Resolution 1475RESOLUTION NO. 1475
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS,
WASHINGTON, ADOPTING A REVISED FEE SCHEDULE FOR THE
CITY'S DEVELOPMENT -RELATED FEES AND CHARGES FOR SERVICES.
WHEREAS, ECDC 15.00.020 provides for the establishment and amendment of certain fees
charged by the city by resolution; and
WHEREAS, extensive effort has been made by city staff to analyze the full costs associated with city
permitting and service activities; and
WHEREAS, the city council has previously established and affirms as its goal that permit fees shall
be set to cover the reasonable costs of processing and issuing permits and requests for service; and
WHEREAS, the city recently processed its first small wireless facility permit application and realized
that the amount charged to review that application did not come close to covering the costs of the
staff time and attorney time that were actually incurred by the city; and
WHEREAS, the city also recognizes that there is a learning curve in complying with federally
mandated small wireless facility time limits and other federally imposed constraints on the
processing of small wireless facility applications, and that future application processing costs
incurred are expected to decrease to some degree; and
WHEREAS, the Federal Communications Commission (FCC) has determined that fees charged by
local governments for the deployment of small wireless facilities in the ROW must be (i) a
reasonable approximation of the local governments' costs, (ii) based on costs that are objectively
reasonable, and (iii) no higher than fees charged to similarly situated competitors in similar
situations; and
WHEREAS. The FCC has set the following non -recurring fee amounts as presumptively reasonable:
$500 for a single application that includes up to five small wireless facilities, $100 for each additional
small wireless facility beyond five; and
WHEREAS, the FCC's presumptively reasonable fee amounts are known as "safe harbors" because
a local government may charge these amounts without having to independently justify them; and
WHEREAS, the Ninth Circuit Court of Appeals recognized in City of Portland V. United States, 969
F.3d 1020 (2020), that if a local governments' fees exceed those levels, they are not automatically
preempted because they can be justified, and that localities may charge fees above those safe harbor
levels where they can demonstrate that their actual costs exceed the presumptive levels; and
WHEREAS, the Ninth Circuit confirmed the FCC's statement that the calculation of actual, direct
costs is a well -accepted method of determining reasonable compensation; and
WHEREAS, the FCC has stated that fees above a reasonable approximation of costs will have the
effect of prohibiting wireless service; and
WHEREAS, the city's permit application fees exist to offset the costs incurred in processing the
application and are reasonable in relation to the efforts of those involved in reviewing the proposal
and the costs incurred; and
WHEREAS, the city will keep track of its hourly costs over the next few small wireless facility
permit applications until it has enough data to set a fixed fee that is a reasonable approximation of
the city's actual, objectively reasonable application review costs; and in the meantime will charge the
safe harbor amounts up front and on the back end charge for its actual reasonable costs incurred;
and
WHEREAS, the city council adopted Resolution 1442 on December 10, 2019, which adopted a
schedule of fees to be charged in relation to development activity; and
WHEREAS, this resolution is intended to replace Resolution 1442; now therefore,
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY
RESOLVES AS FOLLOWS:
Section 1. The fees and charges for services set forth in the schedule attached as Exhibit A to
this Resolution, which is incorporated herein by this reference, are hereby adopted, along with the
referenced tables which are also included therein, and shall be effective on June 16, 2021.
Section 2. If any section, sentence, clause or phrase of this resolution or any fee or charge for
service adopted or amended hereby should be held to be invalid or unconstitutional by a court of
competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or
constitutionality of any other section, sentence, clause or phrase, or any fee or charge adopted or
amended hereby.
Section 3. Resolution 1442 shall have no further effect as of June 16, 2021 as the fees adopted
by Resolution 1442 are being replaced by the fees adopted herein.
RESOLVED this 15' day of June, 2021.
CITY OF EDMONDS
'N•L•L ' R, MIKE NELSON
Pa
ATTEST:
CITY CLERK, SCO. ASSEY
FILED WITH THE CITY CLERK: June 11, 2021
PASSED BY THE CITY COUNCIL: June 15, 2021
RESOLUTION NO.: 1475
2021
FEES ASSOCIATED
c?/
OWN-
1 gc)0
0
Building — Engineering — Planning - Fire
121 5t" Ave N, Edmonds WA 98020
425.771.0220
Approved fees effective January 1, 2021
Page 1 of 12
GENERAL DEVELOPMENT SERVICES PERMIT FEES
Building / Planning / Engineering / Fire
City Technology Fee for each permit application...................................................... $40.00
Credit Card Transaction Fee
3%
Development Review Committee Meeting................................._...._...._.._..........._.._.......:......................:.........$0
Pre -Application Meeting ........................... ............ .................... :....:....:................................................... $1,000.00
(50% applied toward future plan check fee for that specific project only)
Recording Fee (for recording documents with Snohomish County)... ..................... . Recording Cost + $110.00
Violation Compliance Fee............ . . ........ .......... — ........ .... __ ....... .................... $250.00 or up to 5x Permit Fee
Residential State Building Code Surcharge Fee........................................................................................ $6.50
..................................................................................................................... Each additional dwelling unit $2.00
Commercial State Building Code Surcharge Fee ................. ................ ........................._............. ........ ..... $25.00
..................................................................................................................... Each additional dwelling unit $2.00
(not applicable to certain minor permits such as plumbing, mechanical, re -roof)
PLAN REVIEW & INSPECTION FEES:
Plan review is calculated at 85% of the building permit fee and includes up to 3 reviews per division/ department.
Commercial/ Multi -family/ Residential: Plan review fee includes Building, Planning, Fire & Engineering reviews.
General plan review fee per reviewing department/division.........................................$110.00/hr (1 hr min.)
plus peer review fee if applicable
Plan review for re -submittals after the 3rd review ............................ ____ ..................................... $110.00/hr
Development Project Peer Review (Peer Review).................................................................................. $110.00
plus cost of consultant review fee charged for outside consultant peer review services when
City staff lacks the expertise to review a specific project or aspect of a project.
General Inspection Fee per department/division....................................... I ...................................... $110.00/ea
Re -Inspection Fee .......................................... ..................... :......... :....::.................. ..:...:..:.:....:.............. $110.00/ea
Engineering Inspection Fee* ......... ..................................................................... 3.3% of Value of Improvements
*Applies to Civil Site Improvements, such as Subdivisions, Commercial & Multi -Family Permits
Stormwater Engineer Review Fee ............................................ ...... ......... ..................... ............. ....,.... $130.00/hr
Transportation Engineer Review Fee ................................... ............................ ................. ........ .........$130.00/hr
UtilityEngineer Review Fee............................................................................................................... $130.00/hr
REFUNDS:
The City may authorize refunding of any permit fee paid which was erroneously paid or collected. The City
may authorize refunding of not more than 80 percent of the permit fee paid when no work has been done
under a permit issued in accordance with the applicable code(s). The City may also refund not more than 80
percent of the plan review fee paid when an application for a permit for which a plan review fee has been
paid is withdrawn or canceled before any plan reviewing is done. Refunds shall not be granted of any fee on
an expired permit. Any application for a refund must be made in writing and describe the circumstances to
justify. Refunds for permit fees covered by 19.70.025 ECDC may be authorized by the Building Official. The
Planning Manager may authorize refunds of Planning fees or service charges. The City Engineer may
authorize refunds of Engineering fees or service charges.
Page 2 of I?
BUILDING PERMIT FEES
Accessory Dwelling Unit Compliance (ADU)....................
Adult Family Home Compliance (AFH) ............................
Alternate Methods Review ...............................................
Appeal of Building Official Interpretation ........................
Cellular Communication and Facilities .......................__
Changeof Use............................................._....................
Demolition (Residential Primary Structure) .....................
Demolition (Commercial Primary Structure) ...................
Demolition (Secondary Structure or Interior Only) ......... I
Dock/Marina/Floats..........................................................
$405.00
$550.00
..................................... $110.00/hr + Peer Review
................................................................... $970.00
................................................. TABLE 1
.......................................................... $510.00
.......................................................... $300.00
.........:................................................ $500.00
............................ ................................. $150.00
........ .......... ........ ............. ..$200.00 + TABLE 1
Fence ........... :....... .:...............
.:..:..:...::...:.................................... ......................... .......... .................. ......... .. $100.00
Hot Tub/Spa (Single -Family) ............ :.............................. ......... ...... .... :......... :............................ ....... ,.... I .... $200.00
Manufactured Coach Installation - Commercial (Federal HUD Label)....................................................$500.00
Manufactured Home Installation (Federal HUD Label) ............ ............... .......... ......... .............................. $550.00
ParkingLot ....... ................................................................. .......... ..... ..... ..................................... $200.00+TABLE 1
Re -roof (Commercial) ........................................... .... ........ Valuation based on $2.00 per square foot + TABLE 1
Re -roof (Residential -includes sheathing).......__...._.................._.............................,...,............................. $100.00
Retaining Wall (Commercial)
Retaining Wall (Residential)..
$740.00 + Peer Review
$300.00 + Peer Review
Solar/Photovoltaic (Residential) ............................................. .................... ...................... ....... ........ .......... $120.00
Solar/Photovoltaic (Commercial) - Valuation does not include cost of solar panels or inverters......... TABLE 1
Swimming Pool (Pre -manufactured, above ground)................................................................................ $120.00
Swimming Pool (In -Ground)......-.. .... .......... ... _ ...... ........... ............................ TABLE 1
Temporary Certificate of Occupancy (Commercial Only— valid for 60 days)........
SIGNS:
$330-00
Sign (Per sign excluding specific sign categories listed below) ................................. ............................... $165.00
Blade Sign (Includes all blade signs in proposal)............................................................................................... $0
Pedestrian Sign (Includes all pedestrian signs in proposal) ................................................. :.... :.... ..... ....... $80.00
PoleSign (per sign).................................................................................................................................... $825.00
Murals (Includes all murals in a proposal) ................... :............................................................................ $165.00
*Planning ADB Design Review may apply
ESLHA DESIGNATED PROPERTIES:
Additional fees associated with development in the North Edmonds Earth Subsidence Landslide Hazard Area (ESLHA)
ESLHA Administrative Fee ..................................... ..... :..... ::...... :.................................. :........................ $2,385.00
ESLHA Consultant Review ............................................. :............ :........... Full cost of review is paid by applicant.
Deposit at Application for Peer Completeness Review......._......................................._.................... $500.00
Deposit at Full Application ................................................ ................................ ... .... .... ..:::................... $Z,500.00
Deposit at Re -submittal if additional Peer Review is needed ..................... ................. .................. $1,500.00
ESLHA Minor Project Administrative Processing Fee ................... ............... ...................... ............... ..... .$300.00
ESLHASubmittal Packet............................................................................................................................ $15.00
Page 3 of 12
MECHANICAL PERMITS:
BASE PERMIT FEE: . $50.00
UNIT FEE SCHEDULE:
For the installation or relocation of each
FURNACE - Forced -air or gravity -type, including ducts and appliance vents ......................................... $30.00
AIR HANDLER - Including ducts (Diffusers, blowers, etc.)
Up to and including 10,000 cfm (4719 L/s).......................................................................................$30.00
Over 10,000 cfm (4719 L/s) including ducts ..................................................... .................$40.00
GAS HEATER - Suspended, recessed wall or floor -mounted unit............................................................ $30.00
HYDRONIC HEATING SYSTEM .... ... ......... ............ ........... ....... ........................ .......... ___ ............... .......... $150.00
APPLIANCE VENT- (Type B, BW, L gas vent, etc.) ................................................... ____ .... ....... ........ ..... $15.00
INCINERATOR....................................................................................................................................... $50.00
VENTILATION AND EXHAUST
Fan connected to single duct (Bath, laundry, kitchen exhaust, etc.) ---- ........................................... $15.00
Each system which is not a portion of any heating or air-conditioning system .............................. $15.00
HOOD - Type 1, Type 2, Fume Hood including ducts ........................ .................................................... $150.00
GAS PIPING: (New or relocated)
Gas -Piping systems of 1 to 5 outlets._...........................................................:..........,............................._. $30.00
Each additional outlet over 5.....:.............................. ........... .......... ...... .... ... ..... ..... ..... :............. ................ $5.00
BOILER OR COMPRESSOR
Up to and including 50 HP (176 KW).........................:...:.....................................:....:....:....:...:................$50.00
Over 50 HP (176 kW) ............... ................................................... ................................................. ............ $100.00
ABSORPTION SYSTEM, AIR CONDITIONING SYSTEM OR HEAT PUMP
Up to and including 1,750,000 Btu/h (512.9 kW) ..................................................... $50.00
Over 1,750,000 Btu/h (512.9 kW)................:....:..........................._.._........._.......................................::..$100.00
OTHER FEES:
Commercial Plan review hourly fee................................................._._.._...........................................$110.00/hr
Each appliance or piece of equipment regulated by the IMC for which no other
fee is listed (Fire dampers, ductless mini- split systems, etc.)............................................................ $30.00
Page 4 of 12
PLUMBING PERMITS:
BASEPERMIT FEE:............................................................................................................................. ..$50.00
UNIT FEE SCHEDULE:
For the installation, alteration, repair, addition or relocation of each: ...................................................... .... $15.00
Plumbing fixture (on one trap or a set of fixtures on one trap)
Drain w/in footprint of building (rainwater systems, roof deck drains, etc.)
Water Heater (includes expansion tank)
Re -pipe - Drain, vent or water piping (each fixture served)
Water Service Line (replacement or repair)
For the installation, alteration, repair, addition or relocation of each:
Water treating equipment (water softener)............................................................. ............... ........ ....... $35.00
Backflow protective device - 2" and smaller ............................................... ............................... ,..,.,....... $35.00
Backflow protective device - Over 2".......................................................................................................$45.00
Graywater system or reclaimed water system (in addition to fixture fee)............................................$65.00
Non -grease waste pre-treatment interceptor (oil/waterseparator, etc.) .................. ,..,........ ............. $110.00
Medical gas piping system serving 1 to 5 inlet/outlet(s) for a specific gas ... .................................. ....$110.00
Each additional medical gas inlet/outlet................................................................... .................... .....$15.00
Grease Trap (HGI Inside Building)............................................................................................................ $220.00
Gravity Grease Interceptor (GGI))........... ........................$770.00
OTHER FEES:
Commercial plan review fee hourly fee
PARK IMPACT FEES:
Single -Family ...........................
Multi -Family ............................
Non -Residential Development
Residential Administrative Fee
Commercial Administrative Fei
TRANSPORTATION IMPACT FEES:
..... $110.00/h r
IMPACT FEES
.................................................... $2,734.05 per Dwelling Unit
................................................... $2,340.16 per Dwelling Unit
.. .... .... ......... .......................................... .$1.34 per square foot
....................................................................................... $50.00
.................................................................................... $100.00
Refer to City Code & Handouts to calculate impact fee. The following applies in addition to impact fee:
Residential Administrative Fee........................................................................_...._.._...._............................$50.00
Commercial Administrative Fee ................. ................................................... $100.00
Independent Fee Calculation —Transportation Engineer Review........................................................ $260.00
plus peer review fee as applicable.
Page 5 of 12
GRADING PERMIT FEES
PLAN REVIEW:
CUBIC YARDS
PLAN REVIEW FEE
50 cubic yards or less
$55.00
(when located in a designated critical area)
51 to 100 cubic yards
$110.00
101 to 1,000 cubic yards
$220.00
1,001 to 10,000 cubic yards
$440.00
$440.00 for the first 10,000 cubic yards, plus $110.00 for
10,001 to 100,000 cubic yards
each additional 10,000 yards or fraction thereof.
$1,430,00 for the first 100,000 cubic yards, plus $110.00
100,001 to 200,000 cubic yards
for each additional 10,000 cubic yards or fraction thereof.
$2,530.00 for the first 200,000 cubic yards, plus $110.00
200,001 cubic yards or more
for each additional 10,000 cubic yards or fraction thereof.
PERMIT FEE:
CUBIC YARDS
PERMIT FEE
$35.00
Base Permit Fee
50 cubic yards or less
$110.00
(when located in a designated critical area)
51 to 100 cubic yards
$110.00
$110.00 for the first 100 cubic yards, plus $25.00 for each
101 to 1,000 cubic yards
additional 100 cubic yards, or fraction thereof.
$335.00 for the first 1,000 cubic yards, plus $45.00 for each
1,001 to 10,000 cubic yards
additional 1,000 cubic yards, or fraction thereof.
$740.00 for the first 10,000 cubic yards, plus $65.00 for
10,001 to 100,000 cubic yards
each additional 10,000 cubic yards or fraction thereof.
$1,325.00 for the first 100,000 cubic yards, plus $100.00 for
100,001 cubic yards or more
each additional 10,000 cubic yards or fraction thereof.
Pa«e 6 of 12
FIRE PERMIT FEES
FIRE SPRINKLER PERMITS:
Residential IRC Structures
New Residential Fire Sprinkler Systems ................................................... ............... ................................ $300.00
Residential Fire Sprinkler System Alteration ... .......... .:....... .................................................................... $200.00
Commercial & Multi -Family Fire Sprinkler Systems
Newsystems.........................................................................................................._....__..._...._. $300.00 + TABLE 1
Modifications:
1 to 5 sprinklers_._.... .......... ................................. ...................
................................ $250.00
6 to 25.......................................................................................................................................................
$500.00
26 or more..............................................................................................................................
$300.00 + TABLE 1
Additional inspections/plan review as required ...... .............................................................$110.00/hr
FIRE ALARM PERMITS:
New fire alarm system .......... ............................................................
....... ..... $300.00 + TABLE 1
.........................
Emergency Responders Radio System(DAS)........................................................................
$100.00 + TABLE 1
Modifications:
1 to 5 initiating devices, Communicator (AES, Cellular).......................................................................
$250.00
6 to 25, including panel replacement.....................................................................................................$500.00
26 or more .................. .............................. .................. ........ ..... ...... I
........ ................... ... ...... $300.00 + TABLE 1
Additional inspections/plan review as required, .......... _...................................................................$110.00/hr
TANK PERMITS:
Residential fill, remove or install (per each)...........................................................................................$200.00
Commercial fill, remove or install (per each)......................................................................................... $450.00
OTHER FIRE PERMITS:
Fire Suppression Systems:
Commercial Hood Suppression System (per system)......................................................................
$325.00
Standpipe................. ......................................................................................
..................................... $450.00
FireConnection .................. :.:......... ::........::....... ..................................
.............. ....................................... $500.00
FireOperational ....... :............... ::.............. ;:...:........ ............................... ................................................... $100.00
Fire fees include plan review and inspections.
Paye 7 of 12
PLANNING AND LAND USE FEES
GENERAL:
Type I (Staff decisions, no notice).............................................................................................................$275.00
Type 11 A (Staff decisions with notice)..................................................,.................................................... $970.00
Type IIIA (ADB/Hearing Examiner).............................................................Hearing Examiner Cost + $2,000.00
Type IIIB (Hearing Examiner) ......................................... Hearing Examiner Cost + $2,000.00
Type IV (Rezone, Development Agreement)..........................................................................................$7,000.00
Type V (Plan & Edmonds Community Development Code Amendments)............................................$7,000.00
LotLine Adjustment ............................ ....................... ......... :..:......... :.................. :.._.:...... ___ ............... $1,050.00
Short Subdivision Preliminary Approval................................................................................................$3,225.00
Short Subdivision Civil Plan Review.......................................................................................................$3,050.00
Short Subdivision Final Approval ........ ...................................................................................................
$1,590.00
Subdivision Preliminary Approval.........................._....................................
Hearing Examiner Cost + $6,510.00
Subdivision Civil Plan Review .
.............................. ....
. . . ............................$4,670.00
SubdivisionFinal Approval .................. ..... ........... ...........................................................
......................... $1,590.00
ModificationRequest. ...............................................................................................................................
$970.00
Minor Change to Approved Plat...............................................................................................................
$275.00
Major Change to Approved Plat.......................................................................
Same as Original Application Fee
PRDPreliminary Approval...,.. ..................................................... ..... __ ................
....................... $6,510.00
PRDFinal Approval.................................................................................................................................$1,590.00
ADB Design Review —Signs ....................................................................................................................... $970.00
Staff Design Review if project exceeds SEPA threshold ............................. .............................................. $970.00
Landscape Plan Inspection Fee .................... ......................_.._...._........._......................._.................1%of Estimate
SEPAReview..... ... _ .................... ............ .................................................................. . ........ . ........ ...... $740.00
SEPA Planned Action Compliance Review (Hwy 99)................................. ................ ........ ...._.,................ $275.00
EISReview.............................................................................._._.._............_......................_...... Cost
Outdoor Dining, Amateur Radio...............................................................................................................$275.00
Critical Areas Checklist Application.......::..................................................................................................$110.00
Critical Areas Checklist Update ....................... .....,.... ................................................. .$55.00
...............................
Critical Areas Variance / Reasonable Use Application ................................ Hearing Examiner Cost + $7,640.00
Critical Areas Study Admin............. :...... :;.::,:.:.:......... ::........ :.... ...::.... :.....:.....:...::.... :........ $110.00/hr (min. 1 hr)
Critical Areas Contingent Review (See ECDC 23.40.195 for more detail on fees) .... ............................. $970.00
Shoreline Contingent Review (See ECDC 24.80.100)..:...........................:...................:....:....................... $970.00
Planning Fee not categorized .............................. .......... ...................................................................... $110.00/hr
Request for Reconsideration............................................... ::...::.......... ............. :........ ,....::......................... $275.00
Note: When an application is heard by the Hearing Examiner (HE), the cost of the hearing is billed to the applicant.
APPEALS:
Appeal of Staff Decision (Type I, II or Hearing Examiner) .................... .................. ........... ..... .................. $450.00
Appeal of Type IIIB Decision to City Council ............................................ :....... .......... ............................... $550.00
Appeal of Notice of Civil Violation......................................_..........._......................................................... $970.00
ADB = Architectural Design Board
HE = Hearing Examiner
SEPA = State Environmental Policy Act
EIS = Environmental Impact Statement
PRO = Planned Residential Development
Page 8 of 12
ENGINEERING FEES
MISCELLANEOUS FEES:
Backflow Prevention Compliance Fee
.................................................... $165.00
Developers Agreements..........................................................................
$220.00 + $110.00/hr + City Attorney Fees
Fire/Aid Sign Address Fabrication Fee..........................
.....................$100.00/ea
Street Sign Fabrication Fee..................._._.._._.._._.._..............................$200.00/ea
Water and Sewer Availability Letters ........
:....... :....:.... :......................... $65.00/ea
Latecomers Agreement............................................................................
$220.00 + $110:00/hr + City Attorney Fees
LID Sewer Agreement .... ::......... ...................
........ .................................... $220.00 + $110.00/hr + City Attorney Fees
Variance from Underground Wiring ...........................................:...........
$330.00 + $110.00/hr + City Attorney Fees
GENERAL FACILITY CHARGES:
• Water GFC's are based on meter size:
Water and sewer GFC's shall be paid by each new customer connecting to the utility systems.
Storm GFC's shall be paid by the applicant for ESU's added or created by development.
Meter Size General Facility Charge
%" $5,050.00
1" $12,624.00
11/2 " $25,248.00
2" $40,397.00
GFC's for Single Family Residences only: Fee is based on meter size required for domestic demand (typically 3/").
GFC shall not be based on meter upsizing for fire sprinkler system only.
Sewer Utility GFC ................................. ............................ $4,417.00 per ERU
A single family residential development = 1.0 ERU per dwelling unit
A multifamily residential development = .67 ERU per dwelling unit
Applicants for non-residential development shall pay a GFC equal to the ERU determination that is made by
the Public Works Director.
• Stormwater Management GFC...................:......................$799.00 per ESU
A single family residential development with up to 5,000 sf hard surface area = 1.0 ESU
All other construction calculated according to a ratio of 1.0 ESU per 3,000 sq ft of new, replaced or new
plus replaced impervious surface area.
Page 9 of 12
RIGHT-OF-WAY FEES:
Right -of -Way Construction Permit ..................................
$330.00 + Inspection Fees
Right -of -Way Construction Permit —Small Wireiess....... $330.00+
$11011hour for any portion of an hour after the first
three hours of staff review time + City Attorney
Fees for legal review (if necessary) + Inspection Fees
Right -of Way Minor Construction Permit .......................$110.00
+ Inspection Fees
Street Restoration for Water Meter Installation .........$1,000.00
+Street Overlay Cut Penalty Fee if applicable
Street Overlay Cut Penalty Fee.......................................$220.00
+ ROW Permit Fees
+Add'I per SQYD charge times overlay cut multiplier
Encroachment Permit......................................................$330.00
+ Recording Fees
Street Use Permit.._...........................................................$110.00
+ Bistro Dining Fees if applicable
Bistro Dining Fees...............................................................
$30.00 Annual Fee + Monthly ROW Use Fee
@ $0.50/ SQ FT x 12.84% (leasehold tax)
Alley, Sidewalk, Parking Disruption/ Closure Fees ..........
$220.00 + ROW Permit + Monthly Closure Fees
Closure fees charged for any activity that occupies or closes, sidewalks, parking spaces(s), parking lanes(s) or
other paved area of a street/road for more than 72
hours. Monthly portion of Fee [$ per month] = 1% of
assessed value per square foot of abutting property
x right of way area [SF] disrupted/closed. If
disruption/closure affects any portion of the area
of a parking space, the area of disruption closure is calculated
based upon the area of a full parking space.
SEWER FEES:
General
New Commercial & Multi-Family.....................................$220.00 + Inspection Fees Facility
New Single Family............................................................. $110.00 + Inspection Fees Charges May
Apply
Repair - Full Line Replacement ........................................ $110.00 + Inspection Fees
Repair - Partial Line Replacement ............. ........ ............... $110.00 (Includes 1 inspection
+Add'I Inspection Fees, if applicable)
Special Conditions (Grinder Pumps, Ejectors).................$110.00 +Sewer Fees+ Utility Engineer Review
Drainage Permit (Pool, Hot Tub, Jocuzzi)........................... $55.00 Each Occurrence
STORMWATER FEES:
Stormwater Permit ................ ..................................... ......$330.00 + General Inspection Fees
WATER METER FEES:
Meter Size Meter Fee
Installation of New Service & Meter* 3/4"
$2,920.00
1"
$2,970.00
1%"
$6,220.00
2"
$6,390.00
*General Facility Charges may apply
GFC = General Facility Charge ESU = Equivalent Service Unit
ROW = Right of Way ERU = Equivalent Residential Unit
Pa(—)e 10 of 12
ICC VALUATION TABLE
August 2020
Adopted by City of Edmonds effective Jan 1, 2021
Group (2018 International Building Code)
IA
16
IIA
116
IIIA
1116
1V
VA
VB
A-1 Assembly, theaters, with stage
250.39
241.91
235.63
226.10
212.32
206.18
1218.83
197.45
190.33
A-1 Assembly, theaters, without stage
229.42
220.94
214.66
205.12
191.35
185.21
197.86
176.48
169.35
A-2 Assembly, nightclubs
196.13
190.29
185.62
178.02
167.82
163.20
171.70
151.89
146.71
A-2 Assembly, restaurants, bars, banquet halls
195.13
189.29
183.62
177.02
165.82
162.20
170.70
149.89
145.71
A-3 Assembly, churches
232.04
223.57
217.29
207.75
194.34
189.19
200.49
179.48
172.35
A-3 Assembly, general, community halls,
libraries, museums
194.17
185.69
178.41
169.87
155.09
149.96
162.61
140.23
134.10
A-4 Assembly, arenas
228.42
219.94
212.66
204.12
189.35
184.21
196.86
174.48
168.35
B Business
202.30
194.92
188.44
179.18
163.55
157.42
172.13
143.89
137.46
E Educational
212.03
204.70
198.82
190.25
177.27
168.29
183.70
155.00
150.26
F-1 Factory and industrial, moderate hazard
119.53
113.92
107.38
103.45
92.64
88.38
99.02
76.33
71.73
F-2 Factory and industrial, low hazard
118.53
112.92
107.38
102.45
92.64
87.38
98.02
76.33
70.73
H-1 High Hazard, explosives
111.77
106.15
100.62
95.69
86.11
80.85
91.26
69.81
0.00
H234 High Hazard
111.77
106.15
100.62
95.69
86.11
80.85
91.26
69.81
64.20
H-5 HPM
202.30
194.92
188.44
179.18
163.55
157.42
172.13
143.89
137.46
1-1 Institutional, supervised environment
199.81
192.96
186.97
179.69
164.91
160.39
179.84
148.44
143.75
1-2 Institutional, hospitals
338.94
331.56
325.08
315.82
299.46
0.00
308.77
279.79
0.00
1-2 Institutional, nursing homes
235.48
228.11
221.62
212.37
197.49
0.00
205.32
177.82
0.00
1-3 Institutional, restrained
230.03
222.65
216.17
206.91
192.77
185.64
199.86
173.11
164.69
1-4 Institutional, day care facilities
199.81
192.96
186.97
179.69
164.91
160.39
179.84
148.44
143.75
M Mercantile
146.21
140.37
134.70
128.11
117.54
113.93
121.78
101.61
97.44
R-1 Residential, hotels
201.71
194.86
188.87
181.59
166.56
162.04
181.74
150.09
145.40
R-2 Residential, multiple family
168.94
162.09
156.10
148.82
135.04
130.52
148.97
118.57
113.88
R-3 Residential, one- and two-family
157.40
153.13
149.31
145.53
140.33
136.62
143.14
131.34
123.68
R-4 Residential, care/assisted living facilities
199.81
192.96
186.97
179.69
164.91
160.39
179.84
148.44
143.75
S-1 Storage, moderate hazard
110.77
105.15
98.62
94.69
84.11
79.85
90.26
67.81
63.20
S-2 Storage, low hazard
109.77
104.15
98.62
93.69
84.11
78.85
89.26
67.91
62.20
U Utility, miscellaneous
85.53
80.63
75.42
72.03
64.67
60.42
68.74
51.21
48.79
Square Foot Construction Costs a' b'
a. Private Garages use Utility, miscellaneous
b. For shell only buildings deduct20 percent
c. N.P. = not permitted
d. Unfinished basements (Group R-3) = $22.45 persq. ft.
e. Carport = $25.00 per sq. ft.
f. Sunroom (unheated) = $28.00
g. Deck Ramp, Stairs, Trellis, Porch = $20.00 per sq. ft.
h. Dock = $35.00 per sq. ft.
i. Unheated Storage = $25.00 per sq. ft.
Page I I of 12
VALUATION BASED BUILDING PERMIT FEES
TABLE 1
Total Valuation"
Residential
Commercial
$1 to $500
$100 Base fee + $30
$100 Base fee + $36
$100 Base fee + $30 for the first $500 + $3 for
$100 Base fee + $36 for the first $500 + $3.60 for
$501 to $2,000
each additional $100, or fraction thereof to and
each additional $100, or fraction thereof to and
including $2,000
including $2,000
$100 Base fee + $75 for the first $2,001 + $14 for
$100 Base fee + $90 for the first $2,001 + $16.80
$2,001 to $25,000
each additional $1,000, or fraction thereof to and
for each additional $1,000, or fraction thereof to
including $25,000
and including $25,000
$2S,001 to
$100 Base fee + $400 for the first $25,001 + $10
$100 Base fee + $480 for the first $25,001 + $12
$50,000
for each additional $1,000, or fraction thereof to
for each additional $1,000, or fraction thereof to
and including $S0,000
and including $50,000
$50,001 to
$100 Base fee + $650 for the first $S0,001 + $7
$100 Base fee + $780 for the first $50,001 + $8.40
$100,000
for each additional $1,000, or fraction thereof to
for each additional $1,000, or fraction thereof to
and including $100,000
and including $100,000
$100,001 to
$100 Base fee + $1,000 for the first $100,001 +
$100 Base fee + $1,200 for the first $100,001 +
$500,000
$6 for each additional $1,000, or fraction thereof
$7.20 for each additional $1,000, or fraction
to and including $500,000
thereof to and including $500,000
$500,001 to
$100 Base fee + $3,400 for the first $500,001 +
$100 Base fee + $4,080 for the first $500,001 + $6
$1,000,000
$5 for each additional $1,000, or fraction thereof
for each additional $1,000, or fraction thereof to
to and including $1,000,000
and including $1,000,000
$1,000,001 and
$100 Base fee + $5,900 for the first $1,000,000 +
$100 Base fee + $7,080 for the first $1,000,000 +
up
$4 for each additional $1,000, or fraction thereof
$4.80 for each additional $1,000, or fraction
thereof
The Building Valuation Data table shall be updated on January 1st of each year to the latest version as published
by ICC.
**See Valuation Table located on previous page.
TABLE 1 - VALUATION BASED APPLICABLE PERMITS:
Commercial Structures: New, Additions & Remodels Garages & Carports
Residential Structures: New, Additions & Remodels Swimming Pools (In -Ground)
Accessory Structures (Greenhouse/Shed) Cell Communications/ Cellular Facilities
Deck, Stairs, Ramps Other permits types as determined
Commercial: Hot/Tub and Spas, Solar/ Photovoltaic Systems, Re -roofs & Tenant Improvements
Plus: $6.50 Residential State Surcharge Fee per permit and $2 per each dwelling unit
$25.00 Commercial State Surcharge Fee per permit and $2 per each dwelling unit
aye 12 of 12