ENG2021-0355 ROW PERMIT CORRECTED ADDRESSOF WAY EUC
PERMIT
PERMIT
NUMBER
City of Edmonds
EdmondsRIGHT
121
98020
1 1
www.cityofedmonds.gov
Description: PSE INSTALL GAS SERVICE/NO PAVEMENT CUTS
ISSUED: 09/23/2021
Address: 18403 94T- 1 VF= 1ni EDMONDS WA 98020
EXPIRES: 03/23/2022
HIGH ST.
Permit Type: RIGHT OF WAY EUC Permit Subtype: MINOR
Parcel Number: 00565600101805
NAME TYPE NAME
ADDRESS
PHONE
APPLICANT PSE/INFRASOURCE 1660 PARK LANE, BURLINGTON WA 98233 (425)457-6353
OWNER OCONNOR JAMES J & FREDERICA 18403 HIGH ST, EDMONDS WA 98020
FEE INFORMATION
DESCRIPTION
AMOUNT
PAID
CITY TECHNOLOGY FEE CHARGED PER PERMIT
$40.00
$0.00
RIGHT OF WAY MINOR - EUC PERMIT FEE
$110.00
$0.00
THIS DOCUMENT IS NOT VALID UNTIL FEES ARE PAID AND THE CITY ENGINEER OR HIS/HER DEPUTY HAS SIGNED BELOW
09/23/2021
BY DATE
Printed: Thursday, September 23, 2021 3:16:30 PM 1 of 2
-KRWOF WAY EUC PERMIT
City of • • •
•:• •ENG2021-03,155
www.cityofedmonds.gov• •
CONDITIONS
CONDITION TYPE
Easement and/or permission from adjacent property owner is required prior to entry or work within
ADJACENT PROPERTY
an adjacent property.
It is the owner's responsibility to repair/replace all damage of utilities or frontage improvements in
DAMAGE TO FRONTAGE
City right of Ways or Easements to City Standards caused by or occurring during the permitted
IMPROVEMENTS
project.
Alert affected residents and/or businesses prior to work start.
Verify clear bore crossings.
ENGINEERING OTHER
Restore landscape to like or better conditions.
Call for required inspections as noted.
ESC REQ
Maintain erosion and sedimentation control per City and SWMMW standard requirements.
Sound/Noise originating from temporary construction sites as a result of construction activity are
exempt from the noise limits of ECC Chapter 5.30 only during the hours of 7:OOam to 6:OOpm on
SOUND OR NOISE
weekdays and 10:OOam and 6:OOpm on Saturdays, excluding Sundays and Federal Holidays. At all
other times the noise originating from construction sites/activities must comply with the noise limits
of Chapter 5.30, unless a variance has been granted pursuant to ECC 5.30.120.
TRAFFIC CONTROL
Traffic Control per approved plan and MUTCD. All Flaggers shall be certified.
All utilities shall be located prior to any excavation. New locates shall be called for if at time of
UTILITY LOCATES
excavation, original locates are no longer identifiable.
INSPECTIONS
INSPECTION TYPE
DATE
RESULT
COMPLETE
A-1 JOB START
X-2 ENGINEERING FINAL"
E-7 RESTOR LIMITS
Printed: Thursday, September 23, 2021 3:16:30 PM 2 of 2
of EpM04O�
RIGHT OF WAY CONSTRUCTION
PERMIT APPLICATION
Complete and submit this Application in accordance with the Submittal
/'Vc. i sa° Requirements outlined in Right -of -Way permit Handout E6�.
If any field is not applicable to your project, write "N/A' instead of leaving blank.
All fields required. Incomplete Applications will be denied.
SECTION A
General •
Project Name io6378814
Site Address or if no site address use Property Address at NW corner of project area: 18403 High St
Associated Permits: BLD PLN ENG X
Owner and Entity Holding Franchise (if applicable)
Name of Company PSE/Infrasource Franchise Ordinance No:
Point of Contact Susan Sid ick
Title SR Permit Specialist
Address 1660 Park lane
city Burlington
State WA
Zip 98233
Phone 425-457-6353
Email susan.sidickapse.com
Contractor and Authorized Agent of Owner
Name of Company
(see note below)
Contractor Contacts During Construction
Primary Name PSE/Infrasource Susan Sidick
Agent Name PSE/Infrasource
Title SR Permit Specialist
Title SR Permit Specialist
Mobile 425-457-6353
Address 1660 Park lane
Email susan.sidick@pse.com
City Burlington
State WA
Zip 98233
Secondary Name
Phone 425-457-6353
Title SR Permit Specialist
Email susan.sidick@pse.com
Mobile
City of Edmonds Business License No:
Email
State License No: INFRASL871 C2
[N Contractor verifies it is currently bonded
d( Contractor verifies it currently has general liability insurance
NOTE: ECDC 18.6o. o2o requires that the Application be signed by a licensed and bonded contractor unless otherwise approved by the city
engineer.
❑ Multifamily residential ❑ Commercial ❑ City project
❑ Single family residential subdivision ff Single family -other ❑ Industrial
❑ Demo and rebuild or from vacant land?
❑ Other, please specify:
❑ Utility Franchise Work associated with development (check one of the above boxes as welt
❑ Traffic Control Only (no associated development)
❑ Utility Franchise Work (no associated development)
City of Edmonds ROW construction permit Application --Page 1 of 3 Updated 3/25/2021
Include an overall narrative description of the proposed work. Be specific and detailed:
Describe infrastructure to be impacted, such as, poles, wires, conduit, utility mains, etc.
Include whether this is construction, maintenance, or repair.
Include description of proposed construction methods, (e.g., bores, trenches, overhead wires proposed, depth for
underground utilities, etc.)
Install gas service at approx i' (&ORI+LJK6W 26 W nr; VRIWVXUIDFHFXW
DQWLFLSDWHG 6FORIUG3/6:
RIGHT-OF-WAY
CLOSURE
AREA
TOTAL
DURATION
(Number of Months)
Sidewalk 72 hours +
LF
I x
LF
SF
Alley 72 hours +
LF
Ix
I LF
SF
Parking 72 hours +
LF
Ix
I LF
SF
day
SECTION B - If you are not a utility company performing work in the City ROW, skip to SECTION C.
1. The work in the right of way is on or for the following type of facilities:
❑ telecommunications ❑ cable ❑ power ❑ gas
❑ water ❑ sewer ❑ storm
Details of Work to be Completed
1. Does the utility owner have existing overhead infrastructure in the area of work?
Yes
No
x
2. Will any equipment be added underground or above ground (e.g. pedestals, vaults, etc.)?
x
If yes, describe:
3.
Does the proposed work connect a lot or commercial development with utilities that serve more
than one lot or commercial development?
x
4.
Does the work involve rebuilding or relocating an existing aboveground utility system which
connects a lot or commercial development to an existing underground common utility stem?
x
5.
Does the work involve proposed additions to an aboveground utility stem? If es:
x
Are the additions for the purpose of serving new commercial development?
x
Are the additions for the purpose of serving a single-family residential subdivision?
x
Details
of Work to be Completed
Yes
No
6.
Does your project involve rebuilding or replacing utility equipment which currently serves more
than one lot or commercial development?
If yes, answer the following questions related to project area, i.e. the actual area in which the
x
project is proposed:
6a.
Does your project involve wires/cables/lines? If yes:
x
How many are existing? I I How many are to be added?
City of Edmonds ROW construction permit Application --Page 2 of 3 Updated 3/25/2021
6b.
Does your project involve poles? If yes:
x
How many poles are existing in the project area?
What is the height of the existing poles?
How many poles are to be removed?
Are additional poles to be laced?
How many? I I What is the height of the additionalpoles?
6c.
Are any poles to be modified/rebuilt/replaced? If yes:
x
How many? I I What is the height of the poles after?
Describe the modification rebuild:
SECTION C
Traffic Control and Public Safety. Traffic control and public safety shall be in accordance with City regulations as
required by the City Engineer. Every flagger must be trained as required by WAC 296-155-305 and must have
certification verifying completion of the required training in their possession.
Restoration. Restoration shall be in accordance with City codes and Standards. All street cut trench work shall be
patched with asphalt or City approved material prior to the end of the workday -NO EXCEPTIONS.
Insurance. The City may require the owner or contractor to provide proof of insurance acceptable to the City prior to
any permit approval.
Indemnification. The Applicant agrees to defend, indemnify, and hold harmless the City of Edmonds, its officials,
officers, employees, and agents against any injuries, damages, or claims of any kind or description whatsoever,
foreseen or unforeseen, including defense costs and attorney fees, resulting directly or indirectly from any act or
omission of the Applicant, its subcontractors, anyone directly or indirectly employed by them, and anyone for whose
acts or omissions they may be liable, arising out of, related to, or by reason of the granting of this permit; and
specifically including but not limited to all loss by the failure of the Applicant to fully or adequately perform, in any
respect, all authorizations or obligations under the permit. These indemnification requirements shall survive the
expiration, revocation, or termination of any resulting permit approval.
Acceptance of terms, conditions, and requirements. Applicant accepts the terms, conditions, and
requirements set forth in this Application and agrees they apply to any resulting permit and shall comply with them to
the satisfaction of the City Engineer. Applicant further agrees to comply with the conditions listed on the Submittal
Requirements; with all applicable city ordinances, including but not limited to ECDC Title 18; and with all applicable
requirements of state and federal law.
Statement of Applicant. I declare under penalty of perjury under the laws of the State of Washington that: I am a
licensed and bonded contractor; the information provided herein is correct and complete; and I am authorized by
owner to act on its behalf and have authority to bind the owner to this application.
Fees. The Applicant is responsible for all permit fees.
APPLICANT SIGNATURE: Susan Sidick DATE: 07/21/2021
APPLICANT PRINTED NAME: Susan Sidick
APPLICANT TITLE: SR Permit Specialist
NO WORK SHALL BEGIN PRIOR TO PERMIT ISSUANCE
City of Edmonds ROW construction permit Application --Page 3 of 3 Updated 3/25/2021
Puget Sound Energy Gas Pre -Inspect Form
Job #:
Date:
Jurisdiction:
ROW Permit:
Est. Start Date:
Est. Duration:
106378814
6/22/21
Edmonds
Yes
Week
1 Day (8 Hours)
Address: 18403 High St
City / Zip: Edmonds, 98020
Customer: Chris Cooley
PM / Inspector: Loqan Ghiringhelli 1 (804) 401-6809
Job Description ROW Scope of Work
Project Scope: From 2" PE main on High St - install approx 97' (20' Stub with 2600 EFV & 77' extension) of 1-1/8" PE scat svc ext and
New Construction:
No
set an A425 meter at inches, OFL.
Construction Method
SCHEDULE ALL INSPECTION THROUGH MYBUILDINGPERMIT.COM
All Scat/Trenchless
PLAT Map: 160.067
183rd Pjt SW N
co
-
/ /
5/8" PE
1 "2
18 401
2 S
PL
/ /
1-1/8" PE A425
CO
I.
8403
1
/60,Ro a
w
I
PL
�; PL nr
0
OWNER/CONTRACTOR RESPONSIBLE FOR LOCATING
V
ALL ON SITE UTILITIES. RELOCATION/REVISION TO ANY
UTILITIES MAY REQUIRE A SEPERATE PERMIT.
Applicant shall repair/replace all ENGINEERING DIVISION 5/9' MPE
2006
--
damage to utilities or frontage APPROVED AS NOTED
OWNER/CONTRACTOR IS RESPONSIBLE FOR
EROSION CONTROL AND DRAINAGE
improvements in City right-of-way
per city standards that icaused or �Jp�/ (,�/Q�,�H,,,,,� 09/21/2021
occurs during the permitted project. VV
Work
Location
Size of Cut
Surface Type
15'
East
of CL
High St
&
205'
South
of CL
183rd Place SW
3 x 5
Soft Surface
of CL
&
of CL
of CL
&
of CL
of CL
&
of CL
Service Information
Street Information
Job Type
Diameter:
1-1/8" PE
Flaggers #:
Arterial:
No
New Residential Svc
EFV:
1-1/8" - 2600 - 9999144
Police #:
TCP:
Yes
Tie -In Fitting
Meter:
A425
I
I
I
Speed Limit:
No Parks #:
HDPE - 2" IPS - (DIA) 1"CTS
9999564
Meter Loc:
02 - OFL
Trolley Lines:
Mtr Hoods #:
Del Press:
6" W.C.
Traffic Signal:
Bus Stop:
SNO YRD - Snohomish '
Bollards:
2.5" #
4" #
ADA Ramps #:I
I Route #'s:
IF PAVEMENT CUTS ARE NEEDED ADDITIONAL FEES SHALL APPLY
RESTORATION LIMITS SHALL BE PROVIDED BY THE CITY INSPECTOR
I
TEMPORARY TRAFFIC CONTROL PLAN
Notes:
1. All signs and spacing to conform to the MUTCD
and City of Edmonds standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise
indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall
not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m
8. Work area will be Work area will be 205' SCL of
183rd PI SW & 15' ECL of High St.
9. If used, place NO -PARK signs 72 hours in
advance of the day that the work is to be done.
,
o�
Obey y
,
Oyp�
V7
�
O
O
J
is
O
co
/
O
08
�
z
,8
,
RK#
TOW
W AWAV C
•
°ryOryEeee.,g�RfA
w�
�'•
KEEP DRIVEWf
•
,
l
COMMUNITY D
SIGN SPACING
MPH
"X"
60/65
1000,
45/55
500,
35/40
350'
30
200'
25
100'
18403 High St
Edmonds
WA 98020
USA
ENGINEERING DIVISION
APPROVED AS NOTED
JX W-L,10,44, 09/21 /2021
VV
CHANNELIZATION
DEVICE SPACING
MPH
TAPER
TANGENT
55/70
40
80
35/45
30
60
25/30
20
40
LEGEND
®
28" TRAFFIC CONE
®
WORK PIT
TRAFFIC FLOW
WORK VEHICLE/
FLASHING LIGHTS
SIGN LOCATION
RIGHT OF WAY
—
ROW - -
Puget Sound Energy REV
PUGET Designer: Traffic Control Sup—isor:
Gregory Harwood 07/19/2021 0
SOUND PATRICK MCGHUEY Card No.012238
ENERGY (360) 570-6801 CardExp.09/30/2023 Job #
g regory. ha rwood@pse. com
patrick.mcghuey@pse.com (425)424-6425 106378814
Project Address:
18403 HIGH ST, EDMONDS Page 1 OF 1