laws are regulated by Chapter 18.106 RCW. Property owners who hire an unlicensed plumber may assume the risks and potential monetary liability for work performed by unlicensed plumbing contractors. For more information contact L&I Department of Licensing at 1-800-647-0982. INSPECTIONSSchedule •https://Inspection.MvBuildingPermit.com COMPLETED RESULT SEQID INSPECTION TYPE INSPECTOR NOTES DATE B-3 PLUMB ROUGH IN X-0 PLUMBING FINAL" B-4 SHOWER PAN Printed: Tuesday, June 15, 2021 9:27:18 AM 2 of 2