SPECIAL INSPECTION AND TESTING AGREEMENT
Permit #: BI D2020-0866
F, 16g0 Project: Home Development Comoanv 7115174th Street SW
Prior to issuance of a permit, this firm most be completed in its entirety and returned to the City for
approval. Tire completed farm must have signatures of acknowledgment by all parties.
DUTIES AND RESPONSIBILITIES
Special Inspection Firm sued Special InspecctoDi:
The Special Inspection firm of Co('ix'7 GeJSCjI?n C.dS k-ix will perfannspecial
inspection for the following types of work (separate forms must be submitted if mom than one firm is to be
employed):
_ Reinforced Concrete
_ Spray applied Fireproofing
—Boiling in Concrete
_ Smoke Control Systems
_ Prestressed Concrete
- __Lateral Wood
_ Shotcrete
_ Structural Observation by design professional
_ Stmctural Masonry
X Soils
—Structural Epoxy
`Expansion BoltsIThreaded Expansion inserts
High Strength Bolting
All individual inspectors to be employed on this pmjeel will be WABO certified for the type of work they are to
inspect. If inspection is for work that is not covered by the WABO categories, or the inspector is not WABO
certified a detailed resume of the inspector and firm must be submitted. The resume most show that the inspector
and the firm are qualifted by education and experience to perform the work and testing required by the project
design and specifications.
The work shall be inspected for eonfommnce with the plans and specifications approved by the City. Revisions
and addenda Sheets Will not be used for inspection, unless they have been approved by the City. Inspection
records shall include:
• A daily record to be maintained on site, itemizing the inspections performed. Any nonconforming work
shall be brought to the immediate attention ofdhe contractor for resolution.
• A weekly roper shall be submitted to the City: detailing the inspections and testing performed, listing any
nonconforming work and resolution of nonconforming items.
• A final report shall be submitted to the building department prior to the Certificate of Occupancy being
issued. This report will indicate that inspection and testing was completed in conformance with the
approved plans, specifications and approved revisions or addenda. Any unresolved discrepancies must be
detailed in the final report.
Contractor:
\\eJmsrr-usrt's\urtarOralS�dakm+Ueskup\Cummm�lx Lelmn andS I1-,R ,wn tw-s 20M9pecwl IoxPcetian forms\SI2020-0866 Hama
Dvn'lopmwl Cmry,anY lsoilz).docl 0, 1212020
The contractor shall! provide the special inspector or agency adequate notification of work requiring inspection.
The City approved plan and specifications must be made av ailablc, at the jobsite for the use of the special
inspector and the City inspector, The contractor shall maintain all daily inspection reports, oil site, for review by
all parties.
The special inspection functions are considered to be in addition to the normal inspections performed by the City
and the contractor is responsible for contacting the City to schedule regular inspections. No concrete shall be
poured or other work covered until approval is given by the City inspector.
Buildinp_ Department:
The building department shall. review any revisions and addenda. The City inspector rill monitor the special
inspection functions for corrrphauce with the agreement and.the approved plans. The City inspector shall be
responsible for approving variows stages of constniction to hG covered and for work to proceed.
Design Professionals:
The architect and/or engineer -will clearly indicate on the plans and specifications the specific types of' special
inspection required and shall include a schedule tier inspection strict testing. The architect and/or engineer will
coordinate their revision and addenda process in such a way as to ensure that call required City approvals are
obtained. prior to work sh0vAm Ull the revisions being perfortned ir1 the field.
Uw ner:
The project owner, or the architect or engincxwr acting as the owners agent, shall employ the special inspector or
agency.
ENFORCEMEN'r
A failure of the special inspector or firm to perform in keeping with the requirements of the IBC:, the approved
plates and this document, may void this agreement and the 1101ding Dffloial's approval of the special inspector.
In such a case a new special inspector and/or tear would need to be proposed I'or approval, A failure of the
design and/or construction parties to perform in accordance with this agreement may result in a STOP WORK
notice being posted on the project until nonconforming items have been resolved.
AC:KNOWLEDGMEN'['S
I have rcad and agree: to comply with the tc:nns and conditions of this agreement.
r r
Owner:Owner:_ITS Y+�1 rt ,�ti�� kt,fCa ir . - Si!nature 11Date �Uic)
---
C:olitractor: -14-vut' dLa Q L-dii Signature
Date:
Areh./Eng _ _ __�si"nat.ure Date:
Special lnsp.! f��f'lui Signature_ Date:
2ZY7
Special Insp. Agency.
C,Aa l� IL C
ACCI-.PTF D FOR THE CITY OF EDMONDS BUILDING DIVISION
By:
Date:
�ledmsE r-it;crf'tiiu �rprut5�detkau neskwp'.Cvrnrnenis [.elle'rs and Specink fnspection turmti 2019',5pee6l inspection furms'St 2020 pb % Home
DcvinpmenI company tsoi6).due10. 121'2020