Loading...
20606 77TH PL W20606 77TH PL W CITY OF EDMONDS FOR INSPECTION CALL • �,0 PUBLIC WORKS DEPART Permit 1 SLDE SEWER PERMIT 775-2525 Ext. 220 Issue Date _///-�% S7- * ,PERMIT MUST BE POSTED ON JOB SITE U 1. Address of Construction—,'. Ul 2. Property Legal Description (include all easements=TREATMENT =mum U. - ANT 3. Single Family Residence Multi -Family No. of Units ly Commercial LU 4. Owner and/or Builder 5. Contractor & License No. 6. Invasion into City Right -of -Way: No Yes (If Yes Right-of- way Construction Permit Required - Call Dial Dig (342-5344) before excavation). E-1 Uattach 7. Cross other private property: Yes No �� Easement required - legal description and county easement number. H w READ THE FOL.LOWI.NG AND SIGN: 1 a. Property owners must obtain a permit to install side sewers on their r property. A licensed side sewer contractor must be employed to °Q construe* side sewers in the public right-of-way. w b. The side sewer contractor assumes full reponsibility for each H installation for one year. ac. Commercial establishment requires a minimum of a six inch (6") 1 P4 sewer line. 1 o d. Side sewers may not be installed closer than thirty inches (30") to any structure. 1 e. Side sewer lines must be laid at a minimum grade of 2% (1.150) 1 O and maximum grade of 100% (450). o H f. No turn in side sewer greater than 45 (1/8,bend) is 1 allowed between cleanout. All 90 turns must be constructed of a 45° (1/8 bend) and wye with removable cap. 1 g. No down spouts, footing drains or floor drains can be connected 1 to side sewer system. h. Pea gravel is required for bedding when installing sewer lines 1 through other than granular soil. 1 i. Cleanouts are required at 30"-60" from each plumbing exit line and at minimum intervals of 100' along sewer line run. 1 j. Trenches within City right-of-way must be restored to original 1 conditions. Contractors shall be responsible for right-of-way failure 1 due to poor compaction of fill. k.. Side sewer must be left uncovered until inspected and approved ,1 by the City. 1. Inspection during normal working hours only. Two (2) working 1 days notice required. 1 DATE: I certify that I have read and shall comply with the above PERMIT FEE, DISAPPROVED BY: Date: 014 X P.1nc�.d : B Date: CONNECTION FEE: APPROVED By • Date: , p' 0 * PEPMIT MUST BE POSTED ON JOB SITE Side Sewer Drawing EDMONDS The City of Edmonds TREATN;c^;T PLANT EASEMENT NO . ..:.....:................................... NEW CONSTRUCTION ❑ REPAIRS LID NO . .................. .ASMT. NO.................... OWNER 32.p--l��J`- . ........................................................... CONTRACTOR ...... .................................................... PERMIT NO, JOB ADDRESS ..... ..... ............... LEGAL DESCRIPTION: LOT NO_...................................... BLOCK NO. .................................... NAMEOF ADDITION.........:........•----._.._.._._..___.._..----..__......_..---.._----._..._.._._.._.__.----...-•-•--••............... a0G sPV 0 PWW-0001-11/75 (REV.11/78) c _•_1 —. n wr� 7 7 P1. W Approved: f--•---•-•-- ------------------------•-•-----------•- DATE-•--�-•----•--.. ._.. '� B ._..---_.