Resolution 1497RESOLUTION NO. 1497
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS,
WASHINGTON, ADOPTING A NEW FEE SCHEDULE FOR THE CITY'S
DEVELOPMENT -RELATED FEES AND CHARGES TO ADD FEES
RELATING TO THE CITY'S SPECIAL EVENTS PERMITS
WHEREAS, ECDC 15.00.020 provides for the establishment and amendment of certain fees
charged by the city by resolution; and
WHEREAS, extensive effort has been made by city staff to analyze the full costs associated with
city permitting and service activities; and
WHEREAS, the city council has previously established and affirms as its goal that permit fees
shall be set to cover the costs of processing and issuing permits and requests for service; and
WHEREAS, the city council adopted Resolution 1475 in June 2021, which adopted a schedule of
fees to be charged in relation to permit issuance and other development activity; and
WHEREAS, the city council has adopted Ordinance No. 4269 to document in the Edmonds City
Code the requirements for obtaining permits from the city to hold Special Events; and
WHEREAS, city staff has established the costs associated with issuing such permits; and
WHEREAS, this resolution is intended to add the new Special Event Permit fees to the city's
schedule of fees and to replace Resolution 1475; now therefore,
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY
RESOLVES AS FOLLOWS:
Section 1. The fees and charges for services set forth in the schedule attached as Exhibit A
to this Resolution, which is incorporated herein by this reference, are hereby adopted, along with
the referenced tables which are also included therein, and shall be effective on and after July 5,
2022.
Section 2. If any section, sentence, clause or phrase of this resolution or any fee or charge
for service adopted or amended hereby should be held to be invalid or unconstitutional by a court
of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or
constitutionality of any other section, sentence, clause or phrase, or any fee or charge adopted or
amended hereby.
Section 3. Resolution 1475 shall have no further effect as of July 5, 2022 as the fees adopted
by Resolution 1475 are being replaced by the fees adopted herein.
RESOLVED this 5ch day of July, 2022.
CITY OF EDMONDS
.W,
MAYOR, MIKE NELSON
i
ATTEST:
Lh-K,SCO PASSEY
FILED WITH THE CITY CLERK: July 1, 2022
PASSED BY THE CITY COUNCIL: July 5, 2022
RESOLUTION NO. 1497
2
2022
FEES ASSOCIATED WITH
DEVELOPMENT
O-V E DA
fin
■r..
-t�1 c. 1890
Building -Engineering -Planning -
Fire
121 51h Ave N, Edmonds WA 98020
425.771.0220
Approved fees effective January 1, 2022, ENG updated July 6th, 2021
GENERAL DEVELOPMENT SERVICES PERMIT FEES
Building / Planning / Engineering / Fire
City Technology Fee for each permit application .......................................... ............................................. W.00
CreditCard Transaction Fee............................................................................................................................. 3%
DevelopmentReview Committee Meeting............................................................ ............................. I ............ $0
Pre -Application Meeting...........................................................................................:—......_................$1,000.00
(50% applied toward future plan check fee for that specific project only)
Recording Fee (for recording documents with Snohomish County) ......................... Recording Cost + $110.00
Violation Compliance Fee................................................................._................$250.00 or up to 5x Permit Fee
Residential State Building Code Surcharge Fee ................................ ................................ :.......................... $6.50
..................................................................................................................... Each additional dwelling unit $2.00
Commercial State Building Code Surcharge Fee..................................................................................... $25.00
............................. :...................................... :................................................ Each additional dwelling unit $2.00
(not applicable to certain minor permits such as plumbing, mechanical, re -roof)
PLAN REVIEW & INSPECTION FEES:
Plan review is calculated at 85% of the building permit fee and includes up to 3 reviews per division/ department.
Commercial/ Multi -family/ Residential: Plan review fee includes Building, Planning, Fire & Engineering reviews.
General plan review fee per reviewing department/division.........................................$110.00/hr (1 hr min.)
plus peer review fee if applicable
Plan review for re -submittals after the 3rd review............................................................................$110.00/hr
Development Project Peer Review (Peer Review).................................................................................. $110.00
plus cost of consultant review fee charged for outside consultant peer review services when
City staff lacks the expertise to review a specific project or aspect of a project.
General Inspection Fee per department/division ....... :..:.... :........................... ................... ........ 7....... $110.00/ea
Re -Inspection Fee .......................................... :......................................... :.......................................... $110.00/ea
Engineering Inspection Fee*..............................................................................3.3% of Value of Improvements
*Applies to Civil Site Improvements, such as Subdivisions, Commercial & Multi -Family Permits
Stormwater Engineer Review Fee............... ........................._ ,.... .. ••• .. • .............$130.00/hr
...... .................. ..... .............
Transportation Engineer Review Fee. ........... :............................. :::....... ::.............
:..:........,..._,_......,....$130.00/hr
UtilityEngineer Review Fee ......................... ...................................................... ...,.................. :...... $130.00/hr
REFUNDS:
The City may authorize refunding of any permit fee paid which was erroneously paid or collected. The City
may authorize refunding of not more than 80 percent of the permit fee paid when no work has been done
under a permit issued in accordance with the applicable code(s). The City may also refund not more than 80
percent of the plan review fee paid when an application for a permit for which a plan review fee has been
paid is withdrawn or canceled before any plan reviewing is done. Refunds shall not be granted of any fee on
an expired permit. Any application for a refund must be made in writing and describe the circumstances to
justify. Refunds for permit fees covered by 19.70.025 ECDC may be authorized by the Building Official. The
Planning Manager may authorize refunds of Planning fees or service charges. The City Engineer may
authorize refunds of Engineering fees or service charges.
Page 2 of l 3
BUILDING PERMIT FEES
Accessory Dwelling Unit Compliance(ADU)............................................................................................. $405.00
Adult Family Home Compliance (AFH).....................................................................................................
$550.00
Alternate Methods Review..........................................................................................
$110.00/hr + Peer Review
Appeal of Building Official Interpretation ...........................................
,..................................................... $970.00
Cellular Communication and Facilities...................................................................................................... TABLE 1
Changeof Use ...... ___ ... ........... .......................... ___ ..........................................................
:....................... $510.00
Demolition (Residential Primary Structure) ........................
.. ..................$300.00
Demolition (Commercial Primary Structure).................._.........................................................................$500.00
Demolition (Secondary Structure or Interior Only)..............................................._...................................
$150.00
Dock/Marina/Floats.......................... ,.... ::..... ::........................
..... ,...... ........................... ... ......... $200.00+TABLE 1
Fence.............................................................................................
. .................................................... $100.00
HotTub/Spa (Single -Family) ..............................................
.......... :............................ .......... ...._,................ $200.00
Manufactured Coach Installation - Commercial (Federal HUD Label) ................... :.............. -................ $500.00
Manufactured Home Installation (Federal HUD Label) ........................................
..•.........:......:...........W....$550.00
ParkingLot..............................................................................................................::..................$200.00+TABLE
1
Re -roof (Commercial).......................................................Valuation
based on $2.00 per square foot +TABLE 1
Re -roof (Residential - includes sheathing).................................................................................................
$100.00
Retaining Wall (Commercial) ....................... ...,...... ...........................................................
$740.00+ Peer Review
Retaining Wall (Residential)........................_...................._................................................
$300.00 + Peer Review
Solar/Photovoltaic (Residential)................................................................................................................$120.00
Solar/Photovoltaic (Commercial) - Valuation does not include cost of solar panels or inverters......... TABLE 1
Swimming Pool (Pre -manufactured, above ground) ..................
.................... ._.............................. ::........ $120.00
SwimmingPool (In-Ground)............................................................................._........................................TABLE
1
Temporary Certificate of Occupancy (Commercial Only
— valid for60 days)..... ....................... ............ $330.00
SIGNS:
Sign (Per sign excluding specific sign categories listed be/ow)..... .............................•.....,,..........,............ $165.00
Blade Sign (Includes all blade signs in proposal)........................:..............................,.................I..................... $0
Pedestrian Sign (Includes all pedestrian signs in proposal) .............. ........................... $
80.00
PoleSign (per sign).............................................................................................................................. $825.00
Murals (Includes all murals in a proposal). .............................................................. ................................ $165.00
*Planning ADB Design Review may apply
ESLHA DESIGNATED PROPERTIES:
Additional fees associated with development in the North Edmonds Earth Subsidence Landslide Hazard Area (ESLHA)
ESLHAAdministrative Fee....................................................................................................................$2,385.00
ESLHA Consultant Review...................................................................... Full cost of review is paid by applicant.
Deposit at Application for Peer Completeness Review.................................................................... $500.00
Depositat Full Application..........................................................................................:....................$2,500.00
Deposit at Re -submittal if additional Peer Review is needed........................................................$1,500.00
ESLHA Minor Project Administrative Processing Fee............................................................................-$300.00
ESLHA Submittal Packet................................................................. - .... .... •• .-. - .. .................... $15.00
Page 3 of 13
MECHANICAL PERMITS:
BASEPERMIT FEE: -------- ...................................................... :.................................................... :.......:........ -$50.00
UNIT FEE SCHEDULE:
For the installation or relocation of each:
FURNACE - Forced -air or gravity -type, including ducts and appliance vents..............,.........................$30.00
AIR HANDLER - Including ducts (Diffusers, blowers, etc.)
Up to and including 10,000 cfm (4719 L/s).................... .......................................................... :......... $30.00
Over 10,000 cfm (4719 L/s) including ducts............................................................_.........................$40.00
GAS HEATER -Suspended, recessed wall or floor -mounted unit ................. ............................... ........... $30.00
HYDRONICHEATING SYSTEM ....................................................... ......... ................................................. $150.00
APPLIANCE VENT - (Type B, BW, L gas vent, etc.)...........:....................................................................... $15.00
INCINERATOR.................................................... ................................................................................... $50.00
VENTILATION AND EXHAUST
Fan connected to single duct (Bath, laundry, kitchen exhaust, etc.)...............................................$15.00
Each system which is not a portion of any heating or air-conditioning system .............................. $15.00
HOOD -Type 1, Type 2, Fume Hood including ducts .... ........................ :."........... .......................... .....$150.00
GAS PIPING: (New or relocated)
Gas -Piping systems of 1 to 5 outlets.................................................................... ........... ......................
..._. $30.00
Each additional outlet over 5.................................................................................. .. .. ..... . - .... $5.00
BOILER OR COMPRESSOR
Up to and including 50 HP (176 KW) ....................................... ................... .............. ........................ ........ $50,00
Over50 HP (176 kW)...............................................................................................................................$100.00
ABSORPTION SYSTEM, AIR CONDITIONING SYSTEM OR HEAT PUMP
Up to and including 1,750,000 Btu/h (512.9 kW)................................................................................... $50.00
Over 1,750,000 Btu/h (512.9 kW) .................... .............................................. ............................ $100.00
OTHER FEES:
Commercial Plan review hourly fee..................................................................................................$110.00/hr
Each appliance or piece of equipment regulated by the IMC for which no other
fee is listed (Fire dampers, ductless mini- split systems, etc.) $30.00
Page 4 of 13
PLUMBING PERMITS:
BASEPERMIT FEE: ...... ........................................................................................................................... m $50.00
UNIT FEE SCHEDULE:
For the installation, alteration, repair, addition or relocation of each: ............................. . ......................... $15.00
Plumbing fixture (on one trap or a set of fixtures on one trap)
Drain w/in footprint of building (rainwater systems, roof deck drains, etc.)
Water Heater (includes expansion tank)
Re -pipe - Drain, vent or water piping (each fixture served)
Water Service Line (replacement or repair)
For the installation, alteration, repair, addition or relocation of each:
Water treating equipment (water softener)......................................................................................:.,...$35.00
Backflow protective device - 2" and smaller................................................................_..........................$35.00
Backflow protective device - Over 2".......................................................................................................
$45.00
Graywater system or reclaimed water system (in addition to fixture fee) .................. ..........................
$65.00
Non -grease waste pre-treatment interceptor (oil/water separator, etc.)...........................................$110.00
Medical gas piping system serving 1 to 5 inlet/outlet(s) for a specific gas ................. :.............:::........
$110.00
Each additional medical gas inlet/outlet.............................. ..................................................................
$15.00
Grease Trap (HGI Inside Building)................................._.............................................................,............$220.00
Gravity Grease Interceptor(GGI)) .........................................................._................................................$770.00
OTHER FEES:
Commercial plan review fee hourly fee ......... ......... ................................... :.........................:............$110.00/hr
IMPACT FEES
PARK IMPACT FEES:
Single-Family.......................................................................................................... $2,734.05 per Dwelling Unit
Multi-Family........................................................................................................... $2,340.16 per Dwelling Unit
Non -Residential Development ........................ ................................................. .............. $1.34 per square foot
Residential Administrative Fee.........................................................._...................c:.:.................................$50.00
Commercial Administrative Fee.............................................................................................................. $100.00
TRANSPORTATION IMPACT FEES:
Refer to City Code & Handouts to calculate impact fee. The following applies in addition to impact fee
Residential Administrative Fee ....................... ........................................ ..................... $50.00
Commercial Administrative Fee ............................................ ....................... ........................................... $100.00
Independent Fee Calculation —Transportation Engineer Review.............................:.......................... $260.00
plus peer review fee as applicable.
Pa-e 5 of 13
GRADING PERMIT FEES
PLAN REVIEW:
r
CUBIC YARDS
PLAN REVIEW FEE
50 cubic yards or less
$55.00
(when located in a designated critical area)
51 to 100 cubic yards
$110.00
101 to 1,000 cubic yards
$220.00
1,001 to 10,000 cubic yards
$440.00
$440.00 for the first 10,000 cubic yards, plus $110.00 for
10,001 to 100,000 cubic yards
each additional 10,000 yards or fraction thereof.
$1,430.00 for the first 100,000 cubic yards, plus $110.00
100,001 to 200,000 cubic yards
for each additional 10,000 cubic yards or fraction thereof.
$2,530.00 for the first 200,000 cubic yards, plus $110.00
200,001 cubic yards or more
for each additional 10,000 cubic yards or fraction thereof.
PERMIT FEE:
CUBIC YARDS
PERMIT FEE
Base Permit Fee
$35.00
50 cubic yards or less
$110.00
(when located in a designated critical area)
51 to 100 cubic yards
$110.00
$110.00 for the first 100 cubic yards, plus $25.00 for each
101 to 1,000 cubic yards
additional 100 cubic yards, or fraction thereof.
$335.00 for the first 1,000 cubic yards, plus $45.00 for each
1,001 to 10,000 cubic yards
additional 1,000 cubic yards, or fraction thereof.
$740.00 for the first 10,000 cubic yards, plus $65.00 for
10,001 to 100,000 cubic yards
each additional 10,000 cubic yards or fraction thereof.
$1,325.00 for the first 100,000 cubic yards, plus $100.00 for
100,001 cubic yards or more
each additional 10,000 cubic yards or fraction thereof.
Page 6 of U
FIRE PERMIT FEES
FIRE SPRINKLER PERMITS:
Residential IRC Structures
New Residential Fire Sprinkler Systems................................................................................................. $300.00
Residential Fire Sprinkler System Alteration ................. ........................... ......................................... ..... $200,00
Commercial & Multi -Family Fire Sprinkler Systems
Newsystems..............................................................................:.............I.............................. $300.00 + TABLE 1
Modifications:
1 to 5 sprinklers ....................................... ::...........................
.._................................................................. $250.00
.. ........
6 to 25....................................................................................................................._
..........................$500.00
26 or more._._..................................................:......................................................................
$300.00 + TABLE 1
Additional inspections/plan review as required................................................................................$110.00/hr
FIRE ALARM PERMITS:
Newfire alarm system .............................................. ......................
:...................................... $300.00 + TABLE 1
Emergency Responders Radio System(DAS)..._.....................
::..........:............:........_........... $100.00+TABLE 1
Modifications:
1 to 5 initiating devices, Communicator (AES, Cellular).............
..................................._...................... $250.00
6 to 25, including panel replacement .......... ...........................
................................................................ $500.00
26 or more .................................................. ::............ ..........
............ :....................................... $300.00 + TABLE 1
Additional inspections/plan review as required ............... .... .. ..............$110.00/hr
TANK PERMITS:
Residential fill, remove or install (per each)...........................................................................................
$200.00
Commercial fill, remove or install (per each) ......... .... ......................
...................... ................................ $450.00
OTHER FIRE PERMITS:
Fire Suppression Systems:
Commercial Hood Suppression System (per system)
......,....................:..........................................$325.00
Standpipe............................................................................................................................................
$450.00
FireConnection.......................................................................................................... ........ .......$500.00
FireOperational ............................... ....... ...................... I ............................. .. ............ .. .. .......... ......... $100.00
Fire fees include plan review and inspections.
Page 7 of 13
PLANNING AND LAND USE FEES
GENERAL:
Type I (Staff decisions, no notice) .................. .......... :........................................................ ......................... $275.00
Type 11 A (Staff decisions with notice)....................................................................................................... $970.00
Type IIIA (ADB /Hearing Examiner)............................................................. Hearing Examiner Cost + $2,000.00
Type I I I B (Hearing Examiner) ......................................... ..................... ......... Hearing Examiner Cost + $2,000.00
Type IV (Rezone, Development Agreement)..........................................................................................$7,000.00
Type V (Plan & Edmonds Community Development Code Amendments).............................................$7,000.00
LotLine Adjustment ........................................... .......................................................
:......... :;.....:...... :..... $1,050.00
Short Subdivision Preliminary Approval ......................................... .......... .............................................. $3,225.00
Short Subdivision Civil Plan Review ................................
.... ... $3,050.00
Short Subdivision Final Approval............................_..............................................................................$1,590.00
Subdivision Preliminary Approval .............. .::......:.........................
............... Hearing Examiner Cost+ $6,510.00
Subdivision Civil Plan Review .........................
... $ 4,670.00
SubdivisionFinal Approval ...............................................
..................................................................... $1,590.00
ModificationRequest................................................................................................................................
$970.00
Minor Change to Approved Plat...............................................................................................................
$275.00
Major Change to Approved Plat.......................................................................
Same as Original Application Fee
PRDPreliminary Approval ............................................. ::.......................................................................
$6,510.00
PRDFinal Approval.................................................................................................................................$1,590.00
ADBDesign Review —Signs ..................................................................................:.....................................
$970.00
Staff Design Review if project exceeds SEPA threshold .......................
........................................ .............. $970.00
Landscape Plan Inspection Fee ..............................................
,.,.....,....... ........... .............. ,........... ...1%of Estimate
SEPAReview...................................................................................:...._......................................................$740,00
SEPA Planned Action Compliance Review (Hwy 99)................................................................................$275.00
EISReview .................................... ................................................
........... .............................. ........................... Cost
Outdoor Dining, Amateur Radio ...... ............. ...... ...... ........................................... ........... $275.00
Critical Areas Checklist Application.............................................................................:............................. $110.00
Critical Areas Checklist Update ........................... ........................................................................... ............. $55.00
Critical Areas Variance / Reasonable Use Application................................Hearing Examiner Cost + $7,640.00
Critical Areas Study Admin................................................................................................ $110.00/hr (min. 1 hr)
Critical Areas Contingent Review (See ECDC 23.40.195 for more detail on fees).................................$970.00
Shoreline Contingent Review (See ECDC 24.80.100)...............................................................................$970.00
Planning Fee not categorized ...............
Request for Reconsideration ...............:
............ $110.00/h r
................. $275.00
Note: When an application is heard by the Hearing Examiner (HE), the cost of the hearing is billed to the applicant.
APPEALS:
Appeal of Staff Decision (Type I, II or Hearing Examiner)..............................._........................................ $450.00
Appeal of Type IIIB Decision to City Council ................................. .......... .................................................. $550.00
Appeal of Notice of Civil Violation............................................................................................................$970.00
ADB = Architectural Design Board
HE = Hearing Examiner
SEPA = State Environmental Policy Act
EIS = Environmental Impact Statement
PRD = Planned Residential Development
Page 8 of I')
ENGINEERING FEES
MISCELLANEOUS FEES:
Backflow Prevention Compliance Fee .................................................... $165.00
Developers Agreements.......................................:.................................. $220.00 + $110.00/hr + City Attorney Fees
Fire/ Aid Sign Address Fabrication Fee ..................... .......................... $100.00/ea
Street Sign Fabrication Fee.................................................................$200.00/ea
Water and Sewer Availability Letters...................................................$65.00/ea
Latecomers Agreement............................................................................ $220.00 + $110.00/hr + City Attorney Fees
LID Sewer Agreement.............................................................................. $220.00 + $110.00/hr + City Attorney Fees
Variance from Underground Wiring ................. :..................................... $330.00 + $110.00/hr+ City Attorney Fees
Special Event Permit Fee small eventj less than 100 people) ............ 50.00 ea
Special Event Permit Fee small event — Edmonds -based NP entit .. 25.00 ea
Special Event Permit Fee fmajor eventj more than 100 people) ........... 125 ea
Special Event Permit Fee major event — Edmonds -based NP entit 62.50 ea
GENERAL FACILITY CHARGES:
• Water GFC's are based on meter size:
Water and sewer GFC's shall be paid by each new customer connecting to the utility systems.
Storm GFC's shall be paid by the applicant for ESU's added or created by development.
Meter Size General Faci lity Cha rge
3/" $5,050.00
V, $12, 624.00
11/2 " $25,248.00
2" $40,397.00
GFC's for Single Family Residences only: Fee is based on meter size required for domestic demand (typically %").
GFC shall not be based on meter upsizing for fire sprinkler system only.
• Sewer Utility GFC............................................................. $4,417.00 per ERU
A single family residential development = 1.0 ERU per dwelling unit
A multifamily residential development = .67 ERU per dwelling unit
Applicants for non-residential development shall pay a GFC equal to the ERU determination that is made by
the Public Works Director.
• Stormwater Management GFC..........................................$799.00 per ESU
A single family residential development with up to 5,000 sf hard surface area = 1.0 ESU
All other construction calculated according to a ratio of 1.0 ESU per 3,000 sq ft of new, replaced or new
plus replaced impervious surface area.
Pagge 9 of 121
RIGHT-OF-WAY FEES:
Right -of -Way Construction Permit....................................$330.00 + Inspection Fees
Right -of -Way Construction Permit —Small Wireless .......... $330.00 + $110/hour for any portion of an hour after the
first three hours of staff review time + City Attorney Fees for legal review (if necessary) + Inspection Fees
Right -of Way Minor Construction Permit .......................$110.00 + Inspection Fees
Street Restoration for Water Meter Installation .........$1,000.00
Street Overlay Cut Penalty Fee.......................................$220.00
Encroachment Permit ................................................. ..... $330.00
+ Street Overlay Cut Penalty Fee if applicable
+ ROW Permit Fees
+ Add'I per SQYD charge times overlay cut multiplier
+ Recording Fees
Street Use Permit ..................................... .............. ,.......... $110.00 + Bistro Dining Fees if applicable
Bistro Dining Fees ............... .............. ......... ..7....... 7.......... ,....$30.00 Annual Fee + Monthly ROW Use Fee
@ $0.50/ SQ FT x 12.84% (leasehold tax)
Alley, Sidewalk, Parking Disruption/ Closure Fees ..........$220.00 + ROW Permit + Monthly Closure Fees
Closure fees charged for any activity that occupies or closes, sidewalks, parking spaces(s), parking lanes(s) or
other paved area of a street/road for more than 72 hours. Monthly portion of Fee [$ per month] = 1% of
assessed value per square foot of abutting property x right of way area [SF] disrupted/closed. If
disruption/closure affects any portion of the area of a parking space, the area of disruption closure is calculated
based upon the area of a full parking space.
SEWER FEES: General
New Commercial & Multi -Family ..................................... $220.00 + Inspection Fees Facility
New Single Family .............................__.............................$110.00 + Inspection Fees Charges May
Apply
Repair - Full Line Replacement...........::...........................$110.00 + Inspection Fees
Repair - Partial Line Replacement .................... :............... $110.00 (Includes 1 inspection
+Add'I Inspection Fees, if applicable)
Special Conditions (Grinder Pumps, Ejectors).................$110.00 +Sewer Fees +Utility Engineer Review
Drainage Permit (Pool, Hot Tub, Jacuzzi) ........................... $55.00 Each Occurrence
STORMWATER FEES:
Stormwater Permit..........................................................$330.00 +General Inspection Fees
WATER METER FEES:
Meter Size Meter Fee
Installation of New Service & Meter* 3/4" $2,920.00
1" $2,970.00
1%" $6,220.00
2" $6,390.00
*General Facility Charges may apply
Pace 10 0f 13
ICC VALUATION TABLE
August 2021
Adopted by City of Edmonds effective Jan 1, 2022
r
Group (2021 International Building Code) IA IB IIA IIB IIIA 71IIB IV VA VB
A-1 Assembly, theaters, with stage 298.55 288.43 280.93 269.54 253.09 245.77 260.87 235.34 226.84
A-1 Assembly, theaters, without stage
273.51
263.39
255.89
244.51
228.06
220.73
235.84
210.31
201.80
A-2 Assembly, nightclubs
233.39
226.42
220.85
211.80
199.64
194.14
204.26
180.65
174.48
A-2 Assembly, restaurants, bars, banquet
halls
232.39
225.42
218.85
210.80
197.64
193.14
203.26
178.65
173.48
A-3 Assembly, churches
276.84
266.72
259.22
247.83
231.83
225.68
239.17
214.08
205.57
A-3 Assembly, general, community halls,
libraries, museums
231.62
221.50
213.00
202.61
185.16
178.84
193.94
167.42
159.91
A-4 Assembly, arenas
272.51
262.39
253.89
243.51
226.06
219.73
234.84
208.31
200.80
B Business
240.93
232.14
224.41
213.38
194.94
187.44
204.97
171.50
163.65
E Educational
253.16
244.50
238.07
227.82
212.65
201.92
219.97
185.88
180.09
F-1 Factory and industrial, moderate
hazard
142.51
135.81
128.20
123.31
110.60
105.32
118.02
91.13
85.44
F-2 Factory and industrial, low hazard
141.51
134.81
128.20
122.31
110.60
104.32
117.02
91.13
84.44
H-1 High Hazard, explosives
133.05
126.35
119.74
113.85
102.42
96.14
108.56
82.95
0.00
H234 High Hazard
133.05
126.35
119.74
113.85
102.42
96.14
108.56
82.95
76.26
H-5 HPM
240.93
232.14
224.41
213.38
194.94
187.44
204.97
171.50
163.65
1-1 Institutional, supervised environment
240.35
232.11
225.21
216.12
198.77
193.28
216.40
178.22
172.87
1-2 Institutional, hospitals
403.60
394.81
387.08
376.05
356.54
1 0.00
367.65
333.11
0.00
1-2 Institutional, nursing homes
280.29
271.50
263.77
252.74
235.00
0.00
244.34
211.57
0.00
1-3 Institutional, restrained
1-4 Institutional, day care facilities
273.98
265.19
257.46
246.43
229.58
221.08
238.03
206.14
196.29
240.35
232.11
225.21
216.12
198.77
193.28
216.40
178.22
172.87
M Mercantile
174.08
167.12
160.55
152.50
140.10
135.60
144.96
121.12
115.94
R-1 Residential, hotels
242.77
234.53
227.63
218.55
200.90
195.42
218.82
180.35
175.00
R-2 Residential, multiple family
203.34
195.11
188.20
179.12
162.64
1 157.15
179.40
142.08
136.73
R-3 Residential, one- and two-family
189.34
184.22
179.47
225.21
117.74
175.04
169.94
163.79
172.07
157.66
148.33
R-4 Residential, care/assisted living
facilities
240.35 232.11
216.12
198.77
193.28
216.40
178.22
172.87
S-1 Storage, moderate hazard
132.05
125.35
112.85
100.42
95.14
107.56
80.95
75.26
S-2 Storage, low hazard
131.05
124.35
117.74
111.85
100.42
94.14
106.56
80.95
74.26
U Utility, miscellaneous
104.03
98.14
92.46
88.40
79.71
73.77
84.55
62.84
59.88
Square Foot
Construction GFC = General Facility Charge ESU = Equivalent Service Unit Costs a, b,c
a. Private ROW = Right of Way ERU = Equivalent Residential Unit Garages use
Utility,
miscellaneous f. Sunroom (unheated) _ $28.00
Page 1 1 of 13
b, For shell only buildings deduct20
d. Unfinished basements (Group R-3) = $23.20 persq. ft.
e. Carport = $25.00 per sq. ft.
Ram0. SIajr5. I reWis, }'fl rcn = 7zu, uv per Sq. ii.
i. Unheated Storage = $25.00 per sq. ft.
VALUATION BASED BUILDING PERMIT FEES
TABLE 1
Total Valuation**
Residential
Commercial
$1 to $500
$100 Base fee + $30
$100 Base fee + $36
$100 Base fee + $30 for the first $500 + $3 for
$100 Base fee + $36 for the first $500 + $3.60 for
$501 to $2,000
each additional $100, or fraction thereof to and
each additional $100, or fraction thereof to and
including $2,000
including $2,000
$100 Base fee + $75 for the first $2,001 + $14 for
$100 Base fee + $90 for the first $2,001 + $16.80
$2,001 to $25,000
each additional $1,000, or fraction thereof to and
for each additional $1,000, or fraction thereof to
including $25,000
$100 Base fee + $400 for the first $25,001 + $10
and including $25,000
$100 Base fee + $480 for the first $25,001 + $12
$25,001 to
for each additional $1,000, or fraction thereof to
for each additional $1,000, or fraction thereof to
$50,000
and including $50,000
and including $50,000
$100 Base fee + $650 for the first $50,001 + $7
$100 Base fee + $780 for the first $50,001 + $8.40
$50,001 to
for each additional $1,000, or fraction thereof to
for each additional $1,000, or fraction thereof to
$100,000
and including $100,000
and including $100,000
$100 Base fee + $1,000 for the first $100,001 +
$100 Base fee + $1,200 for the first $100,001 +
$100,001 to
$6 for each additional $1,000, or fraction thereof
$7.20 for each additional $1,000, or fraction
$500,000
to and including $500,000
thereof to and including $500,000
$100 Base fee + $3,400 for the first $500,001 +
$100 Base fee + $4,080 for the first $500,001 + $6
$500,001 to
$5 for each additional $1,000, or fraction thereof
for each additional $1,000, or fraction thereof to
$1,000,000
to and including $1,000,000
and including $1,000,000
$100 Base fee + $7,080 for the first $1,000,000 +
$1,000,001 and
$100 Base fee + $5,900 for the first $1,000,000 +
$4.80 for each additional $1,000, or fractionthereof
up
$4 for each additional $1,000, or fraction thereof
The Building Valuation Data table shall be updated on January 1st of each year to the latest version as published
by ICC.
**See Valuation Table located on previous page.
TABLE 1 -VALUATION BASED APPLICABLE PERMITS:
Commercial Structures: New, Additions & Remodels
Residential Structures: New, Additions & Remodels
Accessory Structures (Greenhouse/Shed)
Deck, Stairs, Ramps
Garages & Carports
Swimming Pools (In -Ground)
Cell Communications/ Cellular Facilities
Other permits types as determined
Pace 12 of I')
Plus: $6.50 Residential State Surcharge Fee per permit and $2 per each dwelling unit
$25.00 Commercial State Surcharge Fee per permit and $2 per each dwelling unit
Page 13 of' 13