Loading...
2017-07-11 City Council - Full Agenda-193210. PUBLIC SAFETY AND PERSONNEL COMMITTEE (POLICE TRAINING ROOM) 1. Custodial Services Interlocal Agreement with Town of Woodway (10 min.) Edmonds City Council Agenda July 11, 2017 Page 2 5.1 City Council Agenda Item Meeting Date: 07/11/2017 Approval of Council Special Meeting Minutes of June 27, 2017 Staff Lead: Scott Passey Department: City Clerk's Office Preparer: Scott Passey Background/History N/A Staff Recommendation Review and approve the draft meeting minutes on the Consent Agenda. Narrative N/A Attachments: 06-27-2017 Draft Council Special Meeting Minutes Packet Pg. 3 5.2 City Council Agenda Item Meeting Date: 07/11/2017 Approval of Council Meeting Minutes of June 27, 2017 Staff Lead: Scott Passey Department: City Clerk's Office Preparer: Scott Passey Background/History N/A Staff Recommendation Review and approve the draft meeting minutes on the Consent Agenda. Narrative N/A Attachments: 06-27-2017 Draft Council Meeting Minutes Packet Pg. 5 5.3 City Council Agenda Item Meeting Date: 07/11/2017 Approval of claim, payroll and benefit checks, direct deposit and wire payments. Staff Lead: Scott James Department: Administrative Services Preparer: Nori Jacobson Background/History Approval of claim check #226202 dated June 23, 2017 for $16,205.37, claim checks #226203 through #226307 dated June 29, 2017 for $1,854,476.13 and claim checks #226308 through #226375 dated July 6, 2017 for $110,527.84. Approval of wire payment of $21,133.80 dated June 22, 2017. Approval of payroll direct deposit and checks #62744 through #62752 for $530,927.64, check #62762 for $61.58, benefit checks #62753 through #62761 and wire payments of $495,384.15 for the pay period June 16, 2017 through June 30, 2017. Staff Recommendation Approval of claim, payroll and benefit checks, direct deposit and wire payments. Fiscal Impact Claim checks and wire payment $2,002,343.14 Payroll Employee checks and direct deposit $530,989.22 Payroll Benefit checks and wire payments $495,384.15 Total Payroll $1,026,373.37 Narrative In accordance with the State statutes, City payments must be approved by the City Council. Ordinance #2896 delegates this approval to the Council President who reviews and recommends either approval or non -approval of expenditures. Attachments: claim ck 06-23-17 claim cks 06-29-17 claim cks 07-06-17 wire 06-22-17 FrequentlyUsedProjNumbers 06-29-17 payroll summary 07-05-17 payroll summary 07-05-17a payroll benefit 07-05-17 Packet Pg. 16 5.4 City Council Agenda Item Meeting Date: 07/11/2017 Confirm Appointment of Cemetery Board Candidate Kelly Sawyer Staff Lead: {Type Name of Staff Lead} Department: Mayor's Office Preparer: Carolyn LaFave Background/History Due to a retirement, position #6 of the Cemetery Board became open. One application was received for this position after 2 rounds of recruitment. Staff Recommendation Please confirm Kelly Sawyer's appointment to the Cemetery Board Narrative Candidate Kelly Sawyer was interviewed by Mayor Earling and put forth for appointment to the Cemetery Board. Kelly's skill set, her desire for the continued success of the Cemetery, and her wish to become involved in the community make her an ideal candidate for this Board. Packet Pg. 101 5.5 City Council Agenda Item Meeting Date: 07/11/2017 Report of final construction costs for the Citywide CIPP Sewer Rehabilitation Project -- Hwy 99 Pipe Rehabilitation Phase Staff Lead: Rob English Department: Engineering Preparer: Megan Luttrell Background/History On February 16, 2016, Council awarded the contract for the Citywide CIPP Sewer Rehabilitation -- Project Hwy 99 Pipe Rehabilitation Phase to Shoreline Construction in the amount of $108,740. On June 27, 2017, staff presented this item to the Parks, Planning and Public Works Committee and it was forwarded to the July 11th consent agenda for approval. Staff Recommendation Accept project. Narrative During the course of the project, one change order amounting to a net change of $5,692 was written against the contract. This change order allowed the rechanneling of a manhole to better direct flow, adjusted contract line item total to reflect actual quantities utilized in the project, and provided an additional sales tax payment to bring the total tax paid to 10.3% from 9.8%, as required effective April 1, 2017. Construction was completed on time and 5.2% over original contract. Final contract price was $114,432. Packet Pg. 102 5.6 City Council Agenda Item Meeting Date: 07/11/2017 Authorization for Mayor to sign a Supplemental Agreement with David Evans & Associates for the 76th Ave & 212th St. Intersection Improvements Project Staff Lead: Rob English Department: Engineering Preparer: Megan Luttrell Background/History On November 29, 2016, Council authorized the Mayor to sign Supplemental Agreement #8 with David Evans & Associates for the 76th Ave. W @ 212th St. SW Intersection Improvement project. On June 27, 2017, staff presented this item to the Parks, Planning and Public Works Committee and it was forwarded to the July 11th consent agenda for approval. Staff Recommendation Authorize Mayor to sign the Supplemental Agreement. Narrative Construction on the 76th Ave and 212th St Intersection Project began in April and is scheduled to be completed by the end of the year. Since the start of the construction phase, David Evans & Associates has been involved in responding to Request for Information (RFI's) from the contractor, providing plan clarifications, and reviewing Contractor material submittals. The City has asked the consultant to perform additional work that was not anticipated at the beginning of construction. The additional work includes: (1) performing calculations to determine survey elevations for vaults to be installed with the joint utility trench; (2) providing a revised plan/profile for the new watermain on 76th Ave; and (3) providing revised plans for the joint utility trench to reduce the trench width and associated costs. The supplemental agreement will provide an additional budget of $40,000 for construction support services, plus $10,000 in management reserve. The completion date is also being extended from December 31, 2017 to June 30, 2018, to allow enough time to work with the consultant to close-out the project. The additional fee will be paid by the grants and utility funding budgeted for this project. Attachments: David Evans & Associates Supplement Packet Pg. 103 5.7 City Council Agenda Item Meeting Date: 07/11/2017 April Monthly Financial Report Staff Lead: Dave Turley Department: Administrative Services Preparer: Sarah Mager Background/History <Type or insert Info here> Staff Recommendation No action needed; informational only. Narrative April Monthly Financial Report Attachments: April Monthly Budgetary Financial Report Packet Pg. 112 6.1 City Council Agenda Item Meeting Date: 07/11/2017 Proposed Noise Ordinance (15 min.) Staff Lead: Phil Williams Department: Engineering Preparer: Rob English Background/History On June 13, 2017, staff presented this item to the Parks, Planning and Public Works Committee and it was forwarded for further discussion at the June 20th Council meeting. On June 20, 2017, Council directed staff to update the code language regarding the proposed noise exemption for City construction to clarify that the granting of such exemptions employ a process similar to the "balanced factor" approach utilized in the Code section governing variances. On June 27, 2017, staff presented revised information to the Public Works, Parks and Planning Committee. Staff Recommendation Approve the proposed changes and direct staff to place an ordinance on the consent agenda to revise Chapter 5.30 of the Edmonds City Code. Narrative Attached are proposed code changes to Chapter 5.30, "Noise Abatement and Control" related to exemptions for sounds created by City construction projects. The new provisions in section 5.30.100, "Exemptions", has been further amended to specify that City construction work will be subject to an exemption process similar to that used in the variance process. Staff have also drafted a Public Works Policy detailing the criteria and method for the granting of a noise exemption, and have also produced a sample Exemption Application as guidance on what a successful application would look like. The Public Works policy makes clear that all memoranda resulting in a successful administrative exemption to the noise ordinance will be forwarded to City Council members. Attachments: Draft Version noise code revisions Redlined Version of noise code revisions Example Exemption Application Public Works Night Work Policy Packet Pg. 153 8.1 City Council Agenda Item Meeting Date: 07/11/2017 Presentation of 2017 Comprehensive Water System Plan (10 minutes) Staff Lead: Rob English Department: Engineering Preparer: Megan Luttrell Background/History The Water Comprehensive Plan was last updated in 2010. Staff Recommendation A public hearing is scheduled for the July 18, 2017 City Council meeting. Narrative The water system plan is an update to the City of Edmonds' (City's) December 2010 Water Comprehensive Plan, which received Washington State Department of Health (DOH) approval in February 2011. The City is required to update and submit a water system plan to DOH for review and approval every ten years in accordance with current drinking water regulations. Prior to January 2017, the plan update and approval period was six years. The purpose of this updated plan is to meet the State's regulatory requirements and to provide the City with a useful working document to guide the planning, scheduling, and budgeting of water system improvements. This updated plan will also be used by City staff to help maintain the water system to ensure both existing and future customers are provided with a safe and reliable supply of drinking water and fire protection. The planning period for this water system plan is 20 years. Water System Overview The City's municipal water system started in 1928 and has grown over the years as the City expanded and annexed more areas. The City's water system provides service to approximately 80 percent of the population within the City limits of roughly 10,177 metered water service connections. The other 20 percent of the City's population receive water service from the Olympic View Water & Sewer District, which is located within the southwest portion of the City limits. All water supplied to City customers is currently purchased from Alderwood Water and Wastewater District (AWWD) and is conveyed through a single metered connection near the northeast corner of the water system. The City also has the capability to serve a portion of its system with water purchased from Seattle Public Utilities (SPU), but currently maintains this source of supply and the single metered connection on standby. Water purchased from AWWD originates from the City of Everett Sultan River source. Water supplied by SPU originates from SPUs Tolt River source. The City's water system has seven pressure zones with two supply stations, 17 pressure reducing valve (PRV) stations, two pressure relief stations, one pump station, more than 139 miles of water main, and Packet Pg. 189 8.1 11 emergency interties with adjacent water systems. Water storage is provided by four reservoirs that have a combined capacity of 7.5 million gallons (MG). Water System Analysis and Planned Improvements The existing water system was analyzed to determine its ability to meet current water system regulations and the City's own policies and design criteria. Several analyses were performed to evaluate all components of the water system under both existing and future water demand conditions. The results of the analyses were used to identify and size improvements for the water system. Staff will use this ranking in the future years to identify which improvements will be made each year to provide the City with the flexibility to coordinate water main projects with street or other utility projects that may be planned for the same area. There may also be times when the priority ranking for a replacement may change due to subsequent main breaks, increased demands due to developments happening earlier than anticipated or other circumstances that require replacement sooner than planned. Financing for Planned Water System Improvements The need for improvements to the water system is almost entirely due to aging infrastructure that has reached the end of its useful service life, is undersized and unable to meet current requirements, or has some other existing system deficiency. The improvements identified in this plan have been sized to meet both current needs and future growth within the system. Improvements identified for the next six years (2017-2022) are estimated to cost approximately $18.9 million, which results in an average expenditure of approximately $3.15 million per year (in 2016 dollars). A financing plan has been developed for funding the planned improvements and ongoing operations and maintenance, while paying down debt. The financing plan is based on the City's preference to fund capital improvements from cash reserves without incurring new debt. The improvements will be funded through a combination of cash reserves from system reinvestment, rate revenues, and new water service connection general facility charges. Ongoing water rate adjustments are necessary to provide sufficient revenue to support water system operations, maintenance and replacements. The financing plan is based on the City's recently adopted water rate adjustments for 2017 through 2019 and projected adjustments for future years. Attachments: 2017 Comprehensive Water System Plan Packet Pg. 190 8.2 City Council Agenda Item Meeting Date: 07/11/2017 Presentation of the City of Edmonds' Water Use Efficiency Program for 2017 (10 min.) Staff Lead: Phil Williams Department: Public Works & Utilities Preparer: Royce Napolitino Background/History The City of Edmonds has been an active participant in the Everett Water Utilities Water Conservation Program since the late 1990's. In addition, other programs specific to Edmonds include : leak detection surveys; annual waterline replacement program; bills showing water consumption history; school -based education; and public outreach. Staff Recommendation Adopt the 2017 Water Use Efficiency Program and forward to the State of Washington for approval. Narrative The City of Edmonds Water Use Efficiency Program topics includes the following: Current Water Conservation Program - an update of the current program including program changes; Water Use Efficiency Goal Establishment - Efficiency & Conservation programs in which Edmonds participates; and the Water Supply Summary - Our Water Source and Annual Water Consumption. Attachments: 2017 Water Use Efficiency Program 6-29 Packet Pg. 612 8.3 City Council Agenda Item Meeting Date: 07/11/2017 Presentation of utility easements and temporary construction easements at 7521 212th St. SW and 7525 212th St. SW for the 76th Ave. W @ 212th St. SW Intersection Improvements project (10 minutes) Staff Lead: Rob English Department: Engineering Preparer: Katie MacCaul Background/History Staff Recommendation Forward the item to the consent agenda for approval at the July 18th City Council meeting. Narrative As part of the 76th Ave. W @ 212th St. SW Intersection Improvements project, the overhead utilities will be converted to underground within approximately 250' of each approach. On the northeast corner of the intersection, the City has reached an agreement with the property owner at 7521 212th St. SW and 7525 212th St. SW (same owner) for utility easements and temporary construction easements. The utility easements will provide the City with 197 square feet of easement at 7525 212th St. SW and 100 square feet at 7521 212th St. SW for the installation of the Joint Utility Trench (JUT). The JUT will hold PUD, Wave, Comcast, Frontier, and WSDOT / City underground utility lines. Based on the design plans, the JUT was going to be placed under the sidewalk in City right of way. However, an existing underground Frontier duct bank (not located during design phase) is located in the same alignment of the proposed JUT. The alignment of the JUT has been revised and will now be in the referenced utility easement area. In addition, 100 square feet of temporary construction easement is needed at 7521 212th St. SW and 281 square feet at 7525 212th St. SW to provide enough construction area to build the JUT. The total compensation provided to the property owner for the easements is $10,500 ($8,682.50 for utility easements and $1,714.50 for temporary construction easements). This cost will be funded by revenue from transportation impact fees. Attachments: Utility Easement 7521 212th Utility Easement 7525 212th Temporary Construction Easement 7521 212th Temporary Construction Easement 7525 212th Real Property Voucher Packet Pg. 620 8.4 City Council Agenda Item Meeting Date: 07/11/2017 Discussion regarding "newspaper" boxes in public ROW (15 min.) Staff Lead: Phil Williams Department: Public Works & Utilities Preparer: Phil Williams Background/History NA Staff Recommendation Provide feedback to staff (Public Works, Development Services, Legal) regarding whether or not Council wishes to address this issue more formally Narrative The issues related to newspaper boxes located in the City ROW arise periodically in most jurisdictions. These structures are generally small (approx. 4' X 2' X 2') plastic or metal boxes designed to distribute literature of various types, including newspapers, specialty publications, real estate pamphlets, and other commercial circulars; some may have a mechanism to collect money and many others are free. These boxes are placed in the City ROW anywhere there is high pedestrian traffic and usually in locations where other boxes are already located. They are generally not attached to anything including the adjacent boxes. They are of all different shapes and colors. These shapes and colors are usually designed to be distinctive so that if a reader wants a certain publication they can spot the one they are looking for at a distance. The following issues are frequently raised concerning these boxes: 1) They can and do tip over and spill their contents, creating litter 2) They are frequently not maintained regularly, not cleaned regularly, and often out of their publication for long periods of time 3) They take up space on the sidewalk and can interfere with pedestrian traffic, especially if parking is available on the curb. 4) They can block sight lines for automobile traffic 5) They are usually brightly colored with odd shapes and do not fit in with any urban design themes, i.e. they are not attractive to look at in most people's opinion The courts have ruled consistently on behalf of free speech when municipalities have tried to regulate certain aspects of the distribution of reading material using these boxes. It is clear that we have no way to regulate the content of these publications unless there is something already illegal about it, i.e. it is pornographic or it is advertising of illegal services, etc. and even these are not a sure thing. Their location can not be regulated unless there is an objective safety issue (some possibilities are listed above). You may be able exclude them from a particular location if a nearby location is available and Packet Pg. 643 8.4 better answers the problems listed above. Staff wishes to discuss this issue with City Council and determine if working on this issue is a priority. We do get complaints about newspaper boxes frequently, either form citizens who don't like the look of them or from nearby businesses who believe they detract from the appeal of their storefronts. Pictures will be shared at the meeting. Packet Pg. 644 9.1 City Council Agenda Item Meeting Date: 07/11/2017 Second Quarter 2017 Budget Amendment (20 min.) Staff Lead: Scott James Department: Administrative Services Preparer: Debra Sharp Background/History Amend the 2017 Budget Ordinance No. 4063 Staff Recommendation Staff recommends that Council forward the Second Quarter 2017 Budget Amendment to Consent for Approval of Ordinance No. XXXX amending the 2017 Budget. Narrative There are a total of 14 budget amendments. Nine of the budget amendments are new items for Council to consider. Four of the budget amendments have offsetting revenue and do not effect the ending fund balance. One of the amendments moves budget appropriation from non -departmental to the Parks and Recreation budget for a retirement payment and does not effect ending fund balance. Four of the budget amendments reduce ending fund balance. The General Fund balance is reduced by two of the amendments for a total of $2,030, which include $1,030 for annual software maintenance for the Government Access Channel Programming and an additional $1,000 for the Diversity Commission Coordinator. Five of the amendments have been before Council previously. Three of the amendments are new budget appropriations. They include the temporary administrative assistant for the engineering department, the bandshell, and the Veterans Plaza. Two are corrections to the budget appropriation for the Lodging Tax Fund and the bond debt service allocation. Attachments: 2017 Second Quarter Budget Amendment Ordinance Packet Pg. 645 9.2 City Council Agenda Item Meeting Date: 07/11/2017 May Monthly Financial Report (15 min.) Staff Lead: Dave Turley Department: Administrative Services Preparer: Sarah Mager Background/History <Type or insert Info here> Staff Recommendation No action needed; informational only. Narrative May Monthly Financial Report Attachments: May Monthly Budgetary Financial Report Packet Pg. 667 10.1 City Council Agenda Item Meeting Date: 07/11/2017 Custodial Services Interlocal Agreement with Town of Woodway (10 min.) Staff Lead: Thom Sullivan Department: Public Works & Utilities Preparer: Royce Napolitino Background/History The City of Edmonds, Facilities Division is proposing to provide custodial services to the Town of Woodway at their City Hall. This is a new issue. Staff Recommendation It is the recommendation of the staff that this Interlocal Agreement be approved and the Mayor authorized to sign it on behalf of the City. Narrative The purpose of this agreement is to provide for certain custodial services to the Town of Woodway. This Agreement does not create a separate entity for the provision of services. Rather, it is the intent of the parties that Edmonds shall provide Woodway with twice monthly custodial/cleaning services for the facility known as Woodway Town Hall. The services will be provided by City of Edmonds custodial staff. All Edmonds staff will maintain: necessary background checks; drivers abstracts; criminal justice information training and certification required by the Department of Homeland Security and the Federal Bureau of Investigation; appropriate medical vaccinations; current CPR/First Aid card; professional knowledge regarding best practices and industry standards for custodial work and green cleaning products; compliance with required Safety Data Sheet labeling and/or documentation; compliance with exposure safety protocols; and knowledge of any site specific hazards that may be known. City of Edmonds Custodial staff is proposing a twice monthly 3 hour shift to clean the City of Woodway's City Hall. Woodway has agreed to pay $100 per hour to the City of Edmonds equaling approximately $600 a month. Our custodians on average make 23.75 an hour plus benefits and 2% premium(Public safety 8 hour shift) which on average is $11.16 plus the 8 hours at 2% premium approximately .50 cents an hour. We will also supply cleaning chemicals only at a monthly cost of $20 dollars. Edmonds should be in the black $360+ per month on average, with this profit being used to supplement deeper dive clean projects at City of Edmonds buildings at overtime rates. Expenses Hourly Month Totals Hourly Avg. Rate $23.75 142.50 Three Hours Benefits $11.16 66.96 Eight Hours at 2% $ .50 8.00 Supplies $3.33 19.98 Woodway's Contribution $100 x 1 hour/ 6 hours a month Packet Pg. 708 10.1 $38.74 237.44 $600.00 Attachments: Woodway Custodial Services ILA Packet Pg. 709