2023-03-14 City Council PPW Packet1.
Op E D
o Agenda
Edmonds City Council
tn.. ISLP PARKS AND PUBLIC WORKS COMMITTEE
CITY COUNCIL CONFERENCE ROOM
121 - 5TH AVENUE N, EDMONDS, WA 98020
MARCH 14, 2023, 7:30 PM
COUNCIL COMMITTEE MEETINGS ARE WORK SESSIONS FOR THE COUNCIL AND CITY STAFF.
COMMITTEE MEETING AGENDAS DO NOT INCLUDE AUDIENCE COMMENTS OR PUBLIC HEARINGS.
PERSONS WISHING TO JOIN THIS MEETING VIRTUALLY IN LIEU OF IN -PERSON ATTENDANCE CAN
CLICK ON OR PASTE THE FOLLOWING ZOOM MEETING LINK INTO A WEB BROWSER USING A
COMPUTER OR SMART PHONE:
HTTPS://ZOOM. US/J/95798484261
OR JOIN BY DIAL -UP PHONE:
US: +1 253 215 8782
WEBINAR ID: 957 9848 4261
STAFF AND COUNCILMEMBERS ATTEND COMMITTEE MEETINGS VIRTUALLY, AND MEMBERS OF
THE PUBLIC ARE ENCOURAGED TO ATTEND THE SAME WAY.
IF MEMBERS OF THE PUBLIC CANNOT ACCESS THE VIRTUAL COMMITTEE MEETINGS WITH THEIR
PERSONAL DEVICES, A MONITOR IS PROVIDED ON CITY COUNCIL COMMITTEE NIGHTS FROM 430-
930 PM AT THE CITY COUNCIL CONFERENCE ROOM AT 121 5TH AVE N, EDMONDS WA.
COMMITTEE MEMBERS: DAVE TETZEL (CHAIR), DIANE BUCKSHNIS, COUNCIL PRESIDENT (EX-
OFFICIO MEMBER)
CALL TO ORDER
COMMITTEE BUSINESS
1. Committee Updates (15 min)
2. Civic Park - Walker Macy Contract Amendment No. 3 (10 min)
3. Longbay Enterprises Contract Amendment No. 5 (10 min)
4. Presentation of Amendment to the Department of Ecology Agreement - 2021-2023 Biennial
Stormwater Capacity Grant (10 min)
5. City of Edmonds Stormwater Management Action Plan (SMAP) Update (20 min)
6. Presentation of Professional Services Agreement for The Blueline Group to provide design
engineering services for the Phase 14 Waterline Replacement Project. (10 min)
7. Presentation of Professional Services Agreement with Transpo Group for the Transportation
Plan Update (25 min)
8. 2022 Transportation Impact Fee Annual Report (10 min)
Edmonds City Council Agenda
March 14, 2023
Page 1
9. 2021-2022 Transportation Benefit District Reports (10 min)
ADJOURNMENT: 9:30 PM
Edmonds City Council Agenda
March 14, 2023
Page 2
2.1
City Council Agenda Item
Meeting Date: 03/14/2023
Committee Updates
Staff Lead: Committee Chair CM Teitzel
Department: City Council
Preparer: Beckie Peterson
Background/History
The purpose of this standing agenda item is to allow a mechanism for staff to provide committees with
brief, verbal updates on an activity or project overseen by a department and so that the Council can be
more aware of what is happening around the city. Updates will facilitate a better set of expectations for
councilmembers, the public, and the staff.
Recommendation
N/A
Narrative
Requested Committee Updates for March 14, 2023:
1. Bike Lanes SR104/ 100th Intersection Project Status (PW)
2. WWTP Update (PW)
3. Highway 99 Enhancement Project Status (PW)
4. Yost Park / Shell Creek Update (Parks)
Packet Pg. 3
2.2
City Council Agenda Item
Meeting Date: 03/14/2023
Civic Park - Walker Macy Contract Amendment No. 3
Staff Lead: Angie Feser
Department: Parks, Recreation & Human Services
Preparer: Angie Feser
Background/History
Walker -Macy is the Landscape Architecture consultant involved with the Civic Center Playfield project
since the Master Plan. Currently the firm is performing construction administration services for the park
improvement project.
There are two parts to this request for Council consideration. First, there was an error in the total
contract amount in a proposed December 13, 2022 amendment. Although approved by Council, the
contract amendment was not able to be executed due to the error.
Second, Walker -Macy is requesting additional items to be added to the contract amount amendment
including two items for additional services related to the park's mitigation project referred to as the
96th Avenue Infiltration project. The amendment total is $119,085 and results in a new contract total of
$1,566,898.
With this $119,085 contract amendment, the Civic Center Playfield project is still within City Council's
budget allocation.
Staff Recommendation
Staff recommends the Parks & Public Works Committee approve recommendation of full Council
approval on the next consent agenda of the City of Edmonds and Walker -Macy Professional Services
Agreement Amendment No. 3 of $119,085 and a new contract total of $1,566,898.
Attachments:
Amendment No. 3 to Walker Macy Professional Services Agreement 3.8.2023
Packet Pg. 4
2.2.a
�``� City of Edmonds Mike Nelson
�` Mayor
700 MAIN STREET • EDMONDS, WA 98020 •425-771-0230
4PARKS, RECREATION AND HUMAN SERVICES DEPARTMENT
��C_ 1$9�
AMENDMENT NO.3 TO
PROFESSIONAL SERVICES AGREEMENT
FOR LANDSCAPE ARCHITECTURE CONSULTING SERVICES
FOR THE EDMONDS CIVIC CENTER PLAYFIELD PROJECT
Dated April 27, 2018
WHEREAS, the City of Edmonds, Washington (the "City") and Walker Macy (the
"Consultant"), entered into an underlying professional services agreement for the provision of
landscape architecture consulting services for the Edmonds Civic Center Playfield Project
("Project"), dated April 27, 2018 ("Underlying Agreement"); and
WHEREAS, the parties entered into Amendment No. 1 to the Underlying Agreement,
dated November 18, 2019 ("Amendment No. 1") and Amendment No. 2, dated September 8,
2021 ("Amendment No. 2"); and
WHEREAS, Section 12 of the Underlying Agreement provides that the City may engage
the Consultant to perform additional services when an amendment to the Underlying Agreement
is approved in writing by both parties; and
WHEREAS, the Underlying Agreement, as amended by Amendment No. 1 and
Amendment No. 2, incorporates a Scope of Work for the Project consultation work and a budget
for that work; and
WHEREAS, the parties desire to further amend the Underlying Agreement to
incorporate an additional extension of the scope of work to be performed, as well as another
increase in the budget to cover this additional consultation work;
NOW, THEREFORE, in consideration of the mutual benefits accruing, it is agreed by
and between the parties to the Underlying Agreement as follows:
1. The provisions of the Underlying Agreement of April 27, 2018 between the City
and the Consultant for Project consultation services, as amended by Amendment No. 1 and
Amendment No. 2, all of which are attached hereto as Attachment A and incorporated herein by
this reference as if fully set forth, is further amended in, but only in, the following respects:
A. Section 1 ("Scope of work") — The Scope of Work set forth in Exhibit A
to the Underlying Agreement and referenced in Section 1 ("Scope of work"), as
amended by Amendment No. 1, is hereby further amended to incorporate the
additional Scope of Work set forth in Exhibit A, attached hereto and incorporated
herein by this reference.
Packet Pg. 5
Amendment No. 3 to Professional Services Agreement, Page 2
B. Section 2 ("Payments") — The Fee Schedule set forth in Exhibit B to the
Underlying Agreement and referenced in Section 2 ("Payments") was amended
by Amendment No. 1 to increase the contract amount from $1,233,185.00 to
$1,356,340.00; was further amended by Amendment No. 2 to increase that
amount to $1,447,813.00; and is hereby amended to incorporate the additional
costs set out in Exhibit A, attached hereto and incorporated herein by this
reference. Subsection A of Section 2 of the Underlying Agreement, as amended
by Amendment No. 1 and Amendment No. 2, is hereby further amended to read
as follows:
A. Payment for work accomplished under the terms of this Agreement
shall be on a time and expense basis as set forth on the Fee Schedule in
Exhibit B, as amended by the fee amendments set forth in Amendment
Nos. 1, 2 and 3; all of which are attached hereto and incorporated
herein by this reference; provided, in no event shall the payment for
work performed pursuant to this Agreement exceed the sum of One
Million Five Hundred Sixty -Six Thousand Eight Hundred Ninety -Eight
Dollars ($1,566,898.00).
C. Section 4 ("Time of performance") — Section 4 of the Underlying
Agreement, as amended by Amendment No. 1, is hereby further amended to add a
category of work for 2023 to read as follows:
2023:
Civic Center Playfield:
Art Installation Review and Lighting Revisions: $19,368
2. Boys & Girls Club Footprint & Service Drive Revisions: $24,647
3. Restroom Building Updates: $32,070
4. Contract Extension through June 2023: $24,000
Total for 2023: $100,085
2. In all other respects, the Underlying Agreement, as amended by Amendment Nos.
1 and 2, shall remain in full force and effect, further amended as set forth herein, but only as set
forth herein.
DATED THIS day of March 2023.
CITY OF EDMONDS
Mike Nelson, Mayor
WALKER MACY
Chelsea McCann, Principal
Packet Pg. 6
2.2.a
Amendment No. 3 to Professional Services Agreement, Page 3
ATTEST/AUTHENTICATED:
Scott Passey, City Clerk
APPROVED AS TO FORM:
Office of the City Attorney
Packet Pg. 7
Amendment No. 3 to Professional Services Agreement, Page 4
2.2.a
Exhibit A
Scope of Work / Fee Schedule
Packet Pg. 8
2.2.a
WALKER I MACY
December 7, 2022
Angie Feser
Parks, Recreation, and Cultural Services Director
City of Edmonds
700 Main Street
Edmonds, WA 98020
LANDSCAPE ARCHITECTURE URBAN DESIGN PLANNING
RE: Edmonds Civic Center Playfield Additional Services Request
Dear Angie,
We appreciate the opportunity to submit the following proposal for landscape architecture and
professional A&E services at Edmonds Civic Field. These additional services represent design changes
or additions during the construction phase of the project.
Scope of Work:
1. Art Installation Review and Lighting Revisions involving architectural, structural,
electrical, and lighting design considerations for the shade structure, hanging art piece,
and wall graphic.
2. Boys & Girls Club Footprint & Service Drive Revisions to improve access to the
existing building including adjustments to curb lines, pavement boundaries, grading,
electrical service, and storm water drainage.
3. Restroom Building Updates associated with the change in restroom supplier and
building design, including additional rounds of drawing review by the consultant team
and the addition of structural foundation design.
4. Contract Extension for 6 additional months of services during construction, through
June 2023.
Fees:
We propose the following fees:
Art Installation Review and Lighting Revisions $19,368
Boys & Girls Club Footprint & Service Drive Revisions $24,647
Restroom Building Updates $32,070
Contract Extension
TOTAL
24 000
$100,085
We propose to bill monthly on a time and materials "not -to -exceed" basis.
1218 3RD AVE, SUITE 1310 I SEATTLE, WA 98101 I PHONE: 206.582.3874
WEB: WALKER'MACY.COM
Packet Pg. 9
2.2.a
Edmonds Civic Center Playfield
December 7, 2022
Page 2 of 2
Please contact me or Jason Bril if you have any questions.
Regards,
WALKER MACY
a��
Lara Rose
Principal, Landscape Architect
Irose@walkermacy.com
Packet Pg. 10
2.2.a
WALKEWMACY
October 24, 2022
Angie Feser
Parks, Recreation, and Cultural Services Director
City of Edmonds
700 Main Street
Edmonds, WA 98020
LANDSCAPE ARCHITECTURE URBAN DESIGN PLANNING
RE: Yost Park ROW Infiltration - Additional Services Request
Dear Angie,
We appreciate the opportunity to submit the following proposal for services during construction related to
Storm Water Infiltration in the Yost Park Right of Way.
Walker Macy will manage the process, and KPFF will perform services during construction related to their
documented civil plans.
Scope of Work:
7.1 Develop "For Construction" set of Construction Documents.
7.2 Attend (1) pre -construction meeting.
7.3 Review product submittals and shop drawings; respond to requests for information, produce
change orders and clarification drawings as needed.
7.4 Attend project coordination calls and visit the site at key milestones.
7.5 Attend (1) substantial completion walk-through and develop a punch list.
7.6 Attend (1) final acceptance walk-through to review completion of the punch list.
7.7 Attend (1) warranty walk-through if required and develop a warranty list.
Fees:
We propose the following fees:
Services During Construction
$9,000
We propose to bill monthly on a time and materials "not -to -exceed" basis.
Please contact me or Jason Bril if you have any questions.
Regards,
1218 3RD AVE, SUITE 1310 I SEATTLE, WA 98101 I PHONE: 206.582.3874 WEB: WALKERMACY.COM
Packet Pg. 11
2.2.a
Edmonds Civic Center Playfield
October 24, 2022
Page 2 of 2
WALKER MACY
6e �
Lara Rose
Principal, Landscape Architect
(rose@walkermacy.com
Packet Pg. 12
2.2.a
WALKEWMACY
May 18, 2022
Angie Feser
Parks, Recreation, and Cultural Services Director
City of Edmonds
700 Main Street
Edmonds, WA 98020
LANDSCAPE ARCHITECTURE URBAN DESIGN PLANNING
RE: Edmonds Civic Center Playfield Additional Services Request
Dear Angie,
We appreciate the opportunity to submit the following Scope of Work for landscape architectural services
at the Yost ROW Stormwater Improvements Project.
Scope of Work:
Based on our understanding of the project, and the information provided, we propose the following scope
of work:
1.1 Provide WSDOT format bid documents, including unit prices
1.2 Update technical specifications to WSDOT format
1.3 Update construction drawings to facilitate identification of unit quantities
Assumptions:
• Walker Macy will develop Bidding Documents and Contract Forms (Parts I and II of WSDOT
format contract) with input and review from the City of Edmonds. Walker Macy will coordinate
with KPFF to provide sections III, IV, V, and VI of the WSDOT format contract.
• Walker Macy will provide WSDOT format documentation in lieu of previously scoped planting and
irrigation plans for Yost, which were not included.
• No site visits are included for this work item. It is assumed any meeting or conferencing shall take
place via telephone and/or internet.
Fees:
We propose the following fees:
WSDOT Format Specifications $10,000.00
Expenses: $0.00
Total: $10,000.00
We propose to bill monthly on a time and materials "not -to -exceed" basis. Client authorization is required E
for any work beyond the established limit.
r
r
Q
1218 3RD AVE, SUITE 1310 SEATTLE, WA 98101 I PHONE: 206.582.3874 WEB: WALKERMACY.COM
Packet Pg. 13
2.2.a
Edmonds Civic Center Playfield
May 18, 2022
Page 2 of 2
Please contact me or Jason Bril if you have any questions, require clarification, or if we can be of further
assistance. We look forward to working with you on the Yost ROW Improvements project.
Regards,
WALKER MACY
a��
Lara Rose
Landscape Architect
(rose@walkermacy.com
Packet Pg. 14
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
PROFESSIONAL SERVICES
AGREEMENT
THIS AGREEMENT ("Agreement") is made and entered into between the City of Edmonds, a
Washington municipal corporation, hereinafter referred to as the "City", and Walker Macy,
hereinafter referred to as the "Consultant".
WHEREAS, the City desires to engage the professional services and assistance of a
consulting firm to provide landscape architectural services with respect to the Civic Center
Playfield project ("Project");
NOW, THEREFORE, in consideration of mutual benefits accruing, it is agreed by and
between the parties hereto as follows:
1. Scope of work. The scope of work shall include all services and material
necessary to accomplish the above mentioned objectives in accordance with the Scope of
Services that is marked as Exhibit A, attached hereto and incorporated herein by this reference.
2. Pay . The Consultant shall be paid by the City for completed work for
services rendered under this Agreement as provided hereinafter. Such payment shall be full
compensation for work performed or services rendered and for all labor, materials, supplies,
equipment and incidentals necessary to complete the work.
A. Payment for work accomplished under the terms of this Agreement shall be
on a time and expense basis as set forth on the Fee Schedule set forth in Exhibit B, attached
hereto and incorporated herein by this reference; provided, in no event shall the payment for
work performed pursuant to this Agreement exceed the sum of One Million Two Hundred Eight
Thousand One Hundred Eighty Five Dollars ($1,233,185.00).
B. All vouchers shall be submitted by the Consultant to the City for payment
pursuant to the terms of this Agreement. The City shall pay the appropriate amount for each
voucher to the Consultant. The Consultant may submit vouchers to the City biweekly during the
progress of the work for payment of completed phases of the project. Billings shall be reviewed
in conjunction with the City's warrant process. No billing shall be considered for payment that
has not been submitted to the City three days prior to the scheduled cut-off date. Such late
vouchers will be checked by the City and payment will be made in the next regular payment
cycle.
C. The costs records and accounts pertaining to this Agreement are to be kept
available for inspection by representatives of the City for a period of three years after final
payment. Copies shall be made available upon request.
3. Ownership and use of documents. All research, tests, surveys, preliminary data
and any and all other work product prepared or gathered by the Consultant in preparation for the
services rendered by the Consultant under this Agreement shall be and are the property of the
Consultant, provided, however, that:
Packet Pg. 15
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
A. All final reports, presentations and testimony prepared by the Consultant
shall become the property of the City upon their presentation to and acceptance by the City and
shall at that date become the property of the City.
B. The City shall have the right, upon reasonable request, to inspect, review
and copy any work product during normal office hours. Documents prepared under this
agreement and in the possession of the Consultant may be subject to public records request and
release under Chapter 42.56 RCW.
C. In the event that the Consultant shall default on this Agreement, or in the
event that this contract shall be terminated prior to its completion as herein provided, the work
product of the Consultant, along with a summary of work done to date of default or termination,
shall become the property of the City and tender of the work product and summary shall be a
prerequisite to final payment under this contract. The summary of work done shall be prepared at
no additional cost.
4. Time of performance. The Consultant shall perform the work authorized by this
Agreement promptly in accordance with the receipt of the required governmental approvals. The
parties agree that the categories of services set forth in the Scope of Services shall be undertaken
on the following schedule (including payments anticipated in each calendar year):
2018:
1. Project Startup: $31,823
2. Schematic Design: $159,872
3.30% Design Development: $190,572
4. 10% Contingency Fund: $38,227
Total: $420,494 (plus expenses)
2019:
1. 50/90/100% Design Construction Documentation: $475,588
2. Permitting: $34,056
3. Bidding: $20,178
4. 10% Contingency Fund: $52,982
Total: $582,804 (plus expenses)
2020:
1. Services During Construction: $174,194
2. Project Closeout: $12,067
3. 10% Contingency Fund: $18,626
Total: $204,887 (plus expenses)
Total for expenses: $25,000
5. Indemnification 1 Hold harmless agreement. The Consultant shall defend,
indemnify and hold the City, its officers, officials, employees and volunteers harmless from any
and all claims, injuries, damages, losses, demands, or suits at law or equity arising from the acts,
errors or omissions of the Consultant in the performance of this Agreement, except for injuries
Packet Pg. 16
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
and damages caused by the sole negligence of the City. Should a court of competent jurisdiction
determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for
damages arising out of bodily injury to persons or damages to property caused by or resulting
from the concurrent negligence of the Consultant and the City, its officers, officials, employees,
and volunteers, the Consultant's liability, including the duty and cost to defend, hereunder shall
be only to the extent of the Consultant's negligence.
The Consultant shall comply with all applicable sections of the applicable Ethics laws, including
RCW 42.23, which is the Code of Ethics for regulating contract interest by municipal officers.
The Consultant specifically assumes potential liability for actions brought by the Consultant's
own employees against the City and, solely for the purpose of this indemnification and defense,
the Consultant specifically waives any immunity under the state industrial insurance law, Title 51
RCW. This waiver has been mutually negotiated by the parties. The provisions of this section
shall survive the expiration or termination of this Agreement.
6. General and professional liability insu_ranee. The Consultant shall obtain and
keep in force during the term of the Agreement, or as otherwise required, the following insurance
with companies or through sources approved by the State Insurance Commissioner pursuant to
Title 48 RCW.
Insurance Coverage
A. Worker's compensation and employer's liability insurance as required by the State.
B. Commercial general liability and property damage insurance in an aggregate amount not
less than two million dollars ($2,000,000) for bodily injury, including death and property
damage. The per occurrence amount shall be written with limits no less than one million
dollars ($1,000,000).
C. Vehicle liability insurance for any automobile used in an amount not less than a one
million dollar ($1,000,000) combined single limit.
D. Professional liability insurance in the amount of one million dollars ($1,000,000).
Excepting the Worker's Compensation Insurance and Professional Liability Insurance secured by
the Consultant, the City will be named on all policies as an additional insured. The Consultant
shall furnish the City with verification of insurance and endorsements required by the
Agreement. The City reserves the right to require complete, certified copies of all required
insurance policies at any time.
All insurance shall be obtained from an insurance company authorized to do business in the State
of Washington. The Consultant shall submit a verification of insurance as outlined above within
fourteen days of the execution of this Agreement to the City.
No cancellation of the foregoing policies shall be effective without thirty days prior notice to the
City.
The Consultant's professional liability to the City shall be limited to the amount payable under
this Agreement or one million dollars ($1,000,000), whichever is the greater, unless modified
elsewhere in this Agreement. In no case shall the Consultant's professional liability to third
parties be limited in any way.
7. Discrimination prohibited. Consultant shall not discriminate against any
employee or applicant for employment because of race, color, religion, national origin, age, sex,
Packet Pg. 17
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
sexual orientation, marital status, veteran status, liability for service in the armed forces of the
United States, disability, or the presence of any sensory, mental or physical handicap, or any
other protected class status, unless based upon a bona fide occupational qualification.
8. Consultant is an independent contractor. The parties intend that an
independent contractor relationship will be created by this Agreement. No agent, employee or
representative of the Consultant shall be deemed to be an agent, employee or representative of
the City for any purpose. Consultant shall be solely responsible for all acts of its agents,
employees, representatives and subcontractors during the performance of this Agreement.
9. City approval of work and relationshi s. Notwithstanding the Consultant's
status as an independent contractor, results of the work performed pursuant to this Agreement
must meet the approval of the City. During pendency of this Agreement, the Consultant shall not
perform work for any party with respect to any property located within the City of Edmonds or
for any project subject to the administrative or quasijudicial review of the City without written
notification to the City and the City's prior written consent.
10. Termination. This being an Agreement for professional services, either party
may terminate this Agreement for any reason upon giving the other party written notice of such
termination no fewer than ten (10) days in advance of the effective date of said termination.
11. Integration. The Agreement between the parties shall consist of this document,
the Scope of Work attached hereto as Exhibit A, and the Fee Schedule attached hereto as Exhibit
B. These writings constitute the entire Agreement of the parties and shall not be amended except
by a writing executed by both parties. In the event of any conflict between this written
Agreement and any provision of Exhibits A or B, this Agreement shall control.
12. Changes/Additional Work. The City may engage Consultant to perform
services in addition to those listed in this Agreement, and Consultant will be entitled to
additional compensation for authorized additional services or materials. The City shall not be
liable for additional compensation until and unless any and all additional work and compensation
is approved in advance in writing and signed by both parties to this Agreement. If conditions are
encountered which are not anticipated in the Scope of Work, the City understands that a revision
to the Scope of Work and fees may be required. Provided, however, that nothing in this
paragraph shall be interpreted to obligate the Consultant to render or the City to pay for services
rendered in excess of the Scope of Work in Exhibit A unless or until an amendment to this
Agreement is approved in writing by both parties.
13. Standard of Care. Consultant represents that Consultant has the necessary
knowledge, skill and experience to perform services required by this Agreement. Consultant and
any persons employed by Consultant shall use their best efforts to perform the work in a
professional manner consistent with sound practices, in accordance with the schedules herein and
in accordance with the usual and customary professional care required for services of the type
described in the Scope of Work.
14. Non -waiver. Waiver by the City of any provision of this Agreement or any time
limitation provided for in this Agreement shall not constitute a waiver of any other provision.
Packet Pg. 18
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
15. Non -assignable. The services to be provided by the Consultant shall not be
assigned or subcontracted without the express written consent of the City.
16. Covenant against contingent tees. The Consultant warrants that s/he has not
employed or retained any company or person, other than a bona fide employee working solely for
the Consultant, to solicit or secure this Agreement, and that s/he has not paid or agreed to pay any
company or person, other than a bona fide employee working solely for the Consultant, any fee,
commission, percentage, brokerage fee, gifts, or any other consideration contingent upon or
resulting from the award of making of this Agreement. For breach or violation of this warranty,
the City shall have the right to annul this Agreement without liability or, in its discretion to
deduct from the contract price or consideration, or otherwise recover, the full amount of such fee,
commission, percentage, brokerage fee, gift, or contingent fee.
17. Compliance with laws. The Consultant in the performance of this Agreement
shall comply with all applicable Federal, State or local laws and ordinances, including
regulations for licensing, certification and operation of facilities, programs and accreditation, and
licensing of individuals, and any other standards or criteria as described in the Agreement to
assure quality of services.
The Consultant specifically agrees to pay any applicable business and occupation (B & 0) taxes
which may be due on account of this Agreement.
18. Notices. Notices to the City of Edmonds shall be sent to the following address:
City of Edmonds
121 Fifth Avenue North
Edmonds, WA 98020
Notices to the Consultant shall be sent to the following address:
Walker Macy
105 S. Main Street, Suite 205
Seattle, WA 98104
Receipt of any notice shall be deemed effective three days after deposit of written notice in the
U.S. mails, with proper postage and properly addressed.
DATED THIS 2-1 DAY OF 2018.
CITY OF EDMONDS WALKER MACY
Packet Pg. 19
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
By
ATTEST/AUTHE CATED: APP VED AS TO FORM:
S assey, City lev Office of the City Attorney
OREGO tJ OFFICIAL STAMP
STATE OF ) LEONA MAY MILLER
NOTARY PUSUCGOREGON
)Ss 16WOOMMISSION
COMMISSION NO.951911
COUNTY OF .UUL-rUo;IAH ) EXPIRES JULY 11, 2020
On this ;r ritay of I , 2 18ij before me, the undersigned, a
Notary Public in and for the State of , duly commissioned and sworn,
personally appeared . e sQ,, a", , to me known to be the Sri Ae.i pal
of the corporation that executed the foregoing instrument, and acknowledged the said
instrument to be the free and voluntary act and deed of said corporation, for the uses and
purposes therein mentioned, and on oath stated that he/she was authorized to execute said
instrument and that the seal affixed is the corporate seal of said corporation.
WITNESS my hand and official seal hereto affixed the day and year first above
Written.
4:&��
NOTARY PURL C
My commission expires:
0"? I I 1 1,2020
Packet Pg. 20
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
EXHIBIT A
WALKERI MACY LANDSCAPE ARCHITCCTURE URBAN DESIGN PLANNING
March 20, 2018
Carrie Hite
Parks, Recreation and Cultural Services Director
City of Edmonds
700 Main Street
Edmonds, WA 98020
RE: Edmonds Civic Center Playfield Improvements — P3282.01
Dear Carrie,
We appreciate the opportunity to submit the following proposal for providing landscape architectural
services for the redevelopment of Civic Center Playfield.
PROJECT UNDERSTANDING AND TEAM ROLES:
1. The project transforms the existing Civic Center Playfield into a new 8 acre park with site
improvements that include a multi -use plaza, a permanent skatepark and pumptrack with integrated
viewing areas, a water feature, multi -use lawn and playfields, one playground, six petanque courts,
one multi -use court, one shade pavilion structure (including restrooms and storage), walking/jogging
paths, exercise stations, picnic area, youth bouldering wall, lawn terraces, berms, planting, lighting,
stormwater gardens and all related utilities that are commensurate with the Master Plan, dated
February 2017. Limits of park improvements are illustrated in Exhibit A, attached.
2. Walker Macy proposes the following sub -consultant team to assist us on the project:
• Architect: ORAArchitects
• Civil and Structural Engineers: KPFF Consulting Engineers
• Mechanical and Plumbing Engineer: Notkin-Wood Harbinger
• Electrical Engineer: Reyes Engineering
• Lighting Designer: FMS
• Cost Consulting: JMB Consulting
■ Fountain Designer: STO Design
■ Irrigation Consultant: Design Two Four Two Six
• Skatepark Consultant: Grindline
• Geotechnical Consultant: Landau
3. Walker Macy's role will be to provide the following:
• We will work directly with The City of Edmonds and the design team during the effort to
ensure a comprehensive approach to the work, and will provide leadership at meetings with
client, City, and community groups.
1218 3RD AVE, SUITE 1310 f SEATTLE. WA 981U1 PHONE: 206.582 3874 I WEL'- WALKERMACY.COM
Packet Pg. 21
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
Civic Center Playfield
March 16, 2018
Page 2 of 11
• Detailed planning and site design for all park improvements, access and circulation for Civic
Center Playfield
• Walker Macy, in collaboration with the design team, will document surface improvements
including vehicular and pedestrian paving, planting, grading, irrigation, water feature, sports
courts and fields, playground, youth climbing wall, skatepark integration and site furnishings
for areas within our scope.
■ Walker Macy will document all site demolition with Civil engineer review.
• Walker Macy, in collaboration with KPFF, will advance the design of 6th Avenue (The
Market Promenade), to a Schematic Design level and 7ch Avenue through Construction
Administration as an optional additional service. Note, this assumes that ROW work is
integrated with park design efforts to reduce cost. If ROW work became a separate effort,
fee estimates would require revision.
The team's skatepark consultant will provide consultation, design guidance and architectural
drawings for the skatepark and/or pumptrack.
5. The City of Edmonds will lead and apply for all applicable grants. Walker Macy will support this
effort with required graphics, narratives, and cost estimates.
6. The team's architect will provide:
a. Architectural drawings and CAD files for the design for a new shade pavilion with
integrated restrooms.
b. Documentation for the demolition of the existing shed
c. Not included in this estimate are renovation of the existing Field House, work on a
Boys and Girls Club facility or footprint that differs from the Master Plan, or
integration of the shade pavilion and restroom structure with a future Boys and Girls
Club facility.
The team's civil engineer will document and provide CAD files for all right-of-way requirements,
erosion and sedimentation control, stormwater features and all utilities.
a. We will collaborate with the civil engineer for stormwater quality features per City of
Edmonds code requirements.
b. The City of Edmonds requires a civil engineer's stamp on all final grading plans.
Therefore we propose to transfer our detailed grading documents after 50% CD to
the civil engineer for final construction documentation, in coordination with Walker
Macy.
c. ROW Improvements along 61h and 71h Avenue. See attached limit of work and
additional services enumerated below.
8. The team's fountain designer will provide water feature design services and mechanical, electrical
and plumbing design guidance, in coordination with related sub consultants, and documentation for
the water feature.
9. The team's mechanical engineer will provide mechanical and plumbing design guidance,
specification and technical review in coordination with related sub -consultants.
Packet Pg. 22
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
Civic Center Playfield
March 16, 2018
Page 3 of 11
10. The team's lighting designer will provide lighting design services for pedestrian, architectural,
sports, and feature lighting, including fixture proposals, photometric assessments, technical
drawings, and specifications in coordination with Walker Macy and related sub consultants.
11. The team's irrigation consultant will provide irrigation design, layout and technical documentation.
The irrigation consultant will also provide CAD files of the irrigation locations for coordination with
Walker Macy.
12. The team's electrical engineer will document all routing and controls for electrical services, layouts
and vaults for site lighting features, including sports field and court lighting. The electrical engineer
will also provide CAD files of the electrical fixture locations for coordination with Walker Macy.
13. The team's geotechnical engineer will document recommendations for surface, subsurface and
groundwater conditions for proposed work and features, including demolition. The geotechnical
engineer will provide or review drawings as required, including earthwork loading, drainage and
foundations.
14. The team's cost estimating consultant will provide statements of probable costs at Schematic
Design and 90% construction documents.
15. Walker Macy will submit a packet to the City for review following Schematic Design, 30%(Design
Development) and 90%(Construction Documentation) milestones. The City will provide a single
collated set of comments to Walker Macy within 40 days of each submittal. Other milestones will
conclude with design team review only.
16. All activities and fees necessary to obtain permits will be by The City of Edmonds and the Owner.
Walker Macy and the design team will provide drawings for inclusion in the permit applications. We
assume permit drawings will be derivatives of our working plans.
SCOPE OF WORK:
Based on our understanding of the project, and the information provided, we propose the following scope
of work:
1. Project Start-up (April -May 2018)
1.1 Attend one conference call with client to discuss scope, budget and schedule.
1.2 Review survey and geotechnical reports, budget information, code requirements, permit
requirements and other project background material made available to Walker Macy.
1.3 Coordinate scope of work and attend meetings as needed with sub -consultants.
1.4 Coordinate and lead team kick-off meeting with sub -consultants
1.5 Attend and document one (1) project kick-off meeting with client, in Edmonds, to review
design efforts and to coordinate our work.
1.6 Confirm reclaimed timber and seat board inventory for potential use in the park.
Meetings Summmary:
• One (1) conference call meeting with client to discuss scope, budget and schedule
Packet Pg. 23
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
Civic Center Playfield
March 16, 2018
Page 4 of 11
• One (1) kick-off meeting with client in Edmonds
• One (1) consultant team kickoff meeting ( additional subconsultant meetings as needed)
2. Schematic Design (June -August 2018)
2.1 Refine and/or revise site design to accommodate findings from survey and geotech reports
and changes to program since Master Plan was published Create CAD base files.
2.2 Park feature design development, including water feature, skatepark, playground, exercise
stations and scramble wall.
2.3 Design team meetings and coordination of site work across all disciplines.
2.4 Attend and document one (1) meeting with the client in Edmonds, followed by weekly
conference calls.
2.5 Attend and document one (1) Project Advisory Meeting, in Edmonds.
2.6 Attend and document one (1) meeting with the Edmonds Petanque Club.
2.7 Attend and document one (1) meeting with Edmonds Skatepark Committee.
2.8 Attend and document one (1) meeting with Edmonds Chamber of Commerce regarding
event planning.
2.9 Attend one (1) meetings with Public Works and Engineering to coordinate Schematic
Design of The Market Promenade — 6th Street Improvements (per optional services).
2.10 Review Edmonds standard documentation and drawing format requirements and revise
drawing formats as needed.
2.11 Prepare documentation for and attend one (1) Edmonds Internal Parks and Planning
review in Edmonds after SD submittal.
2.12 Attend one (1) City Council Meeting in Edmonds.
2.13 Attend and document one (1) meeting with the Boys and Girls Club in Edmonds.
2.14 Prepare/attend/document one (1) art meeting with Edmonds Cultural Services Manager.
2.15 Provide 100% Schematic Design Submittal with the following deliverables:
• CAD Base drawings for team coordination
• Updated Illustrative Site Plan
• Area take -offs diagram
• Materials Plan / Site Plan
■ Up to three (3) CAD Sections / Elevations, as needed to convey design intent
• Grading Concept Plan for Civic Center Playfield
• Schematic Design Grading Concept for 6th Avenue (per additional services)
■ Narrative / basis of design memo
• Image boards describing proposed materials and plant typologies
• (1) Updated birdseye perspective rendering
Packet Pg. 24
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
Civic Center Playfield
March 16, 2018
Page 5 of 11
• Stormwater concept plan
• Plan, roof plan and sections of pavilion
• Skatepark plan
• Lighting concept plan
• Water feature concept plan
• 100% SD Cost Estimate, including delineated budget"
Meetings Summary:
• One (1) meeting with client in Edmonds
• Weekly conference calls with client
• One (1) Project Advisory Committee Meeting in Edmonds
• One (1) City Council Meeting in Edmonds
■ One (1) meeting with Edmonds Petanque Club in Edmonds.
• One (1) meeting with Edmonds Skatepark Committee in Edmonds
• One (1) Chamber of Commerce Meeting in Edmonds
• One (1) meeting for City of Edmonds internal (Parks and Planning) review in Edmonds
■ One (1) meeting with City of Edmonds Public Works to coordinate 6th Avenue
Improvements (per additional services).
• One (1) meeting with the Boys and Girls Club
3. 30% (Design Development, September —November 2018) No City review following 30%
milestone, submittal is for internal review purposes only)
3.1 Incorporate and/or respond to Schematic Design submittal City review comments. City to
provide one collated set of comments for response.
3.2 Attend one (1) meeting with client to review the schematic design phase and discuss
construction budget for the site and landscape improvements, design development goals and
schedule.
3.3 Review Schematic Design cost estimate and contribute to Value Engineering efforts by amending
landscape scope as required to bring project into budget goals.
3.4 Lead team design development and coordination. Coordinate technical documentation for
grading plan, demolition, layout, architectural, civil/stormwater, planting, irrigation and lighting
plans in coordination with consultant team.
3.5 Attend one (1) meeting with the Edmonds Petanque Club to review and refine court design.
3.6 Attend one (1) meeting with Edmonds Skatepark Committee to review and refine
skatepark/pumptrack design.
3.7 Consult on arts integration plan with Edmonds Cultural Services Manager.
3.8 Attend meeting and follow up with artist(s) to discuss concepts and park design integration.
3.9 Review and incorporate Edmonds standard details and related requirements.
3.10 Attend one (1) meeting with City in Edmonds to review 30% plans and outstanding issues
Packet Pg. 25
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
Civic Center Playfield
March 16, 2018
Page 6 of 11
3.11 Submit internal 30% Design. Deliverables include:
■ Demolition Plans
• Civil Utility and Stormwater Plans
• Grading Plans
■ Materials Plans, including Lighting and Furnishings
• Planting Area Plans noting plant types (e.g., tree, shrub, groundcover); not specific
plant species.
■ Irrigation Conceptual Zone Plans (includes point of connection, mainline routing, and
irrigation value locations).
• Architectural Plans
• Lighting Plans
• Electrical Plans
• Mechanical Cut Sheets and Plans
Water Feature Plans
• Skatepark Plans
• Draft basis of design memo summarizing assumptions, design intent, code
requirements and draft specifications.
• Draft specifications, including Division One.
Meetings Summary:
• Two (1) client review meetings in Edmonds.
• Weekly conference calls with client
• One (1) meeting with Edmonds Petanque Club
■ One (1) meeting with Edmonds Skatepark Committee
• One (1) meeting with Edmonds internal review committee (Parks and Planning) in
Edmonds to review 30% DD submittal.
4. 60%, 90% and 100% Design Construction Documentation (December 2018 -August 2019) City
Review after 90% only.
4.1 Attend two (2) coordination meetings with The City of Edmonds.
4.2 After 30% and 90% submittals, review the construction budget, schedule and milestones. Attain
approval from City to proceed with 100% Construction Documentation.
4.3 Lead design development and coordination of technical documents in coordination with
consultant team.
4.4 Coordinate artist integration for each phase.
4.5 Produce 50%, 90% and 100% Construction Documents. Deliverables include:
• Site Demolition Plans
■ Site Civil Plans and Details
• Site Grading Plans
• Site Materials and Furnishings Plans
Packet Pg. 26
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
Civic Center Playfield
March 16, 2018
Page 7 of 11
■ Site Layout Plans
• Soil Plans and Details
+ Planting Plans and Details
• Irrigation plans and Details
■ Site Construction Details
■ Site Structural Plans and Details
• Architectural Plans and Details
■ Lighting Plans and Details
■ Electrical Plans and Details
■ Water Feature Plans and Details
• Skatepark Plans and Details
■ Specifications, including Division1 Specifications.
4.6 Submit 90% documents to City for review. The 50% and 100% milestones will be used for
internal team review and QA/QC only.
4.7 Develop cost estimate at 90% submittal.
4.8 Complete geotech review at 50% internal review.
4.9 One (1) meeting with Edmonds Skatepark Committee after 50% review.
4.10 Prior to 100% submittal, contribute to Value Engineering efforts by amending landscape scope
and drawings as required to bring project into budget goals. Value engineering drawing revisions
after 90% Construction Documentation are not included in this scope of work.
Meeting summary:
• Two (2) client review meetings, in Edmonds.
• One (1) meetings with Edmonds Skatepark Committee
6. Permitting (April — November 2019)
5.1 Submit preliminary and final stamped and signed documents to the client as required for
permitting. The permits currently anticipated for this project are all under one umbrella permit
package and include:
a. ROW development (per optional services)
b. Grading and park features
c. Building plans
d. Utility plans
5.2 Respond to permit comments during permitting.
5.3 Revise drawings and resubmit to the permit center if required.
6. Bidding (September - November 2019)
L
Packet Pg. 27
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
Civic Center Playfield
March 16, 2018
Page 8 of 11
6.1 Produce Bid Set documents, based on 100% construction documents, including Division 1
Specifications.
6.2 Attend pre -bid conference.
6.3 Prepare addenda during bid period as necessary.
6.4 Assist in review of bids.
Deliverables:
• Permit drawings based on Construction Documents.
Meetings:
• One (1) pre -bid conference in Edmonds.
7. Services During Construction (December 2019 — December 2020)
7.1 Develop "For Construction" set of Construction Documents.
7.2 Attend (1) pre -construction meeting.
7.3 Review product submittals and shop drawings; respond to requests for information, produce
change orders and clarification drawings as needed.
7.4 Attend twenty two (22) project meetings and Construction Observation site visits (one every
other week), particularly at the following milestones:
• Review of rough grading.
• Review of hardscape layout.
• Perform one nursery visits at milestones to review and tag plant material.
• Review irrigation mainline layout and open mainline trenching.
• Review of finish grading.
• Review tree and/or plant material layout.
• Review irrigation coverage.
• Stormwater system review (civil)
• Artwork integration review/observation
• Additional milestones as defined by sub -consultants
7.5 Attend (1) substantial completion walk-through and develop a punch list.
7.6 Attend (1) final acceptance walk-through to review completion of the punch list.
7.7 Attend (1) warranty walk-through and develop a warranty list.
8. Project Closeout
8.1 Prepare record documents for all work within our scope based on contractor provided record
drawings in CAD format.
FEES:
Packet Pg. 28
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
Civic Center Playfield
March 16, 2018
Page 9 of 11
We propose the following fees:
1. Project Start Up
2. Schematic Design
3. Design Development (30%)
4. Construction Documents (50/90/100%)
5. Permitting
6. Bidding
7. Service During Construction
8. Project Close -Out
Subtotal
9. 10% Design Contingency
Total
$31, 823.00
$159,872.00
$190,572.00
$475,588.00
$34,056.00
$20,178.00
$174,194.00
$12,067.00
$1,098,350.00
$109, 835.00
$1,208,185.00 plus expenses
We propose to bill monthly on a percentage of completion per phase. Expenses are additional, and will
be billed at 1.1 times our cost.
OPTIONAL SERVICES:
Based on our understanding of the project, and the information provided, we propose the following
Optional Services. We propose to bill monthly on a percentage of completion per phase. Expenses are
additional, and will be billed at cost. Project Understanding, Team Roles, and Assumptions enumerated in
this Scope of Work shall also apply to these optional services.
Parking Impact Study
Conduct parking impact study related to Civic Center Playfield improvements. Walker Macy
proposes Fehr & Peers to assist with the study. See attached proposal.
Estimated Fee: $25,600
ROW Improvements
Study grading on 6`h Avenue to determine feasibility of The Market Promenade and flush curb
condition to a Schematic Design Level. Develop and document ROW improvements, per the
approved Master Plan along 7ffi Avenue and 6th Avenue (from back -of -curb on the park -side)
through Construction Administration.
Estimated Fee: $51,775.00
10% Design Contingency $5,178.00
Total: $56,953.00
ASSUMPTIONS:
1. Our proposal is based on the above scope of work, attached limit of work, and a project
construction budget not to exceed $10M.
2. Recent geotechnical investigation revealed conditions that may increase construction cost
significantly above prior estimate. Reductions in park program or phasing may be required.
Areas of park that require redesign may require additional services.
Packet Pg. 29
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
Civic Center Playfield
March 16, 2018
Page 10 of 11
3. The siting, if any, and scale of the future Boys and Girls Club will be determined prior to
Schematic Design phase initiation. Redesigns for Club siting may require additional services.
4. All work in the right-of-way along 6th and 7th Avenues, as well as pedestrian crossings on 6th and
7th Avenues, are listed as optional services and are not included in the base scope and fee.
5. Changes to overhead power and other utilities along rights -of -way are not included in this scope
of work.
6. Construction drawings will be provided or based upon Walker Macy standards.
8. Revisions to the construction documents due to value engineering which occur after 90%
submittal will require Walker Macy to evaluate potential impact to fees.
9. Site visits in addition to those identified will require Walker Macy to evaluate potential impact to
fees.
10. Walker Macy will provide complete Division One specifications (based on templates provided by
the City of Edmonds) and will manage the submittal and RFI process. Walker Macy will attend all
meetings outlined in the scope of work. Meetings beyond those noted will be additional services
and will be billed as time and materials.
11. This proposal assumes the project will be constructed in one phase. If the project is broken into
multiple design or construction phases, scope and fees will be re-evaluated.
12. Project is scheduled to be completed by December 2020. If project extends substantially beyond
the scheduled date additional scope and fees will be re-evaluated.
13. The project team cost estimator will develop landscape and site improvements, quantity take -offs,
and unit pricing. This information will be provided to Walker Macy for review as noted in the scope
above. Walker Macy and the design team will evaluate quantities and unit cost and provide
comments to client.
15. Design review services are not currently part of the proposed scope of services.
16. LEED documentation is not currently a part of the proposed scope of services.
17. Walker Macy is not responsible for verifying the accuracy of Contractors' record documents.
19. Walker Macy will provide typed CSI-formatted specifications.
20. City arborist will provide assessment of existing trees within proposed limits of work.
21. KPFF provided the City of Edmonds a schematic side sewer stub location on 11.30.17 for the
future restroom and water feature. We assume the new 8 inch SS Main and stub outs will be in
place prior to construction of Civic Field and be completed by the COE. Future coordination for
this 8 inch SS Main will include coordination at the view terraces."
22. City review and feedback duration is assumed at 40 days. If this review period extends
substantially beyond the expected duration, impacts to team fees and project schedule will be re-
evaluated.
Please contact me if you have any questions, require clarification, or if we can be of further assistance.
We look forward to working with you on the Civic Center Playfield Improvement Project.
Sincerely,
WALKER MACY
Packet Pg. 30
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
Civic Center Playfield
March 16, 2018
Page 11 of 11
Chris Jones
Principal
cjones@walkermacy.com
Approved:
Name and title
Date
Packet Pg. 31
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
m
K
w
V
iw K
H .n
K
8
8 $ 8 $ 8 8
5
Z
N
K
8
8 8
pk
N
71
p
4
$ g H
a
A
u Je
IE
t4
E
$
r
M
a
a
E
v
a
g
Yft
4
o}
E
u
p E
y
`o
o
c
E Q`
E
E
Fr6
S�
a E
Jti
U
$
9
D--
E
$
F E
l�
a_
o
u
U
5
u
E
n
w
—
E-
�7
it3
c
E
g
ffi
3
> >
i
BE -
> >
> E
m n
E
v E
c
�gg
C
C
G
n
g-
.e E
dddddSllli
E
,�
£
£:l
ii
5
a
S
q
q
g
E`
,�i
a84
5Na
[[
4
kkk-,i
I I
[[I
ry
Packet Pg. 32
o ms)nEnvelope ID:@cc U0-52D$408SA7 m- es mEB@
-
! �
^
■
)
[
°
|
/2 § )�
\ $§
,
.a\§
\ \
) B
-
\
\ \
)\ \ / |
) !
9
]}\
�
,
■
R S ,
,�,2,, , ,!!!!l1;:1;
�
`■�E
. , ,�, �...
.. ,
� ,
.�...�.�,.� .,
k
\ (
k
_ „ �,� ��,
,_ „ ..,�«■o
: I
,_,,,•,_,__,.-,,,�--a
k
\
!\|)
\
!
0
o
\�j\)/
-
\!
:
!`
■�
2)
_
=
k'
\)f|};
)k
\L2
•
{t!\`°
�!
§
\l�ii;;.il.*§.§Ii,§
|!»-��,:;\)!;`�•.1=;)
t.
_
!!-\§::t:{;t;
K
»
:
.w�.|\���
|�7)=
)k§
■�
Packet Pg. 33
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
C
S
$
$ m
$ a
4
i
? [! g
#
C
c
yS
N
8 S
2 m
$. $
ry
$
G
80
3
Hq
k
o
g g
p� 4
og,g 11
g
m
N
�
rooi
08
g
$
8
B g
oo 8@
8 IS S oo 0000
s
N
a
e•�
M
j�qj
ry P
M
Y d
mh
�yNy�
No A rvry N
ti Q ..rr NP6
m �rwfi!• •SarS
.rj
^rvry o$
mM „an�m.000.awmo��
o
o
',vo
�
8�b
33
3
�
u
—
9
8
N
Y\1
E
^
r
5
5
�
p
L
Y
$�
W
�y
�5
E
x
■>yh
•�
o
�
q^j
d C
9
i$
5
y3
y
u
a
'Gy-.21
Ssi
6
c
v.�SiaLLU
I
Packet Pg. 34
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
Packet Pg. 35
o ms)nEnvelope ID:@cc U$52D$408SA7
m- es mEB@
&
2: .
!
!!
°
|
z
!
}!I
£
E
§
\
^
2
■
`
�
�
E
\
L)
-
n
�
k a
§
!
^
-
±
�
�
!
�
\
\!
L)
q
f
a
a
a
00
.
.
n
k
■
a
B
)
�
E
®
4
a
k
§
.
§
ku
c
,
m
7
`«
!$§
\
�/:!
§Et;!
he
!!;!
§
;!|
!■«!!-
00
he
\!;_
\!!\
7
j.2a
\§
0
_ -
--
-
CI){{!
§
§
z
�
(
/
_
\
§
\ 12
_
8
{
-§
\
)�
2
\
0
)
)
!§H!
,
\
Packet Pg. 36
o ms)nEnvelope ID: @cc U$52D$4mSA7 m- es mEB@
a
a �
■ e#�
@ a f■f
e
§�#2!
�
■!!7!
!
_§
|2!
�■!|!
"
|
IF
!■|
|.
r�
.
!|
2!
|z
If222!®
!!!�
'
r|!§})}|}���■
ll;;;|
�l.•
!,
!!|=
!
laa.
f
\
,
§
| Packet Pg. 3
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
{ of EOAiD
ip
Ci of Edmonds Dave Earling
Mayor
700 MAIN STREET • EDMONDS, WA 98020.425-771-0230
PARKS, RECREATION AND CULTURAL SERVICES DEPARTMENT
AMENDMENT NO. 1 TO
PROFESSIONAL SERVICES AGREEMENT
FOR LANDSCAPE ARCHITECTURE CONSULTING SERVICES
FOR THE EDMONDS CIVIC CENTER PLAYFIELD PROJECT
Dated April 27, 2018
WHEREAS, the City of Edmonds, Washington (the "City") and Walker Macy (the
"Consultant"), entered into an underlying professional services agreement for the provision of
landscape architecture consulting services for the Edmonds Civic Center Playfield Project
("Project"), dated April 27, 2018 ("Underlying Agreement"); and
WHEREAS, Section 12 of the Underlying Agreement provides that the City may engage
the Consultant to perform additional services when an amendment to the Underlying Agreement
is approved in writing by both parties; and
WHEREAS, the Underlying Agreement incorporates a Scope of Services for the Project
consultation work; and
WHEREAS, the parties desire to amend the Underlying Agreement to incorporate an
extension of the scope of services to be performed, as well as an increase in the budget to cover
the additional consultation work;
NOW, THEREFORE, in consideration of the mutual benefits accruing, it is agreed by
and between the parties to the Underlying Agreement as follows:
1. The provisions of the Underlying Agreement of April 27, 2018 between the City
and the Consultant for Project consultation services, attached hereto as Attachment A and
incorporated herein by this reference as if fully set forth, is amended in, but only in, the
following respects:
(a) Section 1 ("Scope of work") — The Scope of Services attached hereto as
Exhibit A is in addition to and shall supplement the Scope of Services set forth in
Exhibit A of the Underlying Agreement and referenced in Section 1 ("Scope of
Work").
(b) Section 2 ("Payments") — The Fee Schedule incorporated into Exhibit A
is in addition to and shall supplement the Fee Schedule set forth in Exhibits A and
B of the Underlying Agreement and referenced in Section 2 ("Payments").
Subsection A of Section 2 shall be amended to read as follows:
Packet Pg. 38
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
Amendment No. 1 to Professional Services Agreement, Page 2
A. Payment for work accomplished under the terms of this Agreement shall be
on a time and expense basis as set forth on the Fee Schedule set forth in
Exhibit B, attached hereto and incorporated herein by this reference, and the
Fee Schedule for the additional Yost Park Stormwater Design services
incorporated into Exhibit A, attached hereto and incorporated herein by this
reference; provided, in no event shall the payment for work performed
pursuant to this Agreement exceed the sum of ONE MILLION, THREE
HUNDRED FIFTY-SIX THOUSAND, THREE HUNDRED FORTY
DOLLARS ($1,356,340.00).
(c) Section 4 ("Time of performance") — Section 4 shall be amended
to read as follows:
4. Time of nerformanee_ The Consultant shall perform the work
authorized by this Agreement promptly in accordance with the receipt of
the required governmental approvals. The parties agree that the
categories of services set forth in the Scope of Services shall be
undertaken on the following schedule (including payments, anticipated in
each calendar year):
2018:
Civic Center Playfield:
1. Project Startup: $31,823
2. Schematic Design: $159,872
3. 30% Design Development: $190,572
4. 10% Contingency Fund: $38,227
Total for 2018: $420,494 (plus expenses)
2019:
Civic Center Playfield:
1. 50/90/100% Design Construction Documentation: $475,588
2. Permitting: $34,056
3. Bidding: $20,178
4. 10% Contingency Fund: $52,982
Yost Park Stormwater Dgign:
1. Infiltration Feasibility Evaluation: $41,713 (including expenses)
2. Site Survey: $15,300 (including expenses)
3. Design and Permitting: $37,150 (including expenses)
4. Infiltration Testing: $19,232 (including expenses)
Total for 2019: $696,199 (plus Civic Center Playfield expenses)
2020:
Civic Center Playfield:
1. Services During Construction: $174,194
2. Project Closeout: $12,067
3. 10% Contingency Fund: $18,626
Yost Park Stormwater Design:
1. Construction Administration: $7,260 (including expenses)
2. Project Management: $2,500 (including expenses)
Total for 2020: $214,647 (plus Civic Center Playfield expenses)
Packet Pg. 39
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
Amendment No. I to Professional Services Agreement, Pap 3
Total for Civic Center Playfield expenses: $25,000
GRAND TOTAL: $1,356,340
2. In all other respects, the Underlying Agreement shall remain in full force and
effect, amended as set forth herein, but only as set forth herein.
DATED this 6 day of November, 2019.
CITY[OF EMWNDS WALKER MACY
, L Y D. e�5�- �,,-
vI O. Earling, Mayor Chelsea McCann, Principal
AT BIAUTH ATED:
ott Passey, it Clerk
APPRgQy�,Bf Q FORM:
� r
Office of the City Attorney
0' EG6 KJ
STATE OF W A SION/1TON)
)ss
COUNTY OF .L/uff H oC. )
On this 0+k.day of L(Wf,MLgr 2019, before me, the under -signed, a
Notary Public in and for the State of duly commissioned and sworn,
personally appeared Chelsea McCann, an e e IN ed the foregoing instrument, and
acknowledged the said instrument to be her free and voluntary act and for the uses and
purposes therein mentioned, and on oath stated that she was authorized to execute said
instrument.
WITNESS my hand and official seal hereto affixed the day and year first above
written.
OFFICIAL STAMP
LEONA MAY MILLER
NOTARY PUBLIC-OREGION
COMMISSION NO.951911
CRY COMMISSION EXPIRES JULY 11, 2020
My commission expires JA if 120Z0
Packet Pg. 40
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
Exhibit A
�%�
Scope of Work / Fee Schedule
WALKERI MAC !�% LANDSCAPE ARCHITECTURE URBAN DESIGN PLANNING
November 7, 2019
Shannon Burley
Deputy Parks, Recreation, and Cultural Services Director
City of Edmonds
700 Main Street
Edmonds, WA 98020
RE: Edmonds Civic Center Playfield, Stormwater Design at Yost Park
Dear Shannon,
Due to high groundwater conditions at the Edmonds Civic Center Playfield (ECCP) site, the project team
encountered challenges in designing a code -compliant, on -site stormwater detention system for the
proposed development. As a result, the City of Edmonds (City) and the ECCP design team are exploring
the feasibility of installing stormwater infiltration facilities at City -owned Yost Park as a "detention trade" to
partially satisfy flow control requirements at ECCP. The design at Yost will focus on shallow infiltration
facilities (infiltrating bio retention) rather than UIC wells based on preliminary site evaluation conducted by
Shannon & Wilson.
Walker Macy proposes the following sub -consultant team to assist us on the project:
• Geotechnical: Shannon & Wilson
• Civil Engineer: KPFF Consulting Engineers
• Survey: KPFF Consulting Engineers
SCOPE OF WORK:
1. Infiltration Feasibility Evaluation
1.1. Conduct a site visit with the City to identify drilling locations.
1.2. Drill and install two wells approximately 80 feet deep. Each well will be competed with a flush -
mounted monument.
1.3. Perform geotechnical laboratory tests on the samples.
1.4. Perform visual geologic reconnaissance of the steep slopes between the Yost pool and parking
areas.
1.5. Prepare a report detailing the results of the field explorations, site reconnaissance and laboratory
testing.
2. Site Survey
2.1. Perform site survey to establish site control and mapping points on Washington State Plane
Coordinates NAD 83/91 and vertical datum on NAVD 88
2.2. Prepare boundary base map and plot easements affecting the subject property,
2.3. Perform topographic survey of the site as outlined by the design team.
1218 30 AVE, SUITE 1310 1 SEATTLE, WA 98101 1 PHONE: 208,582,38N I WES! WALKrA MAGY,C01A
Packet Pg. 41
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
Edmonds Civic Center Playfield — Stormwater Design at Yost Park
November 7, 2019
Page 2 of 3
3. Design and Permitting
3.1. Review project Survey
3.2. Produce 50% Design and Permit Submittal. Deliverables Include:
• Site Demolition Plan
TESC Plan and Details
• Paving and Grading Plan and Details
• Storm Drainage Plan, Profiles, and Details
• Storm Drainage Report
• Planting Plans and Details
• Specifications
3.3. Incorporate City review comments after the 50% submittal.
3.4. Prepare single cost estimate
3.5. Prepare Bid Set after completion of permitting.
3.6. Attend four team meetings by conference call or web meeting
3.7. Perform three site visits
4. Infiltration Testing
4.1. Conduct a site visit to mark a maximum of four test pit excavation locations. Excavation to be
performed by the City.
4.2. Perform geotechnical laboratory tests on the retrieved soil samples
4.3. Prepare summary geologic logs based on field observations and geotechnical laboratory testing,
and present observed and recommended design infiltration rate values
5. Construction Administration
5.1. Respond to submittals and requests for information (RFls) from the contractor
5.2. Perform up to four site visits during construction
SCHEDULE:
• We assume design duration of six months, starting when we receive the project survey and notice
to proceed.
ASSUMPTIONS:
• Wall Design is not included (not anticipated).
• Irrigation, if required, will be documented as design -build.
• SWPPP is not anticipated since site disturbance will be less than 1 acre
• KPFF assumes the design and permitting of a maximum of two shallow infiltration facilities
(infiltrating bioretention). A project survey is currently being completed for Yost Park; upon
receipt of that survey, KPFF will review existing conditions and determine whether or not two
infiltration facilities will be sufficient. If more than two are required, we will request additional
services.
Packet Pg. 42
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
Edmonds Civic Center Playfield — Stormwater Design at Yost Park
November 7, 2019
Page 3 of 3
• Per Preliminary information provided by Shannon & Wilson, an infiltration rate of 1-2inches per
hour is available at the site. Shannon & Wilson will perform field testing at the actual proposed
infiltration sites to better estimate infiltration rates.
• Re -grading will be limited to small areas where minor modifications to drainage patterns are
necessary. This will generally be accomplished through a grind and overlay of existing asphalt
surfacing.
• Division 1 specifications will be provided by the City.
• Infiltration test pit excavation will be completed by the City. Test pit locations will be marked in
the field by the design team.
FEES:
We propose the following fees:
1. Infiltration Feasibility Evaluation
2. Site Survey
3. Design and Permitting
4. Infiltration Testing
5. Construction Administration
6. Project Management
Total
$41,713.00
$15,300.00
$37,150.00
$19,232.00
$7,260.00
$2,500.00
$123,155.00 including expenses
We propose to bill monthly on a time and materials "not -to -exceed" basis. Client authorization is required
for any work beyond the established limit.
Please contact me if you have any questions, require clarification, or if we can be of further assistance.
Sincerely,
WALKER MACY
Andrea Kuns
Senior Associate
akuns@walkermacy.com
Approved:
Name and title
Date
Packet Pg. 43
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
� pS Ell*raj
City of Edmonds Mike Mayor
700 MAIN STREET • EDMONDS, WA 98020 • 425-771-0230
PARKS, RECREATION AND CULTURAL SERVICES DEPARTMENT
qo
AMENDMENT NO.2 TO
PROFESSIONAL SERVICES AGREEMENT
FOR LANDSCAPE ARCHITECTURE CONSULTING SERVICES
FOR THE EDMONDS CIVIC CENTER PLAYFIELD PROJECT
Dated April 27, 2018
WHEREAS, the City of Edmonds, Washington (the "City") and Walker Macy (the
"Consultant"), entered into an underlying professional services agreement for the provision of
landscape architecture consulting services for
("Project"), dated April 27, 2018 ("Underlying
November 18, 2019 ("Amendment No. 1 "); and
the Edmonds Civic Center Playfield Project
Agreement") and amended that agreement on
WHEREAS, Section 12 of the Underlying Agreement provides that the parties may
make changes through amendments to the Underlying Agreement that are approved in writing by
both parties; and
WHEREAS, the Underlying Agreement and its Amendment No. 1 incorporate a Scope
of Work for the Project consultation work and a budget for this work; and
WHEREAS, the parties desire to further amend the Underlying Agreement to increase
the budget to cover additional fees for the consultation work;
NOW, THEREFORE, in consideration of the mutual benefits accruing, it is agreed by
and between the parties to the Underlying Agreement as follows:
1. The provisions of the Underlying Agreement of April 27, 2018 between the City
and the Consultant for Project consultation services, as amended by its Amendment No. 1, both
of which are attached hereto as Attachment A and incorporated herein by this reference as if
fully set forth, are further amended in, but only in, the following respect:
(a). Section 2 ("Payments") — The Fee Schedule set forth in Exhibit B to the
Underlying Agreement and referenced in Section 2 ("Payments"), as amended by
Amendment No. 1 and its Exhibit A, shall be further amended to provide for
additional fees for prior authorized work as well as an adjustment in billing rates
for the consultant team. Subsection A of Section 2, which was revised by
Amendment No. 1, is hereby further amended to read as follows:
Packet Pg. 44
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
Amendment No. 2 to Professional Services Agreement, Page 2
A. Payment for work accomplished under the terms of this
Agreement shall be on a time and expense basis as set forth
on the Fee Schedule in Exhibit B; the Fee Schedule for the
additional Yost Park Stormwater Design services
incorporated into Exhibit A to Amendment No. 1; and the
fee amendment for prior authorized work and adjustment
for 2021-2022 billing rates set forth in Exhibit A to
Amendment No. 2, all of which are attached hereto and
incorporated herein by this reference; provided, in no
event shall the payment for work performed pursuant to
this Agreement exceed the sum of ONE MILLION, FOUR
HUNDRED FORTY-SEVEN THOUSAND, EIGHT
HUNDRED THIRTEEN DOLLARS ($1,447,813.00).
2. In all other respects, the Underlying Agreement, as amended by its Amendment
No. 1, shall remain in full force and effect, further amended as set forth herein, but only as set
forth herein.
September
DATED this 8 th day of 3* 2021.
CITY OF EDMONDS WALKER MACY
DocuSigned by:
17A625EA7657432...
Michael Nelson, Mayor
ATTEST/AUTHENTICATED:
E
DocuSigned by:
Cb{f pass"
78732FF8F8DD4AB...
Scott Passey, City Clerk
APPROVED AS TO FORM:
DocuSigned by:
25BFC07762F2449...
Otuce or the City Attorney
Digitally signed by Chelsea McCann
Chelsea McCann DN:c=US, cn=Chelsea McCann, -Walker
Macy Llc,email=cmccann@walkermacy.com
Date: 2021.09.0817:06:01-07-00'
Chelsea McCann, Principal
Packet Pg. 45
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
Amendment No. 2 to Professional Services Agreement, Page 3
2.2.a
STATE OF WASHINGTON)
)ss
COUNTY OF )
On this day of 2021, before me, the under -signed, a
Notary Public in and for the State of Washington, duly commissioned and sworn,
personally appeared Chelsea McCann, and executed the foregoing instrument, and
acknowledged the said instrument to be her free and voluntary act and for the uses and
purposes therein mentioned, and on oath stated that she was authorized to execute said
instrument.
WITNESS my hand and official seal hereto affixed the day and year first above
written.
NOTARY PUBLIC
My commission expires:
Packet Pg. 46
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
Amendment No. 2 to Professional Services Agreement, Page 4
2.2.a
EXHIBIT A
Scope of Work / Fee Schedule
Packet Pg. 47
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
WALKERI MACY LANDSCAPE ARCHITECTURE URBAN DESIGN PLANNING
April 7, 2021
Angie Feser
Parks, Recreation and Cultural Services Director
City of Edmonds
700 Main Street
Edmonds, WA 98020
RE: Edmonds Civic Center Playfield Improvements — Contract Amendment Request
Dear Angie,
We appreciate the opportunity to submit the following contract amendment request for landscape
architectural services at Edmonds Civic Field.
SCOPE OF WORK:
1. Amendment for prior authorized work:
1.1 We received prior authorization to complete the work associated with the proposals listed in
the table below. Our team is requesting additional fees for the total value of these less the
unallocated (management reserve) fee that was remaining in our contract.
May 2020
Bidding Support
$9,450.00
September 2020
Yost Re -Design
$60,164.00
September 2020
Geotech Explorations
$17,610.00
September 2020
Re -Bid Task 1
$39,950.00
March 2021
Re -Bid Task 2
$29,388.00
2. Adjustment for 2021 — 2022 billing rates:
2.1 The billing rates for the consultant team have increased an average of 4%. We are
requesting additional fee for the Construction Administration scope of our work that is to
be completed in 2021 and 2022.
Packet Pg. 48
DocuSign Envelope ID: 61CC8E20-52D3-408C-A7D6-52BA8A96EBE1
2.2.a
Edmonds Civic Center Playfield
April 7, 2021
Page 2of2
FEES:
We propose the following fees:
1. Prior Authorized Work
2. Billing Rate Adjustment
Tota I :
$78, 973.00
$12,500.00
$91,473.00 plus expenses
All assumptions and conditions of the original contract apply to this proposal.
Please contact me or Lara Rose if you have any questions, require clarification, or if we can be of further
assistance. We look forward to continuing to work with you on the Civic Center Playfield Improvement
Project.
Sincerely,
Andrea Kuns
Senior Associate
akuns@walkermacy.com
Packet Pg. 49
2.3
City Council Agenda Item
Meeting Date: 03/14/2023
Longbay Enterprises Contract Amendment No. 5
Staff Lead: Angie Feser
Department: Parks, Recreation & Human Services
Preparer: Angie Feser
Background/History
The Parks, Recreation & Human Services department has used the real estate consultant services of
Longbay Enterprises since January 2021 to provide professional services and support of parkland
acquisition efforts. These services include searching for available property, negotiating with property
owners, performing due diligence, managing appraisals, drafting and reviewing legal documents and
contracts and providing general consulting services.
Over the past two years, Longbay Enterprises have assisted with the department's efforts to acquire
parkland property with finding and negotiating more than a dozen potential property acquisitions
including the acceptance of the Shirley Johnson property.
The current professional services agreement amount of $90,000 needs to be amended to $150,000 to
provide on -call services upcoming acquisition activities. This amount, being greater than $100,000
requires Council review and approval. This amendment and contract was reviewed and approved by the
City Attorney.
Staff Recommendation
Staff recommends the Parks & Public Works Committee approve and recommend full City Council
approval on Consent Agenda at the next regular meeting for the City of Edmonds and Longbay
Enterprises Professional Services Agreement amendment No. 5 to increase the contract amount to
$150,000.
Attachments:
2023 Amendment No. 5 to Long Bay Enterprises PSA 3.9.2023
Packet Pg. 50
2.3.a
MIKE NELSON
City of Edmonds MAYOR
700 MAIN STREET • EDMONDS, WA 98020 • 425-771-0230
ic9 PARKS, RECREATION AND Human SERVICES DEPARTMENT
AMENDMENT NO.5 TO
PROFESSIONAL SERVICES AGREEMENT
For Real Estate Support Services
Dated January 25, 2021
WHEREAS, the City of Edmonds, Washington (the "City") and Long Bay Enterprises,
Inc. (the "Consultant"), entered into an underlying professional services agreement for the
provision of real estate support services, dated January 25, 2021 ("Underlying Agreement"),
executed an Amendment No. 1 to that Agreement on July 30, 2021 ("Amendment No.1 "),
Amendment No. 2 on January 3, 2022 ("Amendment No. 2"), Amendment No. 3 on March 31,
2022 ("Amendment No. 3"), and Amendment No. 4 on December 9, 2022; and
WHEREAS, Section 12 of the Underlying Agreement authorizes revisions to its terms
only upon a written amendment approved by both parties; and
WHEREAS, the parties desire to further amend the Underlying Agreement to further
increase the budget to cover the consultation work;
NOW, THEREFORE, in consideration of the mutual benefits accruing, it is agreed by
and between the parties to the Underlying Agreement as follows:
1. The provisions of the Underlying Agreement of January 25, 2021, as amended by
Amendment Nos. 1, 2, 3, and 4 between the City and the Consultant for real estate support services,
all of which are attached hereto as Attachment A and incorporated herein by this reference as if
fully set forth, is further amended in, but only in, the following respect:
(a) Section 2 ("Payments") — Subsection A of Section 2 is hereby amended
to read as follows:
A. Payment for work accomplished under the terms of this
Agreement shall be on a time and expense basis as set forth
in Exhibit A; provided, in no event shall the payment for
work performed pursuant to this Agreement exceed the sum
of ONE HUNDRED FIFTY THOUSAND DOLLARS
($150,000.00).
2. In all other respects, the Underlying Agreement, as amended by Amendment Nos.
1, 2, 3, and 4 shall remain in full force and effect, further amended as set forth herein, but only as
set forth herein.
[Remainder of page intentionally left blank — Signatures on following page.]
Packet Pg. 51
Amendment No. 5 to Professional Services Agreement, Page 2
DATED this day of
CITY OF EDMONDS
Michael Nelson, Mayor
ATTEST/AUTHENTICATED:
Scott Passey, City Clerk
APPROVED AS TO FORM:
Office of the City Attorney
2023.
LONG BAY ENTERPRISES, INC.
Cynthia M. Berne, Principal/Broker
Packet Pg. 52
DocuSign Envelope ID: F8058960-3BCB-4ECB-828D-37E99001D033
2.3.a
`��-°`E°MotiA� MIKE NELSON
City of Edmonds MAYOR
700 MAIN STREET • EDMONDS, WA 98020 • 425-771-0230
PARKS, RECREATION AND CULTURAL SERVICES DEPARTMENT
ANC. i Sq0
AMENDMENT NO.4 TO
PROFESSIONAL SERVICES AGREEMENT
For Real Estate Support Services
Dated January 25, 2021
WHEREAS, the City of Edmonds, Washington (the "City") and Long Bay Enterprises,
Inc. (the "Consultant"), entered into an underlying professional services agreement for the
provision of real estate support services, dated January 25, 2021 ("Underlying Agreement"),
executed an Amendment No. 1 to that Agreement on July 30, 2021 ("Amendment No. I"); an
Amendment No. 2 on January 3, 2022 ("Amendment No. 2"); and an Amendment No. 3 on March
31, 2022; and
WHEREAS, Section 12 of the Underlying Agreement authorizes revisions to its terms
only upon a written amendment approved by both parties; and
WHEREAS, the parties desire to further amend the Underlying Agreement to extend the
term through 2023;
NOW, THEREFORE, in consideration of the mutual benefits accruing, it is agreed by
and between the parties to the Underlying Agreement as follows:
1. The provisions of the Underlying Agreement of January 25, 2021, as amended
by Amendment Nos. 1, 2, and 3, between the City and the Consultant for real estate support
services, all of which are attached hereto as Attachment A and incorporated herein by this
reference as if fully set forth, is further amended in, but only in, thefollowing respect:
(a) Section 4 ("Time of performance") — Section 4 shall be amended to read
as follows:
This Agreement will commence on the date set forth below, and will
expire on December 31, 2023. The Consultant shall perform the
work authorized by this Agreement promptly in accordance with the
receipt of the required governmental approvals.
2. In all other respects, the Underlying Agreement, as amended by Amendment Nos.
1, 2, and 3, shall remain in full force and effect, further amended as set forth herein, but only as
set forth herein.
[Remainder of page intentionally left blank — Signatures on following page.]
Packet Pg. 53
DocuSign Envelope ID: F8058960-3BCB-4ECB-828D-37E99001 D033
Amendment No. 4 to Professional Services Agreement, Page Z
2.3.a
9
DATED this day of
CITY OF EDMONDS
DocuSigned by:
E
l iL WS611n,
Mike Nelson, Mayor
APPROVED ASTO FORM:
DocuSigned by:
Sly ati C-- .
Office of the City Attorney
December
2022.
LONG BA
C)�hthia M. Berne, Printcipal/Broker
i
Packet Pg. 54
DocuSign Envelope ID: F8058960-3BCB-4ECB-828D-37E99001D033
2.3.a
l�ti OX Elfhf{j��
City of Edmonds
700 MAIN STREET • EDMONDS, WA 98020 • 425-771-0230
ic9PARKS, RECREATION AND CULTURAL SERVICES DEPARTMENT
#�
MIKE NELSON
MAYOR
AMENDMENT NO.3 TO
PROFESSIONAL SERVICES AGREEMENT
For Real Estate Support Services
Dated January 25, 2021
WHEREAS, the City of Edmonds, Washington (the "City") and Long Bay Enterprises,
Inc. (the "Consultant"), entered into an underlying professional services agreement for the
provision of real estate support services, dated January 25, 2021 ("Underlying Agreement"),
executed an Amendment No. 1 to that Agreement on July 30, 2021 ("Amendment No. 1 ") and an
Amendment No. 2 on January 3, 2022 ("Amendment No. 2); and
WHEREAS, Section 12 of the Underlying Agreement authorizes revisions to its terms
only upon a written amendment approved by both parties; and
WHEREAS, the parties desire to further amend the Underlying Agreement to update the
Consultant's hourly rates for 2022;
NOW, THEREFORE, in consideration of the mutual benefits accruing, it is agreed by
and between the parties to the Underlying Agreement as follows:
1. The provisions of the Underlying Agreement of January 25, 2021, as amended
by Amendment Nos. 1 and 2, between the City and the Consultant for real estate support services,
all of which are attached hereto as Attachment A and incorporated herein by this reference as if
fully set forth, is further amended in, but only in, thefollowing respect:
(a) Exhibit A ("Scope of Work") — The "Compensation" section included
in Exhibit A shall be amended to read as follows:
Compensation. Costs for services in connection with individual acquisitions shall
be tracked separately but kept confidential until the acquisition is complete or is
public knowledge. Billing shall be on a time and materials basis. Hourly rates for
the Consultant's staff are as follows:
Principal $200.00
Sr. RE Analyst $185.00
Administrative Support $ 68.00
This is an all-inclusive billable rate excluding mileage expenses that will be billed
at the time of billing, the Federal allowed rate.
Packet Pg. 55
DocuSign Envelope ID: F8058960-3BCB-4ECB-828D-37E99001 D033
Amendment No. 3 to Professional Services Agreement, Page 2
2.3.a
2. In all other respects, the Underlying Agreement, as amended by Amendment Nos.
I and 2, shall remain in full force and effect, further amended as set forth herein, but only as set
forth herein.
DATED this 31 st day of March 2022.
CITY OF FDMONDS
,tQr1-�2 �cd�h
Angie Feser, Parks, Recreation &
Cultural Services Director
APPROVED AS TO FORM:
Office of the City Attorney
i
i
Packet Pg. 56
DocuSign Envelope ID: F8058960-3BCB-4ECB-828D-37E99001 D033
111 1 ,ACHMENT A
2.3.a
0 E D 11,
., CITY OF EDMONDS
iJ c/i
121 5TH AVENUE NORTH • EDMONDS, WA 98020 • 425-771-0220 FAX 425-672-5750
Website: www.edmondswa.gov
1�go
70
PROFESSIONAL SERVICES
AGREEMENT
MIKE NELSON
MAYOR
THIS AGREEMENT ("Agreement") is made and entered into between the City of
Edmonds, hereinafter referred to as the "City," and Long Bay Enterprises, Inc., hereinafter referred
to as the "Consultant."
WHEREAS, the City desires to engage the professional services and assistance of a
consulting firm to provide real estate support services; and
WHEREAS, the Consultant has the necessary skills and experience, and desires to provide
such services to the City;
NOW, THEREFORE, in consideration of the mutual benefits accruing, it is agreed by
and between the parties hereto as follows:
l . Scope of work. The scope of work shall include all services and material necessary
to accomplish the above mentioned objectives in accordance with the Scope of Work that is
marked as Exhibit A, attached hereto and incorporated herein by this reference.
2. Payments. The Consultant shall be paid by the City for completed work for
services rendered under this Agreement as provided hereinafter. Such payment shall be full
compensation for work performed or services rendered and for all labor, materials, supplies,
equipment and incidentals necessary to complete the work.
A. Payment for work accomplished under the terms of this Agreement shall be on
a time and expense basis as set forth in Exhibit A; provided, in no event shall the payment for
work performed pursuant to this Agreement exceed the sum of FIFTEEN THOUSAND
DOLLARS ($15,000.00).
B. All vouchers shall be submitted by the Consultant to the City for payment
pursuant to the terms of this Agreement. The City shall pay the appropriate amount for each
voucher -to the Consultant. The Consultant may submit vouchers to the City monthly during the
progress of the work for payment of completed phases of the project. Billings shall be reviewed
in conjunction with the City's warrant process. No billing shall be considered for payment that
has not been submitted to the City three (3) days prior to the scheduled cut-off date. Such late
vouchers will be checked by the City and payment will be made in the next regular payment cycle.
C. The costs records and accounts pertaining to this Agreement are to be kept
available for inspection by representatives of the City for a period of three (3) years after final
payment.. Copies shall be made available upon request.
Packet Pg. 57
DocuSign Envelope ID: F8058960-3BCB-4ECB-828D-37E99001D033
2.3.a
3. Ownership and use of documents. All research, tests, -surveys, preliminary data,
reports, and any and all other work product prepared or gathered by the Consultant in preparation
for the services rendered by the Consultant under this Agreement shall be and are the property of
the Consultant, provided, however, that:
A. All final reports, presentations, documentation and testimony prepared by
the Consultant shall become the property of the City upon their presentation to and acceptance by
the City and shall at that date become the property of the City.
B. The City shall have the right, upon reasonable request, to inspect, review
and copy any work product during normal office hours. Documents prepared under this
Agreement and in the possession of the Consultant may be subject to public records request and
release under Chapter 42.56 RCW.
C. In the event that the Consultant shall default on this Agreement, or in the
event that this Agreement shall be terminated prior to its completion as herein provided, the work
product of the Consultant, along with a summary of work done to date of default or termination,
shall become the property of the City and tender of the work product and summary shall be a
prerequisite to final payment under this Agreement. The summary of work done shall be prepared
at no additional cost.
4. Time of performance. This Agreement will commence on the date set forth
below, and will expire on December 31, 2022. The Consultant shall perform the work authorized
by this Agreement promptly in accordance with the receipt of the required governmental
approvals.
5. Indemnification / Hold harmless agreement. The Consultant shall defend,
indemnify and hold the City, its officers, officials, employees and volunteers harmless from any
and all claims, injuries, damages, losses, demands, or suits at law or equity arising from the acts,
errors or omissions of the Consultant in the performance of this Agreement, except for injuries and
damages caused by the sole negligence of the City. Should a court of competent jurisdiction
determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for
damages arising out of bodily injury to persons or damages to property caused by or resulting from
the concurrent negligence of the Consultant and the City, its officers, officials, employees, and
volunteers, the Consultant's liability, including the duty and cost to defend, hereunder shall be
only to the extent of the Consultant's negligence.
The Consultant shall comply with all applicable sections of the applicable Ethics laws, including
RCW 42.23, which is the Code of Ethics for regulating contract interest by municipal officers. The
Consultant specifically assumes potential liability for actions brought by the Consultant's own
employees against the City and, solely for the purpose of this indemnification and defense, the
Consultant specifically waives any immunity under the state industrial insurance law, Title 51
RCW. This waiver has been mutually negotiated by the parties. The provisions of this section
shall survive the expiration or termination of this Agreement.
6. General and professional liability insurance. The Consultant shall obtain and
keep in force during the term of this Agreement, or as otherwise required, the following insurance
with companies or through sources approved by the State Insurance Commissioner pursuant to
Title 48 RCW.
Packet Pg. 58
DocuSign Envelope ID: F8058960-3BCB-4ECB-828D-37E99001D033
2.3.a
Insurance Coverage
A. Worker's compensation and employer's liability insurance as required by the State.
B. Commercial general liability and property damage insurance in an aggregate amount not
less than two million dollars ($2,000,000) for bodily injury, including death and property
damage. The per occurrence amount shall be written with limits no less than one million
dollars ($1,000,000).
C. Vehicle liability insurance for any automobile used in an amount not less than a one million
dollar ($1,000,000) combined single limit.
D. Professional liability insurance in the amount of one million dollars ($1,000,000).
Excepting the Worker's Compensation Insurance and Professional Liability Insurance secured by
the Consultant, the City will be named on all policies as an additional insured. The Consultant
shall furnish the City with verification of insurance and endorsements required by the Agreement.
The City reserves the right to require complete, certified copies of all required insurance policies
at any time.
All insurance shall be obtained from an insurance company authorized to do business in the State
of Washington. The Consultant shall submit a verification of insurance as outlined above within
fourteen days of the execution of this Agreement to the City.
No cancellation of the foregoing policies shall be effective without thirty (30) days prior notice to
the City.
The Consultant's professional liability to the City shall be limited to the amount payable under this
Agreement or one million dollars ($1,000,000), whichever is the greater, unless modified
elsewhere in this Agreement. In no case shall the Consultant's professional liability to third parties
be limited in any way.
7. Discrimination prohibited. The Consultant shall not discriminate against any
employee or applicant for employment because of race, color, religion, national origin, age, sex,
sexual orientation, marital status, veteran status, liability for service in the armed forces of the
United States, disability, or the presence of any sensory, mental or physical handicap, or any other
protected class status, unless based upon a bona fide occupational qualification.
8. Consultant is an independent contractor. The parties intend that an independent
contractor relationship will be created by this Agreement. No agent, employee or representative
of the Consultant shall be deemed to be an agent, employee or representative of the City for any
purpose. The Consultant shall be solely responsible for all acts of its agents, employees,
representatives and subcontractors during the performance of this Agreement.
9. City approval of work and relationships. Notwithstanding the Consultant's
status as an independent contractor, results of the work performed pursuant to this Agreement must
meet the approval of the City. During pendency of this Agreement, the Consultant shall not
perform work for any party with respect to any property located within the City of Edmonds or for
any project subject to the administrative or quasijudicial review of the City without written
notification to the City and the City's prior written consent.
Packet Pg. 59
DocuSign Envelope ID: F8058960-3BCB-4ECB-828D-37E99001D033
2.3.a
10. Termination. This being an Agreement for professional services, either party may
terminate this Agreement for any reason upon giving the other party written notice of such
termination no fewer than ten (10) days in advance of the effective date of said termination.
11. Integration. The Agreement between the parties shall consist of this document
and the Scope of Work and fee schedule attached hereto as Exhibit A. These writings constitute
the entire Agreement of the parties and shall not be amended except by a writing executed by both
parties. In the event of any conflict between this written Agreement and any provision of Exhibit
A, this Agreement shall control.
12. Changes/Additional Work. The City may engage the Consultant to perform
services in addition to those listed in this Agreement, and the Consultant will be entitled to
additional compensation for authorized additional services or materials. The City shall not be
liable for additional compensation until and unless any and all additional work and compensation
is approved in advance in writing and signed by both parties to this Agreement. If conditions are
encountered which are not anticipated in the Scope of Work, the City understands that a revision
to the Scope of Work and fees may be required. Provided, however, that nothing in this paragraph
shall be interpreted to obligate the Consultant to render services, or the City to pay for services
rendered, in excess of the Scope of Work in Exhibit A unless or until an amendment to this
Agreement is approved in writing by both parties.
13. Standard of Care. The Consultant represents that the Consultant has the
necessary knowledge, skill and experience to perform services required by this Agreement. The
Consultant and any persons employed by the Consultant shall use their best efforts to perform the
work in a professional manner consistent with sound practices, in accordance with the schedules
herein and in accordance with the usual and customary professional care required for services of
the type described in the Scope of Work.
14. Non -waiver. Waiver by the City of any provision of this Agreement or any time
limitation provided for in this Agreement shall not constitute a waiver of any other provision.
15. Non -assignable. The services to be provided by the Consultant shall not be
assigned or subcontracted without the express written consent of the City.
16. Covenant against contingent fees. The Consultant warrants that he/she/they
has/have not employed or retained any company or person, other than a bona fide employee
working solely for the Consultant, to solicit or secure this Agreement, and that he/she/they
has/have not paid or agreed to pay any company or person, other than a bona fide employee
working solely for the Consultant, any fee, commission, percentage, brokerage fee, gifts, or any
other consideration contingent upon or resulting from the award of making of this Agreement. For
breach or violation of this warranty, the City shall have the right to annul this Agreement without
liability or, in its discretion to deduct from the contract price or consideration, or otherwise recover,
the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee.
17. Compliance with laws. The Consultant in the performance of this Agreement
shall comply with all applicable Federal, State or local laws and ordinances, including regulations
for licensing, certification and operation of facilities, programs and accreditation, and licensing of
individuals, and any other standards or criteria as described in the Agreement to assure quality of
services.
Packet Pg. 60
DocuSign Envelope ID: F8058960-3BCB-4ECB-828D-37E99001 D033
2.3.a
The Consultant specifically agrees to pay any applicable business and occupation (B & O) taxes
which may be due on account of this Agreement.
18. Notices. Notices to the City of Edmonds shall be sent to the following address:
City of Edmonds
121 Fifth Avenue North
Edmonds, WA 98020
Notices to the Consultant shall be sent to the following address:
Long Bay Enterprises, Inc.
114 Railroad Ave #211
Edmonds, WA 98020
Receipt of any notice shall be deemed effective three (3) days after deposit of written notice in the
U.S. mails, with proper postage and properly addressed.
DATED THIS 25 day of January 2021.
CITY OF EDMONDS
— 14A'ye'a" '0�e""I'
Angie Feser, Parks, Recreation &
Cultural Services Director
APPROVED AS TO FORM:
Office of the City Attorney
LONG BAY ENTERPRISES, INC.
is M.
Packet Pg. 61
DocuSign Envelope ID: F8058960-3BCB-4ECB-828D-37E99001 D033
2.3.a
EXHIBIT A
Scope of Work
General Scope of Work
i
The work under this Agreement shall consist of performing services related to Real Estate
Support Services as herein defined and necessary to accomplish land acquisition by the City
of Edmonds. The Consultant shall furnish all services and labor necessary to accomplish
these tasks, and provide all materials, supplies, equipment, and incidentals, except as
designated elsewhere in the Agreement, necessary to prepare and deliver to the City the
documents and other deliverable item(s) requested by the City.
The Consultant shall maintain utmost confidentiality of the information associated with
these acquisitions in accordance with State Law. Several methods have been identified for
acquisition and in most cases the City may require the Consultant to perform all work on an
acquisition, or act as part of a team by performing only a portion of the project work. In
some cases, the City may ask the Consultant to act on behalf of the City.
Task assignments may include, but are not limited to, the following types of work:
1. Provide advisory services and realistic alternative options in the form of feasibility
studies that analyze the viability of a given objective and identify and explore
alternative scenarios to arrive at a recommended course of action as related to land
acquisition.
2. Prepare market studies, strategic planning studies, and purchase and sale offer
summaries to assist in the land planning process or the acquisition and/or disposition
of real estate assets.
3. Identify the highest and best use of surplus properties, formulate recommendations,
and assist the City in the decision -making and political process.
4. Facilitate the acquisition of land by identifying the best site alternative(s) and their
respective owner(s), conduct site analysis as to the viability of the intended use of
the property with consideration of land use policies and land use regulatory
requirements.
S. Negotiate on behalf of the City multifaceted and/or complex real estate agreements
including, but not limited to, purchase and sale agreements, franchise agreements,
complex lease agreements, cost -sharing agreements, development agreements, and
interlocal agreements and develop and analyze alternative deal points and strategies
that are beneficial for the City.
6. Obtaining Title Reports, Appraisals, and other information necessary in decision
making and negotiations towards purchase or acquisition in any form.
7. Manage projects with cost-effectiveness and clear, measurable goals while
communicating and coordinating with the City, it's stakeholders, community partners
and/or other governmental agencies.
8. Assist the City to educate the community through preparation of materials,
presentations and/or workshops.
9. Other related work as requested by the City.
Packet Pg. 62
DocuSign Envelope ID: F8058960-3BCB-4ECB-828D-37E99001 D033
2.3.a
Authorization of Work
Work requested by the City shall be issued in writing. The information may be brief but will
be sufficient to understand the work being authorized. It is anticipated that the acquisitions
will vary in scope, method, complexity and location. Some acquisitions will be quick while
others will be more open ended and extend over longer durations. The Consultant shall
make reasonable effort to acquire expeditiously real property by negotiation. While the
specific parcels themselves will remain confidential through acquisition, the consultant shall
track internally, the time and effort spent on each acquisition separately, to provide a
breakdown to the City if required, at any stage of the process or upon completion of the
acquisition.
Compensation
Costs for services in connection with individual acquisitions shall be tracked separately
but kept confidential until the acquisition is complete or is public knowledge. Billing
shall be on a time and materials basis. Hourly rates for the Consultant's staff are as
follows:
Principal/PM $ 190.00
Administrative Assistant $ 65.00
Packet Pg. 63
DocuSign Envelope ID: F8058960-3BCB-4ECB-828D-37E99001D033
2.3.a
l�ti OX Elfhf{j��
City of Edmonds
700 MAIN STREET • EDMONDS, WA 98020 • 425-771-0230
ic9PARKS, RECREATION AND CULTURAL SERVICES DEPARTMENT
#�
MIKE NELSON
MAYOR
AMENDMENT NO. 1 TO
PROFESSIONAL SERVICES AGREEMENT
For Real Estate Support Services
Dated January 25, 2021
WHEREAS, the City of Edmonds, Washington (the "City") and Long Bay Enterprises,
Inc. (the "Consultant"), entered into an underlying professional services agreement for the
provision of real estate support services, dated January 25, 2021 ("Underlying Agreement"); and
WHEREAS, Section 12 of the Underlying Agreement authorizes revisions to its terms
only upon a written amendment approved by both parties; and
WHEREAS, the parties desire to amend the Underlying Agreement to increase the budget
to cover the consultation work;
NOW, THEREFORE, in consideration of the mutual benefits accruing, it is agreed by
and between the parties to the Underlying Agreement as follows:
1. The provisions of the Underlying Agreement of January 25, 2021 between the
City and the Consultant for real estate support services, attached hereto as Attachment A and
incorporated herein by this reference as if fully set forth, is amended in, but only in, thefollowing
respect:
(a) Section 2 ("Payments") — Subsection A of Section 2 shall be amended to
read as follows:
A. Payment for work accomplished under the terms of this
Agreement shall be on a time and expense basis as set forth
in Exhibit A; provided, in no event shall the payment for
work performed pursuant to this Agreement exceed the sum
of FORTY-FIVE THOUSAND DOLLARS ($45,000.00).
2. In all other respects, the Underlying Agreement shall remain in full force and effect,
amended as set forth herein, but only as set forth herein.
[Remainder of page intentionally left blank — Signatures on following page.]
Packet Pg. 64
DocuSign Envelope ID: F8058960-3BCB-4ECB-828D-37E99001 D033
Amendment No. I to Professional Services Agreement, Page 2
2.3.a
DATED this 30th day of July 2021.
CITY OF EDMONDS
r
Angie Feser, Parks, Recreation &
Cultural Services Director
APPROVED AS TO FORM:
Office of the City Attorney
LONG BAY ENTERPRISES, INC.
Cynthia M. Berne, Principal/Broker
i
Packet Pg. 65
DocuSign Envelope ID: F8058960-3BCB-4ECB-828D-37E99001D033
2.3.a
`�/A OF EE>AfU
s 41
City of Edmonds
700 MAIN STREET • EDMONDS, WA 98020 • 425-771-0230
PARKS, RECREATION AND CULTURAL SERVICES DEPARTMENT
ANC. 1890
MIKE NELSON
MAYOR
AMENDMENT NO.2 TO
PROFESSIONAL SERVICES AGREEMENT
For Real Estate Support Services
Dated January 25, 2021
WHEREAS, the City of Edmonds, Washington (the "City") and Long Bay Enterprises,
Inc. (the "Consultant"), entered into an underlying professional services agreement for the
provision of real estate support services, dated January 25, 2021 ("Underlying Agreement") and
executed an Amendment No. 1 to that Agreement on July 30, 2021 ("Amendment No. I"); and
WHEREAS, Section 12 of the Underlying Agreement authorizes revisions to its terms
only upon a written amendment approved by both parties; and
WHEREAS, the parties desire to further amend the Underlying Agreement to further
increase the budget to cover the consultation work;
NOW, THEREFORE, in consideration of the mutual benefits accruing, it is agreed by
and between the parties to the Underlying Agreement as follows:
1. The provisions of the Underlying Agreement of January 25, 2021, as amended
by Amendment No. 1, between theCity and the Consultant for real estate support services, both
of which are attached hereto as Attachment A and incorporated herein by this reference as if fully
set forth, is further amended in, but only in, thefollowing respect:
(a) Section 2 ("Payments") — Subsection A of Section 2 shall be amended to
read as follows:
A. Payment for work accomplished under the terms of this
Agreement shall be on a time and expense basis as set forth
in Exhibit A; provided, in no event shall the payment for
work performed pursuant to this Agreement exceed the sum
of NINETY THOUSAND DOLLARS ($90,000.00).
2. In all other respects, the Underlying Agreement, as amended by Amendment No.
1, shall remain in full force and effect, further amended as set forth herein, but only as set forth
herein.
[Remainder of page intentionally left blank — Signatures on following page.]
Packet Pg. 66
DocuSign Envelope ID: F8058960-3BCB-4ECB-828D-37E99001 D033
Amendment No. 2 to Professional Services Agreement, Page 2
2.3.a
DATED this
day of 1/3/2022
CITY OF EDMONDS
DocuSigned by:
dl�tiL UtS611&
Michael Nelson, Mayor
ATTEST/AUTHENTICATED:
rsDocuSigned by:
of pxss"
FF-BF-SDD4flB...
Scott Passey, City Clerk
APPROVED AS TO FORM:
FDocuSigned by:
ly ati ,-4 ,
Office of the City Attorney
2022.
LONG BAY ENTERPRISES, INC.
EDocuSigned by:
394CC...
Cynthia M. Berne, Principal/Broker
i
Packet Pg. 67
2.4
City Council Agenda Item
Meeting Date: 03/14/2023
Presentation of Amendment to the Department of Ecology Agreement - 2021-2023 Biennial Stormwater
Capacity Grant
Staff Lead: Rob English
Department: Engineering
Preparer: Emiko Rodarte
Background/History
On December 13, 2022, Council approved a $50,000 grant from the Department of Ecology (Ecology). At
that time, Council was informed that an amendment to this grant would be coming from Ecology. With
this Amendment, Ecology: 1) Adds $25,000 to the total grant amount (now $75,000) and 2) Extends the
end date of the grant from March 31, 2023 to June 30, 2023. This amendment applies to all Phase 2
communities covered under this Ecology stormwater permit.
This Stormwater Capacity Grant is funded by the state's 2021-2023 biennial budget. This non-
competitive grant program provides financial assistance to permitees to implement the stormwater
management programs required by Ecology's Western Washington Phase II Municipal Stormwater
Permit (NPDES stormwater permit or the Permit). Ecology has been providing these Stormwater
Capacity grants to municipal permittees, including the City of Edmonds, on biennial basis since the late
2000s.
Staff Recommendation
Forward item to the consent agenda for approval at the City Council meeting on March 21, 2023.
Narrative
This grant provides an additional $25,000, on a reimbursable basis, to fund activities, selected by the
City, to comply with the Permit (including equipment purchases). Once the grant amendment is signed
by the Mayor, Ecology will have a total of $75,000 available to the City. The amendment also extends
the end date of the grant from March 31, 2023 to June 30, 2023.
Expenses for implementing Permit -related activities are eligible for reimbursement by this grant if they
are incurred between July 1, 2021 and June 30, 2023. Due to Ecology staff shortages, the grant
agreement has been slow to get to the City for review and signing. Grant dollars are planned to be used
to partially fund the following Permit requirements:
• Stormwater Planning- Stormwater Action Management Planning (SMAP)
• Illicit Discharge Detection and Elimination
• Operation & Maintenance of the stormwater system
The grant agreement has been reviewed by the City Attorney and has been approved as to form.
Packet Pg. 68
2.4
Attachments:
Attachment 1 - DOE Edmonds Grant Amendment
Packet Pg. 69
2.4.a
DEPARTMENT OF
ECOLOGY
State of Washington
AMENDMENT NO. 1
TO AGREEMENT NO. WQSWCAP-2123-Edmond-00128
BETWEEN
THE STATE OF WASHINGTON DEPARTMENT OF ECOLOGY
AND
City of Edmonds
PURPOSE: To amend the above -referenced agreement (AGREEMENT) between the state of Washington Department of
Ecology (ECOLOGY) and City of Edmonds (RECIPIENT) for the 2021-2023 Biennial Stormwater Capacity Grants
(PROJECT).
The purpose of this amendment is to increase the grant funding by an additional $25,000. The grant end date will also be
extended from the original end date of 3/31/23 to 6/30/23 to allow more time for the additional funding to be utilized.
IT IS MUTUALLY AGREED that the AGREEMENT is amended as follows:
Total Cost:
Original: 50,000.00 Amended: 75,000.00
Total Eligible Cost:
Original: 50,000.00 Amended: 75,000.00
Expiration Date:
Original: 03/31/2023 Amended: 06/30/2023
CHANGES TO THE BUDGET
Funding Distribution EG220304
Funding Title: 2021-23 capacity grant
Funding Type:
Funding Effective Date:
Funding Source:
Title:
Fund:
Type:
Funding Source %:
Description:
Template Version 10/30/2015
Grant
07/01 /2021
Funding Expiration Date
Model Toxics Control Operating Account (MTCOA)
FD
State
100%
MTCA
06/30/2023
Packet Pg. 70
State of Washington Department of Ecology
City of Edmonds
2021-2023 Biennial Stormwater Capacity Grants Project
Agreement No. WQSWCAP-2123-Edmond-00128
Approved Indirect Costs Rate:
Recipient Match %:
InKind Interlocal Allowed:
InKind Other Allowed:
Approved State Indirect: 30%
0%
No
No
Is this Funding Distribution used to match a federal grant? No
2021-23 capacity grant
Task Total
Permit Implementation
$ 75,000.00
Total: $ 75,000.00
CHANGES TO SCOPE OF WORK
Task Number: 1 Task Cost: $0.00
Task Title: Project Administration/Management
Pa
Task Description:
A. The RECIPIENT shall carry out all work necessary to meet ECOLOGY grant or loan administration requirements.
Responsibilities include, but are not limited to: maintenance of project records; submittal of requests for reimbursement and
corresponding backup documentation; progress reports; and a recipient closeout report (including photos).
B. The RECIPIENT shall maintain documentation demonstrating compliance with applicable procurement, contracting, and
interlocal agreement requirements; application for, receipt of, and compliance with all required permits, licenses, easements, or
property rights necessary for the project; and submittal of required performance items.
C. The RECIPIENT shall manage the project. Efforts include, but are not limited to: conducting, coordinating, and scheduling
project activities and assuring quality control. Every effort will be made to maintain effective communication with the
RECIPIENT's designees; ECOLOGY; all affected local, state, or federal jurisdictions; and any interested individuals or
groups. The RECIPIENT shall carry out this project in accordance with any completion dates outlined in this agreement.
Task Goal Statement:
Properly managed and fully documented project that meets ECOLOGY's grant and loan administrative requirements
Task Expected Outcome:
* Timely and complete submittal of requests for reimbursement, quarterly progress reports, Recipient Closeout Report, and
two -page Outcome Summary Report. <br>
* Properly maintained project documentation.
Deliverables
Template Version 10/30/2015
Packet Pg. 71
State of Washington Department of Ecology
City of Edmonds
2021-2023 Biennial Stormwater Capacity Grants Project
Agreement No. WQSWCAP-2123-Edmond-00128
Pa
Number
Description
Due Date
1.1
Progress Reports that include descriptions of work accomplished,
project challenges, and changes in the project schedule. Submitted at
least quarterly in EAGL.
1.2
Recipient Closeout Report (1 AGL Form).
1.3
Two -page draft and Final Outcome Summary Reports.
CHANGES TO SCOPE OF WORK
Task Number: 2 Task Cost: $75,000.00
Task Title: Permit Implementation
Task Description:
Conduct work related to implementation of municipal stormwater National Pollutant Discharge Elimination System (NPDES)
permit requirements. If the RECIPIENT is out of compliance with the municipal stormwater National Pollutant Discharge
Elimination System (NPDES) permit, the RECIPIENT will ensure funds are used to attain compliance where applicable. The
following is a list of elements RECIPIENT's project may include.
1) Public education and outreach activities, including stewardship activities.
2) Public involvement and participation activities.
3) Illicit discharge detection and elimination (IDDE) program activities, including:
a) Mapping of municipal separate storm sewer systems (MS4s).
b) Staff training.
c) Activities to identify and remove illicit stormwater discharges.
d) Field screening procedures.
e) Complaint hotline database or tracking system improvements.
4) Activities to support programs to control runoff from new development, redevelopment, and construction sites, including:
a) Development of an ordinance and associated technical manual or update of applicable codes.
b) Inspections before, during, and upon completion of construction, or for post -construction long-term maintenance.
c) Training for plan review or inspection staff.
d) Participation in applicable watershed planning effort.
5) Pollution prevention, good housekeeping, and operation and maintenance program activities, such as:
a) Inspecting and/or maintaining the MS4 infrastructure.
b) Developing and/or implementing policies, procedures, or stormwater pollution prevention plans at municipal properties or
facilities.
6) Annual reporting activities.
7) Establishing and refining stormwater utilities, including stable rate structures.
8) Water quality monitoring to implement permit requirements for a Water Cleanup Plan (TMDL). Note that any monitoring
funded by this program requires submittal of a Quality Assurance Project Plan (QAPP) that the DEPARMENT approves prior
to awarding funding for monitoring.
Template Version 10/30/2015
Packet Pg. 72
State of Washington Department of Ecology
City of Edmonds
2021-2023 Biennial Stormwater Capacity Grants Project
Agreement No. WQSWCAP-2123-Edmond-00128
Monitoring, including:
Pa
a) Development of applicable QAPPs.
b) Monitoring activities, in accordance with a DEPARTMENT- approved QAPP, to meet Phase I/II permit requirements.
9) Structural stormwater controls program activities (Phase I permit requirement)
10) Source control for existing development (Phase I permit requirement), including:
a) Inventory and inspection program.
b) Technical assistance and enforcement.
c) Staff training.
11) Equipment purchases that result directly in improved permit compliance. Equipment purchases must be specific to
implementing a permit requirement (such as a vactor truck) rather than general use (such as a pick-up truck). Equipment
purchases over $5,000 must be pre -approved by Ecology.
Documentation of all tasks completed is required. Documentation may include: field reports, dates and number of inspections
conducted, dates of trainings held and participant lists, number of illicit discharges investigated and removed, summaries of
planning, stormwater utility or procedural updates, annual reports, copies of approved QAPPs, summaries of structural or
source control activities, summaries of how equipment purchases have increased or improved permit compliance. Capital
construction projects, incentives or give -a -ways, grant application preparation, TAPE review for proprietary treatment systems,
or tasks that do not support Municipal Stormwater Permit implementation are not eligible expenses.
Task Goal Statement:
This task will improve water quality in the State of Washington by reducing the pollutants delivered by stormwater to lakes,
streams, and the Puget Sound by implementing measures required by Phase I and II NPDES permits.
Task Erected Outcome:
RECIPIENTS will implement measures required by Phase I and II NPDES permits.
Deliverables
Number
Description
Due Date
2.1
Documentation of tasks completed
Template Version 10/30/2015
Packet Pg. 73
State of Washington Department of Ecology
City of Edmonds
2021-2023 Biennial Stormwater Capacity Grants Project
Agreement No. WQSWCAP-2123-Edmond-00128
Funding Distribution Summary
Recipient / Ecology Share
Pa
Funding Distribution Name
Recipient Match %
Recipient Share
Ecology Share
Total
2021-23 capacity grant
0 %
$ 0.00
$ 75,000.00
$ 75,000.00
Total
$ 0.00
$ 75,000.00
$ 75,000.00
C
ca
,L^
V
a
a
U
L
3
E
0
Cn
_
d
m
M
N
N
O
N
W
O
a
0
w
_
d
E
_
m
E
a
0
_
0
r
c�
r
a�
N
N
L
a
Template Version 10/30/2015
Packet Pg. 74
State of Washington Department of Ecology
City of Edmonds
2021-2023 Biennial Stormwater Capacity Grants Project
Agreement No. WQSWCAP-2123-Edmond-00128
AUTHORIZING SIGNATURES
Pa
All other terms and conditions of the original Agreement including any Amendments remain in full force and effect, except as
expressly provided by this Amendment.
The signatories to this Amendment represent that they have the authority to execute this Amendment and bind their respective
organizations to this Amendment.
This amendment will be effective 07/01/2022.
IN WITNESS WHEREOF: the parties hereto, having read this Amendment in its entirety, including all attachments, do agree in
each and every particular and have thus set their hands hereunto.
Washington State City of Edmonds
Department of Ecology
By: By:
Vincent McGowan, P.E.
Water Quality
Program Manager
Template Approved to Form by
Attorney General's Office
Date Mike Nelson
Mayor
Date
Template Version 10/30/2015
Packet Pg. 75
2.5
City Council Agenda Item
Meeting Date: 03/14/2023
City of Edmonds Stormwater Management Action Plan (SMAP) Update
Staff Lead: Rob English
Department: Engineering
Preparer: Emiko Rodarte
Background/History
On September 13, 2022, this item was presented to the Parks and Public Works Committee.
On October 4, 2022, staff presented update to Stormwater Management Action Plan.
On November 15, 2022, staff presented update on the overall Perrinville Basin projects including the
Stormwater Management Action Plan.
Staff Recommendation
The item is scheduled for a presentation at the March 21, 2023 City Council meeting.
Narrative
The Washington State Department of Ecology (DOE) now requires that their receiving water
prioritization process be used by all Phase II cities, which includes the City of Edmonds (City), to meet
the requirements of S5.C.1.d.ii of the Western Washington Phase II National Pollutant Discharge
Elimination System (NPDES) Stormwater permit (Phase II permit). The approach taken to complete this
prioritization process follows Ecology's Stormwater Management Action Planning (SMAP) Guidance
manual, with data that reflect Edmonds priorities, resident feedback, and the Edmonds specific drainage
basins.
Per DOE deadlines and requirements, the City's receiving water assessment was prepared and
submitted to Ecology in March 2022 as the City's Watershed Inventory Technical Memorandum. This
included collated existing information and data for conditions and stormwater influence of the
watersheds that cover the City limits.
Upon completion of the Watershed Inventory Technical Memorandum, per DOE requirements and using
DOE's SMAP Guidance document, a basin prioritization Technical memorandum was prepared. The
intent of this prioritization was to determine which watershed would be the best candidate for
development of a Stormwater Management Action Plan (SMAP). Based on the DOE criteria, the
Perrinville Creek Basin was selected. DOE required that this document be submitted to them by June 30,
2022.
Since then, per DOE requirements, stormwater management actions were identified and categorized,
with public input being solicited to give a preference in the ranking of these tasks. DOE requires that the
Packet Pg. 76
2.5
final SMAP document be submitted to them by March 31, 2023.
The presentation will provide information about this new NPDES requirement, steps that have currently
taken place and further steps that will be completed in order for the City to remain compliant with the
permit.
Attachments:
Attachment 1- Presentation
Packet Pg. 77
2.5.a
El
Packet-Pg. 78
Provide a brief description of the
project background & schedule
Provide a summary of the public
input process
Review the watershed inventory
and prioritization steps/results
Present proposed stormwater
management actions for the
Perrinville Creek watershed
Packet Pg. 79
2.5.a
Driver: Municipal Stormwater Permit
• Stormwater planning requirements include a water health assessment,
selecting a priority watershed, and developing an implementation plan
3/31/22 3/8/23 vve are
Water Health Assessment Public here
Jan -Feb. 2022 Complete
Survey
StoryMap Met permit deadline Closes
Feb. 2022 6/30/22
Selection of
Public Priority Watershed
Workshops Complete
Met permit aeadline
Feb. 2023
3/31/23
Public Implementation
Workshops Plan Complete
Packet Pg. 80
2.5.a
Workshops
Workshop date and time
Attendees
2/8/22, 12 p m
8
2110122, 6pm
2
2/22/23, 12pm
21
2/22/23, 6pm
18
StoryMap
Survey Period
Responses
February 2022
23
February -March 8, 2023
11
Packet Pg. 81
2.5.a
0
w
Q
m
E
m
a�
0
L
d
3
E
L
0
4+
co
4-
0
0
y.+
_
d
0
L
a
T
0
.N
m
u
0
ea
d
0
G1
L
a
El
Packet-Pg. 82
2.5.a
Stormwater Planning Process
_
0
a
Y
_
a>
E
0
a�
_
0
L
Y
3
E
L
0
/Y
V!
Y
0
_
0
Y
Y
_
0
0
L
IL
O
.y
G1
C
O
m
Y
_
0
IL
Packet Pg. 83
2.5.a
9 Watersheds
6 Candidate
Watersheds
4 Watersheds
Highest Priority
Watershed
r plans/projects
_
0
a
_
E
a�
a�
�a
_
�a
L
3
E
L
0
Cn
4-
0
_
0
_
L
a
El
Packet-Pg. 84
2.5.a
• Edmonds Marsh
• Hall Creek -Lake
Ballinger
• Perrinville Creek
• Shell Creek
T
_
.2
_
0
n o n
a�
a
T
c
a�
E
U
fC
Q
a
Packet Pg. 85
2.5.a
dr
F
Legend
® Perrinville Creek watershed
Perrinvi lie SMAP Catchment
Aperd, •' M Edmonds Boundary
waterbodies (Edmonds)
Streams (Simplified)
Highway
Ecl o Lake�
Perrinville
Creek -
watershed
s
39
x
CAYof
Edmonds
0
Q
m
E
aD
aM
L
d
y..r
M
E
a 0
t'n
_
m
N
d
L
176M ST 5, a
_
I BOTH ST S'. 0
to
$
0
18BTN Sr SI•
Y _
City of
Lynnwood
d
N -
d
a
®
1
creek
=
Siam Drafn
Road
E
Highway
wareraody
tC
Q Pemrcnlle Creek Way
r
0 City of E&r* ds
City of Lynn—d
_
ReM,MIIe Creek SPA.
d
cacchmenl
E
t
U
R
ar
a
Packet-Pg. 86
2.5.a
0
w
Q
m
E
m
a�
0
L
d
3
E
L
0
4+
co
4-
0
O
_
d
L
a.
c
O
.y
O
_
O
r
_
d
N
L
a
El
Packet-Pg. 87
• Stormwater Retrofit Projects: construction
projects or feasibility studies
• Land Management Strategies: programs or
policies addressing land use or zoning
• Stormwater Program Enhancements: public
education and operations and maintenance
activities above and beyond the Stormwater
Permit requirements
Note: in -water work (i.e., culverts) not included
.!ff;,
Packet Pg. 88
2.5.a
Infiltrate
water
Reduce
pollutants
Control flow
s
CD
E
a
a
E
a
Packet Pg. 89
2.5.a
El
Packet Pg. 90
2.5.a
• Neighborhood Scale Retrofit Feasibility Analysis
• Community Outreach
Creek
Road
Highway
Waterbody
Perrinville
Q Perrinville Creek Watershed Creek
Q City of Edmonds Watershed
City of Lynnwood a
Pernnville Creek SMAP
Catchment
Stormwater Retrofit Project Area
Neighborhood style rain garden, example - 81 st Ave.
4
S
R
City of
Edmonds
Packet Pg. 91
2.5.a
179th Street/Olympic View Drive/
Ridge Way/72nd Avenue
188th Street/196th Street/Perrinville
Creek watershed boundary/
76th Avenue
may»
r �
Example of Existing Conditions
Concept Site Plan
Legend
ROW FEASIBILITY
ANALYSIS
8-1 5, Slope
> IS% SIOR
179th StSW ,..----
ROW under
- consideration
CONTOUR LINES
r
10-ftContours
STORMWATER
FEATURES
yt3
Stormdrain Pipe
r
OTHERFEATURES
. 1i
Road
Tax Parcels
BOUNDARIES
Perrinville I Project
Area Boundary
[J r�
�-'��
`+„
n
... Sul -Drainage Areas
r '� { ! " ,I
"-ram-+"} _r
Perrin ville Creek
�SMAP Catchment
Edmonds City Limits
r
t-J j
Perrinville Creek
0 watershed
4
Nore: Mosf area east o! 72ntl
Ave Wllows ro an existing
!
stormwarerr—My.
Jjy ti
0 1W im am
® Fee
r
�enJ
Dnl+r�
Catu"bk
Edmonds >Hnnmk
CrrM
W eMM
Concept Site Plan
. s
}
.ram K• 1
F
x
1%th St SW
_
0
a
c
as
E
(D
a�
to
_
M
L
M
3
E
0
_egend
w
IOW FEASIBILITY 0
ANALYSIS
8-15% Slope 0
> 15% Skye
ROW under
� carnsiderabon d
:ONTOUR LINES (n
10-ft Contours
TORMWATER (L
;EATURES ...
Stormdraln Rpe r--r
)THER FEATURES r
Road =
0
Tax Parcels 'y
]OUNDARIES ;
Pemnvdle 2 Prye
Area Boundary
- -. Sub-Ora.nage Are
Pernnrnlle Creek =
SMAP Catchment
Edmonds Cdy Lin r
PenmWie Creek =
watershed QI
6-
aL
r
r
T
J IL M
V
Ednxlnds
• �r
_
m
E
U
R
El
Packet-Pg. 92
2.5.a
c
0
a
r
c
a�
E
aD
a�
c
R
L
3
E
L
0
r
0
c
0
m
c
m
m
L
a
c
0
2
a�
c
0
�a
r
c
m
a�
L
a
T
E
c,>
Q
E
u
Q
Packet Pg. 93
Stormwater Design Requirements
la
2.5.a
Work with the City of Lynnwood to find
ways to control runoff from existing
development in Lynnwood's portion of
the watershed.
Perrin011e
Creek -
watershed
s
36
Cay of
Edmonds
0
w
Q
m
E
m
aM
0
L
d
a 0
Cn
tv
N
tmnsrs� d
.00T-' 5T s,. 0
a�
�
a
$
0
188TH ST Syr
Y _
City of
=
Lynnwwd
-
N
d
L
a
T
Creek
�
Slam Dram
Road
E
Highway
wacerwdy
tv
Q Pemrenlle Creels Nhr
r
0 Ciiy of Ednwds
City of Lynn—d
_
ReMrMlle Creek Slut
d
Crchmenr
E
t
U
R
ar
a
Packet-Pg. 95
Identify hard surface areas (such as
sections of parking lots or other
areas) that are no longer of
service to the property owner
pavement could
removed.
Packet-Pg. 96
Streamside Landowner Technical Assistance
7W
.' °
"NOW
F
z
r
Edmonds strearnside planti
1, t.
Nan
4,
si a lant.remov 1 ent
",
2.5.a
0
w
Q
m
E
m
a�
0
L
d
3
E
L
0
4+
co
4-
0
0
y.+
_
d
0
2
L
A
v
T
_
O
.y
O
C
O
r
C
d
N
L
a
El
Packet-Pg. 98
Homeowner Rain Gardens
Provide workshops 1nd
41 !'
gardens.technical assistance for 14
constructing rain
to
E' monds/Snohomish Conservation District
raingarden in progress, and .planting art' - r
2.5.a
Provide an opportunity for
community members to
conserve water resources
and learn about stormwater
runoff.
Packet Pg. 100
2.5.a
Implement a social media campaign
to promote pet waste pickup.
SCOOP
Puget Sound Starts Here regional promotional advertising
Packet Pg, 101
2.5.a
Develop and implement a natural yard care
program through social media and other
educational materials.
4
Puget Sound regional Natural Lawn Care resources
Packet Pg. 102
2.5.a
Keep City staff up to
date on green
stormwater facility
maintenance practices
optimizing facility
functions for flow
control and water
Packet Pg. 103
2.5.a
Stormwater Retrofit Projects
• Perrinville Neighborhood Scale Retrofit Feasibility Analysis
Drive/Ridge Way/72nd Avenue
• Perrinville Neighborhood Scale Retrofit Feasibility Analysis
Creek watershed boundary/76th Avenue
179th Street/Olympic View
188th Street/196th Street/Perrinville
Land Management Strategies
Strengthen stormwater design requirements for redevelopment.
{ Work with the City of Lynnwood Level of support
`{ Identify hard surface areas for depaving (from public workshops)
Streamside landowner technical assistance
* High A
Stormwater Program Enhancements Moderate
Homeowner rain gardens
• Conduct annual rain barrel event
• Public education for pet waste pickup
Promote natural yard care
• Continue to train City staff on green stormwater facility maintenance
Packet Pg. 104
2.5.a
0
w
Q
m
E
m
a�
0
L
d
3
E
L
0
4+
co
4-
0
0
y.+
_
d
0
L
a
T
0
.N
m
u
0
ea
d
0
G1
L
a
El
Packet Pg. 105
2.6
City Council Agenda Item
Meeting Date: 03/14/2023
Presentation of Professional Services Agreement for The Blueline Group to provide design engineering
services for the Phase 14 Waterline Replacement Project.
Staff Lead: Rob English
Department: Engineering
Preparer: Emiko Rodarte
Background/History
On January 25, 2022 City Council approved The Blueline Group to be the consultant to provide design
services for the Phase 13 and 14 Waterline Replacement Projects and authorized the mayor to sign the
Professional Services Agreement for the projects that were scheduled to be designed as part of the
Phase 13 Waterline Replacement Project.
Staff Recommendation
Forward the item to the consent agenda for approval at the City Council meeting on March 21, 2023.
Narrative
The City issued a Request for Qualifications (RFQ) in October 2021 to hire a consultant to provide design
engineering services for the Phase 13 and 14 Waterline Replacement Projects. The City received
statements of qualifications from four (4) engineering firms and the selection committee selected
Blueline to provide design engineering services for these Waterline Replacement Projects.
On January 25, 2022 Council approved The Blueline Group (Blueline) to be the consultant to provide
design services for the Phase 13 and 14 Waterline Replacement Projects and authorized the Mayor to
sign the Professional Services Agreement for projects that were scheduled to be designed as part of the
Phase 13 Waterline Replacement Project.
A separate agreement has now been negotiated for projects planned to be constructed in 2024 as part
of the Phase 14 work. The City has negotiated a consultant fee of $125,200. This agreement will allow
Blueline to provide professional services for the design of this project. This agreement will be funded by
the Water Utility Fund.
The Phase 14 Waterline Replacement Project will upgrade/replace portions of the City's potable water
network by replacing approximately 4,000 linear feet of existing waterlines and associated
appurtenances at various locations within the City.
The selection of the sites will be determined using the data supplied in the 2017 Comprehensive Water
System Plan, coordinating with upcoming road, sanitary sewer, and storm drain projects, and input from
Public Works. Projects will focus on replacements to upsize and/or loop portions of the existing network
to improve flow and pressure and remove and replace pipes that are near the end of their life cycle and
Packet Pg. 106
2.6
require additional maintenance.
Attachments:
Attachment 1 - PSA Blueline
Attachment 2 - Project map
Packet Pg. 107
2.6.a
CITY OF EDMONDS MIKE NELSON
121 ST" AVENUE NORTH - EDMONDS, WA 98020 - 425-771-0220 - FAX 425-672-5750 MAYOR
Website: www.edmondswa.gov
PUBLIC WORKS DEPARTMENT
Engineering Division
PROFESSIONAL SERVICES
AGREEMENT
THIS AGREEMENT ("Agreement") is made and entered into between the City of
Edmonds, hereinafter referred to as the "City," and The Blueline Group LLC, hereinafter referred
to as the "Consultant."
WHEREAS, the City desires to engage the professional services and assistance of a
consulting firm to provide design engineering services with respect to the Phase 14 Waterline
Replacement Project; and
WHEREAS, the Consultant has the necessary skills and experience, and desires to provide
such services to the City;
NOW, THEREFORE, in consideration of the mutual benefits accruing, it is agreed by
and between the parties hereto as follows:
1. Scope of work. The scope of work shall include all services and material necessary
to accomplish the above mentioned objectives in accordance with the Scope of Work that is
marked as Exhibit A, attached hereto and incorporated herein by this reference.
2. Payments. The Consultant shall be paid by the City for completed work for
services rendered under this Agreement as provided hereinafter. Such payment shall be full
compensation for work performed or services rendered and for all labor, materials, supplies,
equipment and incidentals necessary to complete the work.
A. Payment for work accomplished under the terms of this Agreement shall be on
a time and expense basis as set forth in Exhibit A; provided, in no event shall the payment for
work performed pursuant to this Agreement exceed the sum of ONE HUNDRED TWENTY-FIVE
THOUSAND, TWO HUNDRED DOLLARS ($125,200.00).
B. All vouchers shall be submitted by the Consultant to the City for payment
pursuant to the terms of this Agreement. The City shall pay the appropriate amount for each
voucher to the Consultant. The Consultant may submit vouchers to the City monthly during the
progress of the work for payment of completed phases of the project. Billings shall be reviewed
in conjunction with the City's warrant process. No billing shall be considered for payment that
has not been submitted to the City three days prior to the scheduled cut-off date. Such late
vouchers will be checked by the City and payment will be made in the next regular payment cycle.
Packet Pg. 108
2.6.a
C. The costs records and accounts pertaining to this Agreement are to be kept
available for inspection by representatives of the City for a period of three (3) years after final
payment. Copies shall be made available upon request.
3. Ownership and use of documents. All research, tests, surveys, preliminary data,
reports, and any and all other work product prepared or gathered by the Consultant in preparation
for the services rendered by the Consultant under this Agreement shall be and are the property of
the Consultant, provided, however, that:
A. All final reports, presentations, documentation and testimony prepared by
the Consultant shall become the property of the City upon their presentation to and acceptance by
the City and shall at that date become the property of the City.
B. The City shall have the right, upon reasonable request, to inspect, review
and copy any work product during normal office hours. Documents prepared under this
Agreement and in the possession of the Consultant may be subject to public records request and
release under Chapter 42.56 RCW.
C. In the event that the Consultant shall default on this Agreement, or in the
event that this Agreement shall be terminated prior to its completion as herein provided, the work
product of the Consultant, along with a summary of work done to date of default or termination,
shall become the property of the City and tender of the work product and summary shall be a
prerequisite to final payment under this Agreement. The summary of work done shall be prepared
at no additional cost.
4. Time of performance. The Consultant shall perform the work authorized by this
Agreement promptly in accordance with the receipt of the required governmental approvals.
5. Indemnification / Hold harmless agreement. The Consultant shall defend,
indemnify and hold the City, its officers, officials, employees and volunteers harmless from any
and all claims, injuries, damages, losses, demands, or suits at law or equity arising from the acts,
errors or omissions of the Consultant in the performance of this Agreement, except for injuries and
damages caused by the sole negligence of the City. Should a court of competent jurisdiction
determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for
damages arising out of bodily injury to persons or damages to property caused by or resulting from
the concurrent negligence of the Consultant and the City, its officers, officials, employees, and
volunteers, the Consultant's liability, including the duty and cost to defend, hereunder shall be
only to the extent of the Consultant's negligence.
The Consultant shall comply with all applicable sections of the applicable Ethics laws, including
RCW 42.23, which is the Code of Ethics for regulating contract interest by municipal officers. The
Consultant specifically assumes potential liability for actions brought by the Consultant's own
employees against the City and, solely for the purpose of this indemnification and defense, the
Consultant specifically waives any immunity under the state industrial insurance law, Title 51
RCW. This waiver has been mutually negotiated by the parties. The provisions of this section
shall survive the expiration or termination of this Agreement.
Packet Pg. 109
2.6.a
6. General and professional liability insurance. The Consultant shall obtain and
keep in force during the term of this Agreement, or as otherwise required, the following insurance
with companies or through sources approved by the State Insurance Commissioner pursuant to
Title 48 RCW.
Insurance Coverage
A. Worker's compensation and employer's liability insurance as required by the State.
B. Commercial general liability and property damage insurance in an aggregate amount not
less than two million dollars ($2,000,000) for bodily injury, including death and property
damage. The per occurrence amount shall be written with limits no less than one million
dollars ($1,000,000).
C. Vehicle liability insurance for any automobile used in an amount not less than a one million
dollar ($1,000,000) combined single limit.
D. Professional liability insurance in the amount of one million dollars ($1,000,000).
Excepting the Worker's Compensation Insurance and Professional Liability Insurance secured by
the Consultant, the City will be named on all policies as an additional insured. The Consultant
shall furnish the City with verification of insurance and endorsements required by the Agreement.
The City reserves the right to require complete, certified copies of all required insurance policies
at any time.
All insurance shall be obtained from an insurance company authorized to do business in the State
of Washington. The Consultant shall submit a verification of insurance as outlined above within
fourteen days of the execution of this Agreement to the City.
No cancellation of the foregoing policies shall be effective without thirty (30) days prior notice to
the City.
The Consultant's professional liability to the City shall be limited to the amount payable under this
Agreement or one million dollars ($1,000,000), whichever is the greater, unless modified
elsewhere in this Agreement. In no case shall the Consultant's professional liability to third parties
be limited in any way.
7. Discrimination prohibited. The Consultant shall not discriminate against any
employee or applicant for employment because of race, color, religion, national origin, age, sex,
sexual orientation, marital status, veteran status, liability for service in the armed forces of the
United States, disability, or the presence of any sensory, mental or physical handicap, or any other
protected class status, unless based upon a bona fide occupational qualification.
8. Consultant is an independent contractor. The parties intend that an independent
contractor relationship will be created by this Agreement. No agent, employee or representative
of the Consultant shall be deemed to be an agent, employee or representative of the City for any
purpose. The Consultant shall be solely responsible for all acts of its agents, employees,
representatives and subcontractors during the performance of this Agreement.
9. City approval of work and relationships. Notwithstanding the Consultant's
status as an independent contractor, results of the work performed pursuant to this Agreement must
meet the approval of the City. During pendency of this Agreement, the Consultant shall not
perform work for any party with respect to any property located within the City of Edmonds or for
any project subject to the administrative or quasijudicial review of the City without written
notification to the City and the City's prior written consent.
Packet Pg. 110
2.6.a
10. Termination. This being an Agreement for professional services, either party may
terminate this Agreement for any reason upon giving the other parry written notice of such
termination no fewer than ten (10) days in advance of the effective date of said termination.
11. Integration. The Agreement between the parties shall consist of this document,
its Appendices 1 & 2, and the Scope of Work and fee schedule attached hereto as Exhibit A. These
writings constitute the entire Agreement of the parties and shall not be amended except by a writing
executed by both parties. In the event of any conflict between this written Agreement and any
provision of Exhibit A, this Agreement shall control.
12. Changes/Additional Work. The City may engage the Consultant to perform
services in addition to those listed in this Agreement, and the Consultant will be entitled to
additional compensation for authorized additional services or materials. The City shall not be
liable for additional compensation until and unless any and all additional work and compensation
is approved in advance in writing and signed by both parties to this Agreement. If conditions are
encountered which are not anticipated in the Scope of Work, the City understands that a revision
to the Scope of Work and fees may be required. Provided, however, that nothing in this paragraph
shall be interpreted to obligate the Consultant to render services, or the City to pay for services
rendered, in excess of the Scope of Work in Exhibit A unless or until an amendment to this
Agreement is approved in writing by both parties.
13. Standard of Care. The Consultant represents that the Consultant has the
necessary knowledge, skill and experience to perform services required by this Agreement. The
Consultant and any persons employed by the Consultant shall use their best efforts to perform the
work in a professional manner consistent with sound practices, in accordance with the schedules
herein and in accordance with the usual and customary professional care required for services of
the type described in the Scope of Work.
14. Non -waiver. Waiver by the City of any provision of this Agreement or any time
limitation provided for in this Agreement shall not constitute a waiver of any other provision.
15. Non -assignable. The services to be provided by the Consultant shall not be
assigned or subcontracted without the express written consent of the City.
16. Covenant against contingent fees. The Consultant warrants that he/she/they
has/have not employed or retained any company or person, other than a bona fide employee
working solely for the Consultant, to solicit or secure this Agreement, and that he/she/they
has/have not paid or agreed to pay any company or person, other than a bona fide employee
working solely for the Consultant, any fee, commission, percentage, brokerage fee, gifts, or any
other consideration contingent upon or resulting from the award of making of this Agreement. For
breach or violation of this warranty, the City shall have the right to annul this Agreement without
liability or, in its discretion to deduct from the contract price or consideration, or otherwise recover,
the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee.
17. Compliance with laws. The Consultant in the performance of this Agreement
shall comply with all applicable Federal, State or local laws and ordinances, including regulations
for licensing, certification and operation of facilities, programs and accreditation, and licensing of
individuals, and any other standards or criteria as described in the Agreement to assure quality of
services. Because this Agreement is subject to federal nondiscrimination laws, the Consultant
Packet Pg. 111
2.6.a
agrees that the provisions of Appendices 1 & 2, attached hereto and incorporated herein by this
reference, apply to this Agreement.
The Consultant specifically agrees to pay any applicable business and occupation (B & O) taxes
which may be due on account of this Agreement.
18. Notices. Notices to the City of Edmonds shall be sent to the following address:
City of Edmonds
121 Fifth Avenue North
Edmonds, WA 98020
Notices to the Consultant shall be sent to the following address:
The Blueline Group, LLC
25 Central Way, Suite 400
Kirkland, WA 98033
Receipt of any notice shall be deemed effective three (3) days after deposit of written notice in the
U.S. mails, with proper postage and properly addressed.
DATED THIS day of
CITY OF EDMONDS
Michael Nelson, Mayor
ATTEST/AUTHENTICATED:
Scott Passey, City Clerk
APPROVED AS TO FORM:
Office of the City Attorney
2023.
THE BLUELINE GROUP, LLC
By:
Its:
Packet Pg. 112
2.6.a
STATE OF WASHINGTON )
)ss
COUNTY OF )
On this day of 2023, before me, the undersigned, a Notary
Public in and for the State of Washington, duly commissioned and sworn, personally
appeared , to me known to be the person who executed
the foregoing instrument, and acknowledged the said instrument to be the free and voluntary
act and deed of said person, for the uses and purposes therein mentioned, and on oath stated
that he/she was authorized to execute said instrument.
WITNESS my hand and official seal hereto affixed the day and year first above
written.
NOTARY PUBLIC
My commission expires:
Packet Pg. 113
2.6.a
APPENDIX 1 CONTRACT
(Appendix A of USDOT 1050.2A Standard Title VI Assurances)
During the performance of this Agreement, the Consultant/Contractor, for itself, its assignees, and successors
in interest (hereinafter collectively referred to as the "Consultant/Contractor") agrees as follows:
1. Compliance with Regulations: The Consultant/Contractor shall comply with the acts and regulations
relative to nondiscrimination in federally -assisted programs of the United States Department of
Transportation (USDOT), Title 49, Code of Federal Regulations, Part 21 (49 CFR 21), as they may be
amended from time to time (hereinafter referred to as the Regulations), which are herein incorporated
by reference and made a part of this Agreement.
Nondiscrimination: The Consultant/Contractor, with regard to the work performed by it during the
Agreement, shall not discriminate on the grounds of race, color, national origin, sex, age, disability,
income -level, or LEP in the selection and retention of subcontractors, including procurement of
materials and leases of equipment. The Consultant/Contractor shall not participate directly or
indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment
practices when the Agreement covers any activity, project, or program set forth in Appendix B of 49
CFR 21.
Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all
solicitations, either by competitive bidding, or negotiation made by the Consultant/ Contractor for
work to be performed under a subcontract, including procurement of materials, or leases of equipment,
each potential subcontractor or supplier shall be notified by the Consultant/Contractor of the
Consultant's/Contractor's obligations under this Agreement and the Regulations relative to
nondiscrimination on the grounds of race, color, national origin, sex, age, disability, income -level, or
LEP.
Information and Reports: The Consultant/Contractor shall provide all information and reports
required by the Regulations and directives issued pursuant thereto, and shall permit access to its
books, records, accounts, other sources of information, and its facilities as may be determined by the
City or the appropriate state or federal agency to be pertinent to ascertain compliance with such
Regulations, orders, and instructions. Where any information required of a Consultant/Contractor is in
the exclusive possession of another who fails or refuses to furnish the information, the
Consultant/Contractor shall so certify to the City, or state or federal agency, as appropriate, and shall
set forth what efforts it has made to obtain the information.
Sanctions for Noncompliance: In the event of the Consultant's/Contractor's noncompliance with the
nondiscrimination provisions of this Agreement, the City shall impose such contract sanctions as it or
the appropriate state or federal agency may determine to be appropriate, including, but not limited to:
• Withholding of payments to the Consultant/Contractor under the Agreement until the
Consultant/Contractor complies; and/or
• Cancellation, termination, or suspension of the Agreement, in whole or in part.
6. Incorporation of Provisions: The Consultant/Contractor shall include the provisions of the above
paragraphs one (1) through five (5) in every subcontract, including procurement of materials and
leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto. The
Consultant/Contractor shall take such action with respect to any subcontractor or procurement as the
City or appropriate state or federal agency may direct as a means of enforcing such provisions,
including sanctions for noncompliance. Provided, that if the Consultant/Contractor becomes involved
in, or is threatened with, litigation by a subcontractor or supplier as a result of such direction, the
Consultant/ Contractor may request that the City enter into such litigation to protect the interests of the
City; or may request that the appropriate state agency enter into such litigation to protect the interests
of the State of Washington. In addition, the Consultant/Contractor may request the appropriate federal
agency enter into such litigation to protect the interests of the United States.
Packet Pg. 114
2.6.a
APPENDIX 2 CONTRACT
(Appendix E of USDOT 1050.2A Standard Title VI Assurances)
During the performance of this Agreement, the Consultant/Contractor, for itself, its assignees, and successors
in interest (hereinafter collectively referred to as the "Consultant/Contractor") agrees to comply with the
following non-discrimination statutes and authorities, including but not limited to:
Pertinent Non -Discrimination Authorities:
• Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits
discrimination on the basis of race, color, national origin); and 49 CFR Part 21.
• The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. §
4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because
of Federal or Federal -aid programs and proejcts);
• Federal -Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on the basis of
sex);
• Section 504 of Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits
discrimination on the basis of disability); and 49 CFR Part 27;
• The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits
discrimination on the basis of age);
• Airport and Airway Improvement Act of 1982, (49 U.S.C. § 471, Section 47123), as amended,
(prohibits discrimination based on race, creed, color, national origin, or sex);
• The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and
applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and
Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs or
activities" to include all of the programs or activities of the Federal -aid recipients, sub -recipients and
contractors, whether such programs or activities are Federally funded or not);
• Titles II and III of the Americans with Disabilties Act, which prohibit discrimination on the basis of
disability in the operation of public entities, public and private transportation systems, places of public
accommodation, and certain testing entities (42 U.S.C. §§ 12131-12189) as implemented by
Department of Transportation regulations at 49 C.F.R. parts 37 and 38;
• The Federal Aviation Administration's Non -Discrimination statute (49 U.S.C. § 47123) (prohibits
discrimination on the basis of race, color, national origin, and sex);
• Executive Order 12898 , Federal Actions to Address Environmental Justice in Minority Populations
and Low -Income Populations, which ensures discrimination against minority populations by
discouraging programs, policies, and activities with disproportionately high and adverse human health
or environmental effects on minority and low-income populations;
• Executive Order 13166, Improving Access to Services for Person with Limited English Profcency,
and resulting agency guidance, national origin discrimination includes discrimination because of
limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable
steps to ensure the LEP person have meaningful access to your programs (70 Fed. Reg. at 74087 to
74100);
• Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating
because of sex in education programs or activities (20 U.S.C. 1681 et seq).
Packet Pg. 115
EXHIBIT A — SCOPE & FEE ESTIMATE
2.6.a
Project Name: Phase 14 Waterline Replacement Project Job #: 23-042
Effective Date: February 28, 2023
Project Description
The Blueline Group, LLC ("Blueline") will provide engineering services for Edmonds' Phase 14 Waterline
Replacement Project ("Project") generally consisting of the replacement of ±3500 LF of existing water
main with 8-inch and ±450 LF 12-inch diameter ductile iron (DI) pipe at the following locations:
Site A — 71h Ave S (Walnut St — Cedar St), Walnut St (71h Ave S — 91h Ave S), Cedar St (7th Ave S — 739 Cedar
St)
Site B —185th PI W/186th St SW (88th Ave W — 84th Ave W)
The design will consist of water main, fire hydrants, connections to existing mains, water services, other
appurtenances, and surface restoration. Blueline will provide topographic base mapping, geotechnical
investigation, design drawings, specifications, engineer's estimates (PS&E) and bidding and construction
support services as outlined herein.
These two sites were designed up to the 90% submittal level as part of previous waterline replacement
projects, Phase 11 for Site A and Phase 12 for Site B. The design for these two sites will need to be
updated to reflect current site conditions, geotechnical exploration and groundwater level
determination, and comments from the City of Edmonds. A 90% resubmittal, reflecting any needed
updates and original comments from the City, will be prepared by Blueline for review by City staff.
Task Summary
Task 001
Project Management
Task 002
Geotechnical Investigation
Task 003
Water System Design
Task 004
Bidding Assistance
Task 005
Construction Support
Task 006
Potholing Reserve
Task 007
Management Reserve
1
Packet Pg. 116
EXHIBIT A — SCOPE & FEE ESTIMATE
2.6.a
Project Schedule
Our Team shall begin work immediately upon receipt of Notice to Proceed and proceed according to the
attached Project Schedule. This schedule reflects the Client's desire to complete construction in 2024.
Key dates include:
Notice to Proceed............................................................................................... April 2023
Geotechnical Explorations.......................................................................... May/June 2023
90% Design Submittal..................................................................................... August 2023
Final Design Submittal................................................................ October/November 2023
Bidding & Award............................................................................................ January 2024
Construction Begins......................................................................................... Spring 2024
Scope of Work
Blueline's scope of work for the project is outlined on the following pages.
Packet Pg. 117
EXHIBIT A — SCOPE & FEE ESTIMATE
2.6.a
Task 001 Project Management
This task is for general coordination and meetings on the project, including plan review/ discussion
meetings, in-house quality assurance, coordination with subconsultants, etc. Blueline will prepare
monthly invoices for work performed during the previous month.
Task 002 Geotechnical Investigation
HWA Geosciences, Inc. will provide Geotechnical Engineering Explorations and Report in accordance
with the attached scope of work.
Task 003 Water System Design
Using the base maps provided from the Phase 11 and Phase 12 Waterline Replacement Projects,
Blueline will produce design plans, engineer's estimate, and specifications (PS&E) for the Project. The
services under this task will include:
• Kick off meeting with the City to review latest comments on project Sites from Phase 12.
• Layout and location of ±3950 LF of new DI water mains.
• Design of fire hydrants, replacement of water services (to the existing water meter), connection
to the existing system, and other associated appurtenances with the selected site limits.
• Separating the PS&E into multiple schedules (A & B).
• Coordination with franchise utility companies during design.
• Prepare plan & profile split sheets for the proposed water main improvements.
o Water design will be shown in plan and profile per City standards.
o Sheets to be 22"x34" with roughly an 18"x28" drawing area.
o Scale for these drawings it to be 1"=20' horizontal and 1"=5' vertical.
o We estimate that ±25 plan sheets will be required.
• Show details necessary for construction of the improvements, utilizing City standard water
details and developing specialized details, as necessary.
• Provide general temporary erosion and sedimentation control notes and details, as necessary.
• Prepare technical specifications, including Proposal, Contract Forms, General Conditions, and
• Measurement and Payment in WSDOT format, using City -provided standard specifications when
• available.
• Prepare Quantity Take -Off Spreadsheet with quantities broken down by plan sheet.
• Prepare 90% and Final Design stage submittals.
• Review meeting with City staff at each stage of the design and incorporate City comments into
next submittal.
• Constructability review and QA/QC.
3
Packet Pg. 118
2.6.a
EXHIBIT A — SCOPE & FEE ESTIMATE
Deliverables: 90% Design Submittals: PDF of Plans, Specifications, and Engineer's Estimate.
Word document of Design Memo.
Final Design Submittal: PDF of Plans, Specifications, Engineer's Estimates, plus
all documents in digital format (including ACAD files).
Task 004 Bidding Assistance
Blueline will provide consultation services during the bidding process, including:
• Attend Pre -Bid Conference and address questions from prospective bidders, if necessary.
• Prepare and issue addenda to clarify the construction documents, if necessary. Consultant will
not charge for addenda if they are needed to correct or clarify errors or omissions in the bid
documents.
• Generally assist the City during the bidding process as needed.
Deliverables: Addenda if necessary.
Assumptions: The City will upload the bid documents to Builder's Exchange, conduct the bid
opening, prepare the bid tabulation, review apparent low bidder references,
and prepare recommendation for contract award.
Task 005 Construction Support
Blueline will provide construction support services for this Project during the construction period.
Blueline will closely coordinate construction management activities with the City's staff and field
inspector. Services under this task are anticipated to include:
• Prepare for and attend the pre -construction conference.
• Review requests for information (RFIs) provided by the Contractor and coordinate responses to
RFIs with the City.
• Provide changes to drawings or specifications as necessary to respond to field conditions or RFIs.
• General consultation and coordination on an as -needed basis. Address construction questions as
they arise.
• Prepare As-Builts in AutoCAD.
Deliverables: RFI responses, if necessary, As-Builts provided electronically, transmit and
provide Utility data and PDF to City's GIS group.
Assumptions: Construction inspection and administration services are not included.
Task 006 Potholing Reserve
This task provides an allowance for Potholing utility crossing locations with the existing power,
communications, water, storm, and sewer utilities during the Design Phase in order to determine the
typical depth of the water main crossings, and pavement thickness. This task would include coordinating
4
Packet Pg. 119
EXHIBIT A — SCOPE & FEE ESTIMATE
2.6.a
with a utility potholing company that provides this service and will include Blueline and/or the potholing
company obtaining necessary right-of-way permits. Fee estimate is based on ±10% of Tasks 001— 005
Any funds under this item are not to be used unless explicitly authorized by the City in writing.
Assumptions: Any applicable ROW permit fees to be paid by the City.
Task 007 Management Reserve
This task provides for unanticipated services deemed to be necessary during the course of the Project
that are not specifically identified in the scope of work tasks defined above. Any funds under this item
are not to be used unless explicitly authorized by the City in writing. Fee estimate is based on ±10% of
Tasks 001— 006.
5
Packet Pg. 120
EXHIBIT A — SCOPE & FEE ESTIMATE
2.6.a
General Assumptions and Notes
• Scope and fees outlined above are based on the Project Description included in this proposal as
well as the following information (any changes to these documents may result in changes to the
fees):
a. Scoping instructions and site maps emailed by the City of Edmonds February 6, 2023
b. City of Edmonds GIS records.
c. Telephone/email conversations with the City prior to the date of this agreement.
• We do not anticipate that environmental services will be necessary for this Project as work is
anticipated to be completed in the paved areas of roadways outside of sensitive areas and
buffers. If it is determined during the design phase that environmental services are needed, we
will provide an Additional Services Authorization request for that effort.
• We do not anticipate SEPA being required, and is therefore excluded.
• We do not anticipate that traffic control plans, drainage calculations or reports, dewatering
plans, electrical plans, or structural engineering plans will be necessary for this project, and are
therefore not included. Should these services become necessary, we will provide an Additional
Services Authorization to the City to retain subconsultants for those efforts.
• Project stops/starts and significant changes to the Project Schedule may result in changes to the
fees provided above and a separate fee proposal will be provided.
• Agency fees (if any) are not included as part of the fees outlined above.
• Temporary Construction Easements are not included. If required, construction easement
preparation and negotiation will be an additional service. It is assumed the City will coordinate
directly with property owners with existing easements where work will be performed.
• The fees stated above do not include reimbursable expenses such as large format copies (larger
than letter/legal size), mileage, and plots. These items will be billed under a separate task called
Expenses.
• Time and expense items are based on The Blueline Group's current hourly rates.
• Blueline reserves the right to move funds between approved Tasks 001— 006 as necessary
based on approved scope of work provided the overall budget of Tasks 001— 006 is not
exceeded. The City Project Manager shall provide written authorization prior to moving funds.
• If the Client requests Blueline's assistance in complying with any public records request,
including without limitation providing copies of documents and communications, Client will pay
Blueline's hourly fees and costs incurred in providing such assistance at then -current rates. Such
fees and costs will be billed as a separate task and will be in addition to the maximum or total
fees and costs stated in the agreement to which this scope of work as attached
6
Packet Pg. 121
Phase 14 Waterline Replacement
Job Number: 23-042 Prepared By: Grace Garwin, EIT
Date: 3/6/2023 Checked By: Rob Dahn, PE
2.6.a
c
m
E
Senior Project Project Engineer I Senior Engineering
Manager Engineer Designer
$240/hr $215/hr $190/hr $190/hr
Task # Base Tasks Total Fee Fee Type
Hours Hours Hours Hours Total Hours
001 Project Management and Coordination
002 Geotechnical Investigations
003 Water System Design
004 Bidding Assistance
005 Construction Support
006 Potholing Reserve
007 Management Reserve
Expenses
30
18
0
0
32
42
50
104
6
10
6
4
9
12
6
24
Total Hours 77 82 62 132
Blueline Personnel $18,480 $17,630 $11,780 $25,080
48
$11,070
Not to
Exceed
a�
N
c
$29,730
Not to
Exceed
0
T
228
$45,970
Not to
Exceed
L-
a.
4-
0
26
$5,490
Not to
Exceed
r-
0
r
0
51
$10,440
Not to
Exceed
a�
N
N
$10,000
Not to
Exceed
L
a
$11,000
Not to
Exceed
r
c
.N
$1,500
Not to
Exceed
353
$125,200
m
Q
a
c
m
E
0
r
a
E
U
2
a
Packet Pg. 122
2.6.a
001 Project Management and Coordination Senior Project Project Engineer Engineer I Senior Engineering Total Hours
Manager Designer
Item # Description $240/hr $215/hr $190/hr $190/hr
Hours
Hours
Hours
Hours
1
Coordination with City
12
12
24
m
E
2
Monthly Invoices/ Progress Reports
12
12
L
3
General Project Coordination
6
6
12
Q
Total Hours
30
18
0
0
48
N
Total Fee
$7,200
$3,870
$0
$0
$11,071
.02
a�
002
Geotechnical Investigations
Total Cost (HWA
Blueline Markup
Total
c
Geosciences)
N
U)
Item #
Description
10%
o
L
IL
1
Geotechnical Investigation
$27,026
$2,703
0
Total Fee
$27,026
$2,703
$29,731
c
r
R
r
c
a�
N
N
L
a
003
Water System Design
Senior Project
Project Engineer
Engineer I
Senior Engineering
Total Hours
r
Manager
Designer
�
c
Item #
Description
$240/hr
$215/hr
$190/hr
$190/hr
.N
Hours
Hours
Hours
Hours
1
Kick -Off Meeting (review previous comments)
2
2
4
2
90% Plans
1
8
6
64
79
a�
3
90% Specifications
1
4
8
13
3
4
90% Engineer's Estimate
1
2
12
15
00
5
Final Plans
1
8
4
40
53
Q
6
Final Specifications
1
8
6
15
a
7
Final Engineer's Estimate
1
4
8
13
8
Review Meeitng w/ City (Incl. Prep Time)
4
4
4
12
r
9
Constructability Review & QA/QC
20
20
E
10
Design Memos
2
2
4
t
M
Total Hours
32
42
50
104
228
Q
Total Fee
$7,680
$9,030
$9,500
$19,760
$45,971
a�
E
t
U
r
Q
Packet Pg. 123
Senior Project
Senior Engineering
2.6.a
004
Bidding Assistance
Project Engineer
Engineer I
Total Hours
Manager
Designer
Item #
Description
$240/hr
$215/hr
$190/hr
$190/hr
Hours
Hours
Hours
Hours
1
Answer Bidder Questions as necessary
1
4
4
9
m
E
2
Prepare and Issue Addenda as necessary
1
2
2
4
9
L
3
General Assistance to the City
4
4
8
Q
Total Hours
6
10
6
4
26
y
Total Fee
$1,440
$2,150
$1,140
$760
$5,490
.0
a�
Senior Project
Senior Engineering
c
005
Construction Support
Project Engineer
Engineer I
Total Hours
O
Manager
Designer
N
Item #
Description
$240/hr
$215/hr
$190/hr
$190/hr
Hours
Hours
Hours
Hours
o
1
Attend Pre -Construction Conference (incl. Prep Time)
2
2
4
a
0
2
Review RFIs and Provide Responses
1
4
2
7
c
3
Prepare Field Changes if necessary
1
2
8
11
O
4
General Assistance to the City
4
2
6
R
5
Provide As-Builts in ACAD based on Inspector Redlines
1
2
4
16
23
Total Hours
9
12
6
24
51
a
Total Fee
$2,160
$2,580
$1,140
$4,560
$10,441 -
r
C
O
006
Potholing Reserve
Total Cost
Total
Item #
Description
W
a�
c
1
Unassigned Services Reserve
$10,000
W
Total Fee
$10,000
$10,001 m
a
007
Management Reserve
Total Cost
Total a
Item #
Description
1
Unassigned Services Reserve
$11,000
r
c
m
E
Total Fee
$11,000
$11,001
M
r
a
E
U
a
Packet Pg. 124
GEOSCIENCES INC.
DBEIMWBE
March 2, 2023
HWA Project No. 2021-158-21
Blueline
25 Central Way, Suite 400
Kirkland, Washington 98033
Attn: Robert Dahn, P.E.
Subject: GEOTECHNICAL ENGINEERING SERVICES
City of Edmonds —Phase 14 Waterline Replacement Project
Edmonds, Washington
Dear Mr. Dahn:
Thank you for the opportunity to present this proposal for HWA GeoSciences Inc. (HWA) to
provide consulting services for the City of Edmonds -Phase 14 Waterline Replacement Project.
HWA understands that the project consists of providing professional services to the Public
Works Engineering and Operations Division in finalizing the Phase 14 project. This scope will
include drilling of three geotechnical borings to determine groundwater information, drilling up
to 5 pavement cores, and generation of a geotechnical data report. Below we present our
proposed scope and fee.
SCOPE OF WORK
HWA scope of work will be to perform geotechnical borings and pavement cores to provide
groundwater information and pavement thicknesses for pipeline installation. Geotechnical
explorations will be limited to one day of geotechnical borings, in which HWA expects to
complete 3 borings, and two days of pavement coring, in which HWA expects to complete 5
pavement cores. Logs of these geotechnical borings and pavement cores will be provided in a
geotechnical data report. Our services will consist of the following subtasks:
• Plan and Prepare Exploration Program for Borings and pavement cores within the
City right of way: HWA will plan and coordinate the field exploration program for this
project. A work plan to perform 3 geotechnical borings and 5 pavement cores along the
alignment will be prepared and submitted to the City for approval. Depth of boreholes
will be about 10-15 feet.
• Obtain City of Edmonds Street Use Permit: HWA will work with the City of Edmonds
to generate appropriate traffic control plans for the proposed drilling. Borings will be
performed within side parking area or road shoulders when possible. However, we
assume that subsurface utilities may require HWA to drill within the roadway travel
lanes. Pavement cores will be completed within the travel lanes. We anticipate that
Packet Pg. 125
2.6.a
March 2, 2023
HWA Project No. 2021-158-21
WSDOT standard traffic control plans, requiring lane closures with flaggers, will be
adequate for this project. We assume that all required street use permits will be provided
by the City at no cost to HWA. HWA will coordinate with a flagging subcontractor to
complete this phase of work where necessary.
• Complete Utility Locates: HWA will notify the one -call utility have underground utilities
located in the vicinity of the proposed borings and pavement cores.
• Conduct Geotechnical Borings: A truck -mounted drill rig equipped with hollow -stem
auger will be used to drill 3 borings along the alignment. Standard Penetration Test (SPT)
samples will be taken at 2-1/2 to 5-foot intervals throughout each boring. All borings
will be monitored and logged under full-time observation of an HWA representative.
The boring will be drilled by a licensed geotechnical driller under subcontract to HWA.
Each boring will be drilled through an 8-12-inch diameter hole through the pavement.
The pavement at each boring location will be repaired with fast setting non -shrink grout
such as Blue -Line Non -Shrink grout, or equivalent.
• Pavement Cores: HWA will conduct up to 5 pavement cores to assess pavement
thickness along the project alignments. Three pavement cores will be drilled along 85"
Place SW and 861h Street SW. One pavement core will be completed within 7th Avenue S
and one along cedar Street. All pavement cores will be drilled with a 6-inch diameter
core barrel and will be patched with fast setting non -shrink grout such as Blue -Line Non -
Shrink grout, or equivalent.
• Generate Boring and Core Logs: Samples retrieved from the borings will be sealed in
plastic bags and taken to our Bothell, Washington laboratory for further examination.
Soil and groundwater information will be presented in summary boring logs that will be
generated upon completion of our exploration program.
• Quality Assurance / Quality Control: HWA will have all exploration data presented in
the geotechnical data report reviewed by a principal prior to distribution to the design
team or the city.
• Draft and Final Geotechnical Data Report: We will prepare draft and final
geotechnical data reports presenting the results of our studies. Our reports will include
boring logs, pavement core logs, and a site and exploration plan.
• Project and Contract Management. We will prepare monthly invoices, and progress
reports if required. We will correspond with Blueline /City of Edmonds in the form of
emails, fax, and telephone calls, as necessary. We will provide project management
for the geotechnical engineering subtasks, and we will coordinate with and manage
all our subcontractors.
ASSUMPTIONS/CONDITIONS
The following assumptions were made as part of the development of the proposal for this phase:
Edmonds -Phase 14 Waterline Replacement 2 HWA GeoSciences Inc.
Packet Pg. 126
2.6.a
March 2, 2023
HWA Project No. 2021-158-21
• All required exploration permits will be provided to HWA by the City of Edmonds at no cost
to HWA.
• HWA will apply for the necessary ROW use permits (including up to two (2) traffic control
plan revisions.
• HWA will contract with a subcontractor to perform the borings. The borings and pavement
cores will be conducted during workday hours (8AM to 5PM) with no work hour restrictions,
• No piezometers or groundwater monitoring wells will be installed as part of this
investigation.
• The geotechnical explorations proposed herein will NOT be used to assess site environmental
conditions. However, visual, or olfactory observations regarding potential contamination
will be noted. Analysis, testing, storage, and handling of potentially contaminated soil and
ground water (either sampled or spoils from drilling) are beyond this scope of services. If
contaminated soils and/or ground water are encountered, the material will be properly
contained on -site for disposal as mutually agreed upon without additional cost to HWA.
• All non -contaminated drilling spoils and related debris will be drummed on site and
transported off site for disposal by the drilling subcontractor.
All geotechnical borings and pavement cores, with diameters less than 12-inches, drilled
through existing pavement, will be patched with fast setting non -shrink grout.
• Only geotechnical data from geotechnical exploration will be reported. No geotechnical
recommendations and analysis will be included.
PROJECT BUDGET
We estimate that the scope of services proposed herein will require a budget of $27,026 to
accomplish, as detailed on the attached project cost estimate spreadsheets. We will not exceed
the above cost estimate without your prior authorization. However, if during the evaluation of the
available data or during our field exploration unanticipated subsurface conditions are revealed
which would require a level of effort beyond the scope of our study, we will contact you
immediately to discuss any necessary modifications to our scope of services and/or budget
estimate.
The budget presented in this proposal reflects an estimate based on our current understanding of
the project requirements for a scope of work developed from information provided. HWA
reserves the right to transfer hours and budget dollars between tasks to satisfy project
requirements. Our budget also reflects estimated direct costs to the project for testing, drilling,
equipment rental etc. HWA may also transfer funds allocated for direct costs to
professional/technical hours or vice versa, to satisfy project requirements.
O.O
Edmonds -Phase 14 Waterline Replacement 3 HWA GeoSciences Inc.
Packet Pg. 127
2.6.a
March 2, 2023
HWA Project No. 2021-158-21
Thank you again for the opportunity to provide this proposal for the City of Edmonds — Phase 14
Waterline Replacement geotechnical engineering services. Should you have any questions
regarding this proposal, or require additional services, please contact us at your convenience.
Sincerely,
HWA GEOSCIENCES INC.
cp-oyll�w -4. *J�
Donald J. Huling P.E.
Principal Geotechnical Engineer
Attachments: Project cost estimate
Edmonds -Phase 14 Waterline Replacement 4 HWA GeoSciences Inc.
Packet Pg. 128
2.6.a
Project Cost Estimate HWA Ref: 2021-158-21
City of Edmonds -Phase 14 Waterline Replacement ■ ■ +► � GEOSCIENCLS NC. Date: 2-Mar-23
Edmonds, Washington i�l �ii1 ogFJMwgE Prepared By: DJH
Prepared for Blueline, Attn: Robert Dahn Reviewed By: SEG
Revised:
Scope of Work
Refer to the attached scope
ESTIMATED HWA LABOR:
WORK TASKS
DESCRIPTION
PERSONNEL & 2023 BILLING
RATES
Principal
IX
Geotech.
Eng. VII
Geotech.
Eng. IV
Geotech.
Eng. II
Geologist
III
CAD
Contract
Admin.
TOTAL
HOURS
TOTAL
AMOUNT
$290.00 $300.00
$169.00
$135.00
$127.00
$112.00
$155.00
Project Setup
1
1
2
$455
Obtain/review existing eotechnical data and site visit
1
1
1
3
$408
Plan and prepare field exploration program
1
2
3
$423
Prepare Traffic Control Plans
2
1
3
$465
Obtain city street use permit
2
2
$254
Conduct utility locates
3
1
3
$381
Conduct borings 1 day)
10
10
$1,270
Conduct Pavement Cores 2 day)
16
16
32
$4,192
Prepare boring and Pavement Core Summary Los
2
3
3
8
$1,124
HWA QA/QC
1
1
1 1
$300
Draft and Final Geotechnical Data Report:
3
6
6
4
19
$3,124
Consultation /Project Management
5
1
1
2
7
1
$1,810
TOTAL LABOR CHARGES:
0
10
12
19
1 44
1 5
1 3
93
1 $14,206
ESTIMATED DIRECT EXPENSES:
Mileage @ 0.65/mi 4 round trip at 20mile/trip
$90
Traffic Control (Fla ers/Arrow board/Si s/Etc.) - 3 day$6,000.00
DrillingSubcontractor - 1 day$5,500.00
LaboratoryTesting$750.00
Non -shrink Grout @ $60/hole
$480
TOTAL DIRECT EXPENSES:
$12,820
PROJECT TOTALS AND SUMMARY:
Assumptions:
1. All costs are estimated, and may be increased or decreased within the limits of the total budget at the discretion of HWA's project manager. The HWA project manager may also transfer funds
allocated for direst costs to professional/technical hours, and vice versa, as he/she determines appropriate.
2. Access to the site and all required exploration permits will be provided to HWA by the City of Edmonds at no cost to HWA.
Total Labor Cost
$14,206.00
Direct Expenses
$12,820
GRAND TOTAL:
$27,026
HWA 2023 Budget REV 1 Packet Pg. 129
Phase 14 (2024) Water Replacement Project Sites
2.7
City Council Agenda Item
Meeting Date: 03/14/2023
Presentation of Professional Services Agreement with Transpo Group for the Transportation Plan
Update
Staff Lead: Rob English
Department: Engineering
Preparer: Emiko Rodarte
Background/History
On November 7th, 2022, a Selection Committee interviewed Transpo Group, the only consultant that
submitted an RFQfor this project. Following the interview, the selection panel chose this consultant for
this project due to their extensive experience completing Transportation Plans for other agencies, as
well as their experience working on Multimodal Level of Service.
Staff Recommendation
The item is scheduled for a presentation at the March 21, 2023 City Council meeting.
Narrative
Staff is preparing to begin the update to the City's Transportation Plan in coordination with the
upcoming Comprehensive Plan Update. Under the Growth Management Act (GMA), the City should
perform a major update to the Transportation Plan every six to eight years and the last update was
completed in 2015.
The main objective of the Plan is to identify short-range and long-range strategies that lead to the
development of an integrated multimodal transportation system that facilitates the safe and efficient
movement of people and goods while addressing current and future transportation demand and land
use. The proposed update includes a significant change since it will establish a new multimodal level of
service in place of the previous vehicle level of service at signalized and stop -controlled intersections.
Developing a multimodal level of service will require evaluation of different strategies, policies and
programs to build the framework to implement the new level of service standard. The new program will
also require administrative guidelines, staff training and a concurrency ordinance.
The Transpo Group has prepared a draft scope of services (attachment 1) to complete the
Transportation Plan update. The scope of services includes the following tasks:
1. Goals/Policies Audit and Existing Conditions Inventory
2. Multimodal Level of Service Standard and Transportation Concurrency Management Program
3. Travel Demand Model Update and Forecasted Needs
4. Transportation Systems Improvement Projects / Programs
5. Transportation Finance Program and Impact Fee Rate Schedule
6. Transportation Plan Documentation
Packet Pg. 131
2.7
7. Project Team/Agency Coordination and Public Involvement Support
More detailed information on each task can be found in attachment 1. Staff is currently finalizing the
scope of services and negotiating the fee with the consultant. The cost of the Transportation Plan
update is funded by the 112 Street Fund and will be coordinated with the City's Comprehensive Plan
Update.
Attachments:
Attachment 1- Scope
Packet Pg. 132
2.7.a
Attachment 1 - Scope of Services - DRAFT
Client Name:
Project Name
Exhibit Dated:
Scope of Services
City of Edmonds
Transportation Plan Update
February 23, 2023 TG: 1.22355.00
Based on discussions with City staff and an initial review of the 2015 Transportation Plan, Transpo Group
has prepared the following scope of services in preparing the Transportation Plan Update to support the
City's 2024 Comprehensive Plan Update. The primary study area will be the City and its Urban Growth Area
(UGA).
The scope of services covers the following seven tasks:
1. Goals/Policies Audit and Existing Conditions Inventory
2. Multimodal Level of Service Standard and Transportation Concurrency Management Program
3. Travel Demand Model Update and Forecasted Needs
4. Transportation Systems Improvement Projects/Programs
5. Transportation Finance Program and Impact Fee Rate Schedule
6. Transportation Plan Documentation
7. Project Team/Agency Coordination and Public Involvement Support
The consultant will be supported by City staff in conducting and review of the various work elements. Data
needs and support from the City are identified for each task.
Transpo will participate in up to 21 meetings throughout the Transportation Plan Update, as described in
each task deliverable below.
Task 1. Goals/Policies Audit and Existing Conditions Inventory
Transpo will review the City's existing transportation goals and policies to identify inconsistencies with
PSRC's regional goals and policies, as well as potential area that may change due to the City's updated
multimodal level of service standard or updated financing strategies. This policy review will consider equity,
greenhouse gas emissions reductions and other newly introduced GMA/PSRC policies.
This task will also update the existing conditions inventory and analysis documented in the current 2015
Transportation Plan. It will build off of the City's existing data, GIS, and recent and ongoing transportation
studies. It will also incorporate results from the expanded and updated traffic operations analyses. It will
highlight changes since the last Transportation Plan was adopted.
Subtask 1A — Transportation Goals/Policy Audit
The consultant will conduct a review of the City's existing transportation policies and goals. We will identify
areas that may need revisions or strengthening based on updates since the 2015 Transportation Plan and
consistent with PSRC's Vision 2050.
Subtask 1 B — Review Existing Studies and Plans
The City will provide available transportation and land use studies and plans for use by the consultant. These
will include subarea plans, corridor transportation studies/plans, development traffic impact studies, aerial
photographs, GIS datasets, and similar materials. The consultant will extract relevant information for the
update of the Transportation Plan. We will discuss potential changes since the time the prior studies were
conducted.
N
Page 1
Packet Pg. 133
2.7.a
Subtask 1 C — Assemble and Analyze Traffic Data
In order to establish a solid foundation for the Transportation Plan, the consultant will assemble and analyze
key transportation system data. The data will be collected from the City of Edmonds, WSDOT, Snohomish
County, adjacent jurisdictions (Lynnwood, Mountlake Terrace, and Shoreline, Community Transit, Sound
Transit, and other sources, as applicable. The focus of this task will be to update the inventory to reflect
changes to the transportation system since the prior Transportation Plan was prepared.
The following highlights key work elements of this subtask.
Roadway and Intersection Inventory
The consultant will summarize the existing system of roadways and intersections within the City and its UGA
and adjacent study area. Much of the information will be available from existing plans, Geographic
Information Systems (GIS), other City data, or aerial data sets.
Traffic Volume Data
Existing recent traffic counts will be assembled from the City, WSDOT, and Snohomish County, and other
adjacent jurisdictions. These will be obtained from prior traffic impact studies and data collection conducted
as part of other city, state, or county studies. Additional PM peak hour traffic counts will be collected to
supplement the available traffic volume data. The consultant will collect up to 30 peak hour turning
movement counts (2-hour periods) at study area intersections for use in the evaluation of traffic trends and
travel patterns (PM peak hour counts with several intersections with AM peak hour counts as well). These
counts will also include pedestrian and bicycle activity at each intersection which will be assessed as part of
the Pedestrian and Bicycle Facilities work component below. Up to 10 additional daily tube counts will also
be collected. The count locations will be coordinated with the City. The counts will be conducted by a traffic
count vendor.
Traffic Operations Analysis
Existing traffic operations analysis will be performed to document the current state of the vehicle
transportation system. For budgeting purposes, it is assumed that the consultant will be responsible for
coding up to 30 intersections in the model. Using Synchro and Sidra operational models, existing levels of
service and delay will be calculated.
3rd Party Transportation Data Analysis (Big Data)
An origin -destination study will be conducted at up to 20 districts using Streetlight. This information will
provide an understanding of travel patterns for motorized users within the study area and along state
highways that will be essential to calibrating the forecast travel demand model. Additionally, data from
Replica will be analyzed to highlight existing non -motorized travel patterns and conduct demographic
analysis within Edmonds.
Collision Data
The consultant will assemble and analyze collision data from the City, adjacent jurisdictions, WSDOT and
Snohomish County for the City and its Urban Growth Area (UGA). The data will cover the most recent five-
year period. The primary types and possible causes of the collisions will be identified. Collisions involving
pedestrians or bicyclists will also be documented.
Rail
We will work with the City and the railroad to document the number and type of trains traveling through the
City and its UGA that affect traffic operations in the City and its UGA.
Transit Service, Ridership, and Transportation Demand Management Programs
We will update the inventory of existing transit routes and facilities serving Edmonds. As available, we will
document existing transit ridership. We will also document locations and utilization of park -and -ride lots
serving the City. Current paratransit services, commute trip reduction, and other rideshare programs will also
be summarized.
Pedestrian and Bicycle Facilities
N
C
O
A
a�
a�
a
O
U
Page 2
Packet Pg. 134
2.7.a
Based on the City's existing plans and data and discussions with City staff, the consultant will document
changes to the pedestrian and bicycle facilities since the prior Transportation Plan was prepared This will
leverage the City's current Walkway and Bicycle Plans.
Transportation Improvement Plans
The City's current Six -Year Transportation Improvement Program (TIP) will be reviewed and summarized.
This will provide the baseline for the evaluation of future conditions within the City. The consultant also will
document WSDOT, Snohomish County, and other agency improvements that may be applicable for the
Transportation Plan Update.
City Support:
• Geographic Information Systems (GIS) base layers (aerials, streets, speed limits, intersections,
sidewalks, functional class, etc.)
• Copies of available transportation and land use studies and plans
• Copies of recent development traffic impact studies
• Traffic signal timing for City signals
• City accident data
• City TIP and other improvement project descriptions and status
Consultant Deliverables
• List of suggested goals/policies edits
• Updated traffic operations model
• Maps and tables summarizing the existing transportation facilities
• 3rd Party Data (Streetlight, Replica and/or INRIX) travel data for motorized and non -motorized users
Task 2. Multimodal Level of Service Standard and Transportation
Concurrency Management Program
Transpo will work with the City to develop multimodal level of service (LOS) standards and transportation
concurrency management (TCM) program tailored to the City's goals and policies, land use plan, and as well
as available staff and data resources. This task will identify and evaluate different options for measuring
levels of service, identify a preferred option, and develop implementation tools and guidelines for the
preferred strategy. Implementation tools for the multimodal LOS standard are anticipated to be a major focus
of this effort.
Subtask 2A — Define Program Objectives and Framework
Transpo will review and evaluate the City's current LOS standard and concurrency policies. Transpo will then N
help the City define the primary objectives for the LOS standards and concurrency management program. o
These primary objectives will help guide the update of both the LOS standards and concurrency A
management program.
o:
Explore Objectives and Strategies a
We will further explore the City's objectives for the LOS/TCM program and provide several alternative 0
strategies to consider. Alternative LOS/TCM program options will require different levels of staffing and data N
resources from the City to set up and operate. In defining program objectives, the level of resources that the IL
City has will be an important consideration in the selection of the preferred program.
Compare LOS/TCM Programs
We will summarizing LOS standards/TCM programs of other cities in Western Washington. This summary
will be used to help develop a set of potential LOS standard/TCM program alternatives. These alternatives
will be evaluated based on their adherence to the City's broad objectives in the following subtask.
Draft Program Framework
Based on the City's desired program objectives, a draft framework for the program would be established, but
would be refined as part of the subsequent tasks.
Page 3
Packet Pg. 135
2.7.a
Subtask 2B — Define LOS Standard and Methods
Transpo will summarize potential LOS and concurrency program options and identify how the options match
the primary objectives, as well as how various performance measures may be used to help meet the overall
goals identified in the Transportation Plan. This will result in draft recommendations for refining the LOS
standards and concurrency program.
LOS Standard Refinements/Revisions
Define possible revisions or refinements to the LOS standards to better support the overall objectives of the
TCM program.
Type of Measurement Tools
Define and compare the type of measurement tools and calculation methods that could be used as a basis
for the LOS standards.
Draft Standards & Methodology
Based on the direction from the City, we will develop a draft program for LOS standards and evaluation
methodology. The LOS standards will be used as part of the needs assessment to identify transportation
projects within the City and UGA. In addition, the LOS standards will be critical in tracking transportation
concurrency as discussed below.
Planning Board/Council Meetings — Transpo will present at two Planning Board/City Council meetings. It is
anticipated that the first meeting would occur at the beginning of LOS update process and the second
meeting near the end of the process.
Subtask 2C — Transportation Impact Analysis Guidelines
Transpo will update the City's Transportation Impact Analysis Guidelines to reflect the multimodal LOS
standards, typical site development review needs, and right -size to City resources.
Subtask 2D — Concurrencv Proaram
Based on results of the evaluation, and direction from the City staff completed earlier, Transpo will fully
develop the methodology and tools for Edmond's new multimodal transportation concurrency management
program.
Draft Program Administrative Guidelines
The administrative guidelines will outline the concurrency management program and highlight the process by
which the City evaluates and monitors concurrency. The program will develop a process to track
development projects and process concurrency applications and certificates.
Concurrency Ordinance
Transpo will develop a transportation concurrency management ordinance based upon the outcomes of the
previous tasks. The ordinance will be consistent with City processes and formats and will address the
following types of issues:
• When is concurrency tested?
• How does the applicant obtain concurrency?
• Should there be administrative fees for concurrency?
• What will the appeal procedures be?
Case Study and Staff Training
Transpo will use an actual or likely range of development activity (commercial, multi -family and residential) to
highlight how the tool would work during the City's development review process and train staff on reviewing
and tracking applications, concurrency testing, and issuing concurrency certificates. Transpo will provide
documentation, including information on updating the concurrency program in the future.
City Support. -
Input on current concurrency and development review programs
N
C
O
A
a�
o:
as
a
O
U
Page 4
Packet Pg. 136
2.7.a
• Direction/comment on Level of Service options
Consultant Deliverables
• Five meetings with the Planning Board and/or City Council to review program options
• Technical memorandum documenting preferred LOS/TCM methodology
• Draft and Final Administrative Guidelines
• Draft and Final Concurrency Ordinance
Task 3. Travel Demand Model Update and Forecasted Needs
An updated travel demand forecasting model will be developed covering the City and its UGA. The model will
be prepared using the Visum software platform. The software will not be purchased for the City; however, the
model files will be provided to the City for future use. The model will be based on weekday PM peak hour
conditions. The base year for the calibration model will be 2022/23. The forecast year of the model will be
2044, consistent with the Comprehensive Plan Update.
Development of the model will include the following items:
Subtask 3A — Define Transportation Analysis Zone (TAZ) Structure
TAZs will be established for the City and its UGA and immediately adjacent areas of unincorporated
Snohomish County. The TAZs will be based on a review of the land use element, existing and planned
transportation system, and topography and natural features. The City's TAZ structure will be consistent with
the TAZs in Snohomish and PSRC models to the extent possible. The TAZ structure will account for growth
and development as informed by the City and project team.
Subtask 3B — Assemble Existing and Forecast Land Use
Land use data for base year and future year will be assembled for each TAZ based on land use provided by
the City. The land use data will be stratified into households, employment, and students. The forecasts will
be based on the City's Comprehensive Plan land use forecasts. The consultant will provide the land use by
TAZ in GIS/spreadsheet format to City staff for review and refinement.
Subtask 3C — Develop Base Year Model
This task involves developing the base year travel demand model that reflects current conditions. The base
year travel demand model will be developed using the Visum software platform.
Model Network ci
The consultant will code the existing transportation system serving the City into the Visum software. The =
0
network will include the State highway; principal, minor and collector arterials; and selected neighborhood rn
collector and local roads. >
a�
External Travel Patterns
The O-D study conducted in Task 1 will provide a better understanding of the major traffic patterns through 0
the City for use in developing the model. Estimates of through traffic and overall traffic growth at the external cn
connectors will also be based on a review of historical traffic growth and review of the Snohomish County '
and PSRC travel demand models. �-
Model Calibration and Validation
The existing land use data will be input into the model to generate travel demands and travel patterns for the
weekday PM peak hour. The model parameters will be adjusted so the model reasonably matches with the
traffic count data and observed travel patterns, as well as accepted model validation and reasonableness
checks.
Page 5
Packet Pg. 137
2.7.a
Subtask 3D — Prepare Future Traffic Forecasts
The future land use data will be input into the model along with the planned transportation improvements to
generate future PM peak hour traffic volumes. The resulting forecasts will be reviewed for reasonableness
and adjustments will be made, if needed. This task assumes a future baseline and up to three alternative
scenarios.
Subtask 3E — Evaluate Future Roadway Systems
Using the traffic forecasts, future baseline LOS will be calculated. Similar to the existing conditions summary,
future intersection operations will be summarized. The Synchro/Sidra models will be modified to reflect the
potential future transportation improvements. The Synchro/Sidra analysis will be used to further refine the
improvements and assist in evaluating the overall improvements to the transportation system.
The future travel forecasts and operations analysis will be reviewed with City staff to establish a framework
for future transportation needs. Transpo will work with the City to identify the major alternative(s) evaluated in
the Transportation Plan.
Subtask 3F — Evaluate Walkway and Bicycle Systems
In addition to the travel demand model, Transpo will use GIS-based analysis tools to conduct a needs
assessment to address refinement of Walkway Plan and Bicycle Plan. This may focus on connectivity to key
destinations, gap analysis, and overall level of stress. The needs assessment tool and metrics will be tied
directly to the updated multimodal LOS standards for Walkway and Bicycle systems.
Subtask 3G — Model Documentation
Documentation of the travel demand model will focus on summaries of data, model parameters, calibration
results, and resulting 2044 forecasts. The documentation will include brief text with associated tables,
graphics, and charts.
City Support:
• GIS base layers for the City (aerial, streets, zoning, parcels, etc.)
• Review and refine existing and future land use estimates for the City and its UGA by TAZ
Identification of future baseline projects and alternative network scenarios
Input on alternative networks
Consultant Deliverables a
• Updated travel demand model and documentation
• Tables and graphics summarizing the future needs assessment for motorized and non -motorized
c
users o
• Preliminary map needed improvements w
a�
Task 4. Transportation Systems Improvement Projects/Programs Q
0
This task will focus on defining the City's transportation systems improvement needs. It will build off of the N
existing conditions, travel forecasts, and operations analyses. Recommendations for long-range
transportation improvement projects and programs will be developed.
Subtask 4A — Updated Project List
Based on the needs assessment, a draft list of transportation improvement projects and programs will be
prepared. Improvement projects and programs will also be defined to address user safety, non -motorized
travel, transit service, Ferry service, and rail crossings. Non -motorized facility needs will be evaluated based
on gaps in the planned systems and to correct situations that contribute to high levels of stress. A phasing/
implementation program will be defined to assist the City in preparing its annual Six -Year Transportation
Improvement Program.
Page 6
Packet Pg. 138
2.7.a
The project list will include roadway classification upgrade to new arterials and collector roads to support
future growth expected in the City study area. This will help to reserve future roadway corridors. The project
list may include roadway widening projects, major intersection/ operation enhancements, and improved
facilities for non -motorized transportation.
Cost Estimates
Planning level cost estimates will be prepared based on local area construction cost data provided by the
City for all the proposed projects. We will conduct a brief field survey of key projects to identify any
environmental or other issues that could affect the cost estimates. We also will account for costs associated
with additional right-of-way needs. The resulting planning level cost estimates will provide a reasonable
foundation for the financial plan and implementation program.
Priority and Timing
With a complete project list with associated costs, the projects can be prioritized. Transpo will work with the
City and stakeholder committees to develop a list of criteria to establish priorities by mode. This will inform
the updates to the Roadway Priority List, Walkway Priority List, and Bicycle Priority List. These lists will
include other agency improvements that directly impact Edmonds such as future Sound Transit light rail
upgrades scheduled for 2024 and Community Transit and Ferry improvements (based on discussion with
WSF)
Project List
The draft improvement projects and associated information will be summarized in tabular form. The projects
will be mapped in GIS to illustrate the locations and relationships of the improvements.
Subtask 4B — Traffic Calming Program Review
Transpo will review and update the Traffic Calming Program to reflect the latest goals, policies, and needs of
City staff. This provides guidance on where traffic calming is appropriate as well as recommended practices
and treatments.
City Support:
• Input on framework plan from current and prior plans
• Cost estimating parameters from recent projects and for the Six Year TIP
• Review and input on priorities and timing of improvements
Consultant Deliverables
• Multimodal improvement project list and map a
• Planning level cost estimates --
• Updated road standards c�
• Traffic Calming Program review comments o
.y
Task 5. Transportation Finance Program and Impact Fee Rate Schedule
This task of the work program provides an assessment of strategies to fund implementation of the updated Q-
Transportation Plan, including updating the City's traffic impact fee program. in
IL
Subtask 5A — Document Existing Transportation Revenues and Expenditures
c
The City will provide the consultant summaries of revenues and expenditures related to transportation E
covering the past 3 to 4 years. Revenues will include fuel tax revenues, traffic impact fees, general funds,
grants, and other transportation funding. Expenditures will include capital projects, maintenance, operations, M
administration, and other costs related to its transportation system. Q
The revenues and expenditures will be summarized for use in extrapolating potential future funding levels
from existing sources. Estimates of future revenues from these sources will be prepared and reviewed with
appropriate City staff. Estimates of future expenditures for maintenance, operations, and administration also
will be provided by the City.
Page 7
Packet Pg. 139
2.7.a
Subtask 5B — Update Transportation Impact Fee Rate Schedule
The travel demand model and updated project list/costs provide a basis for updating City's Transportation
Impact Fee rates. Work under this task includes:
• Review Impact Fee Project List — The eligibility of improvements currently included in the City's TIF
will be reviewed to confirm that they should continue to be included in the impact fee program.
• Calculate Impact Fee Share — The model will be used to allocate TIF project costs to the impact fee.
The model will be used to identify the proportion of growth trips versus existing traffic at each project.
Cost allocations also will consider assessment of grants and the cost for resolving existing
deficiencies. The product of this task will be a cost allocation spreadsheet.
• Update TIF Rate Schedule — The impact fee rate schedule will be updated to reflect the revised
project costs and cost allocations.
• Update Ordinance — The TIF ordinance will be updated by City staff to reference the revised fee
schedule and other changes, as needed.
Subtask 5C — Define Funding Strategies and Summarize Financing Program
Based on the levels of existing revenues versus expenditures and the likely maximum level of anticipate
funding through the TIF, other potential funding options will be evaluated. These will include:
• Partnering with state or other agencies to fund improvements
• State or federal grants
• SEPA mitigation
• Frontage improvements
• Transportation Benefit District
• Business Improvement Districts or Special Assessment Districts
The draft financing program will be summarized in tabular form. As required by GMA, the Transportation
Element must identify a reassessment strategy if anticipated funding is not sufficient to cover the total costs
of the improvement projects and programs. We will define implementation strategies and associated policies
to meet that requirement. This may include revisiting level of service standards, growth assumptions, project
priorities, phasing of improvements, or other options. We also will assist the City in defining projects that
could be effectively partnered with WSDOT and/or Snohomish County.
City Support.
• Summaries of City's transportation revenues and expenditures for past 3 to 4 years N
• Direction/review on traffic impact fee program o
• Review of overall financing program for Transportation Element y
• Lead in updating City's impact fee ordinance and adoption
Consultant Deliverables a
• Summary of the funding strategies U
• Finance spreadsheet files N
Task 6. Draft and Final Transportation Plan Documentation
The Transportation Plan will be assembled and will include existing transportation systems, the development
and analyses of the travel forecasts, evaluation of the multimodal transportation system projects and
programs, LOS and concurrency program refinements, transportation financial analyses and updated impact
fee program. It will also address project prioritization methods and supporting information on the project cost
estimates. Based on City comments/direction, we will finalize the policies and goals for inclusion in the draft
Transportation Plan.
Page 8
Packet Pg. 140
2.7.a
The preliminary draft Transportation Plan will be provided to City staff for review in electronic format. Based
on comments, a draft final Transportation Plan document will be prepared for review by the Planning Board
and City Council. Following review and comment by the Planning Board and City Council, the Transportation
Plan will be finalized and transmitted to the City. This assumes only editorial type changes and does not
provide for significant changes in policy direction, the transportation system plans, or similar larger scale
revisions.
City Support
• Review and input on draft and final Transportation Plan document
Consultant Deliverables
• Draft/Final City of Edmonds Transportation Plan
• Electronic files will be provided of all documents in native format and pdf
Task 7. Project Team/Agency Coordination and Public Involvement
Support
The Community Engagement Program will be used to support the update of the Transportation Plan. It
includes four primary subtasks — regular project team meetings, online survey, virtual open house, and
planning board/city council meetings. The community engagement program can be coordinated with other
elements of the Comprehensive Plan update, where feasible.
Subtask 7A — Regular Project Meetings with City Staff (Bi-Weekly Meetings)
Transpo will coordinate with City staff on bi-weekly basis throughout the duration of the project. The
coordination will address project scope/status, technical and policy direction, budget, schedule, and plan for
the Planning Board or City Council meetings, and public open houses. These coordination meetings will be
primarily held through virtual online meetings.
Subtask 7B — Proiect Website and Online Su
Transpo will create a project website to describe the transportation plan update process. This website will
include a link to an online survey, to be conducted to gather feedback on the public's transportation needs,
issues and priorities. The survey would be posted in conjunction with other Comprehensive Plan outreach.
To ensure efficiency, questions would be limited, including no more than one open-ended question. Survey
results would be analyzed and summarized. City to lead promotion of the survey.
Subtask 7C — Comprehensive Plan Neighborhood Open Houses
0
Transpo will work with City staff to participate in up to six interdisciplinary neighborhood open houses. These A
open houses may be either virtual or in -person at the discretion of the City. The format of the open house is
still being determined but will likely include a brief overview of the project scope and facilitation of break-out
tables based on key topics found in the Comprehensive Plan. Transpo would be expected to provide a short a
presentation and at least one staff person to assist city staff facilitation of break-out groups. 0
U)
Subtask 7D — Plannina Board and Citv Council Meetinas (4 Meetinas)
Transpo will present to both the Planning Board and City Council to confirm assumptions and methodologies,
provide input on alternatives, and review results of the planning process. Up to four meetings will be held at
key junctures during the plan update to ensure their input can be utilized in decisions.
Subtask 7E — Coordination with newly formed Transportation Committee & Bicycle Group
(6 Meetings)
Transpo will coordinate with the Transportation Committee (to be created as part of this project) throughout
the update of the TMP and LOS Standard & Concurrency Program Update. This committee will provide
Page 9
Packet Pg. 141
2.7.a
guidance in the update of the Goals and Policies and help establish the priority Proposed Walkway Projects.
It is assumed that Transpo will participate in four meetings with the Committee (these meetings assumed to
be virtual).
Transpo will also coordinate with the existing Edmonds Bike Group to review the proposed Bicycle Plan. It is
assumed that Transpo and City staff will have 2 virtual meetings with the Edmonds Bike Group.
City Support:
• Host project team meetings via MS Teams
• Promote the online survey and project website through existing communication channels
• Post materials on City website
• Arrange for meetings with:
o Planning Board/City Council
o Neighborhood Open Houses
o Transportation Committee
o Edmonds Bicycle Group
Consultant Deliverables
• Presentation materials and attendance at 4 meetings Council Meetings (in person)
• Presentation materials and attendance at up to 6 Neighborhood Open Houses (virtual or in person)
• Presentation materials and attendance at 4 Transportation Committee Meetings (virtual)
• Presentation materials and attendance at 2 Bicycle Group Meetings (virtual)
• Online survey and high-level summary of results
N
Page 10
Packet Pg. 142
2.8
City Council Agenda Item
Meeting Date: 03/14/2023
2022 Transportation Impact Fee Annual Report
Staff Lead: Rob English
Department: Engineering
Preparer: Rob English
Background/History
Staff Recommendation
Forward item to the consent agenda for information at the City Council meeting on March 21, 2023.
Narrative
In 2004, the City authorized the collection of Transportation Impact Fees to help pay for transportation
projects that are needed to serve new growth and development. Pursuant to Section 3.36.080(C) of the
Edmonds City Code (ECC), Attachment 1 is an accounting of the Transportation Impact Fee Fund for
2022. The City collected a total of $319,888 in transportation impact fees during 2022. These revenues
combined with the earned interest of $32,554 and the 2022 beginning fund balance of $1,984,854
resulted in a total available funding of $2,337,296.
On the expense side and in accordance with section 3.36.100 of the ECC, the transportation impact fee
fund paid $39,728.11 for the annual debt service to the Public Works Trust Fund (PWTF) for the 220th
Street SW Improvements Project and $16,754.57 for the local match on the design work completed in
2022 on the 76th Ave/220th St. Intersection Improvement Project.
Attachments:
Attachment 1 - 2022 Transportation Impact Fee Report
Packet Pg. 143
2022 Transportation Impact Fee Receipts and Funds Transfer
Transportation Impact Fee Fund Account Number: 112.502.345.86.000.00
RECEIPTS
Receipt
Owner/Applicant
Previous
New
Fee Collected
with Building
Date
Permit Number
Number
Site Address
ITE Land Use
ITE Land Use
Notes
Permit
Fee Amount
01/27/2022 BLD2021-0895
R17659 Eastman/King
vacant
SFR
X
$6,249.14
131 Skyline Dr.
02/04/2022 BLD2021-0235
R17965 Trang
vacant
SFR
X
$6,249.14
23129 74th Ave. W
02/14/2022 BLD2021-1075
R18098 Adamant Homes Inc.
vacant
SFR
X
$6,249.14
8711 240th St. SW, Lot 1
02/14/2022 BLD2021-1096
R18101 Adamant Homes Inc.
vacant
SFR
X
$6,249.14
8715 240th St SW, Lot 3
02/14/2022 BLD2021-1102
R18100 Adamant Homes Inc.
vacant
SFR
X
$6,249.14
8713 240th St SW, Lot 2
03/10/2022 BLD2021-0088
R18615 Anthology
medical office
senior living
X
$133,581.97
21200 72nd Ave. W
05/20/2022 BLD2021-0985
R20364 Keck
vacant
SFR
X
$6,249.14
15722 72nd Ave. W
06/02/2022 BLD2022-0046
R20649 Select Homes Inc.
vacant
SFR
X
$6,249.14
8008 203rd St. SW, Lot 2
06/29/2022 BLD2021-1385
R21251 Port of Edmonds
vacant
admin building
X
$100,077.49
471 Admiral Way
07/26/2022 BLD2021-1719
R21974 Select Homes Inc.
vacant
SFR
X
$6,249.14
7922 203rd St. SW, Lot 2
08/01/2022 BLD2022-0279
R22136 Solomon/Getachew
vacant
SFR
X
$6,249.14
1400 9th Ave. N
09/01/2022 BLD2022-0287
R22848 Echelbarger Homes Inc.
vacant
SFR
X
$6,249.14
21322 92nd Pl. W
09/06/2022 BLD2020-0853
R22865 Edmonds Lutheran Church
church
daycare
Fee reduction applied due to
X
$4,186.78
23525 84th Ave. W
early learning facility
10/03/2022 BLD2022-1032
R23448 Stoller
office
salon
1,086 sq. ft. change of use
X
$870.00
8304 196th St. SW
from general office to salon
10/05/2022 BLD2021-0094
R23522 Edmonds Townhomes
SFR
townhomes
4 units w/ credit for SFR
X
$12,431.80
8029 238th St. SW
11 /07/2022
12/28/2022 BLD2022-0094
R25250 Vaisvila
vacant
SFR
X
$6,249.14
17125 69th PI. W
12/31 /2022
Total
Transportation
Impact Fess collected
in 2022 =
$319,888.58
Interest
Earned 2022
$32,553.95
TRANSFERS
2022
r_
O
Transaction
I Amount
M
Fund Name
Reference
Transferred
Cumulative To
1i
Beginning Balance
$1,984,854.
Q
N
$1,991,103.
i
H
$1,997,352.
N
o
N
$2,003,601.
C
$2,009,850.
'y
N
$2,016,100.
IX
V_
$2,149,682.
Q
d
IX
$2,155,931.
d
LL
$2,162,180.
!Z
E
$2,262,257.
r_
O
$2,268,506.
r
R
O
IZ
$2,274,756.
ca
$2,281,005.
~
N
N
O
$2,285,192.
N
r
$2,286,062.
y
E
t
$2,298,493.
U
GJ 210106 PWTF Annual-$39,728.11
Q
Loan Payment
$2,258,765.
r
C
to
$2,265,014.
V
76th/220th
GJ 220242 Intersection-$16,754.57
Q
Improvements
$2,248,260.
2022 YEAR-END BALA
Packet Pg. 144
2.9
City Council Agenda Item
Meeting Date: 03/14/2023
2021-2022 Transportation Benefit District Reports
Staff Lead: Oscar Anti Ilon
Department: Public Works & Utilities
Preparer: Royce Napolitino
Background/History
Pursuant to Ordinance 3707, and codified in Chapter 3.65 of the Edmonds Municipal Code, the City of
Edmonds City Council established a transportation benefit district to be known as the Edmonds
Transportation Benefit District in November, 2009, with geographical boundaries comprised of the
corporate limits of the City of Edmonds at the time the ordinance was adopted or as they may exist after
any future annexations.
The 2015 State Legislature adopted Second Engrossed Substitute Senate Bill 2ESBB 5987 authorizing the
assumption of control over a TBD by a city with the same boundaries as the TBD, which became
effective in July, 2015. Pursuant of Ordinance 4053, as codified in Chapter 3.65 of the Edmonds
Municipal Code, the City of Edmonds City Council assumed the rights powers, functions, and obligations
of the Transportation Benefit District Board in December, 2016, one of which is to produce and deliver
an annual report regarding the operations of the District.
November, 2019 - Initiative 976 passed by a state wide margin of 53% to 47%, but was rejected by
Edmonds voters 56% to 44%. 1-976 could have rolled back car tab fee increases in excess of $30 among
other impacts to funding . An immediate injunction allowed for the continuation of collection of
licensing fees. Ultimately, the initiative was ruled unconstitutional by Washington State Supreme Court.
Staff Recommendation
Advance to the Council's Consent Agenda - Acknowledge and approve for publication.
Narrative
The City of Edmonds must publish the results of its Transportation Benefit District (TBD) operations. The
City receives local license fees on vehicles within the jurisdictional limits of the City of Edmonds. These
collected funds are expended for street maintenance, preservation, and operation of the street
transportation system within the City's boundaries. TBD-funded activities included localized pavement
repairs, pothole repairs, signage management, maintenance of pavement markings (buttons, curb paint,
etc.), crosswalk maintenance, and traffic signal maintenance and repair. Eligible costs are outlined in
Ordinance 4053.
In 2021, the TBD received $717,707 in revenue from local license fees. These collected funds were
expended for street maintenance, preservation, and operation of the street transportation system
within the City's boundaries, as outlined in Ordinance 4053. The City expended $534,005 from the State
Packet Pg. 145
2.9
Gas Tax and General Fund resources, with the remaining $183,702 retained in the City's Street Fund for
expenditure in the same activities in 2022.
In 2022, the TBD received $693,591 in revenue from local license fees. These collected funds were
expended for street maintenance, preservation, and operation of the street transportation system
within the City's boundaries, as outlined in Ordinance 4053. The City expended $693,591 from the State
Gas Tax and General Fund resources.
The publishing of this report fulfills the requirement within RCW 36.73.160(2), in which, the district shall
issue an annual report, indicating the status of transportation improvement costs, transportation
improvement expenditures, revenues, and construction schedules, to the public and to newspapers of
record in the district.
Attachments:
2021 Transportation Benefit District Statement
2021 Transportation Benefit District Annual Report Notice
2022 Transportation Benefit District Statement
2022 Transportation Benefit District Annual Report
Packet Pg. 146
2.9.a
Schedule of Revenues, Expenditures and
Changes in Fund Balance
Transportation Benefit District
January 1, 2021 through December 31, 2021
(Unaudited Cash Basis)
Revenues
$20 Vehicle Registration Fee 717,707
Total Revenues 717.707
Expenditures
Road Maintenance (includes repairs, patching, crack sealing)
Labor & Benefits 143,802
Supplies 19,371
Traffic Control
Labor & Benefits 150,667
Supplies 140,095
Vehicle Charges 80,070
Excess Transferred to Street Fund 183,702
Total Expenditures 717,707
Net Change in Fund Balances (0)
Fund Balances - Beginning -
Fund Balances - Ending (0)
Packet Pg. 147
2.9.b
Edmonds Transportation Benefit District
Official Notice of 2021 Annual Report
1(
11 C. ] g9"
The City of Edmonds is publishing the results of its Transportation Benefit District (TBD)
operations for the calendar year 2021. The TBD was formed in November 2008 following
procedures outlined in Revised Code of Washington 36.73 and in accordance with Edmonds
City Code Chapter 3.65. In February 2009 a $20 local license fee was established by its Board of
Directors, the Edmonds City Council. The publishing of this report is in accordance with RCW
36.73.160(2).
In 2021 the TBD received a total of $717,707 in revenue from local license fees on vehicles
registered within the jurisdictional limits of the City of Edmonds. These collected funds were
expended for street maintenance, preservation, and operation of the street transportation
system within the City's boundaries. TBD-funded activities included localized pavement repairs,
pothole repairs, signage management, maintenance of pavement markings (buttons, curb
paint, etc.), crosswalk painting, and traffic signal maintenance and repair. The City expended a
total of $534,005 towards these activities in 2021. The remaining $183,702 is retained within
the City's Street Fund for expenditures in the same activities in 2022.
The following link is provided for additional information regarding the Edmonds Transportation
Benefit District. https://edmondswa.gov/cros/One.aspx?portalld=16495016&pageld=17272303
Packet Pg. 148
2.9.c
Schedule of Revenues, Expenditures and
Changes in Fund Balance
Transportation Benefit District
January 1, 2022 through December 31, 2022
(Unaudited Cash Basis)
Revenues
$20 Vehicle Registration Fee 693,591
Total Revenues 693.591
Expenditures
Road Maintenance (includes repairs, patching, crack sealing)
Labor & Benefits 185,104
Supplies 27,832
Traffic Control
Labor & Benefits 218,083
Supplies 123,435
Vehicle Charges 105,905
Excess Transferred to Street Fund 33,232
Total Expenditures 693,591
Net Change in Fund Balances -
Fund Balances - Beginning -
Fund Balances - Ending -
Packet Pg. 149
2.9.d
Edmonds Transportation Benefit District
Official Notice of 2022 Annual Report
1(
11 C. ] g9"
The City of Edmonds is publishing the results of its Transportation Benefit District (TBD)
operations for the calendar year 2022. The TBD was formed in November 2008 following
procedures outlined in Revised Code of Washington 36.73 and in accordance with Edmonds
City Code Chapter 3.65. In February 2009 a $20 local license fee was established by its Board of
Directors, the Edmonds City Council. The publishing of this report is in accordance with RCW
36.73.160(2).
In 2022 the TBD received a total of $693,591 in revenue from local license fees on vehicles
registered within the jurisdictional limits of the City of Edmonds. These collected funds were
expended for street maintenance, preservation, and operation of the street transportation
system within the City's boundaries. TBD-funded activities included localized pavement repairs,
pothole repairs, signage management, maintenance of pavement markings (buttons, curb
paint, etc.), crosswalk painting, and traffic signal maintenance and repair. The City expended a
total of $693,591 towards these activities in 2022.
The following link is provided for additional information regarding the Edmonds Transportation
Benefit District. https://edmondswa.gov/cros/One.aspx?portalld=16495016&pageld=17272303
Packet Pg. 150