Loading...
A-3 BASEMENT FLOOR PLANSAX-1 114" ROOM 3 O LAUNDRY O BATH ROOM 4 10'-4 3/4" ti 3 13/1 "�Z-,8'-6 1/16" O ° 4 3/ " 2'-6" 1'-10 3/4" 10'-0 1/2" 01/ 10'-4 3/4 r 3'-3 1/4" 2'-6" '-6" 9 1/2" 5-5 11 /16" 6 1/2 5'-6" 4'-3 1/2" 3" co 0-- ---------------- ----------------------- ------------------ --------------------------- - CL. Existing 6x6 Beam (V O i (V WORKSHOP FAMILY ROOM UP 26-1 1/4" 4x4 Post ]post-- 3'-10 1/2" 2'-10 3/4" 2'-9 1/4" 3'-5 1/2" 38'-1 1/4" Ret, PROPERTY SETBACK LINE BASEMENT PLAN (EXISTING) 1/411= 1'-off BASEMENT PLAN (NEW) 1/411= 1'-off 5 DETECTOR / COMBO SMOKE & CARBON tD� ODETECTOR, WIRED & INTERCON /BATTERY C/s BACKUP, PER IRC R3 EX AN, VENT TO EXTERIOR, 50 CFM 12705 REGISTERED �iC ARC41-fEGT- IAN STORY STATE OF WASHINGTON REV Al Permit Resubmittal #1 4/19/19 REV A Shear Wall Revision 3/24/20 REV REV: DESCRIPTION: BY: DATE: STATUS: CLIENT: 360 Wealth & Health LLC 5815 1 l6th Ave NE Kirkland, WA 98005 ARCHITECT: Ian Story ian@ianstoryarchitect.com 206.566.7529 SITE: 24304 92ND AVE W EDMONDS, WA 98020 TITLE: BASEMENT FLOOR PLANS SCALE ATA1: DATE: DRAWN: CHECKED: F = 1/4" 3/18/19 IAN STORY PROJECT NO: DRAWING NO: REVISION: 19.03 A-3