Loading...
Permit_1180551CITY OF EDMONDS Building Permit My6uildingPermitxom Permit Information Permit Number RI ngngq_1 nn� Issued Date 7/29/2022 Expiration Date 1 /25/2023 Job Address 7802 209TH ST SW Fee Paid $146.50 EDMONDS, 98020 Order Confirmation 1162660 Floor Related Permit# Suite Application ID 1180551 Contact Information Contact Name Duffy Brody Contractor HIGH PERFORMANCE HOMES INC Phone Number (888)892-7939Ext (3603355055 Property Owner Carmen M Lopez LNI License# HIGHPPH876DN Address 7802 209TH ST SW EDMONDS, WA Phone# (888)892-7939 City Bus. License # 603-231-615 Property Owner Phone (425) 945-6830 Tenant Name Job Description A (Single Family Residential) (Re -Roof Replacement - Roofing & Sheathing) Residence project involving ( The height of the building is not increasing.) Conditions - Post Permit on site. Do not cover until inspected. Do not start any work until the preconstruction meeting is completed. Certification Statement - The applicant states: I certify that I am the owner of this property or the owner's authorized agent, including an appropriately licensed contractor. I have furnished true and correct information. I will comply with all provisions of law and ordinances governing this type of construction work, whether specific herein or not. By submitting this application I give the jurisdiction permission to enter the property to perform inspections. I understand that failure to comply with the above may result in revocation of the permit. Applicant: Duffy Brody Page 1 of 2 t °F EDAf 0 1893 CITY OF EDMONDS Building Permit My6uildingPermitxom Permit Information Permit Number RI n9n99_1nn� Issued Date 7/29/2022 Expiration Date 1 /25/2023 Job Address 7802 209TH ST SW Fee Paid $146.50 EDMONDS, 98020 Order Confirmation 1162660 Floor Related Permit# Suite Application ID 1180551 Inspections Inspection IVR Inspector Date Inspection IVR Inspector Date Tear Off or Sheathing Building Final Inspection Scheduling The issuance of this permit in no way constitutes approval from any other agencies having regulatory authority over the facility and this construction activity. It is the responsibility of the property owner to obtain any and all such required approvals. Page 2 of 2