Loading...
2017-08-22 City Council - Full Agenda-19601. 2. 3. 4. 5. 6. 7 8. 9 o Agenda Edmonds City Council snl. ,nyo COUNCIL CHAMBERS 250 5TH AVE NORTH, EDMONDS, WA 98020 AUGUST 22, 2017, 7:00 PM CALL TO ORDER/FLAG SALUTE ROLL CALL APPROVAL OF THE AGENDA PRESENTATION 1. Update from Federal Lobbyist (20 min) APPROVAL OF THE CONSENT AGENDA 1. Approval of Council Meeting Minutes of August 15, 2017 2. Acknowledge receipt of the Claim for Damages from Suzanne Phillips. 3. Approval of claim, payroll and benefit checks, direct deposit and wire payments. ADJOURN TO COUNCIL COMMITTEE MEETINGS THE CITY COUNCIL COMMITTEE MEETINGS ARE WORK SESSIONS FOR THE CITY COUNCIL AND STAFF ONLY. THE MEETINGS ARE OPEN TO THE PUBLIC BUT ARE NOT PUBLIC HEARINGS. THE COMMITTEES MEET CONCURRENTLY IN SEPARATE ROOMS AS INDICATED BELOW. PARKS, PLANNING, AND PUBLIC WORKS COMMITTEE (JURY MEETING ROOM) 1. Authorization for Mayor to sign Local Agency Professional Services Consultant Agreement with SCJ Alliance for the Highway 99 Revitalization / Gateway Project (10 min.) 2. Recommendation of Consultant for Pre -Design and Permitting Activities for the Edmonds Street Waterfront Connector Project (5 min) 3. Final Acceptance of the 220th Street SW Overlay Project from 84th to 76th Avenue West (5 min.) FINANCE COMMITTEE (COUNCIL CHAMBER) PUBLIC SAFETY AND PERSONNEL COMMITTEE (POLICE TRAINING ROOM) Edmonds City Council Agenda August 22, 2017 Page 1 4.1 City Council Agenda Item Meeting Date: 08/22/2017 Update from Federal Lobbyist (20 min) Staff Lead: Patrick Doherty Department: Community Services Preparer: Patrick Doherty Background/History In 2016 the City brought on Tim Lovain of Capitol Strategies Partners as our federal lobbyist/strategist in Washington, DC. Mr. Lovain has experience working with public -sector agencies in the Puget Sound area, most notably Sound Transit. Since the initial engagement Capitol Strategies Partners has merged with Crossroads Strategies, a large firm with a nationwide client base. Staff Recommendation Presentation from Mr. Lovain. No action required. Narrative The initial scope of services for Capitol Strategies Partners included assistance at the federal level for the proposed Waterfront Connector, Highway 99 and other important public works projects, such as FASTLANE grants, RRIF program, TIGER program, "dead earmarks" from USDOT, etc. In addition, Mr. Lovain monitors and provides real-time updates on legislative and budgetary developments within the federal government, informing us where and how we should be engaged to further our interests and/or projects. At the 8/22/17 Council meeting Mr. Lovain will have a chance to meet the City Councilmembers and provide an update on federal issues of concern to Edmonds. Packet Pg. 2 5.1 City Council Agenda Item Meeting Date: 08/22/2017 Approval of Council Meeting Minutes of August 15, 2017 Staff Lead: Scott Passey Department: City Clerk's Office Preparer: Scott Passey Background/History N/A Staff Recommendation Review and approve the draft meeting minutes on the Consent Agenda. Narrative N/A Attachments: 08-15-2017 Draft Council Meeting Minutes Packet Pg. 3 5.1.a EDMONDS CITY COUNCIL DRAFT MINUTES August 15, 2017 ELECTED OFFICIALS PRESENT Dave Earling, Mayor Thomas Mesaros, Council President Kristiana Johnson, Councilmember Michael Nelson, Councilmember Adrienne Fraley-Monillas, Councilmember Diane Buckshnis, Councilmember Dave Teitzel, Councilmember Neil Tibbott, Councilmember 1. CALL TO ORDER/FLAG SALUTE STAFF PRESENT Al Compaan, Police Chief Phil Williams, Public Works Director Carrie Hite, Parks, Rec. & Cult. Serv. Dir. Patrick Doherty, Econ. Dev & Comm. Serv. Dir Shane Hope, Development Services Director Scott James, Finance Director Dave Turley, Assistant Finance Director Rob English, City Engineer Jeff Taraday, City Attorney Scott Passey, City Clerk Andrew Pierce, Legislative/Council Assistant Jerrie Bevington, Camera Operator Jeannie Dines, Recorder The Edmonds City Council meeting was called to order at 7:00 p.m. by Mayor Earling in the Council Chambers, 250 5t1i Avenue North, Edmonds. He announced audience comment would be limited to 2 minutes per person. The meeting was opened with the flag salute. 2. ROLL CALL City Clerk Scott Passey called the roll. All elected officials were present. 3. APPROVAL OF AGENDA COUNCIL PRESIDENT MESAROS MOVED, SECONDED BY COUNCILMEMBER FRALEY- MONILLAS, TO APPROVE THE AGENDA IN CONTENT AND ORDER. MOTION CARRIED UNANIMOUSLY. 4. PRESENTATIONS 1. LEGISLATIVE SESSION WRAP-UP 2017 Jennifer Ziegler, the City's lobbyist/government affairs specialist, reported: Session overview o Continue to have close margins between republicans and democrats in both chambers o Final biennium to fulfill state funding obligations for basic education most estimates are between $3 and $3.5 billion o Significant disagreement on funding for collective bargaining agreements o Disagreement on major policy issues, including paid family leave, the Hirst decision and the 1 % property tax cap o Concerns regarding Sound Transit motor vehicle excise tax rates Edmonds City Council Draft Minutes August 15, 2017 Page 1 Packet Pg. 4 5.1.a o At 195 days, the longest legislative session in State's history. 2017 legislative session results o Transportation budget - Only minor changes to the Connecting Washington Package - No statutory changes to Sound Transit's governance or MVET valuation schedule o Operating budget - Passed June 30' - narrowly avoiding a government shutdown - $43.7 billion biennial budget - $2.6 billion in new revenue - Increase in K-12 spending of $7.3 billion over 4 years o State shared revenues - Streamlined sales tax mitigation - Fire insurance premium - LEOFF 2 - Liquor Excise Tax Account - Liquor Board Profits - Marijuana Revenues o Policy Items - Public Works assistance account - Paid family leave - A resolution to the Hirst decision o No capital budget (Senate would not pass without acceptable solution to Hirst decision) - Unfunded: Edmonds Waterfront Center - $2.25 M - Unfunded: Edmonds Waterfront Development - $500,000 Edmonds legislative session priorities o Move forward with Highway 99 funding - Accelerated $1 million in 2017-12019 o Funding for Waterfront Crossing Alternative - $700,000 in 2017-19 o Capital Request for Frances Anderson Center - $319,000 in final compromise proposal - passed House, not Senate o Public Records Cost Recovery and Privacy - Allows charge for electronic records - Changed definition of public records; requests for "all records" and bot requests are not an identifiable request in the Public Records Act - Jurisdictions/agencies that spend $100,000+/year responding to requests must report 17 data points to the joint legislative review committee annually o Invest in funding to support services that address homelessness and affordable housing - Four-year extension of document recording fee - Allow use of REET 2 revenue for housing for a short period of time Next steps o Possibility of 4t1i special session o Begin building 2018 legislative session agenda Councilmember Teitzel asked if the Hirst decision could potentially affect property owners in Snohomish County and Edmonds in particular. Ms. Ziegler answered yes, explaining the issue of water laws and GMA is incredibly complicated. Her understanding was some banks are not lending on some property as a result of the decision. Edmonds City Council Draft Minutes August 15, 2017 Page 2 Packet Pg. 5 5.1.a With regard to the use of REET revenue for housing, Councilmember Johnson explained from July 1, 2017 to June 30, 2019, cities can use REET 2 tax funds for acquisition, construction, improvement or rehabilitation of facilities to provide housing for the homeless. In order to use this authority, cities must demonstrate they have or will have adequate funding for all capital projects in their capital facilities plan and must not have adopted any regulation on that revenue. She asked whether Edmonds would qualify to use REET 2 funds. Ms. Ziegler answered that may be better answered by Ms. Hope, Ms. Hite or Mr. Williams. Councilmember Johnson requested further information. Councilmember Buckshnis requested the PowerPoint be provided to Council prior to the meeting in the future. She asked if there was balance in the Public Works Trust Fund. Ms. Ziegler answered loan repayments were still going back into the fund but no new tax revenue was placed in the fund. The General Fund took approximately $250 million in this biennium out of the fund but there was an expectation the capital budget would put new money back into the fund but the capital budget was not passed. Councilmember Buckshnis asked about marijuana revenue, noting Colorado has a great deal of operating revenue from marijuana sales. Ms. Ziegler advised the legislation that was passed had a $12 million cap; if revenues are $18 million over the forecasted amount, local governments would get another $18 million. A portion is distributed based on the number of retailers and a portion based on population. With regard to the Hirst decision, Councilmember Buckshnis said the Tribes are very interested in resolving this; in their opinion this has been an issue for a long time. She was hopeful the Hirst issue could be resolved so that a capital budget could be passed. Mayor Earling thanked Ms. Ziegler for her work in Olympia during the past year; commenting she been a great investment for the City. 2. JUNE QUARTERLY FINANCIAL REPORT Assistant Finance Director Dave Turley provided questions and multiple-choice answers to a quiz that would be revealed at the end of his presentation. He reported: • Diagram of Washington State Unemployment by county o Unemployment one of best indicator of economy o Snohomish County's unemployment rate is 4.1% • Robust Housing Market o HeraldNet reports: Snohomish County home prices reach new high — again. o Seattle Times reports: King County home prices grow $100,000 in a year for first time; West Bellevue jumps 4 1 % • The other side of the coin: o Healthcare costs are projected to rise 10% to 15% o How many more years will the economic recovery continue? • General Fund revenue 2017 compared to 2016 Fund Name 6 Mos 2016 6 Mos 2017 Difference Total General Fund $20,334,355 $20,280,036 ($54,319) -0.3% Total General Fund and Subfunds $21,079,376 $20,748,512 ($330,864) -1.6% • Graph comparing General Fund revenue 2017, 2016 and budget o Chart of Sales Tax by category ■ Six months ending 6/30/17 YTD $3,524,666 in sales tax revenue ■ Retail automotive biggest source ■ Construction trade second largest source • Chart of Sales Tax revenue by category 6 months ending June 30, 2017 change from 2016.... • General Fund expenditures 2107 budget compared to actual Fund Name I YTD 2017 1 YTD 2017 1 Difference I Edmonds City Council Draft Minutes August 15, 2017 Page 3 Packet Pg. 6 5.1.a Budget I Actual Total General Fund and Subfunds 1 $20,506,708 1 $20,031,484 1 $475,224 • Graph comparing General Fund expenditures 2017, 2016 and budget Mr. Turley concluded, the City is right where we expect to be financially at mid -year. While the local economy continues to be strong, we need to remain careful with the City's resources and play for the future. He revealed the answers to the quiz questions (answer in bold): 1. Approximately how many paying customers attended the Taste? a. 5,000 b. 9,000 c. 12,000 d. 20,000 2. Many people (e.g small children) did not have to pay to get in. What was the estimated total attendance? a. 9,000 b. 15,000 c. 25,000 d. 44,000 Finally, how many kegs of beer were sold during the Taste? a. 13 b. 53 c. 130 d. 1,300 Councilmember Buckshnis referred to the Investment Portfolio Summary in the June Quarterly Financial Report, commenting finance staff is doing a great job. Councilmember Fraley-Monillas requested the PowerPoint be provided to Council in advance of the meeting in the future. 5. AUDIENCE COMMENTS (Limited to 2 minutes per person) Sally Wassall, Edmonds, Sunset Avenue resident, thanked the Council for removing angle parking on Sunset Avenue, commenting vehicles parked there were an eyesore, created obstacles, and it was unsafe for other drivers. She also thanked the Council for reducing the 4-hour parking limit to 2-hours but unfortunately neither that, the 20-mph speed limit nor no parking 10 p.m. to 8 am. is enforce When calling the police to complain about cars parked after 10 p.m., she was asked if the vehicle was causing a disturbance. The vehicles are disturbing to her because she is concerned they are waiting to break into her house. When they moved to their house in March 1959, there was an approximately 5.9' bike path and adequate space across the street to get safely in/out of their driveway. Now there is a 10'+ walkway and a parking space close to the end of their driveway, making it difficult to get their 16-3/4 foot Chevy Lumina in and out of their driveway. A plumber visiting their home recently had trouble getting in/out of the driveway due to the parked cars and charged an extra $125 for a difficult location. Jim Perkins, Edmonds, Pt. Edwards resident, said regardless of where one lives, there is concern with safety. During the day, the demonstration garden and its pathways are very nice, but the area is very dark at night and it is a matter of time before something unfortunate happens. He hoped safety was a priority throughout Edmonds. Currently the residents of the 261 units at Pt. Edwards, soon to be 60+ more units in the new building, are a priority. He referred to an article in the Beacon referring to million -dollar condos, assuring most of the 261 units are not million -dollar units. He suggested if the author of that article had a problem with people living in $1 million homes, Edmonds must be a challenging work place for him/her. Edmonds City Council Draft Minutes August 15, 2017 Page 4 Packet Pg. 7 He urged the Council not to compromise the project and make bees and snails more important than people's safety. David Richman, Edmonds, retired biologist, said he was well aware of the effects of lighting on wildlife as he used to collect insects for a museum and often took advantage of lights to attract insects. He suggested the Council seek a solution that is advantageous to all, taking into account the location on the edge of the marsh and the demonstration garden as well as giving consideration to wildlife. He recognized the need for safety but felt there were ways to address the situation such as were used in Tucson, Arizona where residents wanted clear skies for astronomical observation. He submitted a list of references and a statement to the City Clerk. Mike Mitchell, Edmonds, expressed support for lighting on Pine Street. They were unaware of the lighting issue until he read in the newspaper that lighting would be installed on Pine Street. When he told his wife, her comment was good, I don't feel safe down there due to concern with stumbling in the dark. His wife is a member of a walking club that walks in area parks where birds, bugs and slugs happily coexist. The proposed lighting will only be on one side in a small area; with all the concern being expressed, no one has suggested removing lighting on SR-104. He felt the proposal for three light posts was reasonable and he requested the Council adopt that proposal. John Pauls, Edmonds, Sunset Avenue resident, recalled several months ago the City Council approved modifications to parking on the south end of Sunset Avenue. He felt the change to parallel parking was brilliant and helped enormously; the street is much calmer due the wider driving lane, there is no honking as drivers exiting angle parking and the 2-hour parking limit doubled the available parking. Parking is available almost any time except at sunset but not enough parking could be built to satisfy that demand. Widening their driveway helped enormously. Changes now need to be made at the north end; after dropping off a friend at the north end, he found it difficult to exit her driveway. He urged the Council to give the residents on the north end of Sunset the same consideration. Crystal Lanning, Edmonds, agreed with Mr. Pauls' comments. She said the proposal for parallel parking at the north end of Sunset does not work for a number of residents and complicates access to their homes. Staff applied a turning path template to each driveway to ensure a design vehicle could enter and exit every driveway. This is not a one size fits all solution; they will be unable to back their truck and trailer in/out of their driveway if cars are parked across the street in front of their house. Drivers seem to park as long as they want and there have been numerous accidents, particularly on the north end and drivers are unaware which lane is for cars and which is for pedestrians. She recalled hearing in another meeting that people who park on Sunset bring revenue into the City because they shop and eat in town; she has yet to see people with packages returning to their parking spaces, mostly she sees people sitting in their cars reading, eating, and napping. She suggested configuring the solution in a manner that addressed everyone's concerns about congestion, safety and emergency response. Shirley Pauls, Edmonds, Sunset Avenue resident, thanked the Council for their decision to change parking on the south end of Sunset; it is much calmer, people are more relaxed, it is easier to enter and exit parking and there always seems to be parking available. The 2-hour parking improves the availability of parking for people who walk on Sunset instead of commuter parking. The parallel parking also makes it easier for residents to get in/out of their driveways and no parking after 10 p.m. reduces partying. However things that still need to be addressed include, 1) speeding, 2) wrong way drivers, and 3) construction vehicles parking at the north end. Jim Wassall, Edmonds, Sunset Avenue resident, thanked the Council for removing the hazardous angle parking. He expressed concern with the proposed parking spaces staff painted on Sunset next to the walkway. The proposed spaces have no reason for being there other than they help people get out of Edmonds City Council Draft Minutes August 15, 2017 Page 5 Packet Pg. 8 driveway and go north but there is no consideration given for entering their driveways. Another issue is the sidewalk on Sunset is on private property, not City property. Cindy Easterson, Bothell, President, Pilchuck Audubon Society said they value and appreciate the special partnership with the City at the native plant demonstration garden and wildlife area north of Pine Street. This small area provides habitat for wildlife and is a tool for teaching the public about the value of natural spaces. She thanked staff for the opportunity to respond to the proposed options for lighting on Pine Street and to comment from a wildlife perspective. She requested more time to consider options consistent with preserving the natural space. Growing up in rural eastern Washington and spending evenings under the stars led to her love for the natural world. Living in constant artificial light and the ever-present light pollution in western Washington, she questioned equating darkness with fear and the threat of danger and why light was equated with safety. She assured studies show people are not safer by the intrusion of light and that wildlife is harmed by artificial light. For example, the common Black -capped Chickadee is dependent on the natural rhythms of light and dark; in the spring, lengthening days stimulate physical changes in the bird that help it successfully breed. She asked the Council to allow additional time to consider a better solution for Pine Street lighting. Glenn & Heather Safadago, Edmonds, 2" Avenue N resident, said 2" Avenue is a beautiful street whose residents range from young families to seniors, a very active group and many people use the street as a strolling path. He expressed concern with the proposal to allow drivers to turn left from Caspers onto 2' Avenue which would create a loop and he feared a non-stop flow of cars. He was opposed to the proposal due to the possibility of putting children in harm's way. Suzie Schaefer, Edmonds, a volunteer coordinator for the demo garden, recalled in May the Council delayed the installation of lighting on Pine Street at her request due to damage to the garden. She was hopeful the City would develop an imaginative plan for lighting for people that did not have a negative effect on wildlife. She was disappointed staff had not developed a better plan and that both options have issues. She suggested motion -activated lights at foot level was a good option but has not been explored. She acknowledged she does not work for Public Works but nor does Public Works work with wildlife. She requested the Council not make a decision and continue to work together on a solution that will protect wildlife. Bill Taylor, Edmonds, resident of Breakwater on 2nd Avenue N, relayed his understanding there are plans to remove the barrier at the north end of 2nd Avenue to allow north —south traffic. He expressed concern with the safety with that configuration and submitted photos taken today and as well as satellite photos. He explained the problem created by a hedge at the south end of 2nd Avenue that hides pedestrian traffic. Approximately 22 children live on 2nd Avenue between Edmonds and Caspers as well as a woman who is sight impaired and a lot of people walk in the area. Marilyn Lindberg, Edmonds, Sunset Avenue resident, relayed the width of the street at the end of her driveway is 30 feet; 10 feet for the walkway and 8 feet for parking, leaves 12 feet for traffic. When a car is parked opposite her driveway, it takes her three maneuvers to back her compact car out of the driveway. A 18-feet wide fire truck would not be able to access her house with parked vehicles. She concluded 12 feet is not adequate to back out of a driveway or to provide space for emergency vehicle access. Kiersten Christensen, Edmonds, representing the Downtown Alliance (ED!) Board, said the proposed amendments to the BID code and the bylaws reflect current practices and conditions. The original documents were approved four years ago; the changes were reviewed and approved at the July Board meeting. She was excited about what the Alliance's Board can accomplish to keep the Edmonds downtown business district prosperous, vibrant and lively. She relayed the Board's support for the Council approving the proposed amendments. Edmonds City Council Draft Minutes August 15, 2017 Page 6 Packet Pg. 9 Johanna Molloy, Edmonds, representing the Breakwater Condominiums on 2nd Avenue, expressed their concern about the proposal to make 2nd Avenue a 2-way street. Safety is their primary concern; 22 children and several elderly people live on 2nd Avenue and often walk in the street because there are only partial sidewalks. She submitted photographs illustrating the sight issue at the corner. Residents have approached PUD and the City; PUD has offered to take down the tree and replant. There are as many walkers on Sunset as there are on 2nd but there are no sidewalks on 2nd Avenue. She questioned the reason for this proposal and expressed sympathy for the Sunset residents whose views are blocked by parked cars. She suggested having a contest for the most creative promenade for Sunset Avenue. Jim Hendricks, Edmonds, Sunset Avenue resident, appreciated the work that has gone into trying to figure out the walkway and parking. He recommended when the parking is finalized, consideration be given to view corridors for residents as parked cars obstruct views. Al Zahnow, Edmonds, Sunset Avenue resident, thanked the Council for changing the parking limit from 4 hours to 2 hours but recommended the time limit be enforced. He commented on the difficult exiting his driveway. Tom Gabel, Edmonds, Sunset Avenue resident, commented the changes made to parking have upset all the residents on Sunset. Their primary issues are the lack of a consistent plan, lack of enforcement, parking not clearly marked, and wrong way traffic. He described difficulty exiting and entering driveways with the new parking spaces. The addition of the walkway eliminated spaces and now parking spaces are being crammed back in; the geometry has not changed, only the interpretation has changed. He encouraged the City to develop and execute a plan and then enforce it, particularly after 10 p.m. Francois Madath, Edmonds, 2nd Avenue N resident, commented many children live on 2nd Avenue, often crossing the street to visit friends and to play. He expressed interest in clarity in any future plans. Many residents of 2nd Avenue are concerned about the process on Sunset Avenue. The residents of 2nd Avenue do not want cruising from Sunset Avenue to 2" Avenue. They already experience speeding on 2' Avenue; allowing drivers to turn onto 2' Avenue will create more problems which has happened in the past. He encouraged the Council to listen the residents on Sunset and on 2nd Avenue. Lena Maul, Edmonds, 21 Avenue N resident, agreed with her neighbors' comments. When her family moved to 2' Avenue 5 years ago, they were attracted by the 1-way traffic that helps keep her 3 children safe and allows them to foster relationships their neighbors. If traffic becomes 2-way, safety will be impacted greatly for residents and children as well as for many people who walk on 2' Avenue daily. Views from her dining room include the street and Puget Sound; the most coveted seats are those with a view of the street. She agreed Sunset Avenue was a fantastic street; 2nd Avenue was probably the second- best street. She suggested learning from the process on Sunset to maintain the small town feel of 2' Avenue for everyone to enjoy walking, their neighbors and safety. Mayor Earling declared a brief recess. Rick Hedges, Edmonds resident of Sunset Avenue, expressed concerned with the proposed parallel parking spaces that include a space in the middle of his driveway, making it extremely difficult to back out. The proposed parking includes a space in front of his driveway and two in front of his neighbor's house. A nearby pole makes entering/exiting nearly impossible. He urged the Council to reconsider any parking on the north side of Sunset, and have only a travel lane. Tom Graff, Edmonds, member of the Pt. Edwards HOA Board, and Board liaison to the grounds staff, said he loves plants and embraces bees and wildlife but acknowledged there is a safety issue on the sidewalk. He occasionally walks to catch transit before 7 a.m. in the winter when it is dark, icy and slippery. Women living at Pt. Edwards will not walk in that area at night; it is not an issue of getting mugged but Edmonds City Council Draft Minutes August 15, 2017 Page 7 Packet Pg. 10 5.1.a slipping because that area is wet, icy, and dark in the winter. He said the City should be encouraging Pt. Edwards residents to walk into downtown; if he drives, he is unlikely to come downtown. He encouraged the City to provide lighting, pointing out SR-104 is lit. Pine Street is a busy arterial and needs to be safe place to walk. The large halogen light at the hatchery impacts wildlife and should be eliminated. Rich Pettit, Edmonds, Pt Edwards HOA President, said anything to improve the walkability of Edmonds is beneficial to the community. Residents benefit from walkability; however, during the winter, walking is restricted to daylight hours so residents do not go downtown for dinner or other evening activities unless they use a flashlight and are willing to tolerate a dark environment. With regard to wildlife, he pointed out Pt. Edwards has deer and coyotes and he recently saw a family of woodpeckers foraging near the new building under construction, undeterred by construction activity. He concluded wildlife are very adaptable to things that affect their environment. Cheryl Stewart, Edmonds, Sunset Avenue resident, said since the walking path was put in place, there has been a constant problem with parking, safety and ability for residents to use their driveways. She relayed two separate occasions when visiting friends backed out of her driveway into an illegally parked car. Once when backing out of her driveway, she nearly hit a pedestrian strolling on Sunset Avenue. Cars drive on the walking path at night, not realizing it is a walking path. Another issue is the ability for delivery trucks, garbage trucks and emergency vehicles to drive down the street. She proposed utilizing the sidewalk, the parking strip and 18 inches of the current roadway to create a 9-foot walking path. Bryan Stewart, Edmonds, Sunset Avenue N resident near the pump stations, said when pump station maintenance is being done, they cannot exit their driveway. When vehicles are parked in front of his driveway, it is difficult to enter/exit his driveway in his Camry and impossible with his full-sized van. Maintenance people park on the east side of the street opposite the parked cars and drivers often drive on the walkway to get around them. He acknowledged there has always been a problem with parking on the north end of Sunset but there is space for 4-6 parking places that are not opposite driveways. He appreciated what the City did at the south end of Sunset to make it safer and he wanted more parking on the north end but not in front of driveways. Theresa Riley, Edmonds, Pt. Edwards resident, said Pt. Edwards is a community of walkers. One of her first experiences after moving to Pt Edwards was walking into downtown for the Halloween celebration and walking home alone after dark. In the area where the lights are proposed, she was frightened by a dark van with no windows parked in this area. She called a friend at Pt. Edwards to ask that she stay on the phone until she reached the condominiums and to call 911 if something happened. Tonight when she was leaving at 6:45 p.m. to come to this meeting, she decided to drive because it would be dark when she returned. She urged the Council to seriously consider installing lights in that area, even one light. A member of the Nature Conservancy and proponent of preserving wildlife, she recognized a solution needs to consider the safety of people as well as the needs of animals/insects. Alvin Rutledge, Edmonds, suggested an HOA be formed on Sunset Avenue. He recalled the City used to have a citizen parking committee that addressed parking problems. With regard to public safety, he suggested forming a crime watch committee. James Fahey, Edmonds, 2nd Avenue N resident, said he was old enough to know the reason for the current configuration of 2' Avenue. He concurred with his neighbors' comments and urged the Council to consider addressing wrong way traffic at Caspers and to improve signage. Larry DeYoung, Edmonds, 2' Avenue N resident, referred to the Sunset Avenue fiasco, stating he would hate to see the same thing happen on 2' Avenue. When vehicles are parked on both sides of the street, the available width is 19 feet, not enough for 2-way traffic. Regarding signage onto Caspers, he suggested a Edmonds City Council Draft Minutes August 15, 2017 Page 8 Packet Pg. 11 5.1.a flashing 25-mph sign similar to the sign near the 76 station. He suggested a simple solution such as more signage, patrolling the area for wrong way drivers, and enforcing parking restrictions. Doug Maclaren, Edmonds, 2nd Avenue N resident, agreed with previous speakers, emphasized how much residents love their children and how much people love walking on their street. He put a petition in front of their house Sunday morning explaining the potential to open 2' Avenue N to 2-way traffic and got 35 signatures from walkers. People trying to avoid the ferry traffic backup on Main & 3rd speed down 2nd Avenue. He suggested either speed bumps or lowering the speed limit to 20, anticipating 2-way traffic would be a disaster. He suggested improved 1-way/dead-end/do not enter signage instead of the existing residents only signs. He also recommended installation of a flashing sign on the crosswalk on Caspers and 7th Will Magnuson, Edmonds, 2' Avenue N resident, expressed support for retaining the current configuration. He has seen Councilmembers walking on 2nd Avenue enjoying the safety and serenity. The current configuration at the north end was intended to address speeding and drag racing. Bonnie VanWyke, Edmonds, 2' Avenue N resident, said 2nd Avenue North is a wonderful place to live, but residents have to park on the street and there are even more parked cars on market days, when there is a beautiful sunset, etc. In addition, the sidewalks are not contiguous so people often walk in the street. The street is well utilized by walkers, dogs, the elderly, etc. and it should stay the way it is. 6. APPROVAL OF CONSENT AGENDA ITEMS COUNCIL PRESIDENT MESAROS MOVED, SECONDED BY COUNCILMEMBER TEITZEL, TO APPROVE THE CONSENT AGENDA. MOTION CARRIED UNANIMOUSLY. The agenda items approved are as follows: 1. APPROVAL OF COUNCIL SPECIAL MEETING MINUTES OF AUGUST 8, 2017 2. APPROVAL OF COUNCIL MEETING MINUTES OF AUGUST 8, 2017 3. APPROVAL OF CLAIM CHECKS 4. AMENDMENTS TO DOWNTOWN BUSINESS IMPROVEMENT DISTRICT BY-LAWS 7. PUBLIC HEARING 1. RESOLUTION TO DESIGNATE HIGHWAY 99 SUBAREA AS RESIDENTIAL TARGETED AREA Economic Development/Community Services Director Patrick Doherty explained later on the agenda, the Council will be discussing and potentially implementing the Highway 99 Subarea Plan. One of the incentives identified in the plan to help attract redevelopment to the corridor, hopefully including market rate and affordable housing, is Multi -Family Tax Exemption (MFTE) program. That program has already been implemented in Westgate as well as in other cities. He recalled on July 18, 2017 the Council passed a Resolution of Intent to designate the Highway 99 Subarea as a residential targeted area for implementation of the MFTE program and notice of this public hearing. This is the opportunity for the public to comment on the designation of the Highway 99 Subarea as residential targeted area for implementation of the MFTE program and at the conclusion of public hearing, for the Council to designate the Highway 99 Subarea as residential targeted area for implementation of the MFTE program. Edmonds City Council Draft Minutes August 15, 2017 Page 9 Packet Pg. 12 5.1.a Mayor Earling opened the public participation portion of the public hearing. George Keefe, Edmonds, a member of the Edmonds Housing and Stability Coalition, speaking as an individual, urged the Council to increase density in the subarea to permit more residential housing, more market rate, more affordable and particularly more low-income housing. He also encouraged the Council to require landscaped paths in the subarea for the benefit of residents and workers as well as nearby Tom Hayes, Edmonds, expressed appreciation for the effort to upgrade the Highway 99 corridor and the comprehensive work done so far. Maximizing the availability of housing and services to those in need should have a prominent role in development. He referred to Shoreline as inspiration; Ronald United Method Church teamed with Compass Housing and Hopelink to provide low income housing options and services by making 60 units available. During a recent community block party, he toured the facility, finding it very impressive, offering a food bank, opportunities for job searches, training, interviewing skills, etc. Edmonds Lutheran Church is talking with Compass Housing to provide housing options. Many 5013c organizations in addition to Compass Housing do this work throughout region; Compass Housing and Shoreline's facility serves as a great models. He concluded the City should take every opportunity to make housing and services available to the community. Carolynne Harris, Edmonds a member of the Edmonds Housing and Stability Coalition, recalled at the last Hwy 99 Subarea open house, some people were not aware there was an issue with homelessness and housing in Edmonds. There are 150 known homeless children in Edmonds and many more in hiding. It takes four years to get a Compass Housing project underway; the City needs to do something now for the children because the schools and local charities bear the burden. Dominic Rambes, Tekin & Associates, property owners of the Denny's property at 8431 244 St. SW, recalled they described their situation to the Council a couple weeks ago. They submitted and received land use approval; five days later they were told they were not vested and must resubmit using the new regulations. He requested time for their project to be vested, more time for them develop a full set of construction documents and submit for a building permit. It was his understanding if the Council votes tonight, the regulations become effective in five days. Alvin Rutledge, Edmonds, suggested since Denny's closed, there should be a report from the Police Department about crime in that area. Hearing no further comment, Mayor Earling closed the public participation portion of the public hearing. Councilmember Fraley-Monillas inquired about the Denny's property. Development Services Director Shane Hope relayed her understanding Tekin & Associates were going to submit for a building permit this week. Their proposal is to demolish the existing building and build single story retail set back from the street. If the Council adopts the ordinance, the new regulations will be effective 5 days after publication which is typically 7-10 days after the Council takes action. If the project is submitted for a building permit before that time, the end of this week or early next week, it will not subject to the new regulations. COUNCILMEMBER JOHNSON MOVED, SECONDED BY COUNCILMEMBER TEITZEL, TO APPROVE RESOLUTION NO. 1391, A RESOLUTION OF THE CITY OF EDMONDS, WASHINGTON, TO DESIGNATE THE HIGHWAY 99 SUBAREA AS A RESIDENTIAL TARGETED AREA FOR THE PURPOSE OF ESTABLISHING A MULTIFAMILY TAX EXEMPTION PROGRAM AND IT WOULD BE APPROVED AUGUST 15, 2017. MOTION CARRIED UNANIMOUSLY. 8. ACTION ITEMS 1. PROPOSED RESOLUTION SUPPORTING MERGER OF SNOCOM AND SNOPAC Edmonds City Council Draft Minutes August 15, 2017 Page 10 Packet Pg. 13 5.1.a Council President Mesaros explained several jurisdictions have approved resolutions in support of the merger. The packet includes two resolutions, one reflecting unanimous support and the other if there is not unanimous support. He reminded the resolution of support does not approve the merger, ILA or bylaws. He thanked Police Chief Compaan for his work on the Joint Task Force. Mayor Earling advised Lynnwood City Council unanimously approved the resolution last night. Chief Compaan said the resolution is very similar to what the Lynnwood City Council passed last night. Chief Compaan advised the Joint Task Force has been meeting for over a year and are close to presenting a draft ILA to member agencies for consideration. Tonight is an update of the April 4 presentation and the resolution. He summarized it would be helpful to the process to have cities who are supportive of consolidation to go on record via approval of the resolution of support. He introduced Terry Peterson, Executive Director, SNOCOM, and Kurt Mills, Executive Director, SNOPAC. Mr. Peterson reviewed: Three separate entities: o SNOPAC Public Safety Answering Point (PSAP) — Formed in the 70's, located in Everett, a consolidated 9-1-1 Center serving roughly 70% of Snohomish County's population. o SNOCOM PSAP — Formed in the 70's, located in Mountlake Terrace, consolidated 9-1-1 Center serving roughly 30% of Snohomish County's population. o Snohomish County Emergency Radio System (SERS) — Formed in the 90's, Emergency Radio System, group responsible for the voice radio system used by police, fire and 911 countywide. Map of Snohomish County, jointly service area, area served by SNOCOM and area served by SNOPAC Background o A serious service deficiency exists within a Jointly Served Area (JSA) covered by FD1/SNOCOM and SCSO/SNOPAC ■ Excessive 9-1-1 transfers resulting in delays to emergencies ■ Includes an imbalance of funding in relation to workload o County E911 funded a three-part study completed in March 2015 which concluded "...significant opportunity for efficiency and effectiveness gains through consolidation... "and would address the existing 9-1-1 transfers issue. It included several other options including virtual consolidation and co -location o A Snohomish County Joint Task Force (JTF) was formed to further consider these options Why are we are looking at consolidation? o 2016: 44,000 Transfers ■ 66% within the JSA ■ 34% along borders ■ 1 out of 5 (33,433) SNOCOM calls transferred to SNOPAC ■ 1 out of 50 (10,249) SNOPAC calls transferred to SNOCOM ■ Average 21 second delay, over 11 days of hold time a year ■ Significant life/safety issue for the public and for police and fire service providers Joint Task Force (JTF) o Includes Operational and Board Representatives from SNOCOM, SNOPAC & SERS and an independent facilitator with consolidation experience ■ Formed in early 2016 at direction of SNOCOM & SNOPAC Boards ■ Multiple process check -points through Joint (SNOCOM/SNOPAC) Board Meetings to validate process and direction ■ SERS is ex-officio until PSAPs make a decision about consolidation ■ Open transparent process with regular updates to stakeholders including sharing documents online Edmonds City Council Draft Minutes August 15, 2017 Page 11 Packet Pg. 14 5.1.a Mr. Mills reviewed: Primary Decision Points 1) Service Levels: Goal of eliminating SNOPAC/SNOCOM Transfers. 2) Costs: Consider opportunities for cost savings. Labor savings over time through attrition. 3) Resiliency/Redundancy: Current two PSAP model offers important resilience and goal not to lose this. 4) Governance: Structure which ensures a fair voice for diverse group including police/fire, large/medium/small agency Multiple Solutions Evaluated o Evaluated a number of options focused on service levels and resolve SNOPAC/SNOCOM 9- 1-1 Transfer problem ■ Includes two other options that attempt to address transfers through routing and procedural changes ■ Concluded both options have significant operational and fiscal impacts to the PSAPs Status of Primary Decision Points o Excessive 9-1-1 Transfer: Annual 9-1-1 transfers of 45,000-50,000 is a serious problem ■ SNOCOM/SNOPAC Transfers are completely eliminated through consolidation ■ Maintain or improve service levels and eliminate other operational inefficiencies present in a two-PSAP setting o Cost: Both Boards sought ways to decrease costs ■ Projected savings of just under $1MM annually ■ Labor savings recognized over time through attrition (estimated within 2 years) o Resiliency/Redundancy: Current two-PSAP environment provides good resiliency ■ Maintain existing fully -equipped SNOCOM facility as warm backup (secondary location) ■ Prepaid rent through 2023 o Governance ■ Consensus reached on board make-up and general set of rules. Mr. Peterson reviewed: • Estimated One -Time Transition Costs: Low Est. High Est. Office space Renovation $ 500,000 $ 750,000 Organizational/Team Building/Reorganization $ 30,000 $ 50,000 Phone system (reconfigure as Multi -Node) $ 30,000 $ 50,000 Contract Negotiations $ 90,000 $ 120,000 Recorder Modifications $ 5,000 $ 10,000 New ILA Development $ 15,000 $ 30,000 Corporate Structure Legal Review $ 4,000 $ 6,000 Technology Transition (reconfiguration) $ 30,000 $ 125,000 Contingency $ 50,000 $ 100,000 Radio Console Reorganization (MCC7500) $ 15,000 $ 20,000 Parking Needs at SNOPAC $ 50,000 $ 250,000 Total $ 819,000 $ 1,511,000 *Matrix Consulting Study estimated transition costs at between $229,500 & $372,500 Governance o Consensus on majority of governance issues ■ The County and all local governments which are police or fire service providers, or which contract for service, can join. ■ 15 member board - 10 Police Seats - 5 Fire seats Edmonds City Council Draft Minutes August 15, 2017 Page 12 Packet Pg. 15 - Board members selected by caucuses of large, medium & small agencies - Plus 1 non -voting board member selected by contract agencies - Elected and operational staff serve on board Supermajority vote on key decisions: 70% and at least 1 fire vote - Supermajority Vote Items Adding a new member Terminating a member Amending the ILA (unless unanimous consent required by law) Amendments to bylaws Approving the budget if it exceeds last year's budget by a rate over CPI-U + 4% Capital expenditures exceeding $500,000 Dissolution or merger/consolidation of the agency Hiring the Executive Director of the Agency. 1 year of "rate smoothing" for those significantly impacted by new assessment formula Rate Smoothing o New assessment formula projected to provide savings for most o One agency expected to see 30+% increase o Rate smoothing used to reduce the "pain" associated with change of assessment formula ■ Those agencies seeing 9% or greater savings will contribute up to 30% of that savings in 2019 to those agencies seeing 9% or great cost increase Next Steps in Process o Detailed financial reviews (completed) o May thru July - Individual agency briefings (mostly completed) o Over the summer - Work on new Interlocal Agreement, transition budget, timeline o Sept - Joint Board review and advisory position on new ILA o Oct thru Dec - Depending on Joint Board Action, individual agencies re -briefed and have decision whether to sign on to new ILA o New agency could start work as early as Jan 2018, operating out of two physical locations (SNOPAC & SNOCOM's existing facilities) o Jan 2019 merging of operations into single facility with existing SNOCOM facility transitioning into a warm backup. Councilmember Teitzel asked the annual cost to maintain the warm backup site. Mr. Peterson estimated $220,000/year which includes power, water, facility, equipment and worst -case scenario of market rent. Councilmember Teitzel asked how common it was for an emergency telephone system to have a backup site. Mr. Mills answered it was not particularly common but there are examples of medium and large communities with backup sites. There have been numerous occasions when the backup has been used in Snohomish County; it is usually seamless to first responders and the community. Having a backup site is also important because the PSAPs host all the technology for fire, police and corrections. COUNCIL PRESIDENT MESAROS MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO APPROVE RESOLUTION NO. 1392, SUPPORTING THE CONSOLIDATION OF SNOPAC AND SNOCOM PUBLIC SAFETY ANSWERING POINTS (PSPS). Council President Mesaros commented it has been a privilege to represent the City on the SNOCOM Board since he joined the Council in March 2014. This is a great step forward; his personal goals were to improve service at no extra cost; the process resulted in improved service with savings of $1 million year. Edmonds' savings will be approximately $250,000 annually after 2019. Councilmember Nelson, SERS Board Member, commented on how smoothly this process has gone, especially considering how many cities are represented. He commended the governance structure with 15 Edmonds City Council Draft Minutes August 15, 2017 Page 13 Packet Pg. 16 members and a broad and flexible representation from elected officials and emergency professionals. As someone who has had to be transferred after calling, he assured it was an awful experience. He wholeheartedly supported consolidation. Councilmember Johnson said although the presentation indicated there would elected officials on the Board, it appears they are not elected officials but fire and police. Mr. Peterson answered there would be representation from fire and police agencies; there is a requirement for a mix of elected and operational personnel on the Board. Councilmember Johnson asked how elected officials would be selected. Mr. Peterson answered there will be a caucusing process; Edmonds is in the third caucus which is shared with Marysville and Lynnwood and is based on the percentage of population as it relates to the entire County. Those three agencies will collectively share three seats, at least one of the three be an operational person. The caucusing processing would occur in April every year with two-year appointments. The initial caucusing process will occur January 15, 2018 should consolidation move forward; the initial representatives will serve 2+ year terms until April 2020. Councilmember Johnson observed only one operational person was required from the three cities. Mr. Peterson agreed. Councilmember Johnson asked how the other caucuses worked. Mr. Peterson explained there are 3 other caucuses, one dedicated to the Snohomish County Sheriff's Office and because the unincorporated portion of Snohomish County represents 40% of the population, SCSO has 2 seats; of the 2 seats, one is operational staff or SCSO. The second caucus is Everett who has 2 seats, 1 must be operational. The third caucus is Edmonds, Lynnwood, Marysville with 3 seats. The fourth caucus is the remaining 8 smaller cities who share 3 seats; 1 of which must be operational. MOTION CARRIED UNANIMOUSLY. 2. ADOPTION OF SUBAREA PLAN ZONE MAP AMENDMENTS, DEVELOPMENT REGULATIONS, AND PLANNED ACTION FOR HIGHWAY 99 AREA Development Services Director Shane Hope introduced John Fregonese, Principal, Fregonese Associates. Mr. Fregonese explained the City Council last reviewed the Highway 99 Area Plan and proposed code updates on July 31. The focus of tonight's meeting is adoption of the Plan, Development Code/Map and Planned Action. Mr. Fregonese described: • Planning process and timelines • Extensive Public Outreach o Numerous meetings with Planning Board & City Council o Meetings with key property owners 0 3 public open houses 0 4-5 mailings about the project, each to nearly 2200 addresses o Press releases o News media articles o Announcements via email list o Technical advisory committee meetings o Ongoing website info o Facebook posts 0 5 Public hearings o Misc. communication with interested parties • March 2016 public workshop • November 2016 open house • Community Values • Distinct Subdistricts Edmonds City Council Draft Minutes August 15, 2017 Page 14 Packet Pg. 17 5.1.a o Major local and regional destinations on Hwy 99 o International District o Health District o Gateway District • Subarea Plan: implementation strategies, policy recommendations and actions o Planned Transportation Improvements • Current Zoning Map o The only difference between CG and CG2 is the height limit (CG = 60' and CG2 = 75') o Many current zones are remnants from the county's antiquated zoning o Some zones do not match with the parcel boundaries • Proposed Zoning Map o The proposal is to change these zones to the consolidated CG zone o Incorporate design standards that will increase vitality and ensure transition into neighborhoods o More predictable outcomes for community • Zoning Map & Development Regulations - Goals o Vitality and livability o Sustainability o Consistency with subarea plan o Reasonable balance of requirements and options • Site development standards - General 16.60.020 o Pedestrian area - required adjacent to street and composed of three zones: streetscape zone, pedestrian zone and activity zone o Comparison of pedestrian area requirements ■ Required in existing CG regulations? - no ■ Required in proposed CG regulations? - yes o Comparison of dimensional requirements Existing CG Chapter Proposed CG Chapter Height 60-75' 75' max* Street setback 4' min. 5'110' Side/rear setback 0115 0115 Stepback No additional stepback required for upper stories Additional stepback required for upper stories adjacent to single family Site development standards -design standards 16.60.030.A. LE o Illustration of 15' setback with 10' landscape buffer o Additional building stepback with adjacent to RS zones o Photo example of across -the -street transition illustrating streetscape zone separation provided by street and o Minimum 5 feet wide type IV landscaping is required along all street frontages where parking lots abut the street o Access and vehicle parking ■ All off-street surface parking shall be located to the side or rear of the primary building, except as otherwise specifically allowed by this chapter, and shall be screened from sidewalk by a wall or plantings between 2 to 4 feet in height ■ Outdoor parking areas shall comprise 40% or less of the public street frontage area within 100 feet of the primary street for the lot or tract and, on corner lots, may not be located at the corner. Requirements of this subsection do not apply to permitted auto sales uses ■ High parking requirements can impede development ■ Proposed regulations aimed to encourage transit -oriented development options - 0.75 parking spaces per residential unit less than 700 sq. ft. - 1.25 parking spaces per residential unit of 700-1100 sq. ft. - 1.75 parking spaces per residential units greater than 1100 sq. ft. Edmonds City Council Draft Minutes August 15, 2017 Page 15 Packet Pg. 18 5.1.a - Guest parking: 1 space/per 20 units o Required electric vehicle charging stations ■ One or more electric vehicle charging stations must be provided for all new development that includes housing (to serve 10% of required parking spaces) ■ Each electric vehicle charging station typically serves two vehicles ■ 1 station/10 required residential stalls plus planned capacity to double that amount in the future o Required bicycle storage spaces ■ Bicycle storage spaces for multifamily housing, excluding housing for assisted living or other specialized facilities, shall be provided for residents ■ 1 bicycle storage space for each residential unit under 700 square feet and 2 bicycle storage spaces for each residential unit greater than 700 square feet - 50% reduction for bikes stored in common spaces if additional racks are available for guests o Paths within parking lots o Pedestrian and transit access Site Development Standards — Site Design and Layout 16.60.030.0 1) Pedestrian Oriented Design ■ At least 50% of a building's fagade facing the primary public street shall be located within 20 feet of the property line where the primary street frontage exists. ■ Building must include a prominent pedestrian entry on the primary frontage ■ Vehicle parking shall not be located within the first 20 feet of the primary street frontage, other than as allowed for vehicle sales use. 2) Alternative walkable design area option ■ For sites with unique constraints. ■ At least 50% of the building's fagade facing the primary street shall be located within 60 feet of the front property line 3) Exceptions process for pedestrian and walkable design options ■ Exemptions may be allowed by hearing examiner to provide for design flexibility that still encourages pedestrian orientation and efficient land uses under following criteria: - Property is located within 300 feet of highway interchange or has unique pedestrian access constraints - One or more buildings are located facing the primary street frontage - The development provides business and pedestrian areas near the primary street frontage and likely to be active through the day/evening. - Not more than 50% of required parking within first 20 feet of property - At least 25% of required amenity space is located to connect building to the street - Where a site has multiple buildings, amenity space should be located between buildings to allow shared use - One or more buildings on the site must have at least two stories of usable space o Amenity Space ■ An area equivalent to at least 5% of the building footprint shall be provided as amenity space. ■ If a vehicle parking area is being added to the site without concurrent development of a building of at least 2,000 square feet, amenity space must be provided to equal at least 5% of additional parking area. o Building Design and Massing ■ On the primary frontage, 50% of the building fagade between 2 and 10 feet in height shall be comprised of windows or doors that are transparent o New standard for vehicle parking within buildings ■ On primary frontage, no vehicle parking within first 20 feet of building facing street How do proposed regulations encourage sustainable development? Edmonds City Council Draft Minutes August 15, 2017 Page 16 Packet Pg. 19 5.1.a o Examples: ■ Bicycle storage ■ Electric vehicle charging ■ Wider pedestrian areas ■ Not excessive vehicle parking (transit friendly) ■ Amenity space ■ Stormwater management ■ Compact development ■ Landscaping and street trees o Concept illustration of possible redevelopment Mr. Fregonese reviewed a proposed change to sign code • Revision to 20.65.045 o Limit freestanding signs (such as monument signs) to maximum height of 14 feet in this district o Require freestanding signs to be counted as part of total maximum sign area for this district Mr. Fregonese reviewed the Planned Action Ordinance (PAO): • EIS, analyzing environmental impacts was issued for Highway 99 area plan. • To make future project review easier, a draft Planned Action Ordinance has been prepared. It reflects the EIS assumptions & mitigation • Planning Board held public hearing & recommended Council adoption of PAO • City Council held public hearing on PAO on July 31 Mr. Fregonese recommended the Council adopt ordinances for the Subarea Plan, Zone Map and Development Regulations, and Planned Action. Ms. Hope explained there are two versions of the Zone Map and Development Regulations in the Council packet; the only difference is Attachment 2 provides for the normal process of adopting development regulations; following adoption and publication, the regulations are effective in 5 days. The regulations in the ordinance in Attachment 3 are the same but it states any project that had design review approval within a certain timeframe, they are grandfathered under the older regulations if building permits are submitted by September 30. She acknowledged there were pros and cons to the ordinance in Attachment 3; if the Council wants the vision to happen, it would be preferable to adopt the regulations with minimal delay but there is one project with unique circumstances where the applicant is pretty far down the path of a project although they knew several months ago this process was occurring. Councilmember Fraley-Monillas asked if that much bike space, one space for each unit, was warranted. Ms. Hope answered more spaces are required for 2-bedroom units, and the spaces can be reduced by 50% if common area for bike storage and bike racks for visitors are provided. Councilmember Fraley-Monillas commented it seemed like a lot of space for bike storage given that people will not ride on Highway 99. Ms. Hope said the intent was to allow for the possibility to store bikes. Bike storage can be design in multiple ways such as storage space for each unit that could accommodate a bike. Councilmember Fraley-Monillas referred to the applicant already down the path and asked if that was only Mr. Rambes' project. Ms. Hope said others are thinking about projects but theirs is the only project with initial design review approval and as far as staff knows, that is the only project affected. The ordinance in Attachment 3 would allow them until September 30 to submit a building permit and the ordinance in Attachment 2 contains the standard timeframe. Councilmember Fraley-Monillas commented that area is the gateway to Edmonds and it will be important for it to look nice/appropriate. Councilmember Fraley-Monillas referred to the PAO as a blanket SEPA for the Highway 99 corridor and asked if the SEPA was only for the Highway 99 subarea. Ms. Hope answered the EIS done under SEPA Edmonds City Council Draft Minutes August 15, 2017 Page 17 Packet Pg. 20 5.1.a looked at the Highway 99 subarea and made assumptions about what could be developed and potential environmental issues. There are few critical areas so the EIS looked primarily at traffic and aesthetics, transit, pedestrian opportunities, etc. The EIS found if certain mitigations are done such as transportation safety improvements and continued transit, many of the issues will be mitigated. In addition, new design standards provide stronger standards than the current code. The EIS also considered police, fire and utility services and determined that could be met in ordinary ways. Ms. Hope explained the EIS determined it was possible to do X amount of housing, commerce, facilities, etc. and mitigate for traffic and other issues. The ordinance states if the code is followed and development is allowed at the scale envisioned, there will be sufficient mitigation. A significant project may have separate requirements. Rather than a piecemeal approach to SEPA where each project does an EIS, this was an effort to look at the area in a holistic way. She acknowledged not every city is able to do a Planned Action and this is a big step for Edmonds. Mr. Fregonese advised the EIS considers not only residential units but also development of medical facilities. Council President Mesaros relayed his understanding of the September 30 effective date in the ordinance in Attachment 3. Ms. Hope says the ordinance is effective in the standard timeline; any development project in the Highway 99 corridor that received design review approval July to August would have until September 30 to submit a building permit. Council President Mesaros asked why September 30 was selected and if it could be September 15. Ms. Hope said September 15 would be acceptable; the applicant advised staff they would submit this week but September 15 or 30 would provide them additional time. With regard to Councilmember Fraley-Monillas' comments about bicycle storage, Council President Mesaros relayed when using light rail in Seattle, he often sees people taking their bikes on light rail as well as on Sounder. He pointed out the ability to take the new 228' to the new light rail transit center opening in 2019. Ms. Hope remarked the Swift route is Community Transit's highest route for travel as well as for bicycles. Councilmember Buckshnis said she still has concerns with the PAO, remarking it is very new to Edmonds and the Council only had one meeting to discuss it and it did not go through committee. Further, the Council never completed its discussion regarding development agreements. She asked if all three ordinances needed to be approved at the same time. Ms. Hope answered the Council could adopt the Highway 99 Subarea Plan and the development regulations and put the PAO on Consent Agenda or remove the reference to development agreements from the PAO. Councilmember Johnson referred to a letter the Council received today from Arca, a planning and architectural firm, that raised a concern about building fagades and included a photograph of the new development on 196' in Lynnwood. She previously mentioned her concerns with that massive fagade and staff offered to investigate. Ms. Hope said that issue was addressed in the Q&A in the agenda memo; the proposed code requires articulation and breakup of the fagade. Councilmember Johnson said the building on 196' has minimal articulation or breakup of the fagade; the building appears massive from the sidewalk. Ms. Hope agreed the City does not want a massive wall; the regulations require a top and base, articulation, choice of building elements, as well as fagade articulation. She assured Edmonds' regulations are different than Lynnwood's. Mr. Fregonese pointed out the setback would be larger, there would be a pedestrian area in the setback and landscaping, as well as amenity space. Councilmember Johnson said it was not difficult to drive around and see examples of architecture she liked and did not like. She expressed concern with a new sidewalk amenity at the corner of 212t1i & Highway 99, basically a brick semicircle with benches and a garbage can where she has never seen a pedestrian. Another example is the basalt sculpture garden on 196t1i & Highway 99 where she has never seen anyone. She summarized those were amenity spaces no one wanted to use and wanted to ensure Edmonds was not Edmonds City Council Draft Minutes August 15, 2017 Page 18 Packet Pg. 21 5.1.a creating that type of requirement in the code. Ms. Hope answered it is a balance; the City Council wants amenity space associated with development. The code requires 5% of the building footprint be amenity space but it does not all need to be in front of the building; some of it can be located wherever it make sense for the development. For example, a mixed -use building may want some amenity space near the entry conductive to pedestrian activity but other amenity space may be for use by residents/tenants. Councilmember Johnson referred to a study on the use of public spaces by William Whyte in NYC. Mr. Fregonese recalled it included sun, water, people watching, food, etc. and has been influential in design. The code requires green in the amenity space, seating areas; in between buildings in an appropriate location. Councilmember Johnson pointed out in the medical district, the Swift station is called the gateway station; however, the plan has the gateway station at Safeway. Ms. Hope offered to work with Community Transit on that. Councilmember Johnson referred to a suggestion that large projects include pathways between the building and the sidewalk network. She suggested going further; as there will be bicycle storage and bicycles on transit routes, having a parallel bike route and connections between bicycle routes/paths. Although bicycles are not encouraged on Highway 99, people do ride bicycles on Highway 99 and there is nothing to prevent it. Ms. Hope said she will continue working with engineering as plans are updated. Councilmember Johnson referred to screening parking in buildings and whether second floor parking would be visible from street. Ms. Hope said no revision was proposed to the code. Parking generally occurs on the first level; the second stories are required to have glazing and it was unlikely there would be parking. She concluded that change could be made but she felt it was an unnecessary step at this point. Councilmember Johnson referred to the Everett Clinic near the Edmonds Park & Ride where the first two floors are parking and the top floor is glazed. Ms. Hope advised the glazing requirement at the first and second level would help avoid that. COUNCIL PRESIDENT MESAROS MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO EXTEND THE MEETING UNTIL 10:30 P.M. MOTION CARRIED (6-1), COUNCILMEMBER JOHNSON VOTING NO. Highway 99 Subarea Plan COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCIL PRESIDENT MESAROS, TO ADOPT ORDINANCE NO.4077, AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING THE HIGHWAY 99 SUBAREA PLAN AS AN ELEMENT OF THE CITY'S COMPREHENSIVE PLAN, ATTACHMENT 1. MOTION CARRIED UNANIMOUSLY. Development Code Changes COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER FRALEY- MONILLAS, TO ADOPT ORDINANCE NO. 4078, ATTACHMENT 3, AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING AMENDMENTS TO THE EDMONDS COMMUNITY DEVELOPMENT CODE, AMENDING CHAPTER 16.60 ENTITLED "CG — GENERAL COMMERCIAL ZONE," AND ECDC 20.60.045 ENTITLED "FREESTANDING SIGNS — REGULATIONS," REZONING CERTAIN PROPERTY TO CG — GENERAL COMMERCIAL ZONE. Councilmember Johnson asked what would be different if the proposal occurred under the new code. Ms. Hope answered it likely could not be built in the same place, it is proposed to be built 90 feet from the street with parking in front. The building would have to be moved forward and amenity space and pedestrian frontage provided. Councilmember Johnson asked if it would be an expense to the property owners to meet the new code. Ms. Hope answered yes, they would be required to redesign to submit under the new code. Edmonds City Council Draft Minutes August 15, 2017 Page 19 Packet Pg. 22 5.1.a City Attorney Jeff Taraday pointed out they would also have to obtain another design review approval; they already have design review approval. MOTION CARRIED UNANIMOUSLY. Planned Action COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCIL PRESIDENT MESAROS, TO ADOPT ORDINANCE NO.4079, AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, ESTABLISHING A PLANNED ACTION FOR THE HIGHWAY 99 SUBAREA, PURSUANT TO THE STATE ENVIRONMENTAL POLICY ACT, REMOVING THE SECTION RELATED TO DEVELOPMENT AGREEMENTS. Councilmember Fraley-Monillas asked the impact of removing the section related to development agreements. Ms. Hope answered there is a section of the code related to development agreements, this would remove reference in the Planned Action to development agreements. Councilmember Fraley- Monillas asked if staff planned to return to Council with an amendment related to development agreements. Ms. Hope answered at some point but not immediately. She concluded development agreements were a rarely used tool. MOTION CARRIED UNANIMOUSLY. 3. AMENDMENTS TO MULTI -FAMILY TAX EXEMPTION CODE PROVISIONS Economic Development/Community Services Director Patrick Doherty reviewed: • History o 1995 - State Legislature created the Multi -Family Tax Exemption (MFTE) program o RCW 84.14 o To help spur redevelopment in lagging urban centers o Fulfill GMA goals to encourage in -fill development in existing urban centers, thereby reducing sprawl and promoting "smart growth" How it works: o MFTE provides incentive to developers to invest in "residential targeted areas" o Residential targeted areas - mixed -use centers designated by cities in Comp Plans or Subarea Plans to receive greater density of multifamily and commercial development Residential targeted areas o Often called "urban villages" or "urban centers" - ■ Walkable ■ Amenity -rich ■ Transit -supportive ■ Mixed -use areas o Intended to accommodate future growth in housing and employment o Designated by cities through Comp Plans or Subarea Plans per GMA Barriers to development o Notwithstanding a city's plans, transformation to "urban village" can be fraught with challenges o Challenges include: ■ Competition from higher -rent locales (e.g., Seattle, Bellevue) ■ Complications with urban redevelopment - Unwilling property sellers - Need to aggregate multiple properties - Existing long term leases - Environmental remediation Edmonds City Council Draft Minutes August 15, 2017 Page 20 Packet Pg. 23 ■ These factors can stall transportation to planned -for mixed use centers for decades! The MFTE program is one small tool to provide an incentive to developers and investors to overcome these challenges and encourage development of multifamily and mixed -use projects No increase in taxes to taxpayers o Even though a project may be partially exempt from property tax, existing taxpayers see no additional burden. o Exempted taxes simply do not accrue during the exemption period o Upon completion of the exemption period, the entire project is taxed and full tax revenue accrues o Programs reach Program's Reach o Many cities near Edmonds have implemented MFTE including Seattle, Everett, Lynnwood, Kenmore, Shoreline, Marysville, Mountlake Terrace as well as several other cities in Washington o In fact, because of program's widespread application Statewide, many developers have come to consider the MFTE program as a necessary tool to help overcome the challenges of urban redevelopment in all but the highest -rent housing markets MFTE in Edmonds o In July 2016 Edmonds City Council implemented the MFTE in Edmonds o Starting with Westgate Mixed -Use Zone 0 12-year exemption period if the project includes at least 20% of units as affordable to rent or buy to low- and moderate -income households (Low-income = 80% of AMI; moderate -income = 115% ofAMI) Program basics o MFTE Program is applicable to: o Projects containing at least 20 dwelling units o Exempts residential improvement value ONLY o Nonresidential (commercial, e.g.) improvement value is NOT exempt o Land value is NOT exempt Edmonds program provides Proposed amendments o With experience implementing the program in Westgate, amendments to the code provisions are appropriate at this time. o Definitions of low- and moderate -income households ■ Proposed definition change requires that the calculation of low- and moderate -income households be based on Snohomish County median family income (MFI), as reported by US Census and using HUD methodology, NOT the King -Snohomish metro average, as is the case with existing code language, imported from the State statute. ■ This will put the corresponding rental rates more in line with local market ■ Example - The rent + utilities limit for a 2-bedroom unit for a 3-person household earning 80% of median family income, using State statute definition and method, would be $1,728/month - While the rent + utilities limit for a 2-bedroom unit for a 3-person household earning 80% of median family income, calculated using the Snohomish County MFI as proposed in these amendments, would be $1,543/month o Required split between low- and moderate -income affordable units ■ The existing code language, imported from the State statute, requires that a MFTE project include 20% of its units "affordable to low- and moderate -income households," with no required split between the two types of units. ■ These amendments propose that the project include a 50-50 split between these two categories of units, such that the 10% of the units would be made affordable to "low-income households" and 10% to "moderate -income households." Edmonds City Council Draft Minutes August 15, 2017 Page 21 Packet Pg. 24 5.1.a o Adding Highway 99 Subarea as new residential targeted area ■ These amendments propose to add the newly designated Highway 99 Residential Targeted Area as the City's second area where the MFTE program is offered to encourage planned redevelopment, including market -rate and affordable housing COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCIL PRESIDENT MESAROS, TO APPROVE ORDINANCE NO. 4080, AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING PORTIONS OF CHAPTER 3.38 OF THE EDMONDS CITY CODE MULTI -FAMILY TAX EXEMPTION PROGRAM. Councilmember Fraley-Monillas expressed concern with low- and moderate -income housing, commenting the intent of lower rent housing was to address lower wage earners. She asked how a person earning minimum wage benefitted from this. Mr. Doherty answered this program was created over 20 years ago as tool to get development to happen in areas where development is planned. When it was originally created, there was nothing about affordable housing; the 8-year exemption with no affordable housing and 12-year exemption if 20% of the project is low- and moderate -income was added later. This is not a program designed specifically to provide the lowest income housing; it is a program to bring projects to a community and for a portion of the project to include housing for low -and moderate -income households. The City Council made that decision last year when it was implemented in Westgate and offered the 12-year exemption if 20% of the project was low- and moderate income. He said MFTE is not a low-income housing program, it is a program to bring desired development to communities in areas where it has been planned and as a result, provide some affordable units. Councilmember Fraley-Monillas referred to the 50150 split between low and moderate housing. Mr. Doherty said the State's language has no split; the developer makes that decision. The State's language states 20% must be affordable to low- and moderate -income levels. Councilmember Fraley-Monillas asked for an example of low- and moderate -income levels. Mr. Doherty referred to the example in his presentation, explaining 80% of median is considered low, up to 115% of median is moderate. There are other levels below low, this program is not intended to address those levels. The rent + utilities limit for a 2-bedroom unit for a 3-person household earning 80% of median family income, calculated using the Snohomish County AMI as proposed in these amendments, would be $1,543/month. The other 10% of the units could be no higher than 115% of median income. For Councilmember Fraley-Monillas, Mr. Doherty explained 80% of median income in Snohomish County is low income; 30% of gross income is the limit on gross housing (rent and utilities). Councilmember Tibbott said the 30% is rent plus utilities. The Coordinator for Affordable Housing Alliance confirmed $200/month for utilities is appropriate so the rent for 80% of median is about $1300 month. To get that lower rental rate, the tenant has to qualify. Mr. Doherty agreed, adding that the building owner has to confirm every year that the tenants still meet the qualifications. Councilmember Tibbott recalled at the Parks, Planning & Public Works Committee, committee members were provided a comparison of Metro AMI and Snohomish County AMI. The director of the Housing Consortium considered this a boon for affordable housing in Edmonds. Councilmember Tibbott asked if any other cities have done a 10%/10% split. Mr. Doherty no. Councilmember Tibbott commented this represented an innovation. Mr. Doherty said reflecting the Snohomish County AMI in the calculation is also new. Councilmember Tibbott was very supportive of this program. Councilmember Nelson asked if the split could be 15% low and 5% moderate income. Mr. Doherty answered that could be done. Edmonds is the only community to implement Snohomish County AMI; most Edmonds City Council Draft Minutes August 15, 2017 Page 22 Packet Pg. 25 5.1.a communities simply implemented the State language. Every tweak that requires the developer to do more than in other communities takes the City further from a level playing field. Councilmember Nelson observed it previously was 20% and a developer could choose the split; the proposal is a compromise with a 10% split. He asked if increasing the split to 15%/5% or 18%/2% was unreasonable. Mr. Doherty answered Edmonds is already doing more by using Snohomish County specific income and a higher percentage. He summarized the more that is required, the less incentive it provides. Councilmember Fraley-Monillas asked if the split could be changed to 15%/5% in the future. Mr. Doherty answered staff could review and propose a change at any time. Mr. Taraday clarified it not apply retroactively to projects that had already been built and sign a covenant. MOTION CARRIED UNANIMOUSLY. COUNCIL PRESIDENT MESAROS MOVED, SECONDED BY COUNCILMEMBER BUCKSHNIS, TO EXTEND THE MEETING UNTIL 10:50 P.M. MOTION CARRIED (6-1), COUNCILMEMBER JOHNSON VOTING NO. 4. AMENDMENTS TO CHAPTER 3.75, BUSINESS IMPROVEMENT DISTRICT Economic Development/Community Services Director Patrick Doherty reviewed: • Background o RCW 35.87A provides for business improvement districts municipalities "(t)o aid general economic development and neighborhood revitalization, and to facilitate the cooperation of merchants, businesses, and residential property owner which assists trade, economic vitality, and livability" o In January 2013 Edmonds City Council established Downtown Edmonds Business Improvement District (aka "Downtown Alliance") adding new Chapter 3.75 to ECC o Now over four years the Edmonds Downtown Alliance Board and City staff have identified the need for various non -substantive updates to Chapter 3.75 to reflect current practices and conditions o The following amendments were approved by the Downtown Alliance Board at their July 13, 2017 meeting: ■ 3.75.010 - Adds "modification of boundaries" to this section in recognition of the potential for the EDBID to expand. ■ 3.75.040 - Expands the nomenclature for the second, lower -dues -paying classification of businesses previously denominated simply as "by appointment" businesses to include "and/or office -based" and adds new examples such as: professional service firms, assembly or production of goods, corporate offices, etc. ■ 3.75.070 - Adds a clarification that assessments for members in newly expanded areas of the EDBID will pay their dues after the first full quarter after inclusion in the EDBID. ■ 3.75.075 - Removes reference to the original effective date of the ordinance for the one- year exemption of new businesses from paying dues to a simple reference to "new businesses" on an on -going basis. ■ 3.75.120 - Removes references to the initial Mayor and Council appointment/confirmation of EDBID Board members. Updates language regarding the required annual report and allows for submittal of the annual report by October 31 st of each year, rather than October 1 st. This allows for more work to be accomplished in each year about which to report, as well as dovetail more closely to the City's annual budget process. COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER TIBBOTT, TO APPROVE ORDINANCE NO. 4081, AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, ADDING AMENDING PORTIONS OF A NEW CHAPTER 3.38 TO OF THE EDMONDS CITY CODE, TO ESTABLISH THE MULTI -FAMILY TAX EXEMPTION Edmonds City Council Draft Minutes August 15, 2017 Page 23 Packet Pg. 26 5.1.a PROGRAM. MOTION CARRIED UNANIMOUSLY. 5. PINE STREET LIGHTING DISCUSSION Public Works Director Phil Williams referred to a comment during Audience Comments that Public Works does not care about wildlife or does not know anything about wildlife. He and staff are very attuned to wildlife, in fact, he has a BS in wildlife biology and a Masters in aquatics biology so he is in a good position to work with staff to balance natural resource issues with the infrastructure issues that are his primarily responsibility. He reviewed: • Background: 0 2014/2015 Point Edwards residents express safety concerns regarding conflicts between cars and pedestrians as well as general security along Pine Street o November, 2016 -Council authorizes $20,000 for street lighting on lower Pine Street west of SR104 o Late 2016-early 2017 -City staff works with Snooped on a proposal to install street lights. o May, 2017 PW staff begins installation of lights o May 2, 2017 Council puts project on "hold" pending further discussion and discussion of options. o Last 60 days PW Staff has researched three different lighting options: a package from SnoPUD, a package from Sternberg and bollard style lights o Tonight staff is recommending a lighting option o Photographs of area where conduit was installed where demo garden meets the existing sidewalk Options: o SnoPUD Option ■ Three poles -35' mounting height ■ 161' spacing ■ 50w LED Acuity Roadway Type II (oval) 3,000 deg. K ■ Equivalent to I I8w HPS ■ Choice of house -side shield or light trespass shield (most aggressive) ■ City installs buried conduit (halted) ■ PUD install and maintain fiberglass direct -bury poles and luminaires ■ Monthly charge approx. $6.00 each ■ Photograph of the light fixture and an installation with shields ■ Installation Cost: $12,772 ■ Aerial view of proposed pole locations on Pine Street o Sternberg Option ■ 5 poles -13.5' mounting height ■ 82' spacing ■ 32w LED Roadway Type IV (round) 3,000 deg. K ■ Equivalent to approx. 80w HPS ■ No additional house -side shield or cut-off available ■ City does entire installation including concrete bases ■ City owns and maintains system -buys power from PUD ■ Drawing of lighting and specs ■ Cost: $10,876 ■ Aerial view of proposed pole locations on Pine Street ■ Drawing of IES patterns - no house -side shield o Bollard Lighting ■ Photographs of options ■ Example: Lumens -Aluminum Flat Panel LED Bollard path light - 36-40 inches tall Edmonds City Council Draft Minutes August 15, 2017 Page 24 Packet Pg. 27 5.1.a - 20 lights 15' spacing at $165 plus tax = $3,623 - Optic control and box = $250 - Conduit and supplies = $300 - 3 employees/3 days plus vactor truck = $2,000 - Total $6,173 Considerations - Light only on the sidewalk - No light at the Unocal entrance - No light where cars leave SR-104 onto Pine Street - Nowhere in Edmonds have we used pedestrian scale lighting (bollard style) in the public ROW - Staff feels more conventional street lights will do a better job lighting the street and sidewalk and can be shielded to protect the marsh and demo garden - For those reasons staff is not recommending the use of bollard lighting for this application Light fixture in the hatchery could be better shielded and security provided via a motion detection light Discussion and recommendation o Initial cost is similar, affordable o Choice between a city -owned and operated/maintained system vs. a system where SnoPUD is responsible for O&M and replacement o Concern regarding the IES footprint of the Sternberg Type IV fixture without an additional shield o Recommend SnoPUD Councilmember Tibbott clarified in the SnoPUD option, the shields would on the north side so it would shield light from entering the demo garden. Mr. Williams agreed, explaining the shields snap into place; the lights would be mounted with the shield on the north side and additional shielding could be added in the field. Councilmember Tibbott relayed his understanding that the SnoPUD lights would be 161-feet west of the garden and 168 feet to the east. Mr. Williams advised the spacing can be adjusted. Councilmember Tibbott asked the installation timeline for the three options. Mr. Williams answered SnoPUD would be much quicker; the Sternberg lights have a 12-week lead time on delivery of the poles. He was not certain the lead time for the bollard lights. Councilmember Tibbott commented the bollard lights are used primarily in a garden or park to light a path. COUNCILMEMBER TIBBOTT MOVED, SECONDED BY COUNCILMEMBER TEITZEL, TO USE THE SNOPUD OPTION AND MOVE THE LIGHT 10 FEET TO THE EAST, 155' FROM THE FIRST LIGHT. COUNCIL PRESIDENT MESAROS MOVED, SECONDED BY COUNCILMEMBER TEITZEL, TO EXTEND THE MEETING TO 11:10 P.M. MOTION CARRIED (6-1), COUNCILMEMBER JOHNSON VOTING NO. Councilmember Buckshnis commented the Council has received harsh criticism about dragging their feet. She assured the residents of Pt. Edwards are part of the community; the process takes time and requires involving all the stakeholders. It evident to her why this was being fast -tracked but she preferred to slow down and look at all the options. She asked whether motion detection streetlights had been considered, commenting there were some in her neighborhood, Mr. Williams did not recommend that as cars turning onto Pine Street from SR-104 need to see what's in the street ahead and motion detection lights would be very distracting. He had not seen motion detection done with streetlights. He concluded the most conventional way to light a street and sidewalk is with streetlights. He anticipated a significant amount of light could be shielded from the demo garden and still do a good job lighting the street. Edmonds City Council Draft Minutes August 15, 2017 Page 25 Packet Pg. 28 5.1.a Councilmember Buckshnis commented in Wisconsin lights are on timers; citizens turn on the light and it stays on for 15 minutes. Mr. Williams said a motion sensor would be very helpful on the hatchery light. Streetlights have photo sensors that turn the lights on and off. Councilmember Buckshnis commented the light at the hatchery lights only the pond. She emphasized things take time; Sunset has taken two years. She expressed concern with fast -tracking this project and not allowing all the stakeholders an opportunity to have input. She expressed concern one Parks, Planning and Public Works Committee member was still asking questions, yet the Council was being asked to take action tonight. Councilmember Fraley-Monillas commented bollard lighting is only seen at malls and it is not used to light much more than a sidewalk. She asked whether requests for streetlights could be handled similarly to requests for traffic calming. Mr. Williams explained any citizen who wants a light on their street can call the City; if there is a PUD power pole, staff asks the neighbors and if there is general consensus that additional light is needed, PUD installs the light and the City pays the electricity. In this area, there are no PUD poles, all the power to Pt. Edwards and the pump station is underground. Councilmember Fraley- Monillas concluded adding streetlights is typically an easier process than traffic calming. Mr. Williams agreed. Councilmember Nelson said the reason he voted for this project in November 2016 was the same reason he supported it now, to ensure adequate lighting in that area. Challenges arose when staff realized the lights had to be installed on the other side of the street and when the demo garden was mowed which he assumed could be mitigated. Mr. Williams explained Public Works removed a small strip of plants next to the sidewalk to install the conduit; the area has recovered well and plant material will continue to grow. Councilmember Nelson appreciated staff looking at other options, commenting the pause resulted in some changes. Mr. Williams said the SnoPUD option is very similar to what would have been installed. The pause has resulted in a useful conversation and an opportunity to educate staff about the demo garden. He recognized the concern with light into the demo garden, commenting on the need to balance that with safety. Councilmember Teitzel commented a couple months ago an LED streetlight was installed at the end of his alley; the light is very directional down toward the sidewalk. Even without shielding, the SnoPUD option does a very good job directing the light; with shielding it will be even more effective. He expressed support for the motion. Councilmember Johnson asked how the shields will prevent light going into the demo garden as well as light the sidewalk. Mr. Williams explained the shields prevent light shining in that direction and direct it to the ground. The Sternberg lights have a much bigger light pattern. Councilmember Johnson pointed out the demo garden is adjacent to the sidewalk. Mr. Williams said the pole will be next to the sidewalk, the arm is 6 feet long, approximately to the curb. He did not envision much light would go toward the demo garden. COUNCILMEMBER TEITZEL CALLED FOR THE QUESTION. UPON ROLL CALL, VOTE ON THE CALL FOR THE QUESTION FAILED (2-5), COUNCIL PRESIDENT MESAROS AND COUNCILMEMBER TEITZEL VOTING YES; AND COUNCILMEMBERS JOHNSON, NELSON, FRALEY-MONILLAS, BUCKSHNIS AND TIBBOTT VOTING NO. Councilmember Johnson asked whether lighting projects like this were usually in the CIP. Mr. Williams answered the City did not do many lighting project; this is the first one since he has been at the City other than the lights installed on Main Street. Development typically installs streetlights in accordance with frontage standards or a citizen requests a light and staff works with PUD. Councilmember Johnson recalled a project on Hwy 99 for additional street lights. Mr. Williams asked if she was referring to the grant funded project in the International District. Councilmember Johnson said no, there is a project for additional lighting in a very dark area of Hwy 99 where there are no crosswalks and Edmonds City Council Draft Minutes August 15, 2017 Page 26 Packet Pg. 29 there have been several accidents. She asked if the Pine Street lights should have been in the CIP. Mr. Williams was uncertain, noting this was included as a decision package in the budget. Councilmember Johnson said in her experience the reason for the CIP and TIP is to avoid politically based projects, one person pushing a project in their neighborhood. This was a proposal as part of the 2017 budget. Mr. Williams said, from a department perspective, staff normally approaches lighting via a partnership with PUD. Sometimes that process is simply adding a light to a pole; in this case there are no poles so poles and lights had to be installed. He was unsure it was a big enough project to be included in the CIP. Councilmember Johnson wanted to avoid this happening in the future, a Councilmember putting forward a decision package that has not going through the normal staff vetting and budget process. Mr. Williams said he submitted that decision package based on the level of interest and emails from residents. Councilmember Johnson did not recall seeing that in the 2017 budget. She expressed concern with taking action tonight without information about the budget process. She recalled at the first Parks, Planning & Public Works Committee meeting, no information was provided. A third option, bollards, that she has been requesting was presented tonight. She recalled the original concern was pedestrian safety and a request was for pedestrian lights, more of a bollard style than streetlight. Mr. Williams advised the votes on Pine Street lighting discussion occurred during the 2017 budget process on the following dates and times: • November 15, 2016, 49:15, vote 2-5. • November 22, 2016 1:38:00, vote 4-2-1. As a result of the November 22, 2017 vote, he proceeded with the project which included poles and streetlights. He recalled Councilmember Johnson asked about bollard lighting during the November discussions and more recently; his technical analysis is bollard lights are not sufficient to meet the needs for lighting in that area. Councilmember Johnson referred to Pilchuck Audubon Society's request for additional time to determine the needs of wildlife. Mr. Williams said their only request has been for more time, nothing about the light type. Motion sensor lights were mentioned but he did not find that appropriate for the public right-of-way. Councilmember Johnson expressed support for pedestrian movement in all neighborhoods, promoting pedestrian safety and encouraging lighting wherever appropriate. However, the Parks, Planning & Public Works Committee disagreed whether the information was complete; therefore, she is unable to make a decision tonight. Councilmember Buckshnis said the Pine Street lighting was a Council amendment. Mr. Williams said he submitted it originally but it did not make it into the budget. COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCIL PRESIDENT MESAROS, TO EXTEND THE MEETING UNTIL 11:25 P.M. MOTION CARRIED (6-1), COUNCILMEMBER JOHNSON VOTING NO. MOTION CARRIED (5-1-1), COUNCILMEMBER JOHNSON VOTING NO AND COUNCILMEMBER BUCKSHNIS ABSTAINING. 6. SUNSET AVE PARKING Public Works Director Phil Williams reviewed: Task: Determine where additional parallel parking may be located along the roadway. Challenge: Additional Parking may impact adjacent driveways Method: Conduct turning study at each driveway where additional parking is proposed. o Turning radius templates based on large passenger vehicle o Turning radius templates applied to each driveway, entering and exiting Edmonds City Council Draft Minutes August 15, 2017 Page 27 Packet Pg. 30 5.1.a o Turning radius templates applied site wide o Potential parking identified using the turning radius templates Ingress/egress issues o Causes: 1. Substandard driveway widths 2. Substandard driveway aprons 3. Driver expectations and performance 4. Large vehicles o Solutions: 1. Upgrade certain driveway aprons to better allow access 2. Limit additional parallel parking to 7-9 new spaces Interim Solutions — planning level cost estimate 1. Improve driveway access $46,000 2. Add parallel parking/misc restriping $ 1,100 3. Wrong -way driving reduction $20,800 $16,,900 5. Misc Signage $ 8,000 Total (2018 decision package being prepared) $75,900 Mr. Williams displayed an aerial view of Casters Street and 2' Avenue N and curbs preventing left and right turns. He did not agree with the assumption that traffic would increase on 2nd Avenue N as drivers going south would take 3' Avenue N, a much quicker and convenient route to downtown. To the concern that drivers would use 2' Avenue N to travel north to avoid traffic, it is currently legal to drive northbound on 2' Avenue North and turn right onto Caspers. He did not expect cruising to be an issue. Councilmember Fraley-Monillas said 2' Avenue N was used for cruising in the past and she was not interested in opening it to 2-way traffic. She commented there must be a way to block vehicles from entering 2' Avenue. Mr. Williams suggested physical modifications at 2nd Avenue and an ordinance stating drivers cannot go past a certain point except to reach specific addresses. Councilmember Fraley-Monillas expressed support for that suggestion. Mr. Williams pointed out drivers then need a way to get back out. Councilmember Fraley-Monillas said people can turn around in driveways. Mr. Williams said homeowners do not like that. Councilmember Fraley-Monillas expressed support for adding 9 parking spaces on Sunset Avenue. She often drives that loop and agreed there needs to be additional striping done on Sunset to prevent vehicles from parking on the walkway as well as increased police patrols. COUNCIL PRESIDENT MESAROS MOVED, SECONDED BY COUNCILMEMBER TEITZEL, TO EXTEND THE MEETING TO 11:40 P.M. MOTION CARRIED (6-1), COUNCILMEMBER JOHNSON VOTING NO. COUNCILMEMBER BUCKSHNIS MOVED, SECONDED BY COUNCILMEMBER JOHNSON, TO KEEP 2ND AVENUE NORTH THE WAY IT IS. Mr. Williams clarified 2' Avenue N is not a one-way street, it simply has restricted access from Caspers. Councilmember Buckshnis supported leaving 2' Avenue N the way it is and using signage to address any issues. Council President Mesaros suggested installing a "local traffic only" at 3' & Caspers. Mr. Williams agreed additional signage could be installed at that location. Council President Mesaros suggested a solution could Edmonds City Council Draft Minutes August 15, 2017 Page 28 Packet Pg. 31 5.1.a be reached using the local perspective from 2nd Avenue N residents and Mr. Williams' professional perspective. He said flashing lights may not be good solution for nearby residents. MOTION CARRIED UNANIMOUSLY. COUNCIL PRESIDENT MESAROS MOVED, SECONDED BY COUNCILMEMBER FRALEY- MONILLAS, TO ADD AN ADDITIONAL NINE PARKING SPACES TO SUNSET AVENUE. Councilmember Tibbott assumed the nine parking spaces would include funding for striping and additional signage on Caspers. Mr. Williams agreed. Councilmember Tibbott expressed support for the motion. Councilmember Johnson recalled when this was presented to the Parks, Planning & Public Works Committee, it was for discussion only. Mr. Williams advised the intent was discussion at the committee meeting and forwarding it to Council for action. Councilmember Johnson recalled staff was analyzing whether the additional nine spaces were possible. Mr. Williams said staff was comfortable nine additional spaces could be provided, possibly talking with homeowners about driveway aprons and returns. He agreed with Jim Wassall there were locations on Sunset that the sidewalk in on private property. That is an historical artifact that should be addressed someday. Councilmember Johnson asked if the additional nine spaces were contingent on the driveway modifications. Mr. Williams answered they were not contingent but adjustments to the curb returns would make them more comfortable. Councilmember Nelson said he will oppose any additional parking on Sunset, expressing his profound concern with the lack of a physical barrier separating pedestrians from cars after seeing cars inadvertently driving on the pathway. MOTION CARRIED (6-1), COUNCILMEMBER NELSON VOTING NO. COUNCILMEMBER JOHNSON MOVED TO PUT A DO NOT ENTER SIGN AT THE BEGINNING OF CASPERS AND HAVE AN ACCOMPANYING REGULATION THAT ALLOWS LOCAL RESIDENTS TO ACCESS CASPERS BUT NOT A SIGN AS IT IS NOW STATING LOCAL ACCESS ONLY. DIED LACK OF A SECOND. Mr. Williams preferred not to have such strict limits on the signage. 9. COUNCIL COMMITTEE REPORTS COUNCIL COMMITTEE REPORTS Due to the late hour, this item was delayed to a future meeting. 10. MAYOR'S COMMENTS 11. COUNCIL COMMENTS 12. CONVENE IN EXECUTIVE SESSION REGARDING PENDING OR POTENTIAL LITIGATION PER RCW 42.30.110(1)(i) This item was not needed. 13. RECONVENE IN OPEN SESSION. POTENTIAL ACTION AS A RESULT OF MEETING IN EXECUTIVE SESSION This item was not needed. Edmonds City Council Draft Minutes August 15, 2017 Page 29 Packet Pg. 32 5.1.a 14. ADJOURN COUNCILMEMBER FRALEY-MONILLAS MOVED, SECONDED BY COUNCIL PRESIDENT MESAROS, TO ADJOURN THE MEETING. MOTION CARRIED UNANIMOUSLY. The Council meeting was adjourned at 11:38 p.m. Edmonds City Council Draft Minutes August 15, 2017 Page 30 Packet Pg. 33 5.2 City Council Agenda Item Meeting Date: 08/22/2017 Acknowledge receipt of the Claim for Damages from Suzanne Phillips. Staff Lead: {Type Name of Staff Lead) Department: City Clerk's Office Preparer: Linda Hynd Background/History N/A Staff Recommendation Acknowledge receipt of the Claim for Damages by minute entry. Narrative Suzanne S. Phillips 906 Puget Way Edmonds, WA 98020 ($67.90) Attachments: Phillips Claim for Damages Packet Pg. 34 RECEIVE CITY OF EDMONDS CLAIM FOR DAMAGES FORM Please take note that Suzanne S. Phillips 906 Puget Way, Edmonds, WA 98020 AUG I I 01P Bate Claim Fvrm Received by City who currently resides at mailing address 906 Puget Way, Edmonds WA 98020 home phone # 425-967-7640 , work phone # , and who resided at same address at the time of the occurrence and whose date of birth is 10/29/1950 , is claiming damages against City of Edmonds in the sum of $ $67.90 arising out of the following circumstances listed below. 05/23/2017 DATE OF OCCURRENCE: LOCATION OF OCCURRENCE: home - above address DESCRIPTION: TIME: 9:30am (approx) t. Describe the conduct and circumstance that brought about the injury or damage. Also describe the injury or damage. Edmonds Dept Public Works work crew incorrectly used pressure hose to clean side sewer to Puget Way houses, causing e banlloui4e0-Miner wacFer tauter and gase B Into home. Sewer materials erupRid from tonets and sprayed walls, 110ors and fixtures I r�fP—o r 9-wii rthtubs and 1 shower. We cleaned up the resulting mess but had to take 1 rug urgently for professional cleanirl_q at D.A. BURNS, with (attach an extra sheet for additional information, if needed) 2. Provide a list of witnesses, if applicable, to the occurrence including names, addresses, and phone numbers. Tim Harris, Dept Public Works, City of Edmonds-_425-771-0235 See attached receipt. Photos available, Photos available. 3. Attach copies of all documentation relating to expenses, injuries, losses, and/or estimates for repair. 4. Have you submitted a claim for damages to your insurance company? If so, please provide the name of the insurance company: NA and the policy #: License Plate # Type Auto: Yes XNo * * ADDITIONAL INFORMATION REQUIRED FOR AUTOMOBILE CLAIMS ONLY * * Driver License # (year) (make) (model) DRIVER: OWNER: Address: Address: Phone#: Phone#: Passengers: Name: Name: Address: Address: Form Revised 05/06/14 Page t of 2 Q Packet Pg. 35 * * NOTE: THIS FORM MUST BE SIGNED AND NOTARIZED * * E IRO CITY CLERK 5.2.a I, 600n+u +°rT� �� d' �� �iQ � being first duly sworn, depose and say that I am the claimant for the above described; that I have read the above claim, know the contents thereof and believe the same to be true. I further acknowledge that any information I provide as part of this claim may be considered a public record and may be subject to disclosure pursuant to R NI 42.56. x. �t Jr Signature of Claimant(s) State of Washington County of .S i o/ia r,gsA I certify that 1 knave or haves tisfactory evidence that S► rr� 5061 eAr Q thte plson who appeared before me, and said person acknowledged that (he/she) signed this instrument and acknowledged it to be (his/her) free and voluntary act for the uses and purposes mentioned in the instrument. �%„ Elated:u Tu Title q My appointment expires: Please present the completed claim form to: Forth Revised 05/06/14 City Clerk's Office City of Edmonds 121 51h Avenue North Edmonds, WA, 98020 8:00 a.m. to 4:30 p.m. y �=�'te�'�,QzaR�''Oy7►►r,O'�' � 2_ Ct' �psi�..•v`` 111IoF WASH`�� .. Page 2 of 2 Packet Pg. 36 D. A. BURNS & SONS, INC. Seattle 4411 Leary Way NW 98107 Bellevue 13830 Bel -Red Road 98005 TRUSTED SINCE 1935 Invoice # 49840 PHILL12115 1-R Suzanne Phillips 906 Puget Way Edmonds, WA 98020 Placed By: William 425-967-7640 Contact: Suzanne Phillips gzy906@gmail.com Item 5rvc R No. Code Qty W Description Size 1-SSS 141 1 R Hand -Knotted Oriental Rug Cleaning TV x 5' 0" red, black, creme 1-SSS 186 1 R Deodorizing Process (Prior to Cleaning) 3' 5" x 5' 0" D A BURNS AND SONS 4411 LEARY WAY NIN SEATTLE, WA 9BID74540 D6 Oi='2D17 13:48:07 CREDIT CARD VISA SALE Card 4 xxxxMn0iXR}(6662 SEQ ri. 24 Bath #: I8 INVOICE 49840 Approval Cc�.­: 04234D Entry Iktiod Maui Made. ONN SALE AMOUNT 7, CUSTOMER COPY Thank you for thinking of D. A. Burns. 206.782.2 Everett 1ro,1 FreO 425,513.1400 E-mail info@daburns.corr w us ar daburns. com SCC�(r' 1[lIT Invoice pale: 6Ii117 OrderTakeii�$y/3;a�k f���� Customer POM l• C�� Invoiced By: Jericho Sidemadc Based On Sales Orders 49888 Due Discount Date. Amount % Total 5/30/17 $66,15 20% S52.92 N d 5/35J17 $8.75 E cc .•, Subtotal: $61.67 i Tax: $6.23 Total $67.90 E t� Amt Paid: $67.90 y d PAYMENT DUE: $0.00 M E M Credit Card # 6662 0 `o E M c� a a c as E 1 of 1 i LI-STO:NTR Ck`r, Q Packet Pg. 37 5.3 City Council Agenda Item Meeting Date: 08/22/2017 Approval of claim, payroll and benefit checks, direct deposit and wire payments. Staff Lead: Scott James Department: Administrative Services Preparer: Nori Jacobson Background/History Approval of claim checks #226954 through #227050 dated August 17, 2017 for $433,790.63. Approval of payroll direct deposit and checks #62807 through #62813 for $524,466.82, benefit checks #62814 through #62819 and wire payments of $584,227.02 for the pay period August 1, 2017 through August 15, 2017. Staff Recommendation Approval of claim, payroll and benefit checks, direct deposit and wire payments. Fiscal Impact Claims $433,790.63 Payroll Employee direct deposit and checks $524,466.82 Payroll Benefit checks and wire payments $584,227.02 Total Payroll $1,108,220.85 Narrative In accordance with the State statutes, City payments must be approved by the City Council. Ordinance #2896 delegates this approval to the Council President who reviews and recommends either approval or non -approval of expenditures. Attachments: claim cks 08-17-17 FrequentlyUsedProjNumbers 08-17-17 Payroll summary 08-15-17 Payroll benefit 08-15-17 Packet Pg. 38 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 226954 8/11/2017 076182 COLVIN, KATHY 226955 8/17/2017 076040 911 SUPPLY INC Voucher List City of Edmonds Invoice PO # Description/Account 7/20 REFUND 7/20 REFUND 7/20 REFUND 001.000.239.200 Tota 51959 INV#51959 - HAUGHIAN - EDMON BLAUER 8567 PANTS 001.000.41.521.22.24.00 10.0% Sales Tax 001.000.41.521.22.24.00 51961 INV#51961 - MOORE - EDMONDS BLAUER 8436 L/S SHIRT (CLASS 001.000.41.521.22.24.00 10.0% Sales Tax 001.000.41.521.22.24.00 51963 INV#51963 - BICKAR - EDMONDS BLAUER 8436 L/S SHIRT (CLASS 001.000.41.521.22.24.00 BLAUER 8436 L/S SHIRT 001.000.41.521.22.24.00 BLAUER 8446 S/S SHIRT 001.000.41.521.22.24.00 NAMETAGS FOR SHIRTS 001.000.41.521.22.24.00 10.0% Sales Tax 001.000.41.521.22.24.00 51968 INV#51968 - JONES - EDMONDS BLAUER 8567 PANTS 001.000.41.521.22.24.00 BLAUER 8436 L/S SHIRT (CLASS 001.000.41.521.22.24.00 BLAUER 8436 L/S SHIRT 001.000.41.521.22.24.00 BLAUER 8446 S/S SHIRTS 5.3.a Page: 1 m L 3 c 0 Amoun 0- m m L_ 85.0( 1 : 85.0( Y D: m t 179.9E c a� 18.0( P A) 69.9� a 7.0( P E U 69.9� o R 69.9� o Q. 64.9� Q 16.0( ti 22.1( PE c U) ke U 179.9E E A) M 69.9� c 69.9� E t U r Q Page: 1 Packet Pg. 39 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher 226955 226956 226957 226958 Date Vendor 8/17/2017 076040 911 SUPPLY INC 8/17/2017 070322 A&A LANGUAGE SERVICES INC Voucher List City of Edmonds Invoice (Continued) 15-50508 15-51558 8/17/2017 001375 AMERICAN PLANNING ASSOCIATION 161846-1772 180853-1772 PO # Description/Account 001.000.41.521.22.24.00 NAME TAGS FOR 3 SHIRTS 001.000.41.521.22.24.00 10.0% Sales Tax 001.000.41.521.22.24.00 Total RUSSIAN INTERPRETER COURT 0j RUSSIAN INTERPRETER COURT 0j 001.000.23.512.50.41.01 MONGOLIAN INTERPRETER COUR MONGOLIAN INTERPRETER COUR 001.000.23.523.30.41.01 Total APA DUES- MACHUGA 10/17--18 APA DUES- MACHUGA 10/17--18 001.000.62.558.60.49.00 APA DUES- LIEN 10/17--18 APA DUES- LIEN 10/17--18 001.000.62.558.60.49.00 Total 8/17/2017 069751 ARAMARK UNIFORM SERVICES 1990265506 FACILITIES DIVISION UNIFORMS FACILITIES DIVISION UNIFORMS 001.000.66.518.30.24.00 10.3% Sales Tax 001.000.66.518.30.24.00 1990275944 FACILITIES DIVISION UNIFORMS FACILITIES DIVISION UNIFORMS 001.000.66.518.30.24.00 10.3% Sales Tax 001.000.66.518.30.24.00 1990279853 PUBLIC WORKS OMC LOBBY MATE PUBLIC WORKS OMC LOBBY MATE 5.3.a Page: 2 m L 3 c Amoun 0 0 a m 129.9E m 24.0( =a vi Y 47.3E m 1,039.31, v r 4- m c a� 139.6: 0 176.7E o 316.31 a E M 338.0( 0 R 400.0( o 738.0( a a ti 33.3 1 ao 3.4z u) U E 32.5 2 U 3.3: E t U r Q Page: 2 Packet Pg. 40 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 226958 8/17/2017 069751 ARAMARK UNIFORM SERVICES Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 001.000.65.518.20.41.00 PUBLIC WORKS OMC LOBBY MAT: 111.000.68.542.90.41.00 PUBLIC WORKS OMC LOBBY MAT: 421.000.74.534.80.41.00 PUBLIC WORKS OMC LOBBY MAT: 422.000.72.531.90.41.00 PUBLIC WORKS OMC LOBBY MATE 423.000.75.535.80.41.00 PUBLIC WORKS OMC LOBBY MATE 511.000.77.548.68.41.00 10.3% Sales Tax 001.000.65.518.20.41.00 10.3% Sales Tax 111.000.68.542.90.41.00 10.3% Sales Tax 421.000.74.534.80.41.00 10.3% Sales Tax 422.000.72.531.90.41.00 10.3% Sales Tax 423.000.75.535.80.41.00 10.3% Sales Tax 511.000.77.548.68.41.00 1990279854 FLEET DIVISION UNIFORMS & MAT FLEET DIVISION UNIFORMS 511.000.77.548.68.24.00 FLEET DIVISION MATS 511.000.77.548.68.41.00 10.3% Sales Tax 511.000.77.548.68.24.00 10.3% Sales Tax 511.000.77.548.68.41.00 1990286468 FACILITIES DIVISION UNIFORMS FACILITIES DIVISION UNIFORMS 5.3.a Page: 3 m L 3 c Amoun 0 0 0- a) 1.6' m 6.1' =a (i Y 6.1' t 6.1' w m 6.1' a0i 6.0£ 0.1 0, c� a 0.6: 0.6: U 4- 0 0.6: 0 0.6< Q. a Q 0.6: ti ti 5.6£ ao 0 U) 18.4( U E 0.5£ .2 U Page: 3 Packet Pg. 41 vchlist 08/17/2017 11: 54: OOAM Voucher List City of Edmonds Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account 226958 8/17/2017 069751 ARAMARK UNIFORM SERVICES (Continued) 001.000.66.518.30.24.00 10.3% Sales Tax 001.000.66.518.30.24.00 1990296897 WWTP: 8/9/17 UNIFORMS, TOWEI wwtp uniforms 423.000.76.535.80.24.00 wwtp mats & towels 423.000.76.535.80.41.00 10.3% Sales Tax 423.000.76.535.80.24.00 10.3% Sales Tax 423.000.76.535.80.41.00 1990296898 PARKS MAINT UNIFORM SERVICE PARKS MAINT UNIFORM SERVICE 001.000.64.576.80.24.00 1990296899 FACILITIES DIVISION UNIFORMS FACILITIES DIVISION UNIFORMS 001.000.66.518.30.24.00 10.3% Sales Tax 001.000.66.518.30.24.00 Tota 226959 8/17/2017 073740 ARTHUR, AMY 8/13 PARK 85TH ST 8/13 PARK 85TH ST 8/13 PARK 85TH ST 117.100.64.573.20.41.00 Tota 226960 8/17/2017 071124 ASSOCIATED PETROLEUM 1120682-IN WWTP: 8/4/17 DIESEL FUEL ULSD #2 DYED - BULK fuel (includ 423.000.76.535.80.32.00 10.3% Sales Tax 423.000.76.535.80.32.00 Tota 226961 8/17/2017 064807 ATS AUTOMATION INC S 090213 alerton system-PW 5.3.a Page: 4 m L 3 c Amoun c a m 32.5 1 L 3.3E =5 vi Y 5.1( t 115.9E m c W 0.5< 11.9z — 0 57.3z a E .5 U 32.5 0 R 3.3E o 397.4E a a a ti 500.0( ti 1 : 500.0( ob U) ke e U 1,955.8, . 201.4E }; 1 : 2,157.21 y E t U 2 r Q Page: 4 Packet Pg. 42 vchlist 08/17/2017 11: 54: OOAM Voucher List City of Edmonds 5.3.a Page: 5 m L Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account 3 c Amoun 0 0 226961 8/17/2017 064807 ATS AUTOMATION INC (Continued) 0- alerton system-PW 8/1-10/31/17 001.000.66.518.30.48.00 2,866.5( 10.3% Sales Tax =a 001.000.66.518.30.48.00 295.2E Y Total: 3,161.7E t 226962 8/17/2017 001835 AWARDS SERVICE INC 13231 AWARDS TENNIS r AWARDS TENNIS - 001.000.64.571.25.31.00 345.2E a0i 10.4% Sales Tax 001.000.64.571.25.31.00 35.9' Total: 381.1( 0 226963 8/17/2017 075217 BASLER, TONY 20245 SPANISH INTERPRETER COURT OE SPANISH INTERPRETER COURT OE a 001.000.23.512.50.41.01 107.5( E Total: 107.5( 226964 8/17/2017 076096 BATTERY SYSTEMS INC 4016620 UNIT E134PO - BATTERIES AND CC o Unit E134PO - Batteries and Cores (1 511.100.77.594.48.64.00 152.7z o Kept Q- a 511.100.77.594.48.64.00 191.0E Q Core Fees ($10 returned) ti 511.100.77.594.48.64.00 13.0( 10.3% Sales Tax 511.100.77.594.48.64.00 35.4' c 4025569 FLEET UNIT E134PO RETURN BATI Y 10.3% Sales Tax U 511.100.77.594.48.64.00 -15.7, E Fleet Unit E134PO Return Battery 511.100.77.594.48.64.00 -152.71 }; 4102064 UNIT E134PO - CORE FEES REFUN a� Unit E134PO - Core Fees Refund E 511.100.77.594.48.64.00 -10.0( U r Q Page: 5 Packet Pg. 43 vchlist 08/17/2017 11: 54: OOAM Voucher List City of Edmonds 5.3.a Page: 6 m L Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account 3 c Amoun 0 0 226964 8/17/2017 076096 076096 BATTERY SYSTEMS INC (Continued) Total: a 213.7; -0a 226965 8/17/2017 002258 BENS EVER READY 14265 YOST - FIRE EXTINQUISHER SERV m Yost - Fire Extinquisher Service call 001.000.66.518.30.48.00 88.0( vi 10.3% Sales Tax 001.000.66.518.30.48.00 9.0E Total : 97.0E 226966 8/17/2017 074307 BLUE STAR GAS 10638 FLEET AUTO PROPANE 601 GAL w c Fleet Auto Propane 601 Gal .0 511.000.77.548.68.34.12 681.6, 10697 FLEET AUTO PROPANE 701 GAL 0 Fleet Auto Propane 701 Gal 0 511.000.77.548.68.34.12 L 804.8z >+ Total: 1,486.4E m E 226967 8/17/2017 073760 BLUELINE GROUP LLC 13779 E6JC.SERVICES THRU 07/29/17 E6JC.SERVICES THRU 07/29/17 421.000.74.594.34.41.10 28,416.1 o 13783 E6GA.SERVICES THRU 07/29/17 R E6GA.SERVICES THRU 07/29/17 0 L 423.200.75.594.35.41.00 20,189.6( 0- Total: 48,605.8'. Q 226968 8/17/2017 060141 BRANOM INSTRUMENT 586614 LS 5 -TROUBLESHOOT AND REPAI ti LS 5 - Troubleshoot and Repair ti 423.000.75.535.80.48.00 930.0( ao 10.3% Sales Tax 423.000.75.535.80.48.00 95.7� 586626 LS 5 - PARTS FOR CONTRACTED R E LS 5 - Parts for Contracted Repairs cc 423.000.75.535.80.48.00 1,524.0( 10.3% Sales Tax 423.000.75.535.80.48.00 156.9 1 E Total: 2,706.7E r Q Page: 6 Packet Pg. 44 5.3.a vchlist Voucher List Page: 7 08/17/2017 11:54:OOAM City of Edmonds m L 3 Bank code : usbank c Voucher Date Vendor Invoice PO # Description/Account Amoun N 0 226969 8/17/2017 003001 BUILDERS SAND & GRAVEL 322825 WATER/SEWER/STREET/STORM - i 0- Water/Sewer/Street/Storm - Crushed 111.000.68.542.31.31.00 1,023.8E Water/Sewer/Street/Storm - Crushed =a 422.000.72.531.40.31.00 1,023.8E Y Water/Sewer/Street/Storm - Crushed 421.000.74.534.80.31.00 1,023.8E Water/Sewer/Street/Storm - Crushed 423.000.75.535.80.31.00 1,023.8E 10.3% Sales Tax aD 111.000.68.542.31.31.00 105.4( 10.3% Sales Tax 422.000.72.531.40.31.00 105.4( - 10.3% Sales Tax 421.000.74.534.80.31.00 105.4( a 10.3% Sales Tax 423.000.75.535.80.31.00 105.4E Total: 4,517.3E Z 226970 8/17/2017 075874 BULGER SAFE & LOCK 34244 FS 20 - DOOR PART 4- 0 FS 20 - Door Part R o 001.000.66.518.30.31.00 38.5( a 10.3% Sales Tax Q 001.000.66.518.30.31.00 3.9 Total: 42.41, r; 226971 8/17/2017 070144 CEDAR GROVE COMPOSTING INC 0000343883 STORM - RAIN GARDEN SOIL FOR Storm - Rain Garden Soil for 22307 9 0 422.000.72.531.40.31.00 140.0( Y Env Fee U 422.000.72.531.40.31.00 7.5( 9.7% Sales Tax 422.000.72.531.40.31.00 14.3' Total: 161.8' 0 E 226972 8/17/2017 068484 CEMEX LLC 9436027376 STREET - CONCRETE U r Q Page: 7 Packet Pg. 45 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 226972 8/17/2017 068484 CEMEX LLC Voucher List City of Edmonds Invoice PO # Description/Account (Continued) Street - Concrete 111.000.68.542.61.31.00 8.6% Sales Tax 111.000.68.542.61.31.00 9436042836 WATER - CONCRETE Water - Concrete 421.000.74.534.80.31.00 8.6% Sales Tax 421.000.74.534.80.31.00 9436060120 ROADWAY - ASPHALT 10.0% Sales Tax 111.000.68.542.31.31.00 Roadway - Asphalt 111.000.68.542.31.31.00 9436074291 ROADWAY - ASPHALT Roadway - Asphalt 111.000.68.542.31.31.00 10.0% Sales Tax 111.000.68.542.31.31.00 9436081127 ROADWAY - ASPHALT Roadway - Asphalt 111.000.68.542.31.31.00 10.0% Sales Tax 111.000.68.542.31.31.00 9436088197 ROADWAY - ASPHALT Roadway - Asphalt 111.000.68.542.31.31.00 10.0% Sales Tax 111.000.68.542.31.31.00 9436110468 ROADWAY - ASPHALT Roadway - Asphalt 111.000.68.542.31.31.00 10.0% Sales Tax 111.000.68.542.31.31.00 5.3.a Page: 8 m L 3 c Amoun 0 0 a am 382.5( m rl: 32.8� Y m t 318.7E w m 27.4, M 0 25.4� _ 0 254.9( a E 394.2( 0 39.4, 0 L a 288.4( Q 28.8, ti ao 347.0( N y U 34.7( E 164.2( c aD E 16.4, r Q Page: 8 Packet Pg. 46 vchlist 08/17/2017 11: 54: OOAM Voucher List City of Edmonds Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account 226972 8/17/2017 068484 CEMEX LLC (Continued) 9436117798 ROADWAY - ASPHALT Roadway - Asphalt 111.000.68.542.31.31.00 10.0% Sales Tax 111.000.68.542.31.31.00 9436124154 ROADWAY - ASPHALT Roadway - Asphalt 111.000.68.542.31.31.00 10.0% Sales Tax 111.000.68.542.31.31.00 Tota 226973 8/17/2017 003510 CENTRAL WELDING SUPPLY XC26365 WWTP: 8/4/17 CYLINDER RENTAL nitrogen, oxygen, carbon monoxid 226977 8/17/2017 075648 COVICH-WILLIAMS CO INC 0296379-IN UNIT 138 - SUPPLIES 5.3.a Page: 9 m L 3 c Amoun 0 0 a am 0 0) 395.0( =a 0 Y 39.5( t 105.0( m c a� 10.5( 2,905.1; e 0 >' c� 1,088.11 E 112.0E 1: 1,200.2, o TF 5 T 0 L 16,095.2: a I : 16,095Z Q ti ti 108.3' c I : 108.3' U E 52.0( 1 : 52.0( c a� E t U r Q Page: 9 Packet Pg. 47 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 226977 8/17/2017 075648 COVICH-WILLIAMS CO INC 226978 8/17/2017 073759 CRITERION PICTURES USA INC 226979 8/17/2017 061570 DAY WIRELESS SYSTEMS - 03 226980 8/17/2017 007625 EDMONDS ARTS FESTIVAL Voucher List City of Edmonds Invoice (Continued) 425049 204501-00 7/19 REFUND 226981 8/17/2017 074302 EDMONDS HARDWARE & PAINT LLC 002353 PO # Description/Account Unit 138 - Supplies 511.000.77.548.68.31.10 10.3% Sales Tax 511.000.77.548.68.31.10 Tota OUTDOOR MOVIE LICENSE KUN OUTDOOR MOVIE LICENSE KUN 001.000.64.571.22.49.00 Tota INV#204501-00 - EDMONDS PD SX4 ALPR PROCESSOR/POWER 512.000.31.518.88.48.00 Freight 512.000.31.518.88.48.00 10.3% Sales Tax 512.000.31.518.88.48.00 Tota 7/19 REFUND 7/19 REFUND 001.000.239.200 Tota PM: PAINT, COVER PM: PAINT, COVER 001.000.64.576.80.31.00 10.3% Sales Tax 001.000.64.576.80.31.00 Tota 5.3.a Page: 10 G G m L 3 c Amoun c a m 66.9E La)=a 6.9( Y 1 : 73.8E t � r m 300.0( y 1 : 300.0( 0 4,275.0( c4 a 24.0( E 442.8( ,- 4,741.8( o R 0 L Q a 834.9' Q 834.9' ti ti 0 27.4E N U 2.8' E 30.3' 226982 8/17/2017 069523 EDMONDS P&R YOUTH SCHOLARSHIP 6025 NEBIYU SCHOL 6025 NEHEMIAH NEBIYU SCHOLAF 6025 NEHEMIAH NEBIYU SCHOLAF aD 122.000.64.571.20.49.00 75.0( t U 2 r Q Page: 10 Packet Pg. 48 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice 226982 8/17/2017 069523 069523 EDMONDS P&R YOUTH SCHOLARS (Continued) 226983 8/17/2017 008705 EDMONDS WATER DIVISION 1-00575 1-00655 1-00825 1-00875 1-00925 1-01950 1-02125 1-03710 1-03900 1-03950 1-05125 1-05285 PO # Description/Account Total: OLYMPIC BEACH SPRINKLER / ME- OLYMPIC BEACH SPRINKLER / ME- 001.000.64.576.80.47.00 LIFT STATION #7 71 W DAYTON ST LIFT STATION #7 71 W DAYTON ST 423.000.75.535.80.47.10 BRACKETT'S LANDING RESTROON BRACKETT'S LANDING RESTROON 001.000.64.576.80.47.00 SPRINKLER 21 MAIN ST / METER 11 SPRINKLER 21 MAIN ST / METER 11 001.000.64.576.80.47.00 LIFT STATION #8 107 RAILROAD AV LIFT STATION #8 107 RAILROAD AV 423.000.75.535.80.47.10 LIFT STATION #1 450 SUNSET AVE, LIFT STATION #1 450 SUNSET AVE, 423.000.75.535.80.47.10 SUNSET & CASPER SPRINKLER/ M SUNSET & CASPER SPRINKLER/ M 001.000.64.576.80.47.00 SPRINKLER 290 MAIN ST / METER SPRINKLER 290 MAIN ST / METER 001.000.64.576.80.47.00 SPRINKLER 290 DAYTON ST / MET[ SPRINKLER 290 DAYTON ST / MET[ 001.000.64.576.80.47.00 OLD PUBLIC WORKS (NORTH) 200 OLD PUBLIC WORKS 200 DAYTON 421.000.74.534.80.47.00 SPRINKLER 101 2ND AVE N / METE SPRINKLER 101 2ND AVE N / METE 001.000.64.576.80.47.00 SPRINKLER 102 W DAYTON ST / MI 5.3.a Page: 11 m L 3 c Amoun 0 0 0- 75.0( -0a m L 376.6E vi Y m t 44.2E r w m c a� 1,435.3E 0 44.2E o c� a 44.2E E U w- 48.0 1 o R 0 105.3, a a ti 44.2E ti ao 0 139.E 1 Y U E 1,152.6E u Page: 11 Packet Pg. 49 U r Q 5.3.a vchlist Voucher List Page: 12 08/17/2017 11:54:OOAM City of Edmonds m L 3 Bank code : usbank c Voucher Date Vendor Invoice PO # Description/Account Amoun N 0 226983 8/17/2017 008705 EDMONDS WATER DIVISION (Continued) a SPRINKLER 102 W DAYTON ST / MI 001.000.64.576.80.47.00 44.2E L 1-05340 SPRINKLER 190 DAYTON ST / MET[ =a SPRINKLER 190 DAYTON ST / MET[ vi 001.000.64.576.80.47.00 Y 143.4E u 1-05350 OLD PUBLIC WORKS (SOUTH) 200 OLD PUBLIC WORKS (SOUTH) 200 421.000.74.534.80.47.00 175.4, m 1-05650 CITY PARK SPRINKLER/ METER 71, y CITY PARK SPRINKLER/ METER 71, 001.000.64.576.80.47.00 44.2: 1-05675 CITY PARK MAINTENANCE SHOP / CITY PARK MAINTENANCE SHOP / 0- 001.000.64.576.80.47.00 1,104.6( a 1-05700 SPRINKLER @ 3RD/PINE / METER SPRINKLER @ 3RD/PINE / METER E 001.000.64.576.80.47.00 212.1 E 1-05705 LIFT STATION #6 100 PINE ST / MEl LIFT STATION #6 100 PINE ST / MEl o 423.000.75.535.80.47.10 R 93.9( o 1-09650 SPRINKLER 350 MAIN ST / METER i a SPRINKLER 350 MAIN ST / METER i Q- Q 001.000.64.576.80.47.00 128.2, 1-09800 SPRINKLER 390 DAYTON ST / MET[ ti SPRINKLER 390 DAYTON ST / MET[ ti 001.000.64.576.80.47.00 147.3( 1-10778 FOUNTAIN 490 MAIN ST/METER 75" FOUNTAIN 490 MAIN ST/METER 75" � 001.000.64.576.80.47.00 952.5E U 1-10780 SPRINKLER 500 MAIN ST / METER SPRINKLER 500 MAIN ST / METER 001.000.64.576.80.47.00 105.3, 1-13975 CITY HALL 121 5TH AVE N / METER CITY HALL 121 5TH AVE N / METER t 001.000.66.518.30.47.00 660.1 , r Q Page: 12 Packet Pg. 50 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice 226983 8/17/2017 008705 EDMONDS WATER DIVISION (Continued) 1-16130 1-16300 1-16420 1-16450 1-16630 1-17475 1-19950 1-36255 226984 8/17/2017 075713 EGGERS, MICHAEL JOSEPH OFT EGGERS 226985 8/17/2017 031060 ELECSYS INTERNATIONAL CORP 165952 PO # Description/Account SPRINKLER 439 5TH AVE S / METEI SPRINKLER 439 5TH AVE S / METEI 001.000.64.576.80.47.00 SPRINKLER 500 DAYTON ST / METE SPRINKLER 500 DAYTON ST / METE 001.000.64.576.80.47.00 LOG CABIN SPRINKLER / METER 6' LOG CABIN SPRINKLER / METER 6' 001.000.64.576.80.47.00 CENTENNIAL PLAZA SPRINKLER 1 CENTENNIAL PLAZA SPRINKLER 1 001.000.64.576.80.47.00 SPRINKLER 575 MAIN ST / METER SPRINKLER 575 MAIN ST / METER 001.000.64.576.80.47.00 SPRINKLER 590 DAYTON ST / MET[ SPRINKLER 590 DAYTON ST / MET[ 001.000.64.576.80.47.00 PINE STREET PLAYFIELD / METER PINE STREET PLAYFIELD / METER 001.000.64.576.80.47.00 SPRINKLER 1141 9TH AVE S / METE SPRINKLER 1141 9TH AVE S / METE 001.000.64.576.80.47.00 Total OFT EGGERS OFT EGGERS 117.100.64.573.20.41.00 Total RADIX MONTHLY MAINTAGREEME Radix Monthly Maint Agreement - 421.000.74.534.80.48.00 5.3.a Page: 13 m L 3 c Amoun 0 0 0- 0 U L 181.6E =5 0 Y 341.9z r m 48.0 1 y 227.6, 0 L 525.1: a E .5 U 166.3E o R 0 85.7E Q. a Q 44.2E 8,968.7E ti 0 500.0( u 500.0( . Page: 13 Packet Pg. 51 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice 226985 226986 8/17/2017 8/17/2017 031060 009350 031060 ELECSYS INTERNATIONAL CORP (Continued) EVERETT DAILY HERALD EDH770039 EDH770209 EDH770966 EDH770974 226987 8/17/2017 061759 FALK, ERIC M FALK - JULY 2017 226988 8/17/2017 075757 FARMERS ELECTRIC 716 226989 8/17/2017 066378 FASTENAL COMPANY WAMOU45413 WAMOU45652 PO # Description/Account Total : CITY NOTICES - MULTI FAMILY HOL CITY NOTICES - MULTI FAMILY HOL 001.000.25.514.30.41.40 LEGAL AD PLN20170025 LEGAL AD PLN20170025 001.000.62.558.60.41.40 CITY ORDINANCES 4076 CITY ORDINANCES 4076 001.000.25.514.30.41.40 LEGAL AD HWY 99 FEIS LEGAL AD HWY 99 FEIS 001.000.62.558.60.41.40 Total FALK EXPENSE CLAIM - MOTORS E PER DIEM 7/24-7/27/17 SHELTON, V 001.000.41.521.40.43.00 Total UNIT E147EQ - BILLING 3 - OPERAI Unit E147EQ - Billing 3 - Operations 511.100.77.594.48.64.00 10.3% Sales Tax 511.100.77.594.48.64.00 Total WATER - GREEN PAINT FOR MARK Water - Green Paint for Marking 421.000.74.534.80.31.00 10.3% Sales Tax 421.000.74.534.80.31.00 WWTP: S/S FW'S S/S FWs 3/8 & 5/8 423.000.76.535.80.48.00 5.3.a Page: 14 m L 3 c Amoun 0 0 0- 152.0( 4) m L 72.2z vi Y m t 58.4E r w m c a� 22.3( 0 72.2z o 225.3, a E M 142.0( U 142.0( 0 5 0 L 0. a 13,260.0( Q ti 1,365.7E 14,625.7E 0 U 62.1 < E 6.4( c a� E 20.9� r Q Page: 14 Packet Pg. 52 vchlist 08/17/2017 11: 54: OOAM Voucher List City of Edmonds 5.3.a Page: 15 m L Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account 3 c Amoun 0 0 226989 8/17/2017 066378 FASTENAL COMPANY (Continued) 0- 10.3% Sales Tax 423.000.76.535.80.48.00 2.1( m Total: 91.61 `0 226990 8/17/2017 009815 FERGUSON ENTERPRISES INC 0559858 WATER METERS #2024 M-METER-C u Y Water Meters #2024 M-METER-0.62: 421.000.74.534.80.34.30 2,816.5( 10.3% Sales Tax 4- 421.000.74.534.80.34.30 290.1( y 0559858-1 WATER METERS - #2024 M-METER. Water Meters - #2024 M-METER-0.6, 421.000.74.534.80.34.30 720.5( 10.3% Sales Tax o 421.000.74.534.80.34.30 74.2' : 0562082 WATER PARTS a 10.3% Sales Tax E 421.000.74.534.80.31.00 172.1 2 Water Parts 421.000.74.534.80.31.00 o 1,671.5( 0 Total: 75 5,745.01, o 0 226991 8/17/2017 011900 FRONTIER 253-003-6887 LIFT STATION #6 VG SPECIAL ACCI Q' a LIFT STATION #6 VG SPECIAL ACCI Q 423.000.75.535.80.42.00 42.1( ti 253-011-1177 PUBLIC WORKS OMC RADIO LINE ti PUBLIC WORKS OMC RADIO LINE 001.000.65.518.20.42.00 6.4, o PUBLIC WORKS OMC RADIO LINE' N 111.000.68.542.90.42.00 24.4( u PUBLIC WORKS OMC RADIO LINE' E 421.000.74.534.80.42.00 24.4( PUBLIC WORKS OMC RADIO LINE' }; 423.000.75.535.80.42.00 24.4( PUBLIC WORKS OMC RADIO LINE' E t 511.000.77.548.68.42.00 24.4( um r Q Page: 15 Packet Pg. 53 5.3.a vchlist Voucher List Page: 16 08/17/2017 11:54:OOAM City of Edmonds m L 3 Bank code : usbank c Voucher Date Vendor Invoice PO # Description/Account Amoun N 0 226991 8/17/2017 011900 FRONTIER (Continued) a PUBLIC WORKS OMC RADIO LINE 422.000.72.531.90.42.00 24.4' 425-712-0423 WWTP: 8/7-9/6/17 AFTER HOUR BIL =a 8/7-9/6/17 AFTER HOUR BUSINESS vi 423.000.76.535.80.42.00 Y 72.8� 425-745-4313 CLUBHOUSE ALARM LINES 6801 M CLUBHOUSE FIRE AND INTRUSIOI` 001.000.66.518.30.42.00 132.6E m 425-771-4741 425-771-4741 CEMETERY PHONE/II y 425-771-4741 CEMETERY PHONE/II 130.000.64.536.20.42.00 117.5E 425-775-1344 425-775-1344 RANGER STATION 425-775-1344 RANGER STATION o 001.000.64.571.23.42.00 67.5( ca 425-775-7865 UTILITY BILLING RADIO LINE a UTILITY BILLING RADIO LINE TO FI' E 421.000.74.534.80.42.00 67.5< 425-776-2742 LIFT STATION #7 VG SPECIAL ACCI LIFT STATION #7 V/G SPECIAL ACC o 423.000.75.535.80.42.00 R 26.4( o Total: 655.1' Q. a 226992 8/17/2017 012199 GRAINGER 9506793505 SR CENTER - V BELTS Q Sr Center - V Belts ti 001.000.66.518.30.31.00 38.0z ti 10.3% Sales Tax 001.000.66.518.30.31.00 3.9' c Total: 41.9'. Y U 226993 8/17/2017 071446 GREAT FLOORS COMMERCIAL SALES 807528 MCH - CARPET E MCH - Carpet 016.000.66.518.30.48.00 4,831.1z }; 10.3% Sales Tax y 016.000.66.518.30.48.00 497.6' E t U r Q Page: 16 Packet Pg. 54 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice 226993 8/17/2017 071446 071446 GREAT FLOORS COMMERCIAL SAL (Continued) 226994 8/17/2017 076180 GSM FILTRATION INC 2040 PO # Description/Account WWTP: BELT belt 423.000.76.535.80.48.00 Freight 423.000.76.535.80.48.00 226995 8/17/2017 067862 HOME DEPOT CREDIT SERVICES 1020808 FAC - SUPPLIES FAC - Supplies 001.000.66.518.30.31.00 10.0% Sales Tax 001.000.66.518.30.31.00 1020880 FAC MAINT SHOP SUPPLIES Fac Maint Shop Supplies 001.000.66.518.30.31.00 10.0% Sales Tax 001.000.66.518.30.31.00 2022150 SR CENTER - SUPPLIES Sr Center - Supplies 001.000.66.518.30.31.00 10.0% Sales Tax 001.000.66.518.30.31.00 2062637 WATER - SUPPLIES Water - Supplies 421.000.74.534.80.31.00 10.0% Sales Tax 421.000.74.534.80.31.00 20970 PW SUPPLIES PW Supplies 001.000.66.518.30.31.00 10.0% Sales Tax 001.000.66.518.30.31.00 5016752 YOST - SUPPLIES Yost - Supplies Total Total 5.3.a Page: 17 m L 3 c Amoun N 0 a 5,328.7! -0a m L 2,232.0( vi Y 1,076.0' 3,308.0' w m c a� 269.51 0 26.9E o L a 35.6z 3.5( 0 R 76.9z Lo- c. a 7.6c Q ti ti 163.7, 0 16.31 Y E 30.9E 3.1( y E t r Q Page: 17 Packet Pg. 55 vchlist 08/17/2017 11: 54: OOAM Voucher List City of Edmonds 5.3.a Page: 18 m L Bank code : usbank Voucher Date Vendor Invoice PO # Description/Account 3 c Amoun 0 0 226995 8/17/2017 067862 HOME DEPOT CREDIT SERVICES (Continued) a 001.000.66.518.30.31.00 25.9� 10.0% Sales Tax L 001.000.66.518.30.31.00 2.6( 15 5016756 PW - SUPPLIES vi 10.0% Sales Tax cYi 001.000.66.518.30.31.00 3.3z PW - Supplies 001.000.66.518.30.31.00 33.3E m 5020342 YOST - SUPPLIES Yost - Supplies 001.000.66.518.30.31.00 2.9( 10.0% Sales Tax 001.000.66.518.30.31.00 0.3( 5021635 FAC MAINT UNIT 42 - SUPPLIES ca Fac Maint Unit 42 - Supplies a 001.000.66.518.30.31.00 42.1: .E 10.0% Sales Tax R U 001.000.66.518.30.31.00 4.2' o 5023246 SR CENTER - SUPPLIES Sr Center - Supplies R > 0 001.000.66.518.30.31.00 30.8 1 a 10.0% Sales Tax Q 001.000.66.518.30.31.00 3.0Z " 5063245 SEWER - SUPPLIES ti Sewer - Supplies ti 423.000.75.535.80.31.00 36.1 z 10.0% Sales Tax c 423.000.75.535.80.31.00 3.6' 5561284 WATER SUPPLIES E Water Supplies 5 421.000.74.534.80.31.00 18.3' 10.0% Sales Tax 421.000.74.534.80.31.00 1.8, 5573091 TRAFFIC - SUPPLIES t U r Q Page: 18 Packet Pg. 56 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 226995 8/17/2017 067862 HOME DEPOT CREDIT SERVICES Voucher List City of Edmonds Invoice PO # Description/Account (Continued) Traffic - Supplies 111.000.68.542.64.31.00 10.0% Sales Tax 111.000.68.542.64.31.00 5596118 SEWER SUPPLIES Sewer Supplies 423.000.75.535.80.31.00 10.0% Sales Tax 423.000.75.535.80.31.00 6016535 SEWER LS 5 -SUPPLIES Sewer LS 5 -Supplies 423.000.75.535.80.31.00 10.0% Sales Tax 423.000.75.535.80.31.00 6042288 FAC MAINT SHOP SUPPLIES Fac Maint Shop Supplies 001.000.66.518.30.31.00 10.0% Sales Tax 001.000.66.518.30.31.00 6591182 SEWER LIFT STATIONS SUPPLIES Sewer Lift Stations Supplies 423.000.75.535.80.31.00 10.0% Sales Tax 423.000.75.535.80.31.00 7010704 FAC MAINT UNIT 42 - SUPPLIES Fac Maint Unit 42 - Supplies 001.000.66.518.30.31.00 10.0% Sales Tax 001.000.66.518.30.31.00 7033738 SEWER - SR CENTER REPAIR SUP Sewer - Sr Center Repair Supplies 423.000.75.535.80.31.00 10.0% Sales Tax 423.000.75.535.80.31.00 5.3.a Page: 19 m L 3 c Amoun 0 0 a am 0 35.4z m 3.5, Y m t 8.0E w m 0.8' a0i 0 10.5E — 0 L 1.0f a E 51.0E 0 5.1' 0 L a 38.9, Q' Q 3.8£ ti ao 53.7 0 N y U 5.3E E M 143.6 a� E 14.31 r Q Page: 19 Packet Pg. 57 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 226995 8/17/2017 067862 HOME DEPOT CREDIT SERVICES Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 8017909 TRAFFIC - SUPPLIES Traffic - Supplies 111.000.68.542.64.31.00 10.0% Sales Tax 111.000.68.542.64.31.00 8021190 WWTP - AIR CLEANER W WTP - Air Cleaner 001.000.66.518.30.31.00 10.0% Sales Tax 001.000.66.518.30.31.00 8022794 SEWER - SR CENTER REPAIR SUP Sewer - Sr Center Repair Supplies 423.000.75.535.80.31.00 10.0% Sales Tax 423.000.75.535.80.31.00 9017755 ROADWAY - SUPPLIES Roadway - Supplies 111.000.68.542.31.31.00 10.0% Sales Tax 111.000.68.542.31.31.00 9017784 FAC MAINT UNIT 42 - SUPPLIES Fac Maint Unit 42 - Supplies 001.000.66.518.30.31.00 10.0% Sales Tax 001.000.66.518.30.31.00 9024878 FAC - SUPPLIES FAC - Supplies 001.000.66.518.30.31.00 10.0% Sales Tax 001.000.66.518.30.31.00 9050366 SEWER - SUPPLIES Sewer - Supplies 423.000.75.535.80.31.00 10.0% Sales Tax 5.3.a Page: 20 m L 3 c Amoun 0 0 a a) m 16.0' '5 u Y 1.6( t 196.0( a c a) 19.6( 0 133.9, as 13.3t a E .5 U 87.7' o R 8.7 1 o L Q. a a 45.8Z " ti 4.5t ti ao 0 24.0< E 2.4( 'S c 8.9 - E t U ns r Q Page: 20 Packet Pg. 58 vchlist 08/17/2017 11: 54: OOAM Voucher List City of Edmonds Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account 226995 8/17/2017 067862 HOME DEPOT CREDIT SERVICES (Continued) 423.000.75.535.80.31.00 Tota 226996 8/17/2017 073548 INDOFF INCORPORATED 2971717 DOVE HAND SOAP Dove hand soap - returned for credit 001.000.31.514.23.31.00 10.3% Sales Tax 001.000.31.514.23.31.00 2986734 DOVE HAND SOAP Dove hand soap returned for credit - 001.000.31.514.23.31.00 10.3% Sales Tax 001.000.31.514.23.31.00 2993711 PAPER AND CD SLEEVES PAPER AND CD SLEEVES 001.000.23.523.30.31.00 10.3% Sales Tax 001.000.23.523.30.31.00 226997 8/17/2017 014940 INTERSTATE BATTERY SYSTEMS 300-10028634 226998 8/17/2017 062477 KEEP POSTED 21076 21077 Tota PM: CABLE TIES, BATTERY CLEA PM: CABLE TIES, BATTERY CLEA 001.000.64.576.80.31.00 10.3% Sales Tax 001.000.64.576.80.31.00 Tota CONCERTS POST CONCERTS POST 123.000.64.573.20.41.00 W OTS POST W OTS POST 123.000.64.573.20.41.00 Tota 5.3.a Page: 21 m L 3 c Amoun 0 0 0- a) 0.9( 1,782.7' m Y 95.9E 9.8E - c W 95.9E 0 237.9, E R U 24.5' 1 : 262.4; o R NI 0 L NI 0. a 170.5' Q ti 17.5( ti 1 : 188.0$ 0 U) ke U 135.0( E 135.0( 1 : 270.0( E t U 2 r Q Page: 21 Packet Pg. 59 vchlist 08/17/2017 11: 54: OOAM Voucher List City of Edmonds 5.3.a Page: 22 m L 3 Bank code : usbank c Voucher Date Vendor Invoice PO # Description/Account Amoun 0 0 226999 8/17/2017 017050 KWICK'N KLEEN CAR WASH 08092017-01 INV#08092017-01 - EDMONDS PD - 0- 51 CAR WASHES @ $5.06 (INC TX) 001.000.41.521.22.48.00 258.0( m Total: 258.0E `0 227000 8/17/2017 075769 MAILFINANCE INC N6668924 LEASE#N16073348 UB FOLDING M vi Y LEASE#N16073348 UB FOLDING IV t 421.000.74.534.80.48.00 193.5E LEASE#N16073348 UB FOLDING IV m 423.000.75.535.80.48.00 193.5E y LEASE#N16073348 UB FOLDING M 422.000.72.531.90.48.00 193.5E 10.3% Sales Tax 421.000.74.534.80.48.00 19.9Z LO- 10.3% Sales Tax 423.000.75.535.80.48.00 19.9z a 10.3% Sales Tax E 422.000.72.531.90.48.00 19.9Z TU Total: 640.5E o 227001 8/17/2017 076115 MC CLOUGHAN, SAMUEL JOHN 8/7-8/14 ATTENDANT 8/7-8/14/17 OUTDOOR VOLLEYBALI > 8/7-8/14/17 OUTDOOR VOLLEYBALL 0 L 001.000.64.571.25.41.00 88.0( 0- Total: 88.0( Q ti 227002 8/17/2017 076177 MCKINSTRY LOCKBOX 20023480 FACILITIES CONDITION REPORT Facilities Condition Report ti 016.000.66.594.19.65.00 30,600.0( c Total: 30,600.0( Y U 227003 8/17/2017 020039 MCMASTER-CARR SUPPLY CO 42350813 WWTP: FITTINGS/TUBING E FITTINGS/TUBING 423.000.76.535.80.48.00 328.7( Freight 423.000.76.535.80.48.00 100.3z E 43444560 WWTP: SCREWS/LOCKNUTS U r Q Page: 22 Packet Pg. 60 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 227003 8/17/2017 020039 MCMASTER-CARR SUPPLY CO 227004 8/17/2017 063773 MICROFLEX 227005 8/17/2017 024302 NELSON PETROLEUM 227006 8/17/2017 065720 OFFICE DEPOT Voucher List City of Edmonds Invoice PO # Description/Account (Continued) SCREWS/LOCKNUTS 423.000.76.535.80.31.00 Freight 423.000.76.535.80.31.00 43449211 WWTP: WASHERS Washers 423.000.76.535.80.31.00 Freight 423.000.76.535.80.31.00 Tota 00022644 07-17 TAX AUDIT PROGRAM TAX AUDIT PROGRAM 001.000.31.514.23.41.00 Tota 0626080-IN 0627807-IN 0629381-IN FLEET FILTER INVENTORY Fleet Filter Inventory 511.000.77.548.68.34.40 10.3% Sales Tax 511.000.77.548.68.34.40 FLEET FILTER INVENTORY 10.3% Sales Tax 511.000.77.548.68.34.40 Fleet Filter Inventory 511.000.77.548.68.34.40 FLEET FILTER INVENTORY Fleet Filter Inventory 511.000.77.548.68.34.40 10.3% Sales Tax 511.000.77.548.68.34.40 Tota 949722247001 PW - OFFICE PAPER (5 CASES) PW - Office Paper (5 cases) 5.3.a Page: 23 m L 3 c Amoun 0 0 a 0 0 187.0: m =a 13.8, Y m t 159.8z w m 14.8z a0i 804.5t 0 0 L 10.0( 1 : 10.0( E 9.8( 0 R 1.0, o Q. a Q 3.9£ ti ti 38.6£ 0 U) 27.01 0 E 2.7� I : 83.31 +: c a� t r Q Page: 23 Packet Pg. 61 vchlist 08/17/2017 11: 54: OOAM Voucher List City of Edmonds Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account 227006 8/17/2017 065720 OFFICE DEPOT (Continued) 001.000.65.518.20.31.00 10.3% Sales Tax 001.000.65.518.20.31.00 Tota 227007 8/17/2017 072739 O'REILLY AUTO PARTS 3685-286417 UNIT 46 - PARTS Unit 46 - Parts 511.000.77.548.68.31.10 10.3% Sales Tax 511.000.77.548.68.31.10 3685-294732 UNIT 37 - DISC PAD SET Unit 37 - Disc Pad Set 511.000.77.548.68.31.10 10.3% Sales Tax 511.000.77.548.68.31.10 Tota 227008 8/17/2017 070962 PAULSONS TOWING INC 114401 UNIT 454 - TOWING Unit 454 - Towing 511.000.77.548.68.48.00 10.4% Sales Tax 511.000.77.548.68.48.00 Tota 227009 8/17/2017 074793 PETDATA INC 5997 INV#5997 - EDMONDS PD - JUL 2 25 - 1 YR LICENSES @ $3.90 001.000.41.521.70.41.00 3 REPLACEMENT TAGS @ $3.90 001.000.41.521.70.41.00 4 LATE FEES COLLECTED @ $2.5 001.000.41.521.70.41.00 Tota 227010 8/17/2017 075183 PETERSON FRUIT CO 370724 AUGUST 2017 FRUIT PICKUP PLUOTS 5.3.a Page: 24 m L 3 c Amoun 0 0 0- a) 174.9: m 18.0. `5 192.9 i vi Y V d t r 12.3( - c a� 1.2, 0 99.8z o c� 10.2E 1 : 123.6$ E .5 U 4- 0 159.0( > 0 L 16.5z a 1 : 175.51 Q ti 0' ti 97.5( o U) 11.7( U 0 E 10.0( 1 : 119.2( c a� E t r Q Page: 24 Packet Pg. 62 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 227010 8/17/2017 075183 PETERSON FRUIT CO 227011 8/17/2017 068411 PHILLIPS 66 - CONOCO 76 227012 8/17/2017 028860 PLATT ELECTRIC SUPPLY INC Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 3172 001.000.22.518.10.49.00 LG FLAME SEEDLESS GRAPES 001.000.22.518.10.49.00 MENNEOLA 001.000.22.518.10.49.00 UNIT 904 GAS Unit 904 Gas 511.000.77.548.68.34.11 N565703 PW - SUPPLIES PW - Supplies 001.000.66.518.30.31.00 10.3% Sales Tax 001.000.66.518.30.31.00 N571055 PW SUPPLIES PW Supplies 001.000.66.518.30.31.00 10.3% Sales Tax 001.000.66.518.30.31.00 N571626 PW SUPPLIES PW Supplies 001.000.66.518.30.31.00 10.3% Sales Tax 001.000.66.518.30.31.00 N622142 SEWER LS 1 PARTS Sewer LS 1 Parts 001.000.66.518.30.31.00 10.3% Sales Tax 001.000.66.518.30.31.00 N634215 PS - SUPPLIES PS - Supplies 001.000.66.518.30.31.00 5.3.a Page: 25 m L 3 c Amoun c 0- m 28.0( m 22.8( =5 vi Y 21.2E Total : 72.0E t Tota 0 20.6( a E 2.1, .2 U 4- 0 173.1' > 0 L 17.8: a a ti 109.2' ti 11.2E o U) U 46.9. . 0 4.8: }; c a� E t 37.9E U r Q Page: 25 Packet Pg. 63 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher List City of Edmonds Voucher Date Vendor Invoice PO # Description/Account 227012 8/17/2017 028860 PLATT ELECTRIC SUPPLY INC (Continued) 10.3% Sales Tax 001.000.66.518.30.31.00 N641273 WWTP: ILS TA-6 MECH & SPA-2 SR ILS TA-6 MECH & SPA-2 SPLICER 423.000.76.535.80.48.00 10.3% Sales Tax 423.000.76.535.80.48.00 N643931 FAC - SUPPLIES FAC - Supplies 001.000.66.518.30.31.00 10.3% Sales Tax 001.000.66.518.30.31.00 N655894 SR CENTER - SUPPLIES Sr Center - Supplies 001.000.66.518.30.31.00 10.3% Sales Tax 001.000.66.518.30.31.00 N688681 FS 17 - SUPPLIES FS 17 - Supplies 001.000.66.518.30.31.00 10.3% Sales Tax 001.000.66.518.30.31.00 Tota I : 227013 8/17/2017 029117 PORT OF EDMONDS 03870 PORT RIGHT-OF-WAY LEASE FOR i PORT RIGHT-OF-WAY LEASE FOR, 422.000.72.531.90.51.00 Total: 227014 8/17/2017 070809 PUGET SOUND EXECUTIVE 17-2074 COURT SECURITY 08/02/2017-08/0� COURT SECURITY 08/02/2017-08/0, 001.000.23.512.50.41.00 17-2111 COURT SECURITY 08/07/2017-08/0S COURT SECURITY 08/07/2017-08/M 001.000.23.512.50.41.00 5.3.a Page: 26 m L 3 c Amoun 0 0 a am 3.9' m 0 Y 35.5E t 3.6E r m c a� 216.1( 0 22.2( — 0 L 99.8( a E 10.2£ 0 R 51.5E o L a 5.3' Q 872.2 i ti ti ao 3,141.5z c 3,141.51 U E 715.0( c a� E t 742.5( U r Q Page: 26 Packet Pg. 64 vchlist 08/17/2017 11: 54: OOAM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice PO # 227014 8/17/2017 070809 070809 PUGET SOUND EXECUTIVE (Continued) 227015 8/17/2017 030780 QUIRING MONUMENTS INC 00000175955 227016 8/17/2017 066771 RAMBERG, ED BLD20171070 227017 8/17/2017 075972 SC PUBLISHING LLC JESSICALYNNE 8/10 HMP LYNNE 227018 8/17/2017 074431 SEATTLE ASBESTOS TEST LLC 227019 8/17/2017 065119 SIRCHIE FINGERPRINT LAB 227020 8/17/2017 068489 SIRENNET.COM 201713000 0311257-IN 0217824-IN 0218128-IN Description/Account Tota MARKER INSCRIPTION-ROSSI MARKER INSCRIPTION-ROSSI 130.000.64.536.20.34.00 Tota REFUND- NO PERMIT REQUIRED Refund, no permit required 001.000.257.620 8/10 HMP LYNNE 8/10 HMP LYNNE 117.100.64.573.20.41.00 Tota Tota CIVIC STADIUM ASBESTOS TEST CIVIC STADIUM ASBESTOS TEST 001.000.64.576.80.41.00 Tota INV#0311257-IN - CUST #00-A980 ELECTROCTATIC MAT 001.000.41.521.80.31.00 Freight 001.000.41.521.80.31.00 Tota INV#0217824-IN - EDMONDS PD 900 SERIES LED SCENE LIGHTS 001.000.41.521.21.35.00 10.3% Sales Tax 001.000.41.521.21.35.00 UNITS E135,136PO - PARTS Units E135,136PO - Parts 511.100.77.594.48.64.00 5.3.a Page: 27 m L 3 c Amoun 0 0 a 1,457.5( -0a 0 am L is 359.0( vi 359.0( m t r 88.0( c 88.0( 0 0 900.0( "% 1 : 900.0( a E U 700.0( 0 1 : 700.0( 20 0 Q. a 20.0� Q ti 5.0( ti 1 : 25.0$ 0 U) V U 1,990.1, •� 204.9f W E t 5,448.6: UM r Q Page: 27 Packet Pg. 65 vchlist 08/17/2017 11: 54: OOAM Voucher List City of Edmonds 5.3.a Page: 28 m L Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account Amoun 3 c 0 0 227020 8/17/2017 068489 SIRENNET.COM (Continued) a 10.3% Sales Tax 511.100.77.594.48.64.00 561.2' m Total: 8,204.9i `a 227021 8/17/2017 074906 SITE WORKSHOP LLC 4679 VETERANS PLAZA LANDSCAPE AR vi Y VETERANS PLAZA LANDSCAPE AR t 132.000.64.594.76.41.00 2,110.5( Total: 2,110.5( c 227022 8/17/2017 065803 SKYHAWKS SPORTS ACADEMY 5707 SKYHAWKS 5707 SKYHAWKS MINI -HAWK INSTI 5707 SKYHAWKS MINI -HAWK INSTI 001.000.64.571.25.41.00 1,923.7E 5708 SKYHAWKS MULTI- 5708 SKYHAWKS MULTI -SPORT IN: 0 5708 SKYHAWKS MULTI -SPORT IN: >+ 001.000.64.571.25.41.00 675.7E c� a 5709 SKYHAWKS VOLLEY 5709 SKYHAWKS VOLLEYBALL INS 5709 SKYHAWKS VOLLEYBALL INS R 001.000.64.571.25.41.00 201.2E 5711 SKYHAWKS BASKET 5711 SKYHAWKS BASKETBALL INS 0 5711 SKYHAWKS BASKETBALL INS > 001.000.64.571.25.41.00 1,033.5( o Total: 3,834.2E a Q 227023 8/17/2017 075590 SMARSH INV00251648 07-17 NETGUARD MONTHLY SERVI NetGuard Monthly Service Building 001.000.62.524.20.42.00 36.0( NetGuard Monthly Service City Clerk 0 001.000.25.514.30.42.00 6.0( NetGuard Monthly Service Communit Y U 001.000.61.557.20.42.00 6.0( E NetGuard Monthly Service Court 001.000.23.512.50.42.00 6.0( .. NetGuard Monthly Service Developm, a� 001.000.62.524.10.42.00 6.0( E NetGuard Monthly Service Engineerir r Q Page: 28 Packet Pg. 66 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 227023 8/17/2017 075590 SMARSH Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 001.000.67.518.21.42.00 NetGuard Monthly Service Facilities 001.000.66.518.30.42.00 NetGuard Monthly Service Finance 001.000.31.514.23.42.00 NetGuard Monthly Service Human RE 001.000.22.518.10.42.00 NetGuard Monthly Service Informatioi 512.000.31.518.88.42.00 NetGuard Monthly Service Mayor's 0- 001.000.21.513.10.42.00 NetGuard Monthly Service Parks 001.000.64.576.80.42.00 NetGuard Monthly Service Police 001.000.41.521.22.42.00 NetGuard Monthly Service PW Water 421.000.74.534.80.42.00 NetGuard Monthly Service PW Water 421.000.74.534.80.42.00 NetGuard Monthly Service PW Water 423.000.75.535.80.42.00 NetGuard Monthly Service PW Sewei 423.000.75.535.80.42.00 NetGuard Monthly Service PW Storm 422.000.72.531.90.42.00 NetGuard Monthly Service PW Street 111.000.68.542.90.42.00 NetGuard Monthly Service PW Fleet 511.000.77.548.68.42.00 NetGuard Monthly Service PW Admin 001.000.65.518.20.42.00 NetGuard Monthly Service PW Admin 421.000.74.534.80.42.00 NetGuard Monthly Service PW Admin 5.3.a Page: 29 m L 3 c Amoun 0 0 a m 84.0( m 48.0( =a vi Y 6.0( t 6.0( w m 18.0( (D M 6.0( 12.0( c� a 234.0( 36.0( U w- 0 3.0( 0 3.0( Q. a Q 30.0( ti 6.0( 0 18.0( N U 6.0( E 2.1( c a� 0.6( E t U r Q Page: 29 Packet Pg. 67 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 227023 8/17/2017 075590 SMARSH 227024 8/17/2017 037303 SNO CO FIRE DIST # 1 227025 8/17/2017 037375 SNO CO PUD NO 1 Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 422.000.72.531.90.42.00 NetGuard Monthly Service PW Admin 423.000.75.535.80.42.00 NetGuard Monthly Service PW Admin 423.000.76.535.80.42.00 NetGuard Monthly Service PW Street 111.000.68.542.90.42.00 NetGuard Monthly Service PW Street 422.000.72.531.90.42.00 NetGuard Monthly Service WWTP 423.000.76.535.80.42.00 Total 17-1113 Q2-17 EMS BILLING & POSTAGE Q2-17 Ambulance billings & postage 001.000.39.522.70.41.00 Total 2001-2487-3 TRAFFIC LIGHT 9933 100TH AVE W TRAFFIC LIGHT 9933 100TH AVE W 111.000.68.542.64.47.00 2002-0291-9 LIFT STATION #8 113 RAILROAD AV LIFT STATION #8 113 RAILROAD AV 423.000.75.535.80.47.10 2002-7495-9 TRAFFIC LIGHT 23602 76TH AVE W TRAFFIC LIGHT 23602 76TH AVE W 111.000.68.542.64.47.00 2004-9683-4 LIFT STATION #10 17526 TALBOT R LIFT STATION #10 17526 TALBOT R 423.000.75.535.80.47.10 2006-5085-1 CITY PARK RESTROOMS CITY PARK RESTROOMS 001.000.64.576.80.47.00 2008-6924-6 CIVIC CENTER PLAYFIELD BLEACF CIVIC CENTER PLAYFIELD BLEACF 5.3.a Page: 30 m L 3 c Amoun N 0 0- m 2.1( m 0.6( =5 vi Y 0.6( t 6.0( w m 6.0( W 72.0( 666.0( — 0 L c� a 12,251.91 ,E 12,251.9i v w- 0 R 34.3: o a a a 59.0E ti ti 18.8� o U) U 56.01 . Page: 30 Packet Pg. 68 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 227025 8/17/2017 037375 SNO CO PUD NO 1 Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 001.000.64.576.80.47.00 2009-1385-3 DECORATIVE LIGHTING 115 2ND X DECORATIVE LIGHTING 115 2ND X 111.000.68.542.63.47.00 2011-8453-8 HICKMAN PARK HICKMAN PARK 001.000.64.576.80.47.00 2013-8327-0 CITY PARK GAZEBO CITY PARK GAZEBO 001.000.64.576.80.47.00 2014-3123-6 PEDEST CAUTION LIGHT 9110 OLY PEDEST CAUTION LIGHT 9110 OLY 111.000.68.542.64.47.00 2014-4175-5 TRAFFIC LIGHT 21531 HWY 99 / ME TRAFFIC LIGHT 21531 HWY 99 / ME 111.000.68.542.63.47.00 2014-5305-7 CIVIC CENTER PLAYFIELD LIGHTS CIVIC CENTER PLAYFIELD LIGHTS 001.000.64.576.80.47.00 2015-3292-6 LIFT STATION #7 121 W DAYTON S- LIFT STATION #7 121 W DAYTON S- 423.000.75.535.80.47.10 2015-6343-4 TRAFFIC LIGHT 660 EDMONDS WA TRAFFIC LIGHT 660 EDMONDS WA 111.000.68.542.64.47.00 2017-0375-8 PEDEST CAUTION LIGHT 23190 10( PEDEST CAUTION LIGHT 23190 10( 111.000.68.542.64.47.00 2017-1178-5 STREET LIGHTING (183 LIGHTS @ STREET LIGHTING (183 LIGHTS @ 111.000.68.542.63.47.00 2017-9000-3 ALDERWOOD INTERIE 6130 168TH ALDERWOOD INTERIE 6130 168TH 421.000.74.534.80.47.00 2019-2988-2 WWTP: 7/6-8/3/17 FLOW METER 84 5.3.a Page: 31 m L 3 c Amoun 0 0 0- a) 17.0� m 20.2£ Y m t 61.6' r m c a� 16.0< 0 16.6( o a 148.5' f R U 0 58.8: 0 0. 159.2� 0 ti 27.0( ti ao 0 27.1 £ � U E CU 707.2z 6 c a� 20.4z t U r Q Page: 31 Packet Pg. 69 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 227025 8/17/2017 037375 SNO CO PUD NO 1 227026 8/17/2017 006630 SNOHOMISH COUNTY Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 7/6-8/3/17 WWTP FLOW METER 84; 423.000.76.535.80.47.62 2020-7719-4 FIRE STATION #20 23009 88TH AVE FIRE STATION #20 23009 88TH AVE 001.000.66.518.30.47.00 2021-1448-4 CITY PARK S RESTROOMS & SHEL CITY PARK S RESTROOMS & SHEL 001.000.64.576.80.47.00 2022-8909-6 TRAFFIC LIGHT 22400 HWY 99 / ME TRAFFIC LIGHT 22400 HWY 99 / ME 111.000.68.542.64.47.00 2022-8945-0 TRAFFIC LIGHT 21931 HWY 99 / ME TRAFFIC LIGHT 21931 HWY 99 / ME 111.000.68.542.64.47.00 2023-5673-9 TRAFFIC LIGHT 21530 76TH AVE W TRAFFIC LIGHT 21530 76TH AVE W 111.000.68.542.64.47.00 2024-9953-9 LIFT STATION #1 105 CASPERS ST LIFT STATION #1 105 CASPERS ST 423.000.75.535.80.47.10 2025-2918-6 STREET LIGHTING (303 LIGHTS @ STREET LIGHTING (303 LIGHTS @ 111.000.68.542.63.47.00 2044-2584-7 LIFT STATION #2 702 MELODY LN / LIFT STATION #2 702 MELODY LN / 423.000.75.535.80.47.10 2051-8438-5 LIFT STATION #5 432 3RD AVE S / N LIFT STATION #5 432 3RD AVE S / N 423.000.75.535.80.47.10 2205-4757-4 TRAFFIC LIGHT SR104 @ 236TH S1 TRAFFIC LIGHT SR104 @ 236TH S1 111.000.68.542.63.47.00 Total: 70951 PARKS MAINT 5005 DUMP FEES 5.3.a Page: 32 m L 3 c Amoun 0 0 a am 0 16.6( m 0 455.5� t 73.6( m c a� 59.4( 0 68.1: ca a E 23.4E 0 R 432.2z o a a 3,168.9z Q ti ti 45.6E 0 U) 20.8' E 55.4 , 5,884.5E t U r Q Page: 32 Packet Pg. 70 5.3.a vchlist Voucher List Page: 33 08/17/2017 11:54:OOAM City of Edmonds m L Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account 3 c Amoun 0 0 227026 8/17/2017 006630 SNOHOMISH COUNTY (Continued) 0- PARKS MAINT DUMP FEES 001.000.64.576.80.47.00 1,434.0( CT DUMP RUN =a 001.000.66.518.30.47.00 37.0( Y Total: 1,471.0( t 227027 8/17/2017 075675 SORENSON FORENSICS LLC 41156-41164 INV#41156-41164 - EDMONDS PD r TESTING CASE #16-23226 - 001.000.41.521.21.41.00 225.0( a0i TESTING CASE #16-22976 001.000.41.521.21.41.00 225.0( TESTING CASE #2017-00007664 001.000.41.521.21.41.00 225.0( o TESTING CASE #2017-00009717 001.000.41.521.21.41.00 275.0( a TESTING CASE #2017-00007692 E 001.000.41.521.21.41.00 225.0( TESTING CASE #2017-00006292 0 001.000.41.521.21.41.00 390.0( R TESTING CASE #2017-00011953 0 001.000.41.521.21.41.00 275.0( Q. TESTING CASE #2017-00004233 Q- Q 001.000.41.521.21.41.00 275.0( " TESTING CASE #2017-00009821 001.000.41.521.21.41.00 225.0( ti Total: 2,340.0( 0 227028 8/17/2017 038410 SOUND SAFETY PRODUCTS 39522/4 STORM - WORK BOOTS - TJUSTIC( N Storm - Work Boots - TJustice U 422.000.72.531.90.24.00 107.0( 10.3% Sales Tax 422.000.72.531.90.24.00 11.01 39523/4 STORM - WORK WEAR MJ w Storm - Work Wear MJ E t 422.000.72.531.90.24.00 107.0( um r Q Page: 33 Packet Pg. 71 vchlist 08/17/2017 11: 54: OOAM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice PO # Description/Account 227028 8/17/2017 038410 SOUND SAFETY PRODUCTS (Continued) 10.3% Sales Tax 422.000.72.531.90.24.00 Tota 227029 8/17/2017 076184 SOUND UNIFORM SOLUTIONS 201707B067 INV#201707B067 - EDMONDS PD METAL NAMETAG - ROUSSEAU 001.000.41.521.70.24.00 10.3% Sales Tax 001.000.41.521.70.24.00 Tota 227030 8/17/2017 073961 STAR RENTALS 240392-35 STREET - PLATE WHACKER Street - Plate Whacker 111.000.68.542.31.35.00 Concrete Saw 111.000.68.542.31.35.00 10.3% Sales Tax 111.000.68.542.31.35.00 Tota 227031 8/17/2017 076054 STRUM, KRAIG STRUM - JULY 2017 STRUM PER DIEM - MOTORS EV PER DIEM 7/24-7/27 SHELTON, W 001.000.41.521.40.43.00 Tota 227032 8/17/2017 072319 SUNSET BAY RESORT 5622 BEACH CAMP 5622 BEACH CAMP 5622 BEACH CAMP 001.000.64.571.22.41.00 5623 BEACH CAMP 5623 BEACH CAMP 5623 BEACH CAMP 001.000.64.571.22.41.00 5624 BEACH CAMP 5624 BEACH CAMP 5624 BEACH CAMP 001.000.64.571.22.41.00 5625 BEACH CAMP 5625 BEACH CAMP 5.3.a Page: 34 m L 3 c Amoun 0 0 a am 11.01 La) 'W-111� 0 L.1,933.0( c% a 1,850.0( E R 389.6E ,- I : 4,172.6E o R OC 0 A Q- a 142.0( Q 1 : 142.0( ti ti 0 15,093.0( N U E 15,480.0( n U c 15,480.0( E t U 2 r Q Page: 34 Packet Pg. 72 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 227032 8/17/2017 072319 SUNSET BAY RESORT 227033 8/17/2017 040917 TACOMA SCREW PRODUCTS INC Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 5625 BEACH CAMP 001.000.64.571.22.41.00 5626 BEACH CAMP 5626 BEACH CAMP 5626 BEACH CAMP 001.000.64.571.22.41.00 5627 BEACH CAMP 5627 BEACH CAMP 5627 BEACH CAMP 001.000.64.571.22.41.00 5631 BEACH CAMP 5631 BEACH CAMP 5631 BEACH CAMP 001.000.64.571.22.41.00 5632 BEACH CAMP 5632 BEACH CAMP 5632 BEACH CAMP 001.000.64.571.22.41.00 5633 BEACH CAMP 5633 BEACH CAMP 5633 BEACH CAMP 001.000.64.571.22.41.00 5634 BEACH CAMP 5634 BEACH CAMP 5634 BEACH CAMP 001.000.64.571.22.41.00 5635 BEACH CAMP 5635 BEACH CAMP 5635 BEACH CAMP 001.000.64.571.22.41.00 18169240 STORM - SUPPLIES Storm - Supplies 422.000.72.531.40.31.00 10.3% Sales Tax 422.000.72.531.40.31.00 18169241 STREET - SUPPLIES Street - Supplies 111.000.68.542.31.31.00 10.3% Sales Tax 111.000.68.542.31.31.00 Total 5.3.a Page: 35 m L 3 c Amoun N 0 a 0 0 17,028.0( 0 15,867.0( t 16,641.0( m c a� 3,222.0( 0 3,222.0( a E 4,833.0( TU 0 R 4,833.0( o a a 9,666.0( Q 121,365.0( 357.31 Y U 36.8' •� Page: 35 Packet Pg. 73 U vchlist 08/17/2017 11: 54: OOAM Voucher List City of Edmonds 5.3.a Page: 36 m L Bank code : Voucher usbank Date Vendor Invoice PO # Description/Account 3 c Amoun 0 0 227033 8/17/2017 040917 040917 TACOMA SCREW PRODUCTS INC (Continued) Total: a 652.6' -0a 227034 8/17/2017 075491 TAYLOR'S EXCAVATORS INC E3DB.RETAINAGE E3DB.RETAINAGE FEE m E3DB.RETAINAGE FEE- 112.000.223.400 53,171.3� vi Total: 53,171.3$ m 227035 8/17/2017 075139 THE LOUIS BERGER GROUP INC 154857 E4FE.SERVICES THRU 7/28/2017 E4FE.SERVICES THRU 7/28/17 422.200.72.594.31.41.00 61154.9� c Total: 6,154.9� .0 227036 8/17/2017 027269 THE PART WORKS INC INV14557 FAC - SUPPLIES 0 FAC - Supplies o 001.000.66.518.30.31.00 150.0( Freight a 001.000.66.518.30.31.00 7.5. 10.3% Sales Tax 001.000.66.518.30.31.00 16.2, u INV14884 FAC - SUPPLIES o FAC - Supplies 001.000.66.518.30.31.00 382.7z 0 L Freight Q- a 001.000.66.518.30.31.00 7.5, Q 10.3% Sales Tax ti 001.000.66.518.30.31.00 40.1( INV15915 PM: CARTRIDGE 900 VALVE SLOAI` PM: CARTRIDGE 900 VALVE SLOAI` 0 001.000.64.576.80.31.00 260.8z u) 10.3% Sales Tax U 001.000.64.576.80.31.00 26.8E E Total: 891.8$ 227037 8/17/2017 075587 THE UPS STORE #6392 00000001010 WWTP: EPA&PUGET SOUND CLEA EPA&PUGET SOUND CLEAN AIR A( E 423.000.76.535.80.42.00 48.6E r Q Page: 36 Packet Pg. 74 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 227037 8/17/2017 075587 075587 THE UPS STORE #6392 227038 8/17/2017 072649 THE WIDE FORMAT COMPANY 227039 8/17/2017 038315 THYSSENKRUPP ELEVATOR Voucher List City of Edmonds Invoice PO # Description/Account (Continued) Total 101532 MAINTENANCE FOR HP PAGEWIDE Aug-17 Maintenance on HP Pagewid( 512.000.31.518.88.48.00 10.3% Sales Tax 512.000.31.518.88.48.00 Total US53022 ELEVATOR MAINTENANCE MUSEUI ELEVATOR MAINTENANCE MUSEU 001.000.66.518.30.48.00 10.3% Sales Tax 001.000.66.518.30.48.00 US53294 ELEVATOR MAINTENANCE SNO-ISI ELEVATOR MAINTENANCE SNO-ISI 001.000.66.518.30.48.00 10.3% Sales Tax 001.000.66.518.30.48.00 US53301 ELEVATOR MAINTENANCE F. ANDE ELEVATOR MAINTENANCE FRANC[ 001.000.66.518.30.48.00 10.3% Sales Tax 001.000.66.518.30.48.00 US53869 ELEVATOR MAINTENANCE CIVIC C ELEVATOR MAINTENANCE CIVIC C 001.000.66.518.30.48.00 10.3% Sales Tax 001.000.66.518.30.48.00 US54073 ELEVATOR MAINTENANCE SENIOR ELEVATOR MAINTENANCE SENIOR 001.000.66.518.30.48.00 10.3% Sales Tax 001.000.66.518.30.48.00 Total 5.3.a Page: 37 m L 3 c Amoun 0 0 a 48.6E -0a 0 m L 175.0( vi Y 18.0< 1910: w m c a� 364.2( 0 37.5' o L a 1, 292.61 133.1E 0 R 1,175.4( o a a 121.0, Q ti ti 1,188.1 1 0 122.3E Y U E 284.2E u 29.2E y 4,748.0E E U r Q Page: 37 Packet Pg. 75 5.3.a vchlist Voucher List Page: 38 08/17/2017 11:54:OOAM City of Edmonds m L 3 Bank code : usbank c Voucher Date Vendor Invoice PO # Description/Account Amoun N 0 227040 8/17/2017 062693 US BANK 0846 JULY 2017 HR VISA BILL - MARYAN 0- NPELRA Training - Mary Ann 001.000.22.518.10.49.00 299.0( L 1683 PASSPORT POSTAGE =a PASSPORT POSTAGE vi 001.000.23.512.50.42.00 Y 206.1E FAX/COPY MACHINE FOR COURTR 001.000.23.512.50.35.10 219.9� r TONER FOR FAX/COPY MACHINE a 001.000.23.512.50.31.10 105.4, a0i 10.3% Sales Tax 001.000.23.512.50.35.10 22.6( 10.3% Sales Tax — 001.000.23.512.50.31.10 10.8( 1885 INV#1885 08/07/17 - POLICE #2 - EE a FEDEX CHG - PROPERTY CRIMES 001.000.41.521.10.42.00 65.4 1 .E MEAL/INTERVIEW SUSPECT#0157 001.000.41.521.21.43.00 8.9( o FUEL/INTERVIEW SUSPECT #0157 R 001.000.41.521.21.43.00 5.8( p CAR RENTAL/INTER SUSPECT #01! 0. 001.000.41.521.21.43.00 69.8( Q PLANE FARE/INTER SUSPECT #01 E 001.000.41.521.21.43.00 826.3� SEAT CHG/INTER SUSPECT #01571 001.000.41.521.21.43.00 39.0( ao PARKING/INTER SUSPECT #015711 c 001.000.41.521.21.43.00 60.0( MEAL/INTER SUSPECT #015711 (MI E 001.000.41.521.21.43.00 10.9( .2 FEDEX CHG #17-15018,15201 001.000.41.521.10.42.00 LODGING/MEHL- INTER SUSP #015 0 E 001.000.41.521.21.43.00 166.6E u r Q Page: 38 Packet Pg. 76 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 227040 8/17/2017 062693 US BANK Voucher List City of Edmonds Invoice PO # Description/Account (Continued) BAGGAGE FEE/MEHL-INTER SUSP 001.000.41.521.21.43.00 FEDEX CHG #17-10368 001.000.41.521.10.42.00 FEDEX CHG #17-16168 001.000.41.521.10.42.00 3048 INV#3048 08/07/17 - THOMPSON - C RETURN SHOES-HENDERSON 001.000.41.521.11.24.00 3048 INV#3048 08/07/17 - THOMPSON - E DYMO LABEL WRITER (CLERKS) 001.000.41.521.11.31.00 FUJITSU IMAGE SCANNER 001.000.41.521.11.35.00 HOT BISTRO CUPS 001.000.41.521.10.31.00 SHREDDING 2 TOTES@ $4.69 6/28 001.000.41.521.10.41.00 MAGLITE 6V Ni-CAD BATTERIES 001.000.41.521.22.31.00 OCEAN SYSTEMS RENEWAL 001.000.41.521.21.41.00 OFFICER/EMP OF YR PHOTOS 001.000.41.521.10.31.00 HONNEN PICTURE FRAME 001.000.41.521.10.31.00 SHOES-HENDERSON 001.000.41.521.11.24.00 AED POCKET MASKS 001.000.41.521.22.31.00 CR-123A 3 v BATTERIES 001.000.41.521.22.31.00 42' CURVED LED LIGHT BAR 001.000.41.521.21.35.00 5.3.a Page: 39 m L 3 c Amoun 0 0 a 0 50.0( 18.91 Y m 15.1� r m -132.3( (D 0 57.3< — 0 580.0( a 79.9 1 •E R z 9.3£ o R 104.4: p L a 99.0( Q 9.11 ti 6.6' ao 0 132.3( E 75.3E n 68.4( c a� E 94.9� U r Q Page: 39 Packet Pg. 77 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 227040 8/17/2017 062693 US BANK Voucher List City of Edmonds Invoice PO # Description/Account (Continued) LAMINATING POUCHES -LETTER 001.000.41.521.10.31.00 LAMINATING POUCHES- LEGAL 001.000.41.521.10.31.00 LAMINATING POUCHES - MENU 001.000.41.521.10.31.00 8 FOAM MANNEQUIN HEADS 001.000.41.521.40.31.00 SHOES-HENDERSON 001.000.41.521.11.24.00 LEA TRACKING #17-15711 001.000.41.521.21.41.00 GPS LOCATE - 3 DAYS 001.000.41.521.21.41.00 6708 JULY 2017 HR VISA BILL Brown & Caldwell - Job Posting 423.000.76.535.80.41.40 Boxwood Technology - Job Posting 001.000.22.518.10.41.00 8083 VISA BILL DSD, MISC PURCH Misc office supplie- Amazon 001.000.62.524.10.31.00 Adobe- Brad 001.000.62.524.10.41.00 Monument for Veterans plaza 132.000.64.594.76.65.00 8083 RETURN ON VISA BILL- SPOONS RETURN ON VISA BILL- SPOONS 001.000.62.524.10.31.00 BID-1687/0907 BID/ED! COPIES, STICKERS FOR U BID/Ed! Printing 140.000.61.558.70.49.00 BID/Ed! logo stickers for umbrella 140.000.61.558.70.41.00 5.3.a Page: 40 m L 3 c Amoun 0 0 a am 30.2z m 29.4( Y m 28.3( 59.9� m c W 132.3( 0 125.0( o 153.0( a E 100.0( 6 0 200.0( 0 L a 439.9� Q 55.1 z ti 849.3' ao 0 U) le U -9.6( E 20.0E c W E 275.7E r Q Page: 40 Packet Pg. 78 vchlist 08/17/2017 11: 54: OOAM Voucher List City of Edmonds Bank code : usbank Voucher Date Vendor Invoice 227040 8/17/2017 062693 US BANK (Continued) 227041 8/17/2017 044960 UTILITIES UNDERGROUND LOC CTR 707124 227042 8/17/2017 075155 WALKER MACY LLC 227043 8/17/2017 066238 WASHINGTON TRACTOR 227044 8/17/2017 075635 WCP SOLUTIONS P3282.03-4 PO # Description/Account BID/Ed! printing for visitor postcards 140.000.61.558.70.41.00 Total UTILITIES UNDERGROUND LOCATI UTILITIES UNDERGROUND LOCATI 421.000.74.534.80.41.00 UTILITIES UNDERGROUND LOCATI 422.000.72.531.90.41.00 UTILITIES UNDERGROUND LOCATI 423.000.75.535.80.41.00 Total EDMONDS CIVIC FIELD DEMO PRC EDMONDS CIVIC FIELD DEMO PRC 125.000.64.594.75.65.00 Total 1346210 PM: MOWER PARTS PM: MOWER PARTS 001.000.64.576.80.31.00 9.1 % Sales Tax 001.000.64.576.80.31.00 Total 10177208 FAC MAINT - UTILITY CART Fac Maint - Utility Cart 001.000.66.518.30.31.00 10.3% Sales Tax 001.000.66.518.30.31.00 10219203 FAC MAINT - LINERS, TT, TOWELS, Fac Maint - Liners, TT, Towels, 001.000.66.518.30.31.00 10.3% Sales Tax 001.000.66.518.30.31.00 5.3.a Page: 41 m L 3 c Amoun 0 0 0- m 0 530.4( m 6,421.0E `a vi Y m t 140.4E 4- 0) 140.4E (D 144.7z 425.7( 0 L a 2,338.0< E 2,338.0: mT U 4- 0 R 217.7E o Q. a 19.8, Q 237.6( ti ti 0 197.8z N U 20.3E E 1,926.4( E 198.4: r- r Q Page: 41 Packet Pg. 79 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 227044 8/17/2017 075635 075635 WCP SOLUTIONS 227045 8/17/2017 073137 WELCH-LANG, CAROLE 227046 8/17/2017 073552 WELCO SALES LLC Voucher List City of Edmonds Invoice PO # Description/Account (Continued) Total 5838 FUN FACTORY 5838 FUN FACTORY INSTRUCTION 5838 FUN FACTORY INSTRUCTION 001.000.64.571.22.41.00 5839 FUN FACTORY 5839 FUN FACTORY INSTRUCTION 5839 FUN FACTORY INSTRUCTION 001.000.64.571.22.41.00 Total 7355 BUSINESS CARDS DEVELOPMENT DELEOPMENT SERVICES - JOANNI 001.000.62.524.10.31.00 PARKS & RECREATION - DAVE JOF 001.000.64.571.21.31.00 10.3% Sales Tax 001.000.62.524.10.31.00 10.3% Sales Tax 001.000.64.571.21.31.00 7357 UTILITY BILLING - 2000 WHITE PEF Utility Billing - 2000 White Perferated 421.000.74.534.80.31.00 Utility Billing - 2000 White Perferated 423.000.75.535.80.31.00 Utility Billing - 2000 White Perferated 422.000.72.531.90.31.00 10.3% Sales Tax 421.000.74.534.80.31.00 10.3% Sales Tax 423.000.75.535.80.31.00 10.3% Sales Tax 422.000.72.531.90.31.00 7358 ENVELOPES ENVELOPES 001.000.64.571.21.31.00 10.3% Sales Tax 5.3.a Page: 42 m L 3 c Amoun N 0 a 2,343.01 -a) m L 479.7 1 y Y m t 344.71 824.5� c a� 40.5( 0 0 L 40.5( a 4.1 4.1 0 R 30.6 1 o Q. a 30.6 , Q ti 30.6( ti 3.1( o U) 3.1( E 3.1( c 93.3, E r Q Page: 42 Packet Pg. 80 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 227046 8/17/2017 073552 WELCO SALES LLC 227047 8/17/2017 075926 WESTERN EXTERMINATOR 227048 8/17/2017 076111 WESTERN PACIFIC SIGNAL LLC 227049 8/17/2017 064213 WSSUATREASURER 227050 8/17/2017 075122 YAKIMA CO DEPT OF CORR Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 001.000.64.571.21.31.00 7364 UTILITY BILLING - 5000 #10 WIND Utility Billing - 5000 #10 window 421.000.74.534.80.31.00 Utility Billing - 5000 #10 window 423.000.75.535.80.31.00 Utility Billing - 5000 #10 window 422.000.72.531.90.31.00 10.3% Sales Tax 421.000.74.534.80.31.00 10.3% Sales Tax 423.000.75.535.80.31.00 10.3% Sales Tax 422.000.72.531.90.31.00 Tota 1518543 PS - MONTHLY SVC PS - Monthly Svc 001.000.66.518.30.48.00 10.3% Sales Tax 001.000.66.518.30.48.00 5.3.a Page: 43 m L 3 c Amoun c a am 9.6' O i =a 195.E 1 vi Y 195.E , 195.6( m c aD 20.1: 20.1: — 0 L 20.1( a I : 941.2: E a U 99.0( R 10.2( Q. Total : 109.2( Q 23955 E7CB.SERVICES ti E7CB.SERVICES ti 421.000.74.542.30.48.00 13,556.0( Total : 13,556.0( o U) 479 WOMENS MENS COEDS UMPS U WOMENS MENS COEDS UMPS E 001.000.64.571.25.41.00 350.0( Total : 350.0( }; c YAKIMA - JULY 2017 JULY 2017 INMATE HOUSING - EDIV E E 27 DAYS HOUSING - JULY 2017 U r Q Page: 43 Packet Pg. 81 vchlist 08/17/2017 11: 54: OOAM Bank code : usbank Voucher Date Vendor 227050 8/17/2017 075122 YAKIMA CO DEPT OF CORR 97 Vouchers for bank code : usbank 97 Vouchers in this report Voucher List City of Edmonds Invoice PO # Description/Account (Continued) 001.000.39.523.60.51.00 Tota Bank tota Total voucher 5.3.a Page: 44 m L 3 c Amoun c a m 1,544.4( I: 1,544.4( m =a I: 433,790.6:� vi Y V s : 433,790.6: r 4- m c W Page: 44 Packet Pg. 82 0 L Q E V w- 0 2 W E U r Y Q 5.3.b PROJECT NUMBERS (By Project Title) Project Engineering Accounting Project Funding Project Title Number Number 41 a� STM 12th Ave & Sierra Stormwater System Improvements c484 E51FE STR 15th St. SW Walkway (Edmonds Way to 8th Ave) c424 E3DC L_ STM 183rd PI SW Storm Repairs c491 E61FE 3 SWR 2013 Sanitary Sewer Pipe Rehabilitation c390 E2GB SWR 2013 Sewerline Replacement Project c398 E3GA r N 0 STR 2014 Chip Seals c451 E4CB a m STM 2014 Drainage Improvements c433 E41FA U L STM 2014 Lake Ballinger Associated Projects c436 E4FD "a STR 2014 Overlay Program c438 E4CA ui WTR 2014 Waterline Overlays c452 E4CC a� STM 2015 Citywide Drainage Improvements/Rehab Projects c466 E51FA r STR 2015 Overlay Program c463 E5CA c SWR 2015 Sewerline Overlays i007 E5CC 0 SWR 2015 Sewerline Replacement Project c441 E4GA o STR 2015 Traffic Calming c471 E5AB 0 a WTR 2015 Waterline Overlays c475 E5CB E .E WTR 2015 Waterline Replacement Program c440 E4JB 0 4- 0 STR 2016 Curb Ramp Upgrades i016 E6DC STR 2016 Overlay Program i008 E6CA o a SWR 2016 Sanitary Sewer Replacement Projects c469 E5GA a Q SWR 2016 Sewerline Overlays i010 E6CC ti WTR 2016 Water Comp Plan Update c460 E4JC r WTR 2016 Waterline Overlays i009 E6CB o N WTR 2016 Waterline Replacement Projects c468 E5JA STR 2017 Curb Ramp Upgrades i022 E7DA E z STR 2017 Minor Sidewalk Program i023 E7DB o STR 2017 Overlay Program i018 E7CA d 0 SWR 2017 Sanitary Sewer Replacement Project i013 E6GA �, SWR 2017 Sewerline Overlays i020 E7CC m STR 2017 Traffic Calming i021 E7AA L WTR 2017 Waterline Overlays i019 E7CB LL WTR 2017 Waterline Replacement Projects i014 E6J13 CD E SWR 2018/19 Sewerline Replacement Project c492 E6GC 0 WTR 2018/19 Waterline Replacement Project c493 E6JC Q STR 220th Street Overlay Project c462 E4CD STM 224th & 98th Drainage Improvements c486 E6FB Revised 7/27/2017 Packet Pg. 83 5.3.b PROJECT NUMBERS (By Project Title) Project Engineering Accounting Project Funding Project Title Number Number 41 a� WTR 224th Waterline Relocation (2013) c418 E3J13 STR 228th St. SW Corridor Improvements i005 E7AC L_ STR 236th St. SW Walkway (Edmonds Way to Madrona School) c425 E3DD 3 STR 238th St. SW Walkway (100th Ave to 104th Ave) c423 E3DB STR 238th St. SW Walkway (Edmonds Way to Hwy 99) c485 E6DA r N 0 a STM 3rd Ave Rain Gardens i012 E6FC m STR 76th Ave W at 212th St SW Intersection Improvements c368 E1CA U L STR 89th PI W Retaining Wall i025 E7CD STR 9th Avenue Improvement Project c392 E2AB ui FAC AN Upgrades - Council Chambers c476 E5LA a� STR ADA Curb Ramp Upgrades along 3rd Ave S c426 E3DE r STR ADA Transition Plan s016 E6DB c STR Audible Pedestrian Signals i024 E7AB 0 STR Bikelink Project c474 E5DA o PRK City Spray Park c417 E4MA 0 a SWR Citywide CIPP Sewer Rehab Phase I c456 E4GB E .E SWR Citywide CIPP Sewer Rehab Phase II c488 E6GB 0 STR Citywide Pedestrian Crossing Enhancements i026 E7DC STR Citywide Protected/Permissive Traffic Signal Conversion i015 E6AB o a WTR Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) c482 E5J13 Q STM Dayton Street & SR104 Storm Drainage Alternatives c374 E1 FM ti T_ PM Dayton Street Plaza c276 E7MA r STM Dayton Street Storm Improvements (6th Ave - 8th Ave) c472 E5FC o N STM Dayton Street Stormwater Pump Station c455 E4FE FAC Edmonds Fishing Pier Rehab c443 E4MB E z STM Edmonds Marsh Feasibility Study c380 E2FC o General Edmonds Waterfront Access Analysis c478 E5DB d 0 FAC ESCO III Project c419 E3LI3 PRK FAC Band Shell Replacement c477 E6MB m WTR Five Corners Reservoir Re -coating c473 E5KA L STR Five Corners Roundabout (212th Street SW @ 84th Avenue W) c342 E1AA U_ PM Fourth Avenue Cultural Corridor c282 E8MA CD E STR Hwy 99 Enhancements (Phase III) c405 E2AD 0 STR Hwy 99 Gateway Revitalization s014 E6AA Q SWR Lake Ballinger Trunk Sewer Study s011 E5GB STM LID Retrofits Perrinville Creek Basin c434 E4FB Revised 7/27/2017 Packet Pg. 84 5.3.b PROJECT NUMBERS (By Project Title) Project Engineering Accounting Project Funding Project Title Number Number SWR Lift Station #1 Basin & Flow Study c461 E4GC STIR Minor Sidewalk Program i017 E6DD STM North Talbot Road Drainage Improvements c378 E2FA STM Northstream Culvert Repair Under Puget Drive i011 E61FA STM Northstream Pipe Abandonment on Puget Drive c410 E3FE STM NPDES (Students Saving Salmon) m013 E7FG STM OVD Slope Repair & Stabilization m105 E71FA STM Perrinville Creek Culvert Replacement c376 E1 FN STM Perrinville Creek Stormwater Flow Reduction Retrofit Study c408 E3FC FAC Public Safety Controls System Upgrades c444 E41LA STM Seaview Park Infiltration Facility c479 E5FD WWTP Sewer Outfall Groundwater Monitoring c446 E4HA STIR SR104 Corridor Transportation Study c427 E3AB STIR SR104/City Park Mid -Block Crossing c454 E4DB UTILITIES Standard Details Updates solo E5NA STM Storm Drain Improvements @ 9510 232nd St. SW c495 E7FB STM Storm Drainage Improvements - 88th & 194th c429 E3FG STM Stormwater Comp Plan Update s017 E6FD STIR Sunset Walkway Improvements c354 E1DA STM SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System c379 E2FB STM SW Edmonds-105th/106th Ave W Storm Improvements c430 E3FH STIR Trackside Warning System c470 E5AA STIR Train Trench - Concept c453 E4DA STIR Transportation Plan Update c391 E2AA STM Update Stormwater Management Code & Associated Projects c467 E5FB UTILITIES Utility Rate Update s013 E6JA PRK Veteran's Plaza c480 E6MA STM Video Assessment of Stormwater Lines c459 E4FF PRK Waterfront Restoration m103 E7MA STM Willow Creek Daylighting/Edmonds Marsh Restoration c435 E4FC WWTP WWTP Outfall Pipe Modifications c481 E5HA PRK Yost Park Spa c494 E6MC Revised 7/27/2017 Packet Pg. 85 5.3.b PROJECT NUMBERS (By Engineering Number) Engineering Protect Protect Accounting Funding Number Number Protect Title STIR E1AA c342 Five Corners Roundabout (212th Street SW @ 84th Avenue W) STIR E1CA c368 76th Ave W at 212th St SW Intersection Improvements c354 Sunset Walkway Improvements STM ElFM c374 Dayton Street & SR104 Storm Drainage Alternatives Perrinville Creek Culvert Replacement EW STIR E2AA c391 Transportation Plan Update E2AB c392 9th Avenue Improvement Project STIR E2AD c405 Hwy 99 Enhancements (Phase III) albot Road Drainage Improvements STM E2FB c379 SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration Sy; Edmonds Marsh Feasibility Study SWR E2GB c390 2013 Sanitary Sewer Pipe Rehabilitation SR104 Corridor Transportation Study STIR E3DB c423 238th St. SW Walkway (100th Ave to 104th Ave) 15th St. SW Walkway fk-dmonds Way to 8t STIR E3DD c425 236th St. SW Walkway (Edmonds Way to Madrona School) ADA Curb Ramp Upgrades along 3rd Ave ■ STM E3FC c408 Perrinville Creek Stormwater Flow Reduction Retrofit Study orthstream Pipe Abandonment on Puget Drive STM E3FG c429 Storm Drainage Improvements - 88th & 194th SSW c430 Edmonds-105 torm Improvements SWR E3GA c398 2013 Sewerline Replacement Project 224th Waterline Relocation (2013) FAC E3LB c419 ESCO III Project 014 Overlay Program ■ STIR E4CB c451 2014 Chip Seals 2014 Waterline Overla ^� STIR E4CD c462 220th Street Overlay Project �Trairj STIR E4DB c454 SR104/City Park Mid -Block Crossing 2014 Drainage Improvemen STM E4FB c434 LID Retrofits Perrinville Creek Basin low Creek Daylighting/Edmonds Marsh Restoration STM E4FD c436 2014 Lake Ballinger Associated Projects STM E4FE Dayton Street Stormwater Pump Station STM E4FF c459 Video Assessment of Stormwater Lines Revised 7/27/2017 Packet Pg. 86 5.3.b PROJECT NUMBERS (By Engineering Number) Engineering Protect Protect Accounting Funding Number Number Protect Title SWR E4GA ' c441 2015 Sewerline Replacement Project SWR E4GB c456 Citywide CIPP Sewer Rehab Phase I SWR Lift Station #1 Basin & Flow Study WWTP E4HA c446 Sewer Outfall Groundwater Monitoring WTR 2015 Waterline Replacement Program WTR E4JC c460 2016 Water Comp Plan Update Public Safety Controls System Upgrades PRK E4MA c417 City Spray Park Edmonds Fishing Pier Rehab STR E5AA c470 Trackside Warning System 2015 Traffic Calming il STR E5CA c463 2015 Overlay Program 2015 Waterline Overlays - SWR E5CC i007 2015 Sewerline Overlays General E5DB c478 Edmonds Waterfront Access Analysis c466 2015 Citywide Drainage Improvements/Rehab Projects ■ STM E5FB c467 Update Stormwater Management Code & Associated Projects c472 Dayton Street Storm Improvements (6th Ave - 8th Ave) ■ STM E5FD c479 Seaview Park Infiltration Facility E5FEig mprover SWR E5GA c469 2016 Sanitary Sewer Replacement Projects Lake Ballinger Trunk Se Study WWTP E5HA c481 WWTP Outfall Pipe Modifications 2016 Waterline Replacement Projects WTR E5JB c482 Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) orners Reservoir Re -coati n- FAC E5LA c476 AN Uoarades - Council Chambers solo Standard Details Updates STR E6AA s014 Hwy 99 Gateway Revitalization Citywide Protected/Permissive Traffic Signal Conversion STR E6CA i008 2016 Overlay Program 16 Waterline nvariave— SWR E6CC i010 2016 Sewerline Overlays 6DA 85 238th St. SW Walkway (Edmonds Way to Hwy 99) STR E6DB s016 ADA Transition Plan Revised 7/27/2017 Packet Pg. 87 5.3.b PROJECT NUMBERS (By Engineering Number) Engineering Protect Protect Accounting Funding Number Number Protect Title STIR E6DC ' i016 2016 Curb Ramp Upgrades STIR E6DD i017 Minor Sidewalk Program i011 Northstream Culvert Repair Under Puget Drive STM E6FB c486 224th & 98th Drainage Improvements 3rd Ave Rain Garden STM E6FD s017 Stormwater Comp Plan Update STM E6FE c491 183rd PI SW Storm Repairs SWR E6GA i013 2017 Sanitary Sewer Replacement Project idekIPP Sewer Rehab Phase SWR E6GC c492 2018/19 Sewerline Replacement Project Utility Rate Updat WTR E6J13 i014 2017 Waterline Replacement Projects 2018/19 Waterline Replacement Project PRK E6MA c480 Veteran's Plaza Band Shell Replacement PRK E6MC c494 Yost Park Spa E7AA i021 2017 Traffic Calming STIR E7AB i024 Audible Pedestrian Signals i005 228th St. SW Corridor Improvements STIR E7CA i018 2017 Overlav Proaram SWR E7CC i020 2017 Sewerline Overla 89th PI W Retaining Wall STIR E7DA i022 2017 Curb Ramp Upgrades E7DB i023 2017 Minor Sidewalk Program STIR E7DC i026 Citywide Pedestrian Crossing Enhancements QkD Slope Repair & Stabilization STM E7FB c495 Storm Drain Improvements @ 9510 232nd St. SW NPDES (Students Saving Salmon) PM E7MA c276 Dayton Street Plaza Waterfront Restoration PM E8MA c282 Fourth Avenue Cultural Corridor Revised 7/27/2017 Packet Pg. 88 5.3.b PROJECT NUMBERS (By New Project Accounting Number) Engineering Project Project Accounting vi Funding Number Number Project Title a� PM E7MA c276 Dayton Street Plaza PM E8MA c282 Fourth Avenue Cultural Corridor m L_ STIR E1AA c342 Five Corners Roundabout (212th Street SW @ 84th Avenue W) 3 STIR E1 DA c354 Sunset Walkway Improvements STIR E1CA c368 76th Ave W at 212th St SW Intersection Improvements r N 0 STM E1 FM c374 Dayton Street & SR104 Storm Drainage Alternatives a m STM E1 FN c376 Perrinville Creek Culvert Replacement U L STM E2FA c378 North Talbot Road Drainage Improvements STM E2FB c379 ui SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System STM E2FC c380 Edmonds Marsh Feasibility Study a� SWR E2GB c390 2013 Sanitary Sewer Pipe Rehabilitation r STIR E2AA c391 Transportation Plan Update c STIR E2AB c392 9th Avenue Improvement Project 0 SWR E3GA c398 2013 Sewerline Replacement Project o STIR E2AD c405 Hwy 99 Enhancements (Phase III) 0 a STM E3FC c408 Perrinville Creek Stormwater Flow Reduction Retrofit Study E STM EYE c410 Northstream Pipe Abandonment on Puget Drive 0 PRK E4MA c417 City Spray Park WTR E3J13 c418 224th Waterline Relocation (2013) o a FAC E3LB c419 ESCO III Project a Q STIR E3DB c423 238th St. SW Walkway (100th Ave to 104th Ave) r- STR E3DC c424 15th St. SW Walkway (Edmonds Way to 8th Ave) ti r STIR E3DD c425 236th St. SW Walkway (Edmonds Way to Madrona School) o N STIR E3DE c426 ADA Curb Ramp Upgrades along 3rd Ave S STIR c427 SR104 Corridor Transportation Study z STM E3FG c429 Storm Drainage Improvements - 88th & 194th o STM E3FH c430 SW Edmonds-105th/106th Ave W Storm Improvements d 0 STM E4FA c433 2014 Drainage Improvements �, STM E4FB c434 LID Retrofits Perrinville Creek Basin c m STM E4FC c435 Willow Creek Daylighting/Edmonds Marsh Restoration L STM E4FD c436 2014 Lake Ballinger Associated Projects U- STR E4CA c438 2014 Overlay Program CD E WTR E4J13 c440 2015 Waterline Replacement Program 0 SWR E4GA c441 2015 Sewerline Replacement Project Q FAC E4MB c443 Edmonds Fishing Pier Rehab FAC E41LA c444 Public Safety Controls System Upgrades Revised 7/27/2017 Packet Pg. 89 5.3.b PROJECT NUMBERS (By New Project Accounting Number) Engineering Project Project Accounting vi Funding Number Number Protect Title a� WWTP E4HA c446 Sewer Outfall Groundwater Monitoring STIR E4CB c451 2014 Chip Seals L_ WTR E4CC c452 2014 Waterline Overlays 3 STIR E4DA c453 Train Trench - Concept STIR E4DB c454 SR104/City Park Mid -Block Crossing r N 0 a STM E4FE c455 Dayton Street Stormwater Pump Station m SWR E4GB c456 Citywide CIPP Sewer Rehab Phase I U L STM E4FF c459 Video Assessment of Stormwater Lines WTR E4JC c460 2016 Water Comp Plan Update ui SWR E4GC c461 Lift Station #1 Basin & Flow Study a� STIR E4CD c462 220th Street Overlay Project r STIR E5CA c463 2015 Overlay Program c STM E5FA c466 2015 Citywide Drainage Improvements/Rehab Projects 0 STM E5FB c467 Update Stormwater Management Code & Associated Projects o WTR E5JA c468 2016 Waterline Replacement Projects 0 a SWR E5GA c469 2016 Sanitary Sewer Replacement Projects E STIR E5AA c470 Trackside Warning System 0 STIR E5AB c471 2015 Traffic Calming STM E5FC c472 Dayton Street Storm Improvements (6th Ave - 8th Ave) o a WTR E5KA c473 Five Corners Reservoir Re -coating a Q STIR E5DA c474 Bikelink Project ti WTR E5CB c475 2015 Waterline Overlays r FAC E5LA c476 AN Upgrades - Council Chambers o N PRK E6MB c477 FAC Band Shell Replacement General E5DB c478 Edmonds Waterfront Access Analysis z STM E5FD c479 Seaview Park Infiltration Facility o PRK E6MA c480 Veteran's Plaza 'D d 0 WWTP E5HA c481 WWTP Outfall Pipe Modifications �, WTR E5J13 c482 Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) STM E5FE c484 12th Ave & Sierra Stormwater System Improvements L STIR E6DA c485 238th St. SW Walkway (Edmonds Way to Hwy 99) U_ STM E6FB c486 224th & 98th Drainage Improvements CD E SWR E6GB c488 Citywide CIPP Sewer Rehab Phase II 0 STM E6FE c491 183rd PI SW Storm Repairs Q SWR E6GC c492 2018/19 Sewerline Replacement Project WTR E6JC c493 2018/19 Waterline Replacement Project Revised 7/27/2017 Packet Pg. 90 5.3.b PROJECT NUMBERS (By New Project Accounting Number) Engineering Project Project Accounting Funding Number Number Protect Title PRK E61VIC c494 Yost Park Spa STM E7FB c495 Storm Drain Improvements @ 9510 232nd St. SW STIR E7AC i005 228th St. SW Corridor Improvements SWR E5CC i007 2015 Sewerline Overlays STIR E6CA i008 2016 Overlay Program WTR E6CB i009 2016 Waterline Overlays SWR E6CC iolo 2016 Sewerline Overlays STM E6FA i011 Northstream Culvert Repair Under Puget Drive STM E61FC i012 3rd Ave Rain Gardens SWR E6GA i013 2017 Sanitary Sewer Replacement Project WTR E6JB i014 2017 Waterline Replacement Projects STIR E6AB i015 Citywide Protected/Permissive Traffic Signal Conversion STIR E6DC i016 2016 Curb Ramp Upgrades STIR E6DD i017 Minor Sidewalk Program STIR E7CA i018 2017 Overlay Program WTR E7CB i019 2017 Waterline Overlays SWR E7CC i02o 2017 Sewerline Overlays STIR E7AA i021 2017 Traffic Calming STIR E7DA i022 2017 Curb Ramp Upgrades STIR E7DB i023 2017 Minor Sidewalk Program STIR E7AB i024 Audible Pedestrian Signals STIR E7CD i025 89th PI W Retaining Wall STIR E7DC i026 Citywide Pedestrian Crossing Enhancements STM E71FG m013 NPDES (Students Saving Salmon) PRK E7MA m103 Waterfront Restoration STM E7FA m105 OVD Slope Repair & Stabilization UTILITIES E5NA solo Standard Details Updates SWR E5GB s011 Lake Ballinger Trunk Sewer Study UTILITIES E6JA s013 Utility Rate Update STIR E6AA s014 Hwy 99 Gateway Revitalization STIR E6DB s016 ADA Transition Plan STM E6FD s017 Stormwater Comp Plan Update Revised 7/27/2017 Packet Pg. 91 5.3.b PROJECT NUMBERS (By Funding) Project Engineering Accounting Project Funding Project Title Number Number FAC A/V Upgrades - Council Chambers c476 E5LA FAC Edmonds Fishing Pier Rehab c443 E4MB FAC ESCO III Project c419 E3LB FAC Public Safety Controls System Upgrades c444 E41-A General Edmonds Waterfront Access Analysis c478 E5DB PM Dayton Street Plaza c276 E7MA PM Fourth Avenue Cultural Corridor c282 E8MA PRK City Spray Park c417 E4MA PRK FAC Band Shell Replacement c477 E6MB PRK Veteran's Plaza c480 E6MA PRK Waterfront Restoration m103 E7MA PRK Yost Park Spa c494 E6MC STM 12th Ave & Sierra Stormwater System Improvements c484 E5FE STM 183rd PI SW Storm Repairs c491 E6FE STM 2014 Drainage Improvements c433 E4FA STM 2014 Lake Ballinger Associated Projects c436 E4FD STM 2015 Citywide Drainage Improvements/Rehab Projects c466 E5FA STM 224th & 98th Drainage Improvements c486 E6FB STM 3rd Ave Rain Gardens i012 E6FC STM Dayton Street & SR104 Storm Drainage Alternatives c374 E1 FM STM Dayton Street Storm Improvements (6th Ave - 8th Ave) c472 E5FC STM Dayton Street Stormwater Pump Station c455 E4FE STM Edmonds Marsh Feasibility Study c380 E2FC STM LID Retrofits Perrinville Creek Basin c434 E4FB STM North Talbot Road Drainage Improvements c378 E2FA STM Northstream Culvert Repair Under Puget Drive i011 E6FA STM Northstream Pipe Abandonment on Puget Drive c410 E3FE STM NPDES (Students Saving Salmon) m013 E7FG STM OVD Slope Repair & Stabilization m105 E7FA STM Perrinville Creek Culvert Replacement c376 E1 FN STM Perrinville Creek Stormwater Flow Reduction Retrofit Study c408 E3FC STM Seaview Park Infiltration Facility c479 E5FD STM Storm Drain Improvements @ 9510 232nd St. SW c495 E7FB STM Storm Drainage Improvements - 88th & 194th c429 E3FG STM Stormwater Comp Plan Update s017 E6FD Revised 7/27/2017 Packet Pg. 92 5.3.b PROJECT NUMBERS (By Funding) Project Engineering Accounting Project Funding Project Title Number Number STM SW Edmonds Basin #3-238th St. SW to Hickman Park Infiltration System c379 E2FB STM SW Edmonds-105th/106th Ave W Storm Improvements c430 E3FH STM Update Stormwater Management Code & Associated Projects c467 E5FB STM Video Assessment of Stormwater Lines c459 E4FF STM Willow Creek Daylighting/Edmonds Marsh Restoration c435 E4FC STIR 15th St. SW Walkway (Edmonds Way to 8th Ave) c424 E3DC STIR 2014 Chip Seals c451 E4CB STIR 2014 Overlay Program c438 E4CA STIR 2015 Overlay Program c463 E5CA STIR 2015 Traffic Calming c471 E5AB STIR 2016 Curb Ramp Upgrades i016 E6DC STIR 2016 Overlay Program i008 E6CA STIR 2017 Curb Ramp Upgrades i022 E7DA STIR 2017 Minor Sidewalk Program i023 E7DB STIR 2017 Overlay Program i018 E7CA STIR 2017 Traffic Calming i021 E7AA STIR 220th Street Overlay Project c462 E4CD STIR 228th St. SW Corridor Improvements i005 E7AC STIR 236th St. SW Walkway (Edmonds Way to Madrona School) c425 E3DD STIR 238th St. SW Walkway (100th Ave to 104th Ave) c423 E3DB STIR 238th St. SW Walkway (Edmonds Way to Hwy 99) c485 E6DA STIR 76th Ave W at 212th St SW Intersection Improvements c368 E1CA STIR 89th PI W Retaining Wall i025 E7CD STIR 9th Avenue Improvement Project c392 E2AB STIR ADA Curb Ramp Upgrades along 3rd Ave S c426 E3DE STIR ADA Transition Plan s016 E6DB STIR Audible Pedestrian Signals i024 E7AB STIR Bikelink Project c474 E5DA STIR Citywide Pedestrian Crossing Enhancements i026 E7DC STIR Citywide Protected/Permissive Traffic Signal Conversion i015 E6AB STIR Five Corners Roundabout (212th Street SW @ 84th Avenue W) c342 E1AA STIR Hwy 99 Enhancements (Phase III) c405 E2AD STIR Hwy 99 Gateway Revitalization s014 E6AA STIR Minor Sidewalk Program i017 E6DD STIR SR104 Corridor Transportation Study c427 E3AB Revised 7/27/2017 Packet Pg. 93 5.3.b PROJECT NUMBERS (By Funding) Project Engineering Accounting Project Funding Project Title Number Number STR SR104/City Park Mid -Block Crossing c454 E4DB STR Sunset Walkway Improvements c354 E1DA STR Trackside Warning System c470 E5AA STR Train Trench - Concept c453 E4DA STR Transportation Plan Update c391 E2AA SWR 2013 Sanitary Sewer Pipe Rehabilitation c390 E2GB SWR 2013 Sewerline Replacement Project c398 E3GA SWR 2015 Sewerline Overlays i007 E5CC SWR 2015 Sewerline Replacement Project c441 E4GA SWR 2016 Sanitary Sewer Replacement Projects c469 E5GA SWR 2016 Sewerline Overlays i010 E6CC SWR 2017 Sanitary Sewer Replacement Project i013 E6GA SWR 2017 Sewerline Overlays i020 E7CC SWR 2018/19 Sewerline Replacement Project c492 E6GC SWR Citywide CIPP Sewer Rehab Phase I c456 E4GB SWR Citywide CIPP Sewer Rehab Phase II c488 E6GB SWR Lake Ballinger Trunk Sewer Study s011 E5GB SWR Lift Station #1 Basin & Flow Study c461 E4GC UTILITIES Standard Details Updates solo E5NA UTILITIES Utility Rate Update s013 E6JA WTR 2014 Waterline Overlays c452 E4CC WTR 2015 Waterline Overlays c475 E5CB WTR 2015 Waterline Replacement Program c440 E4JB WTR 2016 Water Comp Plan Update c460 E4JC WTR 2016 Waterline Overlays i009 E6CB WTR 2016 Waterline Replacement Projects c468 E5JA WTR 2017 Waterline Overlays i019 E7CB WTR 2017 Waterline Replacement Projects i014 E6JB WTR 2018/19 Waterline Replacement Project c493 E6JC WTR 224th Waterline Relocation (2013) c418 E3JB WTR Dayton St. Utility Replacement Project (3rd Ave to 9th Ave) c482 E5JB WTR Five Corners Reservoir Re -coating c473 E51KA WWTP Sewer Outfall Groundwater Monitoring c446 E4HA WWTP WWTP Outfall Pipe Modifications c481 E5HA Revised 7/27/2017 Packet Pg. 94 5.3.c Payroll Earnings Summary Report City of Edmonds Pay Period: 830 (08/01/2017 to 08/15/2017) Hour Type Hour Class Description Hours Amount -ed2 REGULAR HOURS Educational Pav Correction 0.00 -156.28 111 ABSENT NO PAY LEAVE 45.75 0.00 121 SICK SICK LEAVE 352.75 13,622.36 122 VACATION VACATION 1,891.00 71,801.85 123 HOLIDAY HOLIDAY HOURS 24.00 767.21 124 HOLIDAY FLOATER HOLIDAY 35.00 1,201.73 125 COMP HOURS COMPENSATORY TIME 201.80 6,664.62 129 SICK Police Sick Leave L & 1 48.00 1,554.50 130 COMP HOURS Holidav Compensation Used 18.00 588.40 150 REGULAR HOURS Kellv Dav Used 216.00 8,272.22 155 COMP HOURS COMPTIME AUTO PAY 120.98 5,342.21 160 VACATION MANAGEMENT LEAVE 4.00 311.07 190 REGULAR HOURS REGULAR HOURS 16,893.81 606,483.75 196 REGULAR HOURS LIGHT DUTY 75.50 3,379.49 205 OVERTIME HOURS OVERTIME .5 13.00 233.46 210 OVERTIME HOURS OVERTIME -STRAIGHT 12.00 409.57 215 OVERTIME HOURS WATER WATCH STANDBY 48.00 2,398.87 216 MISCELLANEOUS STANDBY TREATMENT PLANT 16.00 1,565.79 220 OVERTIME HOURS OVERTIME 1.5 496.75 31,602.44 225 OVERTIME HOURS OVERTIME -DOUBLE 9.00 647.67 410 MISCELLANEOUS WORKING OUT OF CLASS 0.00 106.05 411 SHIFT DIFFERENTIAL SHIFT DIFFERENTIAL 0.00 1,000.18 600 RETROACTIVE PAY RETROACTIVE PAY 0.00 590.94 601 COMP HOURS ACCRUED COMP .5 16.00 0.00 602 COMP HOURS ACCRUED COMP 81.00 0.00 604 COMP HOURS ACCRUED COMP TIME 184.25 0.00 606 COMP HOURS ACCRUED COMP TIME 3.75 0.00 acc MISCELLANEOUS ACCREDITATION PAY 0.00 43.95 acp MISCELLANEOUS Accreditation 1 % Part Time 0.00 0.00 acs MISCELLANEOUS ACCRED/POLICE SUPPORT 0.00 166.62 boc MISCELLANEOUS BOC 11 Certification 0.00 86.48 colre MISCELLANEOUS Collision Reconstruction ist 0.00 107.89 cp1 MISCELLANEOUS TRAINING CORPORAL 0.00 147.28 08/17/2017 Packet Pg. 95 5.3.c Payroll Earnings Summary Report City of Edmonds Pay Period: 830 (08/01/2017 to 08/15/2017) Hour Type Hour Class Description Hours Amount crt MISCELLANEOUS CERTIFICATION III PAY 0.00 640.76 det MISCELLANEOUS DETECTIVE PAY 0.00 102.75 det4 MISCELLANEOUS Detective 4% 0.00 983.26 ed1 EDUCATION PAY EDUCATION PAY 2% 0.00 724.94 ed2 EDUCATION PAY EDUCATION PAY 4% 0.00 893.96 ed3 EDUCATION PAY EDUCATION PAY 6% 0.00 4,748.76 fmla ABSENT FAMILY MEDICAL/NON PAID 111.00 0.00 furls SICK FAMILY MEDICAL/SICK 111.25 3,356.18 k9 MISCELLANEOUS K-9 PAY 0.00 102.75 Iq1 LONGEVITY LONGEVITY PAY 2% 0.00 775.34 Ig10 LONGEVITY LONGEVITY 5.5% 0.00 396.36 Ig11 LONGEVITY LONGEVITY PAY 2.5% 0.00 836.11 Iq2 LONGEVITY PAY LONGEVITY PAY 4% 0.00 832.28 Iq3 LONGEVITY PAY LONGEVITY 6% 0.00 5,727.48 Igo LONGEVITY Lonqevitv 1 % 0.00 212.36 Iq6 LONGEVITY Lonqevitv .5% 0.00 379.45 Iq7 LONGEVITY Lonqevitv 1.5% 0.00 956.13 Iq9 LONGEVITY Lonqevitv 3.5% 0.00 82.46 melc COMP HOURS Medical leave Comp 2.00 61.36 mels SICK Medical Leave Sick 308.75 8,709.75 melv VACATION Medical Leave Vacation 47.25 1,162.49 mtc MISCELLANEOUS MOTORCYCLE PAY 0.00 205.50 pds MISCELLANEOUS Public Disclosure Specialist 0.00 47.12 phv MISCELLANEOUS PHYSICAL FITNESS PAY 0.00 1,914.44 prof MISCELLANEOUS PROFESSIONAL STANDARDS ; 0.00 157.56 sqt MISCELLANEOUS ADMINISTRATIVE SERGEANT 0.00 157.56 slw SICK SICK LEAVE ADD BACK 106.86 0.00 str MISCELLANEOUS STREET CRIMES 0.00 424.98 traf MISCELLANEOUS TRAFFIC 0.00 118.17 21,493.45 $793,650.58 Total Net Pay: $524,466.82 08/17/2017 Packet Pg. 96 5.3.d Benefit Checks Summary Report City of Edmonds Pay Period: 830 - 08/01/2017 to 08/15/2017 Bank: usbank - US Bank Check # Date Payee # Name Check Amt Direct Deposit 62814 08/18/2017 chapl CHAPTER 13 TRUSTEE 940.00 0.00 62815 08/18/2017 epoa2 EPOA-POLICE 2,866.50 0.00 62816 08/18/2017 epoa3 EPOA-POLICE SUPPORT 533.50 0.00 62817 08/18/2017 flex NAVIA BENEFIT SOLUTIONS 1,052.05 0.00 62818 08/18/2017 teams TEAMSTERS LOCAL 763 4,906.50 0.00 62819 08/18/2017 icma VANTAGE TRANSFER AGENTS 304884 2,986.27 0.00 13,284.82 0.00 Bank: wire - US BANK Check # Date Payee # Name Check Amt Direct Deposit 2593 08/18/2017 awc AW C 339,465.08 0.00 2597 08/18/2017 wadc WASHINGTON STATE TREASURER 18,994.19 0.00 2598 08/18/2017 us US BANK 110,105.58 0.00 2599 08/18/2017 mebt WTRISC FBO #N3177B1 96,463.25 0.00 2602 08/18/2017 pb NATIONWIDE RETIREMENT SOLUTION 5,615.10 0.00 2603 08/18/2017 oe OFFICE OF SUPPORT ENFORCEMENT 299.00 0.00 0.00 570,942.20 Grand Totals: 584,227.02 0.00 ob 0 r m c m 0 L a. m E U �a r El 8/17/2017 Packet Pg. 97 7.1 City Council Agenda Item Meeting Date: 08/22/2017 Authorization for Mayor to sign Local Agency Professional Services Consultant Agreement with SG Alliance for the Highway 99 Revitalization / Gateway Project (10 min.) Staff Lead: Robert English Department: Engineering Preparer: Katie MacCaul Background/History In 2015, the City secured $10 million from Connecting Washington for the Highway 99 Gateway/Revitalization Project. In spring 2017, the State Legislature approved $1 million of this funding for the 2018-2019 biennium. In addition to this funding the City has appropriated $300,000 in the 2017 budget to match the State appropriation. Staff Recommendation Forward item to the consent agenda for approval. Narrative The Highway 99 Revitalization / Gateway project consists of extending the recent transformation of Highway 99 in Shoreline through Edmonds. The scope of the project includes wider replacement sidewalks, new street lighting, raised center medians for access management, attractive and safe crosswalks, better stormwater management, targeted utility replacements, potential undergrounding of overhead utilities, landscaping, softscape treatments and other improvements to identify the area as being in Edmonds. Access management is being proposed due to the high accident history from 216th St. SW to 224th St. SW (rest of corridor will also be assessed as part of this project). The projects identified in the Edmonds Highway 99 Subarea Plan will be integrated into the project. The initial scope of work will develop a corridor plan for Highway 99 between 244th St to 212th St. The Plan will identify improvements to be made within the corridor, associated project costs, environmental documentation and right of way requirements. It will also establish a prioritized list of improvements and an implementation strategy to construct them in a cost effective sequence that will minimize impacts to businesses and the public. Preliminary work will be completed on the following tasks: Survey / right of way calculations Conceptual plans Stormwater Approach NEPA / SEPA documentation Right of way acquisition Utility Undergrounding Urban Design Cost Estimates Sequencing and Funding assistance Packet Pg. 98 7.1 Public Involvement The Request for Qualifications was advertised on May 23, 2017 and May 30, 2017. Statements of Qualifications were received from two consultants (SCJ Alliance and KPG). SO Alliance was selected based on their qualifications and experience on similar projects. The total fee for this initial contract has been set at a not -to -exceed amount of $467,517 (including $22,263 in management reserve) and the work is scheduled to take approximately seven months to complete. The project is currently funded by Connecting Washington and City funds ($300,000 from Fund 126). Attachment SO Alliance Scope of Work / Fee Proposal Attachments: Scope of Work & Fee Proposal Packet Pg. 99 7.1.a 1 2 3 4 5 6 7 8 SCJ ALLIANCE CONSULTING SERVICES EXHIBIT A DRAFT SCOPE OF WORK HIGHWAY 99 GATEWAY -REVITALIZATION PROJECT Prepared for: Prepared By: Date prepared: Overview EDMONDS, WA City of Edmonds Lisa Reid, P.E., PMP, Senior Project Manager August 16, 2017 9 The objective of this project is to extend the successful transformation of Highway 99 in 10 Shoreline through Edmonds. The scope of the project will include wider replacement sidewalks, 11 new street lighting, raised center medians for access management, attractive and safe 12 crosswalks, better stormwater management, targeted utility replacements, potential 13 undergrounding of overhead utilities, landscaping, softscape treatments and other 14 improvements to identify the area as being in Edmonds. 15 The initial scope of work will develop Highway 99 corridor planning elements, consistent with 16 the Highway 99 Subarea Plan, that will identify the improvements to be made and the 17 associated project costs, environmental documentation and right of way requirements. These 18 plan elements will establish a prioritized list of improvements and an implementation strategy 19 to construct them in a cost-effective sequence that will minimize impacts to businesses and the 20 public. The plan elements will be used as the framework for completing the final design, 21 environmental documentation and right of way acquisition phases for the improvements to 22 Highway 99. 23 The work will consist of the following Phases: 24 • Phase 1— Project Management 25 • Phase 2 — Survey and Right -of -Way Calculations (1 Alliance) 26 • Phase 3 — Conceptual Plans 27 • Phase 4 — Stormwater Approach (Osborn Consulting Inc) 28 • Phase 5 — NEPA/SEPA Documentation 29 • Phase 6 — Right -of -Way Acquisition (Universal Field Services) 30 • Phase 7 — Utility Undergrounding 31 • Phase 8 — Urban Design 32 • Phase 9 — Cost Estimates 33 • Phase 10 — Sequencing and Funding Assistance 34 • Phase 11— Public Involvement Highway 99 Gateway/Revitalization Project August 16, 2017 City of Edmonds Page 1 Packet Pg. 100 7.1.a SCJ ALLIANCE CONSULTING SERVICES 1 Assumptions 2 1. This project is funded by a Connecting Washington grant. 3 2. The project may be completed by using Federal funds in the future. 4 3. Project limits are along Highway 99, from 244tn Street to 2121n Street for the corridor- 5 wide planning elements included in this scope of work. 6 4. There is a partial cloverleaf interchange at SR 99 and SR 104. 7 5. There are six (6) signalized intersections at S. 238t" S 228tn S 224tn, S. 220tn. S. 216tn 8 and S. 212tn Streets. 9 Information Provided by the City 10 This summary is duplicative of the Assumptions included in the Phases and Tasks in this scope of 11 work below and may not be complete. 12 1. Digital, ortho-rectified, aerial photo for the corridor, including datum control 13 2. Right -of -entry and Public Notification for survey work 14 3. Last 3 years of crash history data (2014-2016) 15 4. Traffic counts for the past 2015 and 2017 16 5. As-builts/Record drawings for the City's storm drainage, water, and sewer systems and 17 signals as available. 18 6. Plans for 1990's BAT Lane project 19 7. Highway 99 Subarea Plan (2017) 20 8. Highway 99 Area Planned Action EIS (2017) 21 9. 228tn at SR 99 as -built drawings 22 10. Highway 99 Lighting Phase 1-3 plans 23 Phase 1 Project Management 24 This phase includes tasks to plan, manage, and administer the work; attend project meetings; 25 and provide quality assurance/quality control. 26 Task 1 Project Management 27 1) Project Management: Manage the project by directing and supervising staff and 28 reviewing work for the duration of the project. This management is for the overall work 29 rather than specific tasks. 30 2) Schedule: Develop a basic project schedule to match the scope of work. Update the 31 schedule quarterly. 32 3) Invoice and Progress Reports: Monitor earned value and actual costs on a biweekly 33 basis. Prepare and submit a biweekly progress report. Prepare a monthly progress 34 invoice with biweekly progress reports attached. 35 4) Status Calls: Attend weekly check -in calls with Edmonds project manager. Highway 99 Gateway/Revitalization Project August 16, 2017 City of Edmonds Page 2 Packet Pg. 101 7.1.a SCJ ALLIANCE CONSULTING SERVICES 1 5) Monthly Meetings: Attend monthly meetings at Edmonds City Hall. 2 6) Quality Assurance, Quality Control: Provide senior level QA/QC for deliverables to the 3 City throughout the project. 4 Assumptions 5 • Project management will be provided over a 7-month timeframe and the estimated 6 amount of project coordination is reflected in the budget. 7 • Progress billings will be submitted monthly to the City in a format approved by the City. 8 Deliverables 9 • Schedule in MS Project and PDF format via email (electronic) 10 • Bi-weekly Progress Report submitted via email in PDF format 11 • Progress billings submitted monthly via email in PDF format 12 Phase 2 Survey and Right -of -Way Calculations (1 Alliance) 13 Task 1 Survey Control 14 1) Survey Control: Provide an overall geodetic survey control network for this project. The 15 network will cover the length of the Highway 99 Corridor Area. A GPS transformation set 16 will be conducted to create a standard Survey Control Network. It is anticipated that the 17 coordinate system for this project will be referenced to NAD 83/91 or equivalent for 18 horizontal and that the vertical datum will be referenced to NAVD 88. The survey 19 control network will also include cadastral survey control which will be used for right of 20 way resolution and future topographic work. 21 Task 2 Right -of -Way Survey 22 1) Research and Compile Records: Research and compiling of records in support of 23 resolving the right of way boundary for the Highway 99 Corridor Area will be performed 24 2) Resolution of Right -of -Way: These records as well as WSDOT right-of-way plans and field 25 located survey monuments will be used to resolve the right -of way. Easements on 26 adjoining parcels included in the WSDOT right-of-way plans will be resolved and 27 included. 28 Assumptions 29 • The City will provide a digital, ortho-rectified, aerial photo for the corridor, including 30 datum control. 31 • The City will provide right -of -entry and Public Notification. 32 • Easements, Exhibits, and Legal Descriptions are not part of this phase of this scope. 33 • Property corners will not be set in conjunction with this survey. 34 • Parcel lines will be derived utilizing Snohomish County provided GIS for this Phase; 35 parcel resolution is not a part of this phase. Deliverables Highway 99 Gateway/Revitalization Project August 16, 2017 City of Edmonds Page 3 Packet Pg. 102 7.1.a SCJ ALLIANCE CONSULTING SERVICES 1 • AutoCAD Civil 3D right of way base map (on a CD) 2 • Survey control points in ASCII format (on a CD) 3 Phase 3 Conceptual Plans 4 Task 1 Crash Analysis 5 1) Crash Analysis: Collect crash history data for the last three years and prepare crash 6 analysis diagrams representing the number, types, locations, and severity of crashes and 7 a summary report of the existing crash history data. A brief analysis of the existing 8 safety performance conditions will be performed based on best practices in the Highway 9 Safety Manual (HSM). The goal of this work is to provide information for the 10 development of the Access Management Plan and for communication with business and 11 property owners. 12 Task 2 Traffic Analysis 13 1) Coordination with Prior Work: The Consultant will coordinate with DKS to obtain the 14 modeling prepared as part of the Highway 99 Subarea Plan modeling work and to 15 understand the assumptions included in the model. 16 2) Forecast Future Traffic Volumes: The Consultant will review the 2040 PSRC model and 17 determine if any additional adjustments need to be made to the forecast based on 18 anticipate land use changes supplied by the City. The Consultant will modify forecasted 19 traffic volumes for 2040 based on up to three (3) significant land use changes. 20 3) Initial Queuing Analysis: An analysis of the existing conditions and design year will be 21 performed in SYNCHRO specifically to determine what lane configurations and queue 22 lengths are needed. This will be performed for the six (6) signalized intersections and at 23 the median U-turn locations (up to ten (10) mid -block locations). 24 4) Preferred Alternative Queuing Analysis: Once the basic lane configurations have been 25 determined, model the preferred alternative to determine queue lengths for left -turns, 26 dual left -turns, and U-turn pockets 27 5) Traffic Analysis Summary: Prepare a technical memorandum summarizing the existing 28 and forecasted traffic volumes, and results of the queuing analysis. Update based on 29 feedback from the City. 30 Task 3 Cross -Sections 31 1) Preliminary Cross -Sections: Develop typical sections for each segment of the roadway 32 for the Draft Access Management Plan. Initially, these will be done using Streetmix. It is 33 assumed that the cross section will include wider sidewalks, a refuge area in the 34 medians, and curb radii modifications to accommodate U-turns. Highway 99 Gateway/Revitalization Project City of Edmonds August 16, 2017 Page 4 Packet Pg. 103 7.1.a SCJ ALLIANCE CONSULTING SERVICES 1 2) Final Cross -Sections: Once the Access Management Plan has been finalized, cross- 2 sections for the corridor will be sketched into CAD to make them more project -specific. 3 Task 4 Access Management Plan 4 1) Site Visit: Walk the site and observe driveway use and circulation patterns and business 5 sign types and locations. Record business names and driveway notes on an aerial photo 6 2) Access Management Solutions: Perform a brief analysis of the existing corridor access, 7 and identify potential access management solutions that could be incorporated into the 8 project. These solutions will include a combination of driveway revisions, replacing the 9 center two-way left -turn lane with a continuous median, and potential right and left- 10 turn lane additions. Driveway revision solutions will consist of reducing the number of 11 driveways allowed per parcel, moving driveways to cross streets, meeting corner 12 clearance requirements, encouraging shared driveways for adjacent parcels, and 13 modifying driveway geometry for high -volume driveways to move traffic smoothly off 14 the highway. 15 3) Access Management Plan: Once the suite of access management solutions has been 16 identified, review them to determine which will result in the largest reduction in the 17 number and severity of crashes and which will best improve mobility throughout the 18 corridor. Ensure consistency of the proposed access solutions with the Edmonds SR 99 19 Subarea Plan and the WSDOT Design Manual guidance and develop an integrated 20 Access Management Plan for the corridor that includes proposed driveway revisions, 21 construction of a raised median, and potential additions to right and left -turn lanes. The 22 plan will include a up to two (2) mid -block openings per block between signals if 23 needed. The Draft Access Management Plan will be presented graphically on aerial 24 basemapping to illustrate the impacts to private property parking and circulation. This 25 plan will be submitted to the City for comment and revised into a Final Access 26 Management Plan. 27 4) Driveway Circulation Sketches: At locations where significant driveway revisions are 28 required, prepare up to twenty-five (25) simple hand sketches of the affected private 29 property parking and circulation showing potential changes that would facilitate the 30 proposed access changes. Prioritize solutions that are most desirable with respect to 31 reducing the frequency and severity of crashes and improving mobility in the corridor 32 and include the best options in the Access Management Plan. 33 Task 5 Basic Configuration Plans 34 1) Basic Configuration Plans: Starting with the Access Management Plan and conceptual 35 layout developed for the corridor and consistent with the Highway 99 Subarea Plan, 36 advance the roadway design of the corridor to approximately 10% and develop Basic 37 Configuration Plans. These plans will be the start of future Channelization Plans but will 38 not include the level of detail necessary for Channelization Plans. The plans will include 39 centerline, curbs, sidewalks, driveway locations, median details, channelization, and Highway 99 Gateway/Revitalization Project August 16, 2017 City of Edmonds Page 5 Packet Pg. 104 7.1.a SCJ ALLIANCE CONSULTING SERVICES 1 existing and proposed right-of-way. Station and offset callouts to all elements will not 2 be included (this will be added to future Channelization Plans.) A draft will be submitted 3 to the City for review, and a final set will incorporate City comments. 4 2) Coordination with WSDOT: Meet with WSDOT early in the preparation of the Basic 5 Configuration Plans to check they are in concurrence with the improvements proposed. 6 Task 6 Right -of -Way Needs Determination 7 1) Develop Parcel Spreadsheet: Assemble a populated spreadsheet to include all tax 8 parcels within the project limits along Highway 99 from 244th Street SW to 212th Street 9 SW based on current Snohomish County Assessors records. The parcel spreadsheet will 10 include information with respect to the ownership/taxpayer, size of parcel, zoning; and 11 current use. 12 2) Identify Right -of -Way Needs: Prepare a summary of the right of way needs for the 13 corridor based on the Basic Configuration Plans and Utility Undergrounding Conceptual 14 Plan. This work will be summarized in Phase 6. 15 Assumptions 16 • City to provide last 3 years of crash history data (2014-2016). 17 • City to provide traffic counts for the 2015 and 2017. 18 • City to provide As-builts/Record drawings for the City's storm drainage, water, and 19 sewer systems and available signal systems. 20 • City to provide plans for 1990's BAT Lane project. 21 Deliverables 22 • Draft and Final Technical Memoranda describing and attaching the Access Management 23 Plans (electronic) 24 • Draft and Final Traffic Analysis technical memoranda (electronic) 25 • Draft and Final Basic Configuration Plans in PDF format (electronic) (40-scale, 26 approximately 24 sheets) 27 • Up to fifteen (15) driveway circulation sketches in PDF format (electronic) 28 29 Phase 4 Stormwater Approach (Osborn Consulting Inc.) 30 Task 1 Storm water Approach 31 1) Review Stormwater Codes: The Consultant will review the City of Edmonds' Stormwater 32 Code and other relevant codes from the Cities of Lynnwood and Mountlake Terrace, 33 Snohomish County, and WSDOT and will determine what stormwater approach will be 34 used for the entire corridor that meets all relevant codes. 35 2) Review Existing Conditions: Review available stormwater plans (from 1990's BAT lane 36 project) and research basin information to assemble a summary of the existing Highway 99 Gateway/Revitalization Project August 16, 2017 City of Edmonds Page 6 Packet Pg. 105 7.1.a SCJ ALLIANCE CONSULTING SERVICES 1 stormwater system. This will include delineation of the basins within the corridor and 2 documentation of the downstream flow path for each basin. 3 3) Stormwater Approach: Using impervious area calculations provided by the roadway 4 designer, identify the stormwater requirements and identify required facilities in terms 5 of the conceptual level type/size and location. Review the existing conditions and 6 proposed improvements and identify any considerations or impacts that should be 7 considered relative to stormwater management. 8 4) Stormwater Cost Estimate: Prepare conceptual cost estimates with 30% contingency to 9 be incorporated into the final project conceptual estimate. The cost estimates will be 10 prepared per the City's Cost Estimating Policy based on a planning project development 11 level for a project greater than $1M in cost. 12 Assumptions 13 • Prior reports for work in this area are not available. 14 • Paper copies of deliverables are not required. 15 • Only one stormwater approach will be developed for a single roadway configuration. 16 This task doesn't include alternatives analysis or development of stormwater facilities 17 for multiple roadway configurations 18 • Coordination meetings with City staff at City Hall will be limited to three (3). 19 Deliverables 20 • Draft and Final Stormwater Summary Memorandum documenting the stormwater 21 approach as outlined in Task 1 above. 22 • Conceptual level cost estimate of stormwater facilities with 30% contingency to be 23 incorporated into the final project cost estimate 24 Phase 5 NEPA Documentation 25 Task 1 NEPA Approach 26 1) Purpose and Need: SCJ will work with City of Edmonds staff to develop a Purpose and 27 Need statement for the project that identifies the reason the project is being 28 undertaken and the issues it is intended to solve. Translate the Purpose and Need 29 statement into the Baseline Needs section of the practical solutions Basis of Design 30 memorandum. Identify preliminary metrics associated with the Purpose and Need. 31 2) NEPA Strategy: SCJ staff will evaluate the options for environmental analysis. The 32 evaluation will include consideration of project impacts and future construction funding 33 sources to ensure the appropriate documentation type is selected (i.e. Documented 34 Categorical Exclusion, Environmental Assessment, etc.) The need for special studies (e.g. 35 Section 106, Biological Assessment, air quality, etc.) to support the environmental 36 documentation will also be identified. SCJ will coordinate with WSDOT Local Programs 37 regarding the environmental strategy for the project. Highway 99 Gateway/Revitalization Project August 16, 2017 City of Edmonds Page 7 Packet Pg. 106 7.1.a SCJ ALLIANCE CONSULTING SERVICES 1 Assumptions 2 • Project is entirely located within an urban corridor. 3 • Federal funding is anticipated to be pursued for construction of the improvements, 4 triggering the need for a NEPA analysis. 5 Deliverables 6 • Purpose and Need Statement (electronic) 7 • Summary memorandum addressing NEPA/SEPA strategy and recommended level of 8 documentation, including list of anticipated special studies needed to support the 9 analysis (electronic) 10 Phase 6 Right -of -Way Acquisition (Universal Field Services) 11 Task 1 Summarize Right -of -Way Needs: 12 1) Identify Opportunities for Joint Access: When possible, identify common owners of 13 abutting properties which may lead to early opportunities of creating shared use access 14 treatments. Note: The assessor's office at times will list the taxpayer instead of the 15 property owner. Therefore, the appearance of common ownership may not be 16 apparent. 17 2) Summarize Right of way Needs: Summarize preliminary right of way needs based on 18 work on the conceptual plans, stormwater approach, and utility undergrounding 19 approach. 20 Task 2 Right -of -Way Cost Estimate: 21 1) Develop Right -of -Way Costs: Based on Phase 6, Task 1 above, prepare a preliminary 22 estimate of the costs to purchase right of way. Estimated right of way costs will include 23 related itemized costs similar to a True Cost Estimate Summary sheet per WSDOT's LAG 24 Manual Section 25 — Right of Way Procedures. Estimate of related costs will include just 25 compensation to individual property owners; appraisal and appraisal fees; acquisition 26 negotiation service fees; relocation assistance service fees; relocation costs; title and 27 escrow fees; property management (if any); and incidental expenses (condemnation, 28 etc.). 29 2) Escalate Right -of -Way Costs: Escalate the right of way costs to year(s) of purchase based 30 on discussions with City. 31 Task 3 Right -of -Way Acquisition Approach 32 1) Right -of -Way Approach: Prepare a technical memo that includes the summary of right 33 of way needs which may include real property rights such as: fee simple; permanent 34 easements, temporary construction easements. rights of entry agreements; shared 35 access agreement, etc. The technical memo will also include, estimated costs for all right Highway 99 Gateway/Revitalization Project City of Edmonds August 16, 2017 Page 8 Packet Pg. 107 7.1.a SCJ ALLIANCE CONSULTING SERVICES 1 of way requirement, and a discussion outline of the proposed process to acquire right of 2 way and cost -saving strategies. 3 2) Update Right -of -Way Approach: Update memo based on feedback from the City. 4 Task 4 Property Owner Meetings 5 1) Property Owner Meetings: The City will arrange and up to one (1) Consultant will 6 conduct up to ten (10) meetings with individuals or groups of property owners. 7 Attendance by the SO project manager is included in Phase 11 Task 6. Summarize one- 8 on -one meetings and provide notes to the City. 9 Assumptions 10 • The populated parcel spreadsheet will be a useful tool as the project progresses as a 11 quick reference and to assist staff with coordinating requests for more in-depth parcel 12 information through Preliminary Title Commitments, commonly known as Title Reports. 13 The need for title reports may be subject to and determined on a case -by -case basis in 14 consideration of: base mapping for design; type and impacts of acquisition, current use, 15 and locations identified for shared access use. 16 • Estimates of just compensation to property owners will be based upon adjusted 17 Snohomish County's assessed land values and assumptions of damages to a parcel's 18 reminder use. A market search for recent comparable land sales is excluded. 19 Deliverables 20 • Summary of right of way needs (electronic) 21 • Estimate of right of way acquisition costs 22 • Draft and Final technical memoranda outlining approach to acquire right of way 23 (electronic) 24 • Summarize one-on-one meetings with property owners. 25 Phase 7 Utility Undergrounding 26 Task 1 Utility Identification 27 1) Data Collection: Obtain existing utility information from private utility companies, 28 Olympic View Water and Sewer District, Mountlake Terrace, Lynnwood, and Snohomish 29 County. Put overhead utilities into CAD. Field verify supplied information for accuracy 30 and incorporation into CAD plan. 31 2) Overhead Utility Confirmation: Conduct site visit to determine overhead service drops 32 and confirm utility plans. Modify plans as needed. 33 Task 2 Utility Undergrounding Conceptual Plan 34 1) Coordination Meetings: Plan and facilitate up to two (2) utility coordination meetings 35 with City staff and utility company representatives to determine the process for Highway 99 Gateway/Revitalization Project August 16, 2017 City of Edmonds Page 9 Packet Pg. 108 7.1.a SCJ ALLIANCE CONSULTING SERVICES 1 undergrounding, potential location of a joint trench, and number and approximate 2 location of vaults. 3 2) Conceptual Plan: Develop a conceptual plan for utility undergrounding in CAD for the 4 purpose of confirming the feasibility and conceptual level costs for undergrounding. The 5 conceptual layout will include a possible joint trench location, potential locations of 6 utility vaults to determine right of way needs and service conversions necessary. 7 Task 3 Utility Undergrounding Approach 8 1) Undergrounding Approach: Prepare a technical memorandum proposing an approach to 9 utility undergrounding, including coordination with utility companies, conceptual 10 design, approach to acquisition and use of right of way (to be included in Phase 6 work), 11 and service conversions. Update based on City feedback. 12 2) Coordination Meetings: Attend up to one (1) coordination meeting with utility 13 companies to determine best approach options for implementation into design. 14 Assumptions 15 • Up to two (2) Consultant staff members will attend up to three (3) utility coordination 16 meetings. 17 Deliverables 18 • Draft and Final technical memoranda outlining utility undergrounding approach 19 (electronic) (40-scale, approximately 24 sheets) 20 Phase 8 Urban Design 21 Task 1 Initial Design Concepts for Corridor Aesthetics and Gateway(s) 22 1) Document Review: Review existing City of Edmonds Highway 99 Subarea Plan themes, 23 goals and districts, urban infrastructure plans and other relevant regional transportation 24 projects, project plans, and planning documents, and ensure consistency of approach 25 with the Highway 99 Subarea Plan. 26 2) Site Visit: Site visit to walk length of site, photograph existing conditions, and gather 27 existing character information. 28 3) Develop Aesthetic Themes: From review of existing documents and site visit, generate 29 ideas for an aesthetic theme that will connect the three district identities and create an 30 overarching aesthetic theme for the whole corridor. A unifying theme will connect the 31 corridor, allowing each district to standout while also creating a consistent feel 32 throughout the corridor. 33 4) Gateway Theme: Review other relevant City gateways and generate concepts for 34 gateway treatments that will create distinct entry points at either end of the corridor 35 using districts and themes as determined above. Highway 99 Gateway/Revitalization Project City of Edmonds August 16, 2017 Page 10 Packet Pg. 109 7.1.a SCJ ALLIANCE CONSULTING SERVICES 1 Task 2 Graphics for Public Involvement 2 1) Conceptual Plans: Once an overall aesthetic theme is established, create plan view 3 diagrams to express ideas for thematic consistency throughout the corridor that honor 4 district identities and unite the corridor as a whole. Up to six (6) representative plan 5 sheets will be prepared. 6 2) Conceptual Cross -Sections: Work with planning and stormwater teams to create cross 7 sections and plans that depict application of corridor themes on a site -specific level, 8 including examples of human -scale elements that will carry aesthetic character 9 throughout the corridor while also celebrating each distinct district. Up to six (6) 10 conceptual cross -sections will be prepared. 11 3) Assemble Graphics: Assemble and produce simple graphics to clearly communicate 12 ideas to the public, stakeholders, and City Council. Diagram of corridor theme and 13 districts within the theme, plan and illustrated section(s) to depict "on the ground" feel 14 of themes with site specific elements and gateway concepts. 15 4) Visual Renderings: Prepare up to five (5) before and after, computer generated, 16 renderings of the project. 17 Assumptions 18 • Themes will be relevant to the City of Edmonds and their citizens and will represent the 19 City as a unique entity within a regional context. Ideas presented will clearly show 20 overall aesthetic goals for the corridor as well as elements intended to fulfill those goals 21 to engage citizens and the community, attempting to build consensus for ideas through 22 clear communication and a consistent aesthetic theme that unites previously identified 23 districts. 24 Deliverables 25 • Overall corridor theme and district identity concepts presented in diagrams, plans, 26 renderings, and sections that fit multiple formats for use at meetings, in flyers and on 27 the web (electronic) 28 29 Phase 9 Cost Estimate 30 Task 1 Conceptual Cost Estimate 31 1) Conceptual Cost Estimate: Prepare conceptual level cost estimates by roadway segment 32 to be used in the sequencing plan based on plans developed from other tasks. The cost 33 estimates will be prepared per the City's Cost Estimating Policy based on a planning 34 project development level for a project greater than $11VI in cost. 35 Assumptions 36 • Estimate includes stormwater costs from Phase 4 and right of way costs from Phase 6. Highway 99 Gateway/Revitalization Project August 16, 2017 City of Edmonds Page 11 Packet Pg. 110 7.1.a SCJ ALLIANCE CONSULTING SERVICES 1 • Assign unit costs for quantified items and assign lump sum costs to other items based on 2 professional judgment. 3 • Conceptual level construction estimate will include a 30% contingency. 4 Deliverables 5 • Conceptual level cost estimate with a 30% contingency by roadway segment 6 Phase 10 Sequencing and Funding Assistance 7 Task 1 Sequencing Analysis and Recommendation 8 1) Sequencing Plan: Review cost estimates, utility undergrounding approach, right of way 9 approach, stormwater approach, and conceptual plans and cross -sections. Consider 10 funding needed and strategies and timing of grant applications. Based on this 11 information, prepare up to three (3) scenarios for packaging and sequencing the work. 12 Summarize in draft technical memorandum. Review with City and update 13 recommendations and technical memorandum as needed. 14 Task 2 Funding Assistance 15 1) Funding Planning: Assist the City with the identification of potential grant applications 16 and prioritizing which grants the City will pursue. 17 2) Funding Assistance: Assist the City with up to three (3) funding application preparation 18 as needed. Up to 40 hours are assumed for this task. 19 Assumptions 20 • The City will collaborate on the identification and prioritization of funding sources for 21 this work. 22 • The City will be responsible for the ultimate submittal of all grant funding applications. 23 Deliverables 24 • Draft and Final Sequencing Plan technical memoranda (electronic) 25 • Funding applications and supporting documents as needed for Phase 10 Task 2.2 26 (electronic) 27 Phase 11 Public Involvement 28 Task 1 Public Involvement Plan 29 1) Public Involvement Plan: Collaborate with the City to develop a Public Involvement Plan 30 to outline the process for meeting with stakeholders, property owners, business 31 owners, tenants, and the public. Discuss messaging and timing related to the corridor 32 plan and propose a process through the first phase of PS&E development. Update plan 33 based on feedback from the City. Highway 99 Gateway/Revitalization Project August 16, 2017 City of Edmonds Page 12 Packet Pg. 111 7.1.a SCJ ALLIANCE CONSULTING SERVICES 1 Task 2 Website 2 1) Website Development and Hosting: Develop and host a project website for the entire 3 corridor. Coordinate with the City to develop a project description, schedule, and status 4 information for this project. Provide graphics using deliverables from other Phases of 5 work and up to two (2) new graphics will be developed. 6 2) Website Maintenance: Provide up to two (2) updates to the website to update the 7 public on progress and provide open house information and materials. 8 Task 3 Public Mailings 9 1) Mailing No. 1: Prepare a one -page public mailing to introduce this project to the general 10 public, business owners, and tenants, that describes the need for the project (e.g. share 11 crash history), and inviting the public to the website and Open House No. 1 (Phase 11 12 Task 3.1). Update flyer based on feedback from the City. 13 2) Deliver Mailings: Walk the project site and hand -deliver the public mailings to business 14 owners/tenants who may not get the mailings if they are not the property owners. 15 Task 4 Stakeholder Working Group Meetings 16 1) Identify Stakeholder Working Group: Work with City to identify stakeholder group and 17 reach out to them to introduce project and invite them to ongoing meetings. Potential 18 members include the cities of Mountlake Terrace and Lynnwood, Snohomish County, 19 Community Transit, WSDOT Local Programs, and other cooperating or permitting 20 agencies that have an interest in this project. 21 2) Stakeholder Working Group Meeting No. 1: Plan and facilitate a mini charter of the 22 Stakeholder Group to identify the purpose of the group, responsibilities, and 23 expectations. Share and confirm the purpose and need and baseline needs for project 24 and solicit stakeholder input on metrics and preliminary improvement concepts. Will be 25 held prior to Open House No. 1. Up to three (3) Consultant staff will attend the 26 Stakeholder Working Group Meeting. 27 Task 5 Public Open Houses 28 1) Open House No. 1: Plan and facilitate Open House No. 1 with the public. This will occur 29 after the Mailing No. 1 and Stakeholder Group Meeting No. 1. The purpose of this 30 meeting is to present a project overview, the need for the project, crash history, 31 gateway/aesthetic themes and ideas and a preliminary access management concepts 32 (not plans) to the public for their input. Prepare graphics as needed to support the 33 communication of messaging to the public. Up to three (3) Consultant staff will attend 34 the open house. Highway 99 Gateway/Revitalization Project August 16, 2017 City of Edmonds Page 13 Packet Pg. 112 7.1.a SCJ ALLIANCE CONSULTING SERVICES 1 Task 6 Property Owner Meetings 2 1) Property Owner Meetings: Work with the City to identify property owners who are most 3 impacted by the project and most likely to vocalize their support for or opposition to the 4 project. The City will arrange and the Consultant will conduct up to ten (10) meetings 5 with individuals or groups of property owners. Attendance by right-of-way acquisition 6 representative is included in Phase 6 Task 4. 7 Task 7 City Council Meetings 8 1) Council Support: Prepare graphics and attend up to four (4) Committee and Council 9 meetings to support the City in updating the Council on the results of the alternatives 10 analysis. 11 2) City Council Presentations: Prepare up to two (2) PowerPoint (v. 2013) presentations for 12 the Committee and Council meetings that update the Council on the current status of 13 the project. These meetings will be held approximately half way through this scope of 14 work and near the completion of this scope of work. 15 Assumptions 16 • The Consultant will host the website, coordinate with development of messaging with 17 the City, and will manage all website content. The City will link their website to the page 18 developed for the project. 19 • The City will be responsible for printing and mailing of all public mailings. 20 • The City will be responsible for translation of public mailings as needed for this project. 21 • The City will supply meeting space for Stakeholder Working Group meetings and Public 22 Open Houses. 23 • Handouts for City Council meetings will be prepared and distributed by the City. 24 Deliverables 25 • Draft and Final Public Involvement Plan (electronic) 26 • Website content (electronic) 27 • Draft and Final flyers for Public Mailing No. 1 (electronic, high resolution) 28 • Attendance at one (1) Stakeholder Working Group meeting 29 • Attendance at one (1) Open House 30 • Open House materials 31 • Attendance at up to ten (10) property owner meetings 32 • City Council meeting presentation (electronic) 33 • Attendance at four (4) City Council meeting 34 END OF SCOPE OF SERVICE 35 N:\PROJECTS\0775 CITY OF EDMONDS\077S.01 EDMONDS HIGHWAY SR99 GATEWAY & REVITALIZATION 36 PROJECT\CONTRACT\PRIME AGREEMENT\SCOPE AND BUDGET\EDMONDS HWY 99 SCOPE 2017-0817 CLEAN.DOCX Highway 99 Gateway/Revitalization Project August 16, 2017 City of Edmonds Page 14 Packet Pg. 113 Consultant Labor Hour Estimate - Exhibit D-1 SO Alliance client: Cityof Edmonds SCJ ALLIANCE Project: Highway 99 Gateway -Revitalization Project eaew..w aw+vo.a Job 775.01 File#: Highway 99 Corridor Plan 2017-0817.xlsm Scott Sawyer Lisa Reid Mark Greenig Mark GaW Joe Macaulay xim Tang Ryan Shea Thera Black paatVWihen HaileY Pam Falaom Kevin McCey Maddie Riggs Alissa North Mackav Principal/ Principal Commanic Project Project Senior Senior Trans Senior Landscape Project Task No. Task Description Principal Project Manager Landscape Designer Designer Planner Planner IT Designer dons Graphic Accountan CoordR Total Mana er Architect Director t Phase 1 Project Management Task 1 Project Management 1 Project Management 30.0 9.0 56.0 95.0 2 Schedule 1.0 8.0 9.0 3 Invoice and Progress Reports 14.0 14.0 7.0 35.0 4 Status Calls 28.0 14.0 42.0 5 Monthly Meetings 21.0 12.0 33.0 6 Quality Assurance 30.0 30.0 Subtotal Hours: 31.0 101.0 21.0 23.0 63.0 244.0 Total Phase Hours: 31.0 301.0 26.0 23.0 63.0 244.0 Total Phase Direct Labor: $2,356.00 $8,043.64 $1,196.00 $701.50 $1,963.71 $14,260.85 Phase 3 Conceptual Plans Task 1 Gash Analysis 1 Crash Analysis 2.0 40.0 12.0 M.0 Subtotal Hours: 2.0 40.0 12.0 54.0 Task Traffic Analysis 1 Coordination with Prior Work 2.0 2.0 2 Forecast Future Volumes 8.0 8.0 3 Initial Queuing Analysis 24.0 24.0 4 Preferred Alternative Queuing Analysis 8.0 8.0 5 Traffic Analysis Summary 2.0 16.0 18.0 Subtotal Hours: 2.0 58.0 60.0 Task 3 Goss -Sections 1 PreliminaryCross-Sections 4.0 16.0 20.0 2 Final Cross -Sections 4.0 4.0 20.0 28.0 Subtotal Hours: 8.0 20.0 20.0 48.0 Task 4 Access Management Plan 1 Site Visit 8.0 8.0 16.0 2 Access Management Solutions 12.0 20.0 32.0 3 Access Management Plan 16.0 40.0 80.0 136.0 4 Driveway Circulation Sketches 8.0 50.0 58.0 Subtotal Hours: 44.0 118.0 80.0 242.0 Task 5 Basic Configuration Plans 1 Basic Configuration Plans 4.0 20.0 40.0 40.0 104.0 2 Coordination with WSDOT 4.0 4.0 8.0 Subtotal Hours: 4.0 24.0 44.0 40.0 112.0 Task 6 Rightof-Way, Needs Determination 1 Develop Parcel Spreadsheet 4.0 20.0 24.0 2 Identify Right -of -Way Needs 4.0 12.0 16.0 Subtotal Hours: 8.0 32.0 40.0 Total Hours All Tasks: 4.0 88.0 214.0 180.0 10.0 556.0 Total Direct labor Estimate $304.00 $7,008.32 $9,944.00 $7,786.80 $2,702.00 $27,645.12 Phase 5 NEPA Documentation Task NEPA Approach 1 Purpose and Need 16.0 16.0 32.0 2 NEPA Strategy 2.0 16.0 16.0 34.0 Subtotal Hours: 18.0 32.0 16.0 66.0 Total Phase Hours: 18.0 32.0 16.0 66.0 Total Phase Direct Labor: $1,433.52 $1,923.20 $770.40 $4,127.12 Phase 7 Utility Undergrounding N y.F d 3 a� V 3 Q. O L IL d U_ L 0 O W 0. O V CO d t ci aFr Packet Pg. 114 Consultant Labor Hour Estimate - Exhibit D-1 SO Alliance client: Cityof Edmonds SCJ ALLIANCE Project: Highway 99 Gateway -Revitalization Project eaew..w awHo.a Job 775.01 File#: Highway 99 Corridor Plan 2017-0817.xlsm Scon Sawyer Lisa Reid Mark Greeni Mark Garff Joe Macaula Kim Tan R Hailey g Y g Yan Shea Then Black Dusty Wilson Pam Folsom Kevin McCoy Maddie Riggs Alissa North Task No. Task Description Principal Principal/ Project Manager Project Manager Principal Landscape Architect Senior Designer Senior Designer Trans Planner Senior Planner 1T Landscape Designer Communic ations Direcmr Graphic' Project Accountan t Project Coord ll Total Task 1 Utility Identification 1 Data Collection Overhead Utility Confirmation 2.0 6.0 8.0 16.0 2 4.0 6.0 2.0 12.0 Subtotal Hours: 6.0 12.0 10.0 28.0 Task 2 Utility Undergrounding Conceptual Plan 1 Coordination Meetings 2 Conceptual Plan 12.0 12.0 24.0 8.0 48.0 24.0 80.0 Subtotal Hours: 20.0 60.0 24.0 104.0 Task 3 Utility Undergrounding Approach 1 Undergrounding Approach 16.0 8.0 24.0 2 Coordination Meetings 8.0 4.0 12.0 Subtotal Hours: 24.0 12.0 36.0 Total Hours All Tasks: 50.0 84.0 M.0 168.0 Total Direct Labor Estimate $3,982.00 $3,864.00 $1,470.84 $9,316.84 Phase 8 Urban Design Task 1 Initial Design Concepts for Corridor Aesthetics and Gat- 1 Document Review 8.0 8.0 16.0 2 Site Visit 4.0 4.0 8.0 3 Develop Aesthetic Themes 24.0 16.0 40.0 4 Gateway Theme 24.0 16.0 40.0 Subtotal Hours: 60.0 44.0 104.0 Task 02 Graphics for Public Involvement 1 Conceptual Plans 4.0 24.0 8.0 40.0 76.0 2 Conceptual Cross -Sections 4.0 24.0 8.0 40.0 76.0 3 Assemble Graphics Visual Renderings 8.0 10.0 18.0 4 4.0 8.0 40.0 52.0 Subtotal Hours: 12.0 64.0 16.0 40.0 90.0 222.0 Total Hours All Tasks: 12.0 124.0 16.0 40.0 134.0 326.0 Total Direct Labor Estimate $955.68 $5,970.60 $736.00 $1,730.40 $3,167.76 $12,560.44 Phase 9 Cost Estimate Take, I Conceptual Cost Estimate MOM­pwal C.11 EstamteSubtotal Hours:� 2.0 1 8.0 Tota l Hours All Tasks: 2.0 8.0 60.0 70.0 Total Direct Labor Estimate $152.00 $637.12 $2,760.00 1 1 $3,549.12 Phase 10 Sequencing and Funding Assistance Task 1 Sequencing Analysis and Recommendations 1 Sequencing Plan 2.0 20.0 4.0 4.0 30.0 Subtotal Hours: 2.0 20.0 4.0 4.0 30.0 Task Funding Assistance 1 Funding Planning 6.0 8.0 16.0 16.0 16.0 22.0 40.0 2 Funding Assistance Subtotal Hours: M.0 M.0 32.0 62C Total Hours All Tasks: 2.0 34.0 20.0 36.0 92.0 Total Direct Labor Estimate $152.00 $2,707.76 $920.00 $1,904.76 $5,684.52 Phase 11 Public Involvement Task 1 Public Involvement Plan 8.0 2.0 10.0 1 Public Involvement Plan Subtotal Hours: 8.0 2.0 MC O N y.F d 3 N /R V CD M 3 t fn O Q. O L a d U_ 08 L O 4- 0 N 0. O V ch d E t V R yI y.F Q Packet Pg. 115 Consultant Labor Hour Estimate - Exhibit D-1 SCJ Alliance client: Cityof Edmonds SCJ ALLIANCE Project: Highway 99 Gateway -Revitalization Project eo.w..�w awH�o.a Job 775.01 File#: Highway 99 Corridor Plan 2017-0817.xlsm Scott Sawyer Lisa Reid Mark Greenig Mark GaW Joe Macaulay Kim Tang Ryan Shea Thera Black DustyWllson Hailey Pam Falsom Kevin McCoy Maddie Riggs Ali -North Mackay Task No. Task Description Principal Principal/ Project Manager Project Manager Principal Landscape Architect Senior Designer Senior Designer Trans Planner Senior Planner IT Landscape Designer Communic Director irecte Graphic Project Accountan t Project Coord 11 Total Task 2 Website 1 Website Development and Hosting 10 2.0 4.0 A.0 32.0 2 Website Maintenance 4.0 4.0 2.0 18.0 28.0 Subtotal Hours: 8.0 12.0 2.0 6.0 32.0 60.0 Task 3 Public Mailings 26.0 1 Mailing No. 1 4.0 4.0 2.0 16.0 2 Deliver Mailings 6.0 6.0 Subtotal Hours: 4.0 10.0 2.0 16.0 32.0 Task Stakeholder Working Group Meetings 1 Identify Stakeholder Working Group 8.0 8.0 2 Stakeholder Working Group Meeting No. 1 12.0 6.0 6.0 24.0 Subtotal Hours: 20.0 6.0 6.0 32.0 Task 5 Public Open Houses 1 Open House No. 1 8.0 8.0 4.0 16.0 36.0 Subtotal Hours: 8.0 8.0 4.0 16.0 36.0 Task 6 Property Owner Meetings 1 Property Owner Meetings bo.o 40.0 20.0 Subtotal Hours: 40.0 20.0 60.0 Task 7 City Council Meetings 1 Council Support 40.0 16.0 56.0 2 City Council Presentations 16.0 16.0 32.0 Subtotal Hours: 56.0 32.0 88.0 Total Phase Hours: 144.0 16.0 84.0 16.0 2.0 2.0 6.0 48.0 318.0 Total Phase Direct Labor: $11,468.16 $770.40 $3,864.00 $692.16 $77.20 $96.72 $243.96 $1,614.24 $18,826.84 Total Hours All Phases 39.0 455.0 32.0 156.0 504.0 270.0 72.0 36.0 2.0 134.0 6.0 48.0 23.0 63.0 11840.0 Total Direct Labor Estimate All Phases $2,964.00 $36,236.20 $1,923.20 $7,511.40 $23,184.00 $11,680.20 $2,779.20 $1,904.76 $96.72 $3,167.76 $243.96 $1,614.24 $701.50 $1,963.71 $95,970.85 N y.F d 3 d V CD M 3 O Q. O L IL d U_ L O O W 0. O 'vV I E ci Q Packet Pg. 116 Consultant Fee Determination - Exhibit D-1 SCJ Alliance Client: City of Edmonds Project: Highway 99 Gateway -Revitalization Project Job #: 775 File #: Highway 99 Corridor Plan 2017-0817.xlsm Consultant Fee Determination DIRECT SALARY COST Discipline Hours Principal 39.0 Principal/ Project Manager 455.0 Project Manager 32.0 Principal Landscape Architect 156.0 Senior Designer 504.0 Senior Designer 270.0 Trans Planner 72.0 Senior Planner 36.0 IT 2.0 Landscape Designer 134.0 Communications Director 6.0 Graphics 48.0 Project Accountant 23.0 Project Coord II 63.0 Subtotal: 1,840.0 OVERHEAD Rate $76.00 $79.64 $60.10 $48.15 $46.00 $43.26 $38.60 $52.91 $48.36 $23.64 $40.66 $33.63 $30.50 $31.17 Overhead Rate: 165.35% Direct Salary Cost: $95,971 FIXED FEE Fixed Fee Rate: 30.00% Direct Salary Cost: $95,971 TOTAL SALARY COST SUBCONSULTANTS (Yes or No) i SCJ ALLIANCE CONSUI-ING SERVICES Amount $2,964 $36,236 $1,923 $7,511 $23,184 $11, 680 $2,779 $1,905 $97 $ 3,168 $244 $1, 614 $702 $1, 964 Total Direct Salary Cost $95,971 Overhead Cost $158,688 Fixed Fee Cost $28,791 Total Salary Cost $283,450 1 Alliance Geomatics (Phase 2 - Surveying and Right -of -Way Calculations) $45,033 Osborn Consulting (Phase 4 - Stormwater Approach) $53,953 Universal Field Services (Phase 6 - Right -of -Way Acquisition) $59,019 Total Subconsultants $158,005 REIMBURSABLES Copies, Reproductions, etc: 1.0% of Total Salary Cost $2,834 Web Hosting (per year) 1 $216/year $216 Mileage: 1,400 miles at $0.535 $749 Total Expenses: $3,799 SUBTOTAL (SALARY, SUBCONSULTANTS AND EXPENSES) Subtotal (Salary, Subconsultants and Expenses) $445,254 MANAGEMENT RESERVE FUND (MRF) Management Reserve 5.0% of Subtotal $22,263 Total Estimated Budget: $467,517 a+ Q 8/17/2017 Packet Pg. 117 7.1.a Consultant Labor Hour Estimate - Exhibit D-1 1 Alliance Client: City of Edmonds Project: Highway 99 Gateway -Revitalization Project lobar: 775.01 File n: Copy of Highway 99 Corridor Plan 2017-0815 1 Alliance EJV.xlsx Task No. I Task Description I Prinicple I PM I PLS I CADD 5 I CADD 3 I Tech 5 I Tech 2 I Tech 1 I Total Phase 2 Survey and Right -of -Way Calculations Task 1 Survey Control 1 Survey Control 1.0 2.0 16.0 8.0 60.0 60.0 40.0 187.0 Subtotal Hours: 1.0 2.0 16.0 8.0 60.0 60.0 40.0 1 187.0 Task 2 Right -of -Way Survey 1 Research and Complile Records 4.0 16.0 24.0 44.0 2 Resolve Right-of-Way/Title Review 8.0 60.0 80.0 40.0 60.0 248.0 Subtotal Hours: 12.0 76.0 104.0 40.0 60.0 292.0 W A O 479.0 3 N a+ $18,660.00 R 0 0) O 3 a� x O a O L IL LIL iv L O O 4) CL O 'V vI E ci Q 1 of 2 Packet Pg. 118 7.1.a Consultant Fee Determination - Exhibit D-1 1 Alliance Client: City of Edmonds Project: Highway 99 Gateway -Revitalization Project Job #: 775.01 File #: Copy of Highway 99 Corridor Plan 2017-0815 1 Alliance EJV.xlsx Consultant Fee Determination DIRECT SALARY COST Discipline Hours Prinicple 13.0 PM 78.0 PLS 120.0 CADD 5 40.0 CADD 3 68.0 Tech 5 60.0 Tech 2 60.0 Tech 1 40.0 Subtotal: 479.0 OVERHEAD Rate $70.00 $49.00 $47.00 $39.00 $31.00 $35.00 $27.00 $22.50 Overhead Rate: 110.00% Direct Salary Cost: $18,660 FIXED FEE Fixed Fee Rate: 28.00% Direct Salary Cost: $18,660 TOTAL SALARY COST EXPENSES Amount $910 $3,822 $5,640 $1,560 $2,108 $2,100 $1, 620 $900 Total Direct Salary Cost $18,660 Overhead Cost $20,526 Fixed Fee Cost $5,225 Total Salary Cost $44,411 Copies, Reproductions, etc 1.0% of Total Salary Cost $444 Mileage: 333 miles at $0.535 $178 Total Expenses: $622 SUBTOTAL (SALARYAND EXPENSES) Subtotal (Salary, Subconsultants and Expenses) $45,033 Total Estimated Budget: $45,033 8i17/2017 Packet Pg. 119 7.1.a Consultant Labor Hour Estimate - Exhibit D-1 Osborn Consulting Client: City of Edmonds Project: Highway 99 Gateway -Revitalization Project Job #: 775.01 File #: Copy of Highway 99 Corridor Plan 2017-0815 1 Alliance EJV.xlsx Principal/ Project Design Engineer Task No. Task Description Senior CADD Admin Total Engineer Engineer 01 Phase 4 Stormwater Approach Task 1 Stormwater Approach 1 Review Stormwater Codes 4.0 12.0 24.0 40.0 2 Review Existing Conditions 24.0 24.0 40.0 12.0 100.0 3 Stormwater Approach 24.0 24.0 40.0 20.0 24.0 48.0 180.0 4 Stormwater Cost Estimate 8.0 24.0 12.0 24.0 12.0 80.0 Subtotal Hours: 60.0 84.0 116.0 44.0 48.0 48.0 j 400.0 Total Hours All Tasks: 60.0 84.0 116.0 44.0 48.0 48.0 400.0 Total Direct Labor Estimate $11,340.00 $12,600.00 $15,080.00 $4,884.00 $5,184.00 $4,704.00 $53,792.00 x 1 of 2 Packet Pg. 120 7.1.a Consultant Fee Determination - Exhibit D-1 Osborn Consulting Client: City of Edmonds Project: Highway 99 Gateway -Revitalization Project Job #: 775.01 File #: Copy of Highway 99 Corridor Plan 2017-0815 1 Alliance EJV.xlsx Consultant Fee Determination DIRECT SALARY COST Discipline Hours Rate* Amount Principal/ Senior Engineer 60.0 $189.00 $11,340 Project Engineer 84.0 $150.00 $12,600 Design Engineer 116.0 $130.00 $15,080 Engineer 1/11 44.0 $111.00 $4,884 CAD D 48.0 $108.00 $5,184 Ad m i n 48.0 $98.00 $4, 704 Subtotal: 400.0 Total Salary Cost $53,792 *Rates are fully burdened industry standard rates EXPENSES Copies, Reproductions, etc: 0.0% of Total Salary Cost $0 Mileage: 300 miles at $0.535 $161 Total Expenses: $161 SUBTOTAL (SALARY AND EXPENSES) Subtotal (Salary, Subconsultants and Expenses) $53,953 Total Estimated Budget: $53,953 8/17/2017 Packet Pg. 121 7.1.a Consultant Labor Hour Estimate - Exhibit D-1 Universal Field Services Client: City of Edmonds Project: Highway 99 Gateway -Revitalization Project Job #: 775.01 File #: Copy of Highway 99 Corridor Plan 2017-0815 1 Alliance EJV.xlsx ROW ROW ROW Admin Task No. Task Description Total Oversight PM Specialist Specialist Phase 6 Right -of -Way Acquisition Task 1 Summarize Right -of -Way Needs 1 Obtain Title Reports 2 Develop Parcel Spreadsheet 3 Identify Opportunities for Joint Access 10.0 10.0 4.0 24.0 4 Summarize Right -of -Way Needs 16.0 20.0 8.0 44.0 Subtotal Hours: 26.0 30.0 12.0 68.0 Task 2 Right -of -Way Cost Estimate 1 Develop Right -of -Way Costs 2 Escalate Right -of -Way Costs 45.0 55.0 80.0 30.0 210.0 8.0 8.0 4.0 20.0 Subtotal Hours: 53.0 63.0 80.0 34.0 230.0 Task 3 Right -of -Way Acquisition Approach 1 Right -of -Way Acquisition Approach 2 Update Approach 34.0 16.0 16.0 8.0 8.0 2.0 8.0 3.0 3.0 2.0 Subtotal Hours: 24.0 11.0 11.0 4.0 50.0 Task 4 Property Owner Meetings 1 Property Owner Meetings 15.0 15.0 30.0 Subtotal Hours: 15.0 15.0 30.0 Total Phase Hours: 118.0 119.0 103.0 38.0 378.0 Total Phase Direct Labor: $12,477.32 $10,413.69 $7,510.76 $2,078.22 $32,479.99 c 0 N m 3 d as CD 0 3 i� 2 N 0 0. 0 L a m O u_ Y L 0 4- 0 m 0. O 0 co c d E t v R Q 1 of 2 Packet Pg. 122 7.1.a Consultant Fee Determination - Exhibit D-1 Universal Field Services Client: City of Edmonds Project: Highway 99 Gateway -Revitalization Project Job #: 775.01 File #: Copy of Highway 99 Corridor Plan 2017-0815 1 Alliance EJV.xlsx Consultant Fee Determination DIRECT SALARY COST Discipline Hours ROW Oversight 118.0 ROW PM 119.0 ROW Specialist 103.0 Admin Specialist 38.0 Subtotal: 378.0 OVERHEAD Overhead Rate: 52.31% FIXED FEE Fixed Fee Rate: 28.00% TOTAL SALARY COST Rate Amount $105.74 $12,477 $87.51 $10,414 $72.92 $7,511 $54.69 $2,078 Direct Salary Cost: $32,480 Direct Salary Cost: $32,480 Total Direct Salary Cost $32,480 Overhead Cost $16,990 Fixed Fee Cost $9,094 Total Salary Cost $58,565 Copies, Reproductions, etc: $200 Mileage: 475 miles at $0.535 $254 Total Expenses: $454 SUBTOTAL (SALARYAND EXPENSES) Subtotal (Salary, Subconsultants and Expenses) $59,019 Total Estimated Budget: $59,019 8/17/2017 Packet Pg. 123 7.2 City Council Agenda Item Meeting Date: 08/22/2017 Recommendation of Consultant for Pre -Design and Permitting Activities for the Edmonds Street Waterfront Connector Project (5 min) Staff Lead: Rob English Department: Engineering Preparer: Katie MacCaul Background/History On November 15, 2016, after a presentation and public meeting regarding the At -Grade Rail Crossings Alternatives Analysis, Council unanimously moved to add the Edmonds Street Waterfront Connector Project (the Connector) to the CIP. Staff Recommendation Forward the item to the September 5, 2017 City Council meeting for approval. Narrative After securing an appropriation of $700,000 from the State Legislature in June 2017, staff solicited Statement of Qualifications (SOQs) from firms interested in providing environmental documentation and preliminary design services for the Connector Project. Three consultants were selected for interviews: KPFF Consulting Engineers Berger-ABAM Parametrix. The members of the interviewing team were: Phil Williams, Public Works Director Partick Doherty, Community Services and Economic Development Director Mike Cotton, Deputy Regional Administrator, Washington State Department of Transportation Ed Sibrel, Capital Projects Manager Interviews were held on August 411 and 11t", 2017. Post -interview evaluations are underway and once compiled, a selection will be made and recommended to Council for approval Packet Pg. 124 7.3 City Council Agenda Item Meeting Date: 08/22/2017 Final Acceptance of the 220th Street SW Overlay Project from 84th to 76th Avenue West (5 min.) Staff Lead: Rob English Department: Engineering Preparer: Katie MacCaul Background/History On May 26, 2015, Council awarded a contract to Lakeside Industries, Inc. in the amount of $668,865.50 for the 220th Overlay Project. Staff Recommendation Forward the item to the consent agenda for approval at the September 5, 2017 City Council meeting. Narrative This project involved improvements to 220th Street SW extending from 84th Ave to 76th Ave, including a 2-inch grind and asphalt overlay, pedestrian curb ramp upgrades, bike lanes, curb and gutter replacement, signing, striping, and other work. The contract award amount was $668,865.50 and Council approved a management reserve of $100,330. During the course of the contract, one zero -cost administrative change order was written against the project. A reconciliation change order for-$85,335.69 was executed at project closeout. The final construction amount paid to Lakeside Industries was $583,529.18, 12.7% under the original contract. Packet Pg. 125