Permit_1180551CITY OF EDMONDS
Building Permit
My6uildingPermitxom
Permit Information
Permit Number
RI ngngq_1 nn� Issued Date
7/29/2022
Expiration Date
1 /25/2023
Job Address
7802 209TH ST SW Fee Paid
$146.50
EDMONDS, 98020 Order Confirmation
1162660
Floor
Related Permit#
Suite
Application ID
1180551
Contact Information
Contact Name
Duffy Brody Contractor
HIGH PERFORMANCE HOMES INC
Phone Number
(888)892-7939Ext (3603355055
Property Owner
Carmen M Lopez LNI License#
HIGHPPH876DN
Address
7802 209TH ST SW EDMONDS, WA Phone#
(888)892-7939
City Bus. License #
603-231-615
Property Owner Phone
(425) 945-6830 Tenant Name
Job Description
A (Single Family Residential) (Re -Roof Replacement - Roofing & Sheathing) Residence project involving ( The height of
the building is not increasing.)
Conditions - Post Permit on site. Do not cover until inspected.
Do not start any work until the preconstruction meeting is completed.
Certification Statement - The applicant states:
I certify that I am the owner of this property or the owner's authorized agent, including an appropriately licensed contractor. I have furnished true and
correct information. I will comply with all provisions of law and ordinances governing this type of construction work, whether specific herein or not. By
submitting this application I give the jurisdiction permission to enter the property to perform inspections. I understand that failure to comply with the
above may result in revocation of the permit.
Applicant: Duffy Brody
Page 1 of 2
t °F EDAf
0
1893
CITY OF EDMONDS
Building Permit
My6uildingPermitxom
Permit Information
Permit Number
RI n9n99_1nn�
Issued Date
7/29/2022
Expiration Date
1 /25/2023
Job Address
7802 209TH ST SW
Fee Paid
$146.50
EDMONDS, 98020
Order Confirmation
1162660
Floor
Related Permit#
Suite
Application ID
1180551
Inspections
Inspection IVR Inspector Date Inspection IVR Inspector Date
Tear Off or Sheathing
Building Final
Inspection Scheduling
The issuance of this permit in no way constitutes approval from any other agencies having regulatory authority over
the facility and this construction activity.
It is the responsibility of the property owner to obtain any and all such
required approvals.
Page 2 of 2