Loading...
PPW061119PARKS & PUBLIC WORKS COMMITTEE MEETING June 11, 2019 Elected Officials Present Staff Present Councilmember Kristiana Johnson (Chair) Phil Williams, Public Works Director Councilmember Dave Teitzel Rob English, City Engineer Mayor Dave Earling Carrie Hite, Parks & Recreation Director Mike DeLilla, Senior Utilities Engineer Jeannie Dines, Recorder The meeting was called to order at 7:01 p.m. in the Council Chambers. The agenda was reordered. 1. ECC 5.32 and 5.05.060; Park Rules and Dog Rules Ms. Hite explained she was asked by Snohomish County Public Health to add no smoking/vaping in parks. The parks already have no smoking signs, but it is not codified so it is not enforceable. Staff maintains a list of issues that arise frequently; adding no smoking/vaping in parks provided an opportunity to make some additional housekeeping changes. The proposed changes were also reviewed by the Planning Board in March. She reviewed the following: Changes to Park Rules: 1. Add a chapter to prohibit smoking/vaping in parks. Marijuana added at the City Attorney's recommendation 2. Add a chapter to prohibit feeding wildlife on waterfront beaches 3. Change park hours to read " closed from sunset to sunrise" 4. Clarify chapter 5.32.030 about the allowance motor vehicles in parks 5. Clarifying 5.32.040 to be consistent with the City's practice 6. Small housekeeping items a. ADA language b. Prohibiting the drinking of intoxicants or use of controlled substances unless authorized by a special event permit Discussion following regarding the source of concern with feeding wildlife on waterfront beaches, whether people feed geese at Civic Field, Parks equipment that removes goose waste, and anticipation development of Civic Park will reduce the presence of geese. Ms. Hite said there would be no increased expense for enforcement. Ms. Hite explained people calling to ask where they can walk their dogs are referred to the code which contains a very specific list of locations. Research done by a Parks intern found most cities in the greater Puget Sound area allow dogs on leash in parks. She reviewed changes to Chapter 5.05.060 Dogs on Public Grounds that would allow dogs on leash and under the owner's control in all parks, with the exception of playfields, public beaches, playgrounds, the spray ground and school grounds. Parks plans to install dog waste stations at all parks. Questions and discussion followed regarding allowing dogs on the track at Civic Field, anticipated additional expense for enforcement and dog waste bags, Police Department and Animal Control's support of the change because it is clearer and easier to enforce, dogs at Civic Field to discourage geese, dogs at concerts in the park, no change to the prohibition of dogs at the summer market and plans for a public campaign if the Council approves the change. 06/11/19 PPW Committee Minutes, Page 2 Action: Scheduled for full Council 2. Presentation of a Supplemental Agreement with Parametrix for the Edmonds Street Waterfront Connector Mr. Williams reviewed: Timeline and next steps o 2012 ■ Don't Block our Beach Rally ■ First Responders recognition of access issues o 2014 ■ Council prioritizes and emphasizes need for access 0 2015-2016 ■ Alternatives analysis ■ Waterfront connector at Edmonds Street o 2017-2019 ■ Preliminary design 0 2019-2020 ■ 30%/60% design ■ 90% Design ■ Final design Scope Review — Major Tasks and how tasks fit together o Public Involvement (Tasks 202, 302, 402) o Engineering for the final design o Arts/Cultural Collaboration (Tasks 207, 305, 405) o Stakeholder coordination (Tasks 203, 303, 403) o Architectural Collaboration (Tasks 205, 304, 404) o Environmental Documentation (Tasks 214, 308) Cost Review Phase 2 — 60% Phase 3 — 90% Phase 4 — 100% Project Totals Design $2,153,594 $891,609 637,558 $3,682,961 M mt Reserve 150,000 150,000 50,000 350,000 Total 2,303,594 1,041,609 687,758 4,032,961 Expenses 4,540 6,267 2,750 58,512 Phase Totals $2,353,134 $1,047,876 $690,463 $4,091,473 ■ Project Partners Project Partners Amount Phase City of Edmonds $100,000 Study $150,000 Planning BNSF Railway $50,000 Study $50,000 Planning Community Transit $5,000 Study $5,000 Planning Port of Edmonds $25,000 Study $75,000 Planning $1,500,000 Construction Sound Transit $10,000 Study $10,000 Planning Washington State $500,000 Study $700,000 Planning $6,000,000 Design/Const $1,050,000 Design/Const 06/11/19 PPW Committee Minutes, Page 3 • Project Funding Status Grant Requests Amount Phase BUILD (Federal) $18,856,000 Construction Grant opportunities Amount Phase INFRA Federal TBD Construction RCO State TBD Construction Dept of Ecology (State) TBD Construction Bicycle & Ped II State TBD Construction PSRC (County) TBD Construction PSAR Large Capital State TBD Construction Questions and discussion followed regarding the source of the $2.3M, funding the City has provided, potential sources for a local match (any non-federal funds), whether BNSF will provide further funding, cost of phase 1 ($1.69M), cost of the supplement contract exceeding the original contract, comments from citizens expressing preference for investing the funds in safety improvements on Hwy 99, the Tribes awaiting further information, environmental analysis, mitigation strategy for any identified impacts, SEPA determination, whether an EIS will be required, 1 % for Art, whether there are legal issues associated with locating the connector on the border of a marine sanctuary (Councilmember Teitzel will forward email to Mr. Williams), distance from the pier to the railroad tracks, crash protection for the pier, ensuring the conditions under which the connector would be used forferry offload are clearly stated and in writing with WSDOT, effect of sea level rise on this structure, potential offsite mitigation at Edmonds Marsh, and identifying stakeholder groups. Committee suggestions included the following: • Add noise study (from emergency vehicles) to assumptions on page 30 • Add an additional Council meeting in final tasks • Missing text at the bottom of Page 59 • Identify stakeholders that should be included in public process and communicate with them early in the process • In presentation to Council, include refresher about analysis of alternatives Action: Schedule for full Council 3. Utility Rate Increase & Future Adoption of a Utility Rate Ordinance Mr. DeLilla distributed FCS Group's analysis. Mr. Williams reviewed: • Overview of Utility Rate Study Process • Overview of Revenue Requirement Analysis • Key assumptions o Annual Cost inflation o Operating Forecast o Annual Growth • Utility Policies (Goals) o Rate analysis policy on a 3-year cycle o Capital Fund Policy • Examples of policies that should be developed o Operating Reserve o Capital Reserve o Replacement Reserve Funding (RRF) o Equipment Reserve o Debt Service Coverage o Revenue Sufficiency • Capital Needs Forecast - Water o $21,867,000 in capital projects from 2019-2024 06/11/19 PPW Committee Minutes, Page 4 o Cash resources are expected to fully cover the projected capital costs ■ Reflects pay-as-you-go (cash -only) funding philosophy • Water Revenue Requirement Forecast Proposed Projected Existing 2019 2020 2021 2022 2023 2024 Annual Water Rate Increase 5% 5% 5% 5% 5% Monthly single-family bill @ 7ccf (w/tax) $52.07 $54.00 $55.33 $58.07 $60.95 $63.04 • Capital Needs Forecast - Stormwater o $26,807,000 in capital projects from 2019 to 2024 o Cash resources are expected to cover - 99% of projected capital costs ■ Reflects pay-as-you-go (cash -only) funding philosophy • Stormwater Revenue Requirement Forecast Proposed Projected Existing 2019 2020 2021 2022 2023 2024 Annual Stormwater Rate Increase 9.5% 9.5% 9.5% 4% 4% Monthly single-family bill (w/tax) $18.09 $20.69 $22.66 $24.82 $25.81 $26.84 • Capital Needs Forecast - Sewer o $41,291,000 in capital projects from 2019 to 2024 o Cash resources are expected to fully cover the projected capital costs ■ Reflects pay-as-you-go (cash -only) funding philosophy • Sewer Revenue Requirement Forecast Proposed Projected Existing 2019 2020 2021 2022 2023 2024 Annual Sewer Rate Increase 7.0% 7.0% 7.0% 7.0% 7.0% Monthly single-family bill (w/tax) 1 $48.02 $51.38 $54.98 $58.83 $62.94 $67.35 • Total Bill compared to other cities/utility districts @ 10ccf o Most expensive (Seattle): $265.51 o Edmonds: $132.38 o Least expensive (Lynnwood): $104.72 Discussion and questions followed regarding the planning period for the rate study, annual growth forecast, whether the 5% increase could be reduced to 4% with a leaner fund balance, expected life of new pipes, and a suggestion to emphasize the benefit of pay-as-you-go versus bonds. Action: Schedule for full Council 4. Presentation of a Local Agency Agreement for Construction Management, Material Testing and Inspection Services for the 84th Ave Overlay Mr. English advised the construction contract estimate is $925,000. The City received a federal grant two years ago. The scope of the project is 84th Ave from 220th Street to 212th Street and includes stormwater improvements (-$500,000) and upgrading non -compliant ADA curb ramps. Federal funding requires additional administrative work; this agreement would provide construction management to assist the project manager during the construction phase. Following evaluation of the four responses to the RFQ, staff selected WH Pacific. A scope of services and fee will be negotiated. Discussion and questions followed regarding the federal grants funding the management reserve, inability to include sidewalks and/or trails in the project, sufficient sunlight for solar powered pedestrian - actuated beacons, and lack of in-house capacity for this work. 06/11/19 PPW Committee Minutes, Page 5 Action: Schedule on Consent Agenda once the scope is negotiated and contract prepared as long as fee is less than the city's preliminary estimate ($137,200) 5. Presentation of an Interlocal Agreement with the City of Mountlake Terrace for Aquatic Vegetation Removal in Lake Ballinger Mr. English explained as a result of work done by the Lake Ballinger Forum and residents, a management plan has developed to help treat invasive species in the lake (milfoil, pond weed and water lily). Mountlake Terrace secured a grant through DOE to fund development of a plan/strategy. The plan includes chemical treatment (applying an herbicide to public lands on the north shore in late July, monitoring and reapplication) and a physical treatment (workshop to teach residents how to remove invasive species and installation of burlap barriers). Discussion and questions followed regarding ensuring the herbicide is safe for humans and animals, public outreach to residents, and when this comes to Council including an explanation of the testing done to ensure the herbicide is safe for humans and animals. Action: Schedule on Consent Agenda 6. Presentation of an Intergovernmental Services Agreement with the Snohomish County, for Development of an On -Going Water Quality Monitoring Program for Lake Ballinger Mr. English explained as a result of efforts by the Lake Ballinger Forum, a water quality monitoring program, "Lakewise" is being established for the lake which has been successful implemented by Snohomish County. This program includes training residents to take water quality samples and submit them to a lab. Once the data is available, Snohomish County will consult with the Lake Ballinger Forum on the findings. One resident has volunteered to receive the training; more volunteers are being sought. A brief discussion followed regarding the cost. Action: Schedule on Consent Agenda 7. Lynnwood Mazda Pedestrian Easement Mr. English explained a development project by Lynnwood Mazda for a showroom and service center will require frontage improvements on Hwy 99 and 76th Avenue W. Frontage improvements include 7- foot sidewalks and street trees in tree grates along both property frontages. To provide the improvements, portions of the public sidewalk will encroach onto private property in 10 locations on Hwy 99 and 76th, requiring a public pedestrian easement. A similar easement for the Hyundai building will be presented to the PPW Committee in July. The business is responsible for the cost of the frontage improvements. Councilmember Johnson requested staff research and report on what appeared to be a walkway on the northwest side of the property. Action: Schedule on Consent Agenda 8. Larsen Short Plat -10-ft Street ROW Dedication along 75t" PI W and Retaining Wall Maintenance Easement along 72"d Ave W Councilmember Teitzel referred to an email from a citizen regarding the legal authority for easements and right-of-way when reviewing proposed development projects including whether staff had the authority not to require minimum access widths, etc. Mr. English said staff will address the questions raised in the email at the July PPW Committee meeting. Mr. English explained this is a 3-lot subdivision at 15729 75th Place W. The development code requires dedication of 10 feet of right-of-way for the street as well as a maintenance easement adjacent to the 06/11/19 PPW Committee Minutes, Page 6 retaining wall. A brief discussion followed regarding whether access could be provided on the north side. Action: Schedule on Consent Agenda 9. Wassail Pedestrian Easement at the NE Corner of 639 2"d Ave Mr. English explained the applicant plans to demolish the existing structure and construct a new single family home. Site conditions preclude a traditional corner so the proposal is for the sidewalk on 2nd Ave to curve across private property to connect to the Caspers St sidewalk. Action: Schedule on Consent Agenda 10. 10-ft Sanitary Sewer Easement along the west property boundary of 625 Alder Street Mr. English explained during review of a building permit for a single family residential addition at this address it was discovered an easement did not exist for the public sewer main on the west side the of property. The easement is required as part of the building permit application. Discussion followed regarding other instances where there are no easements. Action: Schedule on Consent Agenda The meeting was adjourned at 9:30 p.m.