Loading...
Resolution 1475RESOLUTION NO. 1475 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING A REVISED FEE SCHEDULE FOR THE CITY'S DEVELOPMENT -RELATED FEES AND CHARGES FOR SERVICES. WHEREAS, ECDC 15.00.020 provides for the establishment and amendment of certain fees charged by the city by resolution; and WHEREAS, extensive effort has been made by city staff to analyze the full costs associated with city permitting and service activities; and WHEREAS, the city council has previously established and affirms as its goal that permit fees shall be set to cover the reasonable costs of processing and issuing permits and requests for service; and WHEREAS, the city recently processed its first small wireless facility permit application and realized that the amount charged to review that application did not come close to covering the costs of the staff time and attorney time that were actually incurred by the city; and WHEREAS, the city also recognizes that there is a learning curve in complying with federally mandated small wireless facility time limits and other federally imposed constraints on the processing of small wireless facility applications, and that future application processing costs incurred are expected to decrease to some degree; and WHEREAS, the Federal Communications Commission (FCC) has determined that fees charged by local governments for the deployment of small wireless facilities in the ROW must be (i) a reasonable approximation of the local governments' costs, (ii) based on costs that are objectively reasonable, and (iii) no higher than fees charged to similarly situated competitors in similar situations; and WHEREAS. The FCC has set the following non -recurring fee amounts as presumptively reasonable: $500 for a single application that includes up to five small wireless facilities, $100 for each additional small wireless facility beyond five; and WHEREAS, the FCC's presumptively reasonable fee amounts are known as "safe harbors" because a local government may charge these amounts without having to independently justify them; and WHEREAS, the Ninth Circuit Court of Appeals recognized in City of Portland V. United States, 969 F.3d 1020 (2020), that if a local governments' fees exceed those levels, they are not automatically preempted because they can be justified, and that localities may charge fees above those safe harbor levels where they can demonstrate that their actual costs exceed the presumptive levels; and WHEREAS, the Ninth Circuit confirmed the FCC's statement that the calculation of actual, direct costs is a well -accepted method of determining reasonable compensation; and WHEREAS, the FCC has stated that fees above a reasonable approximation of costs will have the effect of prohibiting wireless service; and WHEREAS, the city's permit application fees exist to offset the costs incurred in processing the application and are reasonable in relation to the efforts of those involved in reviewing the proposal and the costs incurred; and WHEREAS, the city will keep track of its hourly costs over the next few small wireless facility permit applications until it has enough data to set a fixed fee that is a reasonable approximation of the city's actual, objectively reasonable application review costs; and in the meantime will charge the safe harbor amounts up front and on the back end charge for its actual reasonable costs incurred; and WHEREAS, the city council adopted Resolution 1442 on December 10, 2019, which adopted a schedule of fees to be charged in relation to development activity; and WHEREAS, this resolution is intended to replace Resolution 1442; now therefore, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. The fees and charges for services set forth in the schedule attached as Exhibit A to this Resolution, which is incorporated herein by this reference, are hereby adopted, along with the referenced tables which are also included therein, and shall be effective on June 16, 2021. Section 2. If any section, sentence, clause or phrase of this resolution or any fee or charge for service adopted or amended hereby should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section, sentence, clause or phrase, or any fee or charge adopted or amended hereby. Section 3. Resolution 1442 shall have no further effect as of June 16, 2021 as the fees adopted by Resolution 1442 are being replaced by the fees adopted herein. RESOLVED this 15' day of June, 2021. CITY OF EDMONDS 'N•L•L ' R, MIKE NELSON Pa ATTEST: CITY CLERK, SCO. ASSEY FILED WITH THE CITY CLERK: June 11, 2021 PASSED BY THE CITY COUNCIL: June 15, 2021 RESOLUTION NO.: 1475 2021 FEES ASSOCIATED c?/ OWN- 1 gc)0 0 Building — Engineering — Planning - Fire 121 5t" Ave N, Edmonds WA 98020 425.771.0220 Approved fees effective January 1, 2021 Page 1 of 12 GENERAL DEVELOPMENT SERVICES PERMIT FEES Building / Planning / Engineering / Fire City Technology Fee for each permit application...................................................... $40.00 Credit Card Transaction Fee 3% Development Review Committee Meeting................................._...._...._.._..........._.._.......:......................:.........$0 Pre -Application Meeting ........................... ............ .................... :....:....:................................................... $1,000.00 (50% applied toward future plan check fee for that specific project only) Recording Fee (for recording documents with Snohomish County)... ..................... . Recording Cost + $110.00 Violation Compliance Fee............ . . ........ .......... — ........ .... __ ....... .................... $250.00 or up to 5x Permit Fee Residential State Building Code Surcharge Fee........................................................................................ $6.50 ..................................................................................................................... Each additional dwelling unit $2.00 Commercial State Building Code Surcharge Fee ................. ................ ........................._............. ........ ..... $25.00 ..................................................................................................................... Each additional dwelling unit $2.00 (not applicable to certain minor permits such as plumbing, mechanical, re -roof) PLAN REVIEW & INSPECTION FEES: Plan review is calculated at 85% of the building permit fee and includes up to 3 reviews per division/ department. Commercial/ Multi -family/ Residential: Plan review fee includes Building, Planning, Fire & Engineering reviews. General plan review fee per reviewing department/division.........................................$110.00/hr (1 hr min.) plus peer review fee if applicable Plan review for re -submittals after the 3rd review ............................ ____ ..................................... $110.00/hr Development Project Peer Review (Peer Review).................................................................................. $110.00 plus cost of consultant review fee charged for outside consultant peer review services when City staff lacks the expertise to review a specific project or aspect of a project. General Inspection Fee per department/division....................................... I ...................................... $110.00/ea Re -Inspection Fee .......................................... ..................... :......... :....::.................. ..:...:..:.:....:.............. $110.00/ea Engineering Inspection Fee* ......... ..................................................................... 3.3% of Value of Improvements *Applies to Civil Site Improvements, such as Subdivisions, Commercial & Multi -Family Permits Stormwater Engineer Review Fee ............................................ ...... ......... ..................... ............. ....,.... $130.00/hr Transportation Engineer Review Fee ................................... ............................ ................. ........ .........$130.00/hr UtilityEngineer Review Fee............................................................................................................... $130.00/hr REFUNDS: The City may authorize refunding of any permit fee paid which was erroneously paid or collected. The City may authorize refunding of not more than 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with the applicable code(s). The City may also refund not more than 80 percent of the plan review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn or canceled before any plan reviewing is done. Refunds shall not be granted of any fee on an expired permit. Any application for a refund must be made in writing and describe the circumstances to justify. Refunds for permit fees covered by 19.70.025 ECDC may be authorized by the Building Official. The Planning Manager may authorize refunds of Planning fees or service charges. The City Engineer may authorize refunds of Engineering fees or service charges. Page 2 of I? BUILDING PERMIT FEES Accessory Dwelling Unit Compliance (ADU).................... Adult Family Home Compliance (AFH) ............................ Alternate Methods Review ............................................... Appeal of Building Official Interpretation ........................ Cellular Communication and Facilities .......................__ Changeof Use............................................._.................... Demolition (Residential Primary Structure) ..................... Demolition (Commercial Primary Structure) ................... Demolition (Secondary Structure or Interior Only) ......... I Dock/Marina/Floats.......................................................... $405.00 $550.00 ..................................... $110.00/hr + Peer Review ................................................................... $970.00 ................................................. TABLE 1 .......................................................... $510.00 .......................................................... $300.00 .........:................................................ $500.00 ............................ ................................. $150.00 ........ .......... ........ ............. ..$200.00 + TABLE 1 Fence ........... :....... .:............... .:..:..:...::...:.................................... ......................... .......... .................. ......... .. $100.00 Hot Tub/Spa (Single -Family) ............ :.............................. ......... ...... .... :......... :............................ ....... ,.... I .... $200.00 Manufactured Coach Installation - Commercial (Federal HUD Label)....................................................$500.00 Manufactured Home Installation (Federal HUD Label) ............ ............... .......... ......... .............................. $550.00 ParkingLot ....... ................................................................. .......... ..... ..... ..................................... $200.00+TABLE 1 Re -roof (Commercial) ........................................... .... ........ Valuation based on $2.00 per square foot + TABLE 1 Re -roof (Residential -includes sheathing).......__...._.................._.............................,...,............................. $100.00 Retaining Wall (Commercial) Retaining Wall (Residential).. $740.00 + Peer Review $300.00 + Peer Review Solar/Photovoltaic (Residential) ............................................. .................... ...................... ....... ........ .......... $120.00 Solar/Photovoltaic (Commercial) - Valuation does not include cost of solar panels or inverters......... TABLE 1 Swimming Pool (Pre -manufactured, above ground)................................................................................ $120.00 Swimming Pool (In -Ground)......-.. .... .......... ... _ ...... ........... ............................ TABLE 1 Temporary Certificate of Occupancy (Commercial Only— valid for 60 days)........ SIGNS: $330-00 Sign (Per sign excluding specific sign categories listed below) ................................. ............................... $165.00 Blade Sign (Includes all blade signs in proposal)............................................................................................... $0 Pedestrian Sign (Includes all pedestrian signs in proposal) ................................................. :.... :.... ..... ....... $80.00 PoleSign (per sign).................................................................................................................................... $825.00 Murals (Includes all murals in a proposal) ................... :............................................................................ $165.00 *Planning ADB Design Review may apply ESLHA DESIGNATED PROPERTIES: Additional fees associated with development in the North Edmonds Earth Subsidence Landslide Hazard Area (ESLHA) ESLHA Administrative Fee ..................................... ..... :..... ::...... :.................................. :........................ $2,385.00 ESLHA Consultant Review ............................................. :............ :........... Full cost of review is paid by applicant. Deposit at Application for Peer Completeness Review......._......................................._.................... $500.00 Deposit at Full Application ................................................ ................................ ... .... .... ..:::................... $Z,500.00 Deposit at Re -submittal if additional Peer Review is needed ..................... ................. .................. $1,500.00 ESLHA Minor Project Administrative Processing Fee ................... ............... ...................... ............... ..... .$300.00 ESLHASubmittal Packet............................................................................................................................ $15.00 Page 3 of 12 MECHANICAL PERMITS: BASE PERMIT FEE: . $50.00 UNIT FEE SCHEDULE: For the installation or relocation of each FURNACE - Forced -air or gravity -type, including ducts and appliance vents ......................................... $30.00 AIR HANDLER - Including ducts (Diffusers, blowers, etc.) Up to and including 10,000 cfm (4719 L/s).......................................................................................$30.00 Over 10,000 cfm (4719 L/s) including ducts ..................................................... .................$40.00 GAS HEATER - Suspended, recessed wall or floor -mounted unit............................................................ $30.00 HYDRONIC HEATING SYSTEM .... ... ......... ............ ........... ....... ........................ .......... ___ ............... .......... $150.00 APPLIANCE VENT- (Type B, BW, L gas vent, etc.) ................................................... ____ .... ....... ........ ..... $15.00 INCINERATOR....................................................................................................................................... $50.00 VENTILATION AND EXHAUST Fan connected to single duct (Bath, laundry, kitchen exhaust, etc.) ---- ........................................... $15.00 Each system which is not a portion of any heating or air-conditioning system .............................. $15.00 HOOD - Type 1, Type 2, Fume Hood including ducts ........................ .................................................... $150.00 GAS PIPING: (New or relocated) Gas -Piping systems of 1 to 5 outlets._...........................................................:..........,............................._. $30.00 Each additional outlet over 5.....:.............................. ........... .......... ...... .... ... ..... ..... ..... :............. ................ $5.00 BOILER OR COMPRESSOR Up to and including 50 HP (176 KW).........................:...:.....................................:....:....:....:...:................$50.00 Over 50 HP (176 kW) ............... ................................................... ................................................. ............ $100.00 ABSORPTION SYSTEM, AIR CONDITIONING SYSTEM OR HEAT PUMP Up to and including 1,750,000 Btu/h (512.9 kW) ..................................................... $50.00 Over 1,750,000 Btu/h (512.9 kW)................:....:..........................._.._........._.......................................::..$100.00 OTHER FEES: Commercial Plan review hourly fee................................................._._.._...........................................$110.00/hr Each appliance or piece of equipment regulated by the IMC for which no other fee is listed (Fire dampers, ductless mini- split systems, etc.)............................................................ $30.00 Page 4 of 12 PLUMBING PERMITS: BASEPERMIT FEE:............................................................................................................................. ..$50.00 UNIT FEE SCHEDULE: For the installation, alteration, repair, addition or relocation of each: ...................................................... .... $15.00 Plumbing fixture (on one trap or a set of fixtures on one trap) Drain w/in footprint of building (rainwater systems, roof deck drains, etc.) Water Heater (includes expansion tank) Re -pipe - Drain, vent or water piping (each fixture served) Water Service Line (replacement or repair) For the installation, alteration, repair, addition or relocation of each: Water treating equipment (water softener)............................................................. ............... ........ ....... $35.00 Backflow protective device - 2" and smaller ............................................... ............................... ,..,.,....... $35.00 Backflow protective device - Over 2".......................................................................................................$45.00 Graywater system or reclaimed water system (in addition to fixture fee)............................................$65.00 Non -grease waste pre-treatment interceptor (oil/waterseparator, etc.) .................. ,..,........ ............. $110.00 Medical gas piping system serving 1 to 5 inlet/outlet(s) for a specific gas ... .................................. ....$110.00 Each additional medical gas inlet/outlet................................................................... .................... .....$15.00 Grease Trap (HGI Inside Building)............................................................................................................ $220.00 Gravity Grease Interceptor (GGI))........... ........................$770.00 OTHER FEES: Commercial plan review fee hourly fee PARK IMPACT FEES: Single -Family ........................... Multi -Family ............................ Non -Residential Development Residential Administrative Fee Commercial Administrative Fei TRANSPORTATION IMPACT FEES: ..... $110.00/h r IMPACT FEES .................................................... $2,734.05 per Dwelling Unit ................................................... $2,340.16 per Dwelling Unit .. .... .... ......... .......................................... .$1.34 per square foot ....................................................................................... $50.00 .................................................................................... $100.00 Refer to City Code & Handouts to calculate impact fee. The following applies in addition to impact fee: Residential Administrative Fee........................................................................_...._.._...._............................$50.00 Commercial Administrative Fee ................. ................................................... $100.00 Independent Fee Calculation —Transportation Engineer Review........................................................ $260.00 plus peer review fee as applicable. Page 5 of 12 GRADING PERMIT FEES PLAN REVIEW: CUBIC YARDS PLAN REVIEW FEE 50 cubic yards or less $55.00 (when located in a designated critical area) 51 to 100 cubic yards $110.00 101 to 1,000 cubic yards $220.00 1,001 to 10,000 cubic yards $440.00 $440.00 for the first 10,000 cubic yards, plus $110.00 for 10,001 to 100,000 cubic yards each additional 10,000 yards or fraction thereof. $1,430,00 for the first 100,000 cubic yards, plus $110.00 100,001 to 200,000 cubic yards for each additional 10,000 cubic yards or fraction thereof. $2,530.00 for the first 200,000 cubic yards, plus $110.00 200,001 cubic yards or more for each additional 10,000 cubic yards or fraction thereof. PERMIT FEE: CUBIC YARDS PERMIT FEE $35.00 Base Permit Fee 50 cubic yards or less $110.00 (when located in a designated critical area) 51 to 100 cubic yards $110.00 $110.00 for the first 100 cubic yards, plus $25.00 for each 101 to 1,000 cubic yards additional 100 cubic yards, or fraction thereof. $335.00 for the first 1,000 cubic yards, plus $45.00 for each 1,001 to 10,000 cubic yards additional 1,000 cubic yards, or fraction thereof. $740.00 for the first 10,000 cubic yards, plus $65.00 for 10,001 to 100,000 cubic yards each additional 10,000 cubic yards or fraction thereof. $1,325.00 for the first 100,000 cubic yards, plus $100.00 for 100,001 cubic yards or more each additional 10,000 cubic yards or fraction thereof. Pa«e 6 of 12 FIRE PERMIT FEES FIRE SPRINKLER PERMITS: Residential IRC Structures New Residential Fire Sprinkler Systems ................................................... ............... ................................ $300.00 Residential Fire Sprinkler System Alteration ... .......... .:....... .................................................................... $200.00 Commercial & Multi -Family Fire Sprinkler Systems Newsystems.........................................................................................................._....__..._...._. $300.00 + TABLE 1 Modifications: 1 to 5 sprinklers_._.... .......... ................................. ................... ................................ $250.00 6 to 25....................................................................................................................................................... $500.00 26 or more.............................................................................................................................. $300.00 + TABLE 1 Additional inspections/plan review as required ...... .............................................................$110.00/hr FIRE ALARM PERMITS: New fire alarm system .......... ............................................................ ....... ..... $300.00 + TABLE 1 ......................... Emergency Responders Radio System(DAS)........................................................................ $100.00 + TABLE 1 Modifications: 1 to 5 initiating devices, Communicator (AES, Cellular)....................................................................... $250.00 6 to 25, including panel replacement.....................................................................................................$500.00 26 or more .................. .............................. .................. ........ ..... ...... I ........ ................... ... ...... $300.00 + TABLE 1 Additional inspections/plan review as required, .......... _...................................................................$110.00/hr TANK PERMITS: Residential fill, remove or install (per each)...........................................................................................$200.00 Commercial fill, remove or install (per each)......................................................................................... $450.00 OTHER FIRE PERMITS: Fire Suppression Systems: Commercial Hood Suppression System (per system)...................................................................... $325.00 Standpipe................. ...................................................................................... ..................................... $450.00 FireConnection .................. :.:......... ::........::....... .................................. .............. ....................................... $500.00 FireOperational ....... :............... ::.............. ;:...:........ ............................... ................................................... $100.00 Fire fees include plan review and inspections. Paye 7 of 12 PLANNING AND LAND USE FEES GENERAL: Type I (Staff decisions, no notice).............................................................................................................$275.00 Type 11 A (Staff decisions with notice)..................................................,.................................................... $970.00 Type IIIA (ADB/Hearing Examiner).............................................................Hearing Examiner Cost + $2,000.00 Type IIIB (Hearing Examiner) ......................................... Hearing Examiner Cost + $2,000.00 Type IV (Rezone, Development Agreement)..........................................................................................$7,000.00 Type V (Plan & Edmonds Community Development Code Amendments)............................................$7,000.00 LotLine Adjustment ............................ ....................... ......... :..:......... :.................. :.._.:...... ___ ............... $1,050.00 Short Subdivision Preliminary Approval................................................................................................$3,225.00 Short Subdivision Civil Plan Review.......................................................................................................$3,050.00 Short Subdivision Final Approval ........ ................................................................................................... $1,590.00 Subdivision Preliminary Approval.........................._.................................... Hearing Examiner Cost + $6,510.00 Subdivision Civil Plan Review . .............................. .... . . . ............................$4,670.00 SubdivisionFinal Approval .................. ..... ........... ........................................................... ......................... $1,590.00 ModificationRequest. ............................................................................................................................... $970.00 Minor Change to Approved Plat............................................................................................................... $275.00 Major Change to Approved Plat....................................................................... Same as Original Application Fee PRDPreliminary Approval...,.. ..................................................... ..... __ ................ ....................... $6,510.00 PRDFinal Approval.................................................................................................................................$1,590.00 ADB Design Review —Signs ....................................................................................................................... $970.00 Staff Design Review if project exceeds SEPA threshold ............................. .............................................. $970.00 Landscape Plan Inspection Fee .................... ......................_.._...._........._......................._.................1%of Estimate SEPAReview..... ... _ .................... ............ .................................................................. . ........ . ........ ...... $740.00 SEPA Planned Action Compliance Review (Hwy 99)................................. ................ ........ ...._.,................ $275.00 EISReview.............................................................................._._.._............_......................_...... Cost Outdoor Dining, Amateur Radio...............................................................................................................$275.00 Critical Areas Checklist Application.......::..................................................................................................$110.00 Critical Areas Checklist Update ....................... .....,.... ................................................. .$55.00 ............................... Critical Areas Variance / Reasonable Use Application ................................ Hearing Examiner Cost + $7,640.00 Critical Areas Study Admin............. :...... :;.::,:.:.:......... ::........ :.... ...::.... :.....:.....:...::.... :........ $110.00/hr (min. 1 hr) Critical Areas Contingent Review (See ECDC 23.40.195 for more detail on fees) .... ............................. $970.00 Shoreline Contingent Review (See ECDC 24.80.100)..:...........................:...................:....:....................... $970.00 Planning Fee not categorized .............................. .......... ...................................................................... $110.00/hr Request for Reconsideration............................................... ::...::.......... ............. :........ ,....::......................... $275.00 Note: When an application is heard by the Hearing Examiner (HE), the cost of the hearing is billed to the applicant. APPEALS: Appeal of Staff Decision (Type I, II or Hearing Examiner) .................... .................. ........... ..... .................. $450.00 Appeal of Type IIIB Decision to City Council ............................................ :....... .......... ............................... $550.00 Appeal of Notice of Civil Violation......................................_..........._......................................................... $970.00 ADB = Architectural Design Board HE = Hearing Examiner SEPA = State Environmental Policy Act EIS = Environmental Impact Statement PRO = Planned Residential Development Page 8 of 12 ENGINEERING FEES MISCELLANEOUS FEES: Backflow Prevention Compliance Fee .................................................... $165.00 Developers Agreements.......................................................................... $220.00 + $110.00/hr + City Attorney Fees Fire/Aid Sign Address Fabrication Fee.......................... .....................$100.00/ea Street Sign Fabrication Fee..................._._.._._.._._.._..............................$200.00/ea Water and Sewer Availability Letters ........ :....... :....:.... :......................... $65.00/ea Latecomers Agreement............................................................................ $220.00 + $110:00/hr + City Attorney Fees LID Sewer Agreement .... ::......... ................... ........ .................................... $220.00 + $110.00/hr + City Attorney Fees Variance from Underground Wiring ...........................................:........... $330.00 + $110.00/hr + City Attorney Fees GENERAL FACILITY CHARGES: • Water GFC's are based on meter size: Water and sewer GFC's shall be paid by each new customer connecting to the utility systems. Storm GFC's shall be paid by the applicant for ESU's added or created by development. Meter Size General Facility Charge %" $5,050.00 1" $12,624.00 11/2 " $25,248.00 2" $40,397.00 GFC's for Single Family Residences only: Fee is based on meter size required for domestic demand (typically 3/"). GFC shall not be based on meter upsizing for fire sprinkler system only. Sewer Utility GFC ................................. ............................ $4,417.00 per ERU A single family residential development = 1.0 ERU per dwelling unit A multifamily residential development = .67 ERU per dwelling unit Applicants for non-residential development shall pay a GFC equal to the ERU determination that is made by the Public Works Director. • Stormwater Management GFC...................:......................$799.00 per ESU A single family residential development with up to 5,000 sf hard surface area = 1.0 ESU All other construction calculated according to a ratio of 1.0 ESU per 3,000 sq ft of new, replaced or new plus replaced impervious surface area. Page 9 of 12 RIGHT-OF-WAY FEES: Right -of -Way Construction Permit .................................. $330.00 + Inspection Fees Right -of -Way Construction Permit —Small Wireiess....... $330.00+ $11011hour for any portion of an hour after the first three hours of staff review time + City Attorney Fees for legal review (if necessary) + Inspection Fees Right -of Way Minor Construction Permit .......................$110.00 + Inspection Fees Street Restoration for Water Meter Installation .........$1,000.00 +Street Overlay Cut Penalty Fee if applicable Street Overlay Cut Penalty Fee.......................................$220.00 + ROW Permit Fees +Add'I per SQYD charge times overlay cut multiplier Encroachment Permit......................................................$330.00 + Recording Fees Street Use Permit.._...........................................................$110.00 + Bistro Dining Fees if applicable Bistro Dining Fees............................................................... $30.00 Annual Fee + Monthly ROW Use Fee @ $0.50/ SQ FT x 12.84% (leasehold tax) Alley, Sidewalk, Parking Disruption/ Closure Fees .......... $220.00 + ROW Permit + Monthly Closure Fees Closure fees charged for any activity that occupies or closes, sidewalks, parking spaces(s), parking lanes(s) or other paved area of a street/road for more than 72 hours. Monthly portion of Fee [$ per month] = 1% of assessed value per square foot of abutting property x right of way area [SF] disrupted/closed. If disruption/closure affects any portion of the area of a parking space, the area of disruption closure is calculated based upon the area of a full parking space. SEWER FEES: General New Commercial & Multi-Family.....................................$220.00 + Inspection Fees Facility New Single Family............................................................. $110.00 + Inspection Fees Charges May Apply Repair - Full Line Replacement ........................................ $110.00 + Inspection Fees Repair - Partial Line Replacement ............. ........ ............... $110.00 (Includes 1 inspection +Add'I Inspection Fees, if applicable) Special Conditions (Grinder Pumps, Ejectors).................$110.00 +Sewer Fees+ Utility Engineer Review Drainage Permit (Pool, Hot Tub, Jocuzzi)........................... $55.00 Each Occurrence STORMWATER FEES: Stormwater Permit ................ ..................................... ......$330.00 + General Inspection Fees WATER METER FEES: Meter Size Meter Fee Installation of New Service & Meter* 3/4" $2,920.00 1" $2,970.00 1%" $6,220.00 2" $6,390.00 *General Facility Charges may apply GFC = General Facility Charge ESU = Equivalent Service Unit ROW = Right of Way ERU = Equivalent Residential Unit Pa(—)e 10 of 12 ICC VALUATION TABLE August 2020 Adopted by City of Edmonds effective Jan 1, 2021 Group (2018 International Building Code) IA 16 IIA 116 IIIA 1116 1V VA VB A-1 Assembly, theaters, with stage 250.39 241.91 235.63 226.10 212.32 206.18 1218.83 197.45 190.33 A-1 Assembly, theaters, without stage 229.42 220.94 214.66 205.12 191.35 185.21 197.86 176.48 169.35 A-2 Assembly, nightclubs 196.13 190.29 185.62 178.02 167.82 163.20 171.70 151.89 146.71 A-2 Assembly, restaurants, bars, banquet halls 195.13 189.29 183.62 177.02 165.82 162.20 170.70 149.89 145.71 A-3 Assembly, churches 232.04 223.57 217.29 207.75 194.34 189.19 200.49 179.48 172.35 A-3 Assembly, general, community halls, libraries, museums 194.17 185.69 178.41 169.87 155.09 149.96 162.61 140.23 134.10 A-4 Assembly, arenas 228.42 219.94 212.66 204.12 189.35 184.21 196.86 174.48 168.35 B Business 202.30 194.92 188.44 179.18 163.55 157.42 172.13 143.89 137.46 E Educational 212.03 204.70 198.82 190.25 177.27 168.29 183.70 155.00 150.26 F-1 Factory and industrial, moderate hazard 119.53 113.92 107.38 103.45 92.64 88.38 99.02 76.33 71.73 F-2 Factory and industrial, low hazard 118.53 112.92 107.38 102.45 92.64 87.38 98.02 76.33 70.73 H-1 High Hazard, explosives 111.77 106.15 100.62 95.69 86.11 80.85 91.26 69.81 0.00 H234 High Hazard 111.77 106.15 100.62 95.69 86.11 80.85 91.26 69.81 64.20 H-5 HPM 202.30 194.92 188.44 179.18 163.55 157.42 172.13 143.89 137.46 1-1 Institutional, supervised environment 199.81 192.96 186.97 179.69 164.91 160.39 179.84 148.44 143.75 1-2 Institutional, hospitals 338.94 331.56 325.08 315.82 299.46 0.00 308.77 279.79 0.00 1-2 Institutional, nursing homes 235.48 228.11 221.62 212.37 197.49 0.00 205.32 177.82 0.00 1-3 Institutional, restrained 230.03 222.65 216.17 206.91 192.77 185.64 199.86 173.11 164.69 1-4 Institutional, day care facilities 199.81 192.96 186.97 179.69 164.91 160.39 179.84 148.44 143.75 M Mercantile 146.21 140.37 134.70 128.11 117.54 113.93 121.78 101.61 97.44 R-1 Residential, hotels 201.71 194.86 188.87 181.59 166.56 162.04 181.74 150.09 145.40 R-2 Residential, multiple family 168.94 162.09 156.10 148.82 135.04 130.52 148.97 118.57 113.88 R-3 Residential, one- and two-family 157.40 153.13 149.31 145.53 140.33 136.62 143.14 131.34 123.68 R-4 Residential, care/assisted living facilities 199.81 192.96 186.97 179.69 164.91 160.39 179.84 148.44 143.75 S-1 Storage, moderate hazard 110.77 105.15 98.62 94.69 84.11 79.85 90.26 67.81 63.20 S-2 Storage, low hazard 109.77 104.15 98.62 93.69 84.11 78.85 89.26 67.91 62.20 U Utility, miscellaneous 85.53 80.63 75.42 72.03 64.67 60.42 68.74 51.21 48.79 Square Foot Construction Costs a' b' a. Private Garages use Utility, miscellaneous b. For shell only buildings deduct20 percent c. N.P. = not permitted d. Unfinished basements (Group R-3) = $22.45 persq. ft. e. Carport = $25.00 per sq. ft. f. Sunroom (unheated) = $28.00 g. Deck Ramp, Stairs, Trellis, Porch = $20.00 per sq. ft. h. Dock = $35.00 per sq. ft. i. Unheated Storage = $25.00 per sq. ft. Page I I of 12 VALUATION BASED BUILDING PERMIT FEES TABLE 1 Total Valuation" Residential Commercial $1 to $500 $100 Base fee + $30 $100 Base fee + $36 $100 Base fee + $30 for the first $500 + $3 for $100 Base fee + $36 for the first $500 + $3.60 for $501 to $2,000 each additional $100, or fraction thereof to and each additional $100, or fraction thereof to and including $2,000 including $2,000 $100 Base fee + $75 for the first $2,001 + $14 for $100 Base fee + $90 for the first $2,001 + $16.80 $2,001 to $25,000 each additional $1,000, or fraction thereof to and for each additional $1,000, or fraction thereof to including $25,000 and including $25,000 $2S,001 to $100 Base fee + $400 for the first $25,001 + $10 $100 Base fee + $480 for the first $25,001 + $12 $50,000 for each additional $1,000, or fraction thereof to for each additional $1,000, or fraction thereof to and including $S0,000 and including $50,000 $50,001 to $100 Base fee + $650 for the first $S0,001 + $7 $100 Base fee + $780 for the first $50,001 + $8.40 $100,000 for each additional $1,000, or fraction thereof to for each additional $1,000, or fraction thereof to and including $100,000 and including $100,000 $100,001 to $100 Base fee + $1,000 for the first $100,001 + $100 Base fee + $1,200 for the first $100,001 + $500,000 $6 for each additional $1,000, or fraction thereof $7.20 for each additional $1,000, or fraction to and including $500,000 thereof to and including $500,000 $500,001 to $100 Base fee + $3,400 for the first $500,001 + $100 Base fee + $4,080 for the first $500,001 + $6 $1,000,000 $5 for each additional $1,000, or fraction thereof for each additional $1,000, or fraction thereof to to and including $1,000,000 and including $1,000,000 $1,000,001 and $100 Base fee + $5,900 for the first $1,000,000 + $100 Base fee + $7,080 for the first $1,000,000 + up $4 for each additional $1,000, or fraction thereof $4.80 for each additional $1,000, or fraction thereof The Building Valuation Data table shall be updated on January 1st of each year to the latest version as published by ICC. **See Valuation Table located on previous page. TABLE 1 - VALUATION BASED APPLICABLE PERMITS: Commercial Structures: New, Additions & Remodels Garages & Carports Residential Structures: New, Additions & Remodels Swimming Pools (In -Ground) Accessory Structures (Greenhouse/Shed) Cell Communications/ Cellular Facilities Deck, Stairs, Ramps Other permits types as determined Commercial: Hot/Tub and Spas, Solar/ Photovoltaic Systems, Re -roofs & Tenant Improvements Plus: $6.50 Residential State Surcharge Fee per permit and $2 per each dwelling unit $25.00 Commercial State Surcharge Fee per permit and $2 per each dwelling unit aye 12 of 12