Loading...
2023-10-17 City Council Special Packetof c�,y s Agenda Edmonds City Council SPECIAL MEETING COUNCIL CHAMBERS 250 5TH AVE NORTH, EDMONDS, WA 98020 OCTOBER 17, 2023, 6:00 PM PERSONS WISHING TO JOIN THIS MEETING VIRTUALLY IN LIEU OF IN -PERSON ATTENDANCE MAY CLICK ON OR PASTE THE FOLLOWING ZOOM MEETING LINK INTO A WEB BROWSER USING A COMPUTER OR SMART PHONE: HTTPS://ZOOM. US/J/95798484261 BY PHONE: US: +1 253 215 8782 WEBINAR ID: 957 9848 4261 1. CALL TO ORDER 2. ROLL CALL 3. COUNCIL BUSINESS 1. Utility Rate Study and adoption of a Utility Rate Ordinance (50 min) 2. Presentation of Amendment with Consor North America, Inc for Yost and Seaview Reservoir Repairs and Upgrades Project (10 min) ADJOURN Edmonds City Council Agenda October 17, 2023 Page 1 3.1 City Council Agenda Item Meeting Date: 10/17/2023 Utility Rate Study and adoption of a Utility Rate Ordinance Staff Lead: Rob English Department: Engineering Preparer: Emiko Rodarte Background/History On September 12, 2023, staff presented this item to the Parks and Public Works Committee and it was forwarded to a future City Council meeting for discussion. Staff Recommendation Approve ordinance. Narrative The City owns and maintains drinking water, sewer, and storm utilities. In order to ensure the continued function and maintenance of each of these utilities, the City of Edmonds charges fees to all residences and business which have access and make use of them. The fees generated for each utility fund their respective enterprise funds. These enterprise funds in turn are used to support and fund the respective utility to ensure its continued maintenance and function. The City of Edmonds operates a multiple utility operation which incorporates potable water, sanitary sewer, and storm and surface water management functions. The City received the combined utility rate study from its consultant, the FCS Group. The findings show increases in potable water, sanitary sewer, and storm and surface water management utility rates. This funding will help address rising costs including but not limited to: inflation and the rising maintenance and operations costs, wholesale cost increases for potable water from Alderwood Water and Wastewater District, the replacement of aging and failing water/sewer/storm infrastructure as part of the annual replacement projects and upcoming larger capital projects. The rate increases recommended and proposed by staff will make it so that the City will only need to acquire bonds for the larger upcoming capital projects. The cost for annual maintenance and replacement projects will continue to be rate funded, thereby resulting in considerable future savings to the City. Attachment 1 is the proposed Ordinance and includes the recommended rate increases for the water, sewer and storm utilities. The updates reflect the rate assessment schedule updates based on customer class and clarify the effective dates. Attachments: Attachment 1 - Ordinance Attachment 2 - Presentation Packet Pg. 2 3.1.a ORDINANCE NO. AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING THE PROVISIONS OF ECC SECTION 7.30.030 WATER RATES - METER INSTALLATION CHARGES, RELATING TO UTILITY RATES OF WATER SUPPLIED THROUGH METERS, THE PROVISIONS OF ECC SECTION 7.30.040 UTILITY CHARGES - SANITARY SEWER, RELATING TO UTILITY RATES OF UNMETERED SANITARY SEWER SERVICES, AND THE PROVISIONS OF ECC SECTION 7.50.050 RATES AND CHARGES, RELATING TO UTILITY RATES FOR STORM AND SURFACE WATER MANAGEMENT SERVICES, IN ORDER TO INCREASE SUCH RATES, CLARIFY WHEN NEW RATES SHALL TAKE EFFECT, AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. WHEREAS, the City of Edmonds operates three enterprise utility operations which incorporate potable water distribution, sanitary sewer conveyance and wastewater treatment, and storm and surface water management functions; and WHEREAS, the city's utility rates were last adjusted with Ordinance 4286; and WHEREAS, after the adoption of Ordinance 4286, the city's consultant, FCS Group, completed an updated rate study; and WHEREAS, the updated rate study provides the basis for the rates that are now being recommended for adoption by the city council; and WHEREAS, the increased rates will help address rising costs, including but not limited to: inflation and the rising maintenance and operations costs, wholesale cost increases for potable water from Alderwood Water and Wastewater District, the replacement of aging and failing water/sewer/storm infrastructure as part of the annual replacement projects and upcoming larger capital projects; and WHEREAS, the rate increases will allow the city to limit bond financing to the larger capital projects, with the cost of annual maintenance and replacement projects being funded through these rate increases, which will save the city, and its ratepayers, money over the long term; NOW, THEREFORE, Packet Pg. 3 3.1.a THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, DO ORDAIN AS FOLLOWS: Section 1. Subsections A and B of the Edmonds City Code 7.30.030, entitled "Water rates - Meter installation charges," are hereby amended to read as follows (except for the rate tables which are replaced in their entirety, new text is shown in underline and deleted text is shown in stfil eugh): A. Base Rate. The bimonthly rates of water supplied through meters shall be fixed at the following levels: Effective Date Current 1/1/24 1/1/25 1/1/26 Single Family Residence (per unit) $ 44.08 $ 48.05 $ 52.37 $ 57.08 Duplex Apt Houses, condos and other multi unit Residences (per unit) $ 38.82 $ 42.31 $ 46.12 $ 50.27 Effective Date Current Meter 1/1/24 1/1/25 1/1/26 All other customers $ 53.30 3/4" $ 58.10 $ 63.33 $ 69.03 $ 108.51 1" $ 118.28 $ 128.92 $ 140.52 $ 200.66 1.5" $ 218.72 $ 238.40 $ 259.86 $ 305.92 2" $ 333.45 $ 363.46 $ 396.18 $ 659.94 3" $ 719.33 $ 784.07 $ 854.64 $ 934.80 4" $ 1,018.93 $ 1,110.64 $ 1,210.59 $ 1,895.91 6" $ 2,066.54 $ 2,252.53 $ 2,455.26 B. Variable Rate. In addition to the base rate set forth above, the customer shall be charged the following rate per 100 cubic feet of water consumed: Effective Date Variable Rate Current 1/1/24 1/1/25 1/1/26 $ 4.60 $ 5.01 $ 5.47 $ 5.96 For the purposes of understanding the reference to the "effective date" in the above tables, all water base rate and variable rate charges on water utility bills mailed on or after JanuaryFebruai�., 1 st of each year shall be based on the adopted rates for that effective date even if the utility service Packet Pg. 4 3.1.a period reflected on the bill includes time from before the effective date. Section 2. Subsection A of the Edmonds City Code 7.30.040, entitled "Utility charges — Sanitary sewer," is hereby amended to read as follows (except for the rate tables which are replaced in their entirety, new text is shown in underline and deleted text is shown in A. The following rates shall be charged on all billings after the effective date shown with respect to the following customers and/or service: Effective Date Current 1/1/24 1/1/25 1/1/26 Single Family connected $ 106.11 $ 117.25 $ 129.56 $ 142.52 Residence (bimonthly per unit) unconnected $ 17.14 $ 18.94 $ 20.93 $ 23.02 Duplex, apartment connected $ 85.26 $ 94.21 $ 104.10 $ 114.52 houses, condos, and other multi unit residences unconnected $ 17.14 $ 18.94 $ 20.93 $ 23.02 (bimonthly per unit) All other customers Fixed Rate $ 12.05 $ 13.32 $ 14.71 $ 16.18 (bimonthly per unit) Volume Charge $ 6.84 $ 7.56 $ 8.35 $ 9.19 (per ccf)* *per 100 cubic feet (1 unit) of metered water consumption. For the purposes of understanding the reference to the "effective date" in the above tables, all sanitary sewer rates and charges on sewer utility bills mailed on or after JanuaryF-e� 1 st of each year shall be based on the adopted rates for that effective date even if the utility service period reflected on the bill includes time from before the effective date. Section 3. Subsection A of the Edmonds City Code 7.50.050, entitled "Stormwater rates and charges," is hereby amended to read as follows (except for the rate tables which are replaced in their entirety, new text is shown in underline and deleted text is shown in A. The following rates shall be charged on all billings with respect to the following customers and/or service: Packet Pg. 5 3.1.a Effective Date Category Current 1/1/24 1/1/25 1/1/26 Single Family Residential and Multi Family Residential (Bimonthly) $ 46.90 $ 50.89 $ 55.21 $ 59.90 All other resident customers per ESU (Bimonthly) $ 46.90 $ 50.89 $ 55.21 $ 59.90 For the purposes of understanding the reference to the "effective date" in the above tables, all stormwater rates and charges on stormwater utility bills mailed on or after Januarys 1 st of each year shall be based on the adopted rates for that effective date even if the utility service period reflected on the bill includes time from before the effective date. Section 4. Severability. If any section, sentence, clause or phrase of this ordinance should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section, sentence, clause or phrase of this ordinance. Section 5. Effective Date. This ordinance is subject to referendum and shall take effect thirty (30) days after final passage of this ordinance. APPROVED: MAYOR MIKE NELSON ATTEST/AUTHENTICATED: CITY CLERK, SCOTT PASSEY APPROVED AS TO FORM: OFFICE OF THE CITY ATTORNEY: BY JEFF TARADAY Packet Pg. 6 3.1.a FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: PUBLISHED: EFFECTIVE DATE: ORDINANCE NO. Packet Pg. 7 3.1.a SUMMARY OF ORDINANCE NO. of the City of Edmonds, Washington On the _ day of , 2022, the City Council of the City of Edmonds, passed Ordinance No. A summary of the content of said ordinance, consisting of the title, provides as follows: AN ORDINANCE OF THE CITY OF EDMONDS, WASHINGTON, AMENDING THE PROVISIONS OF ECC SECTION 7.30.030 WATER RATES - METER INSTALLATION CHARGES, RELATING TO UTILITY RATES OF WATER SUPPLIED THROUGH METERS, THE PROVISIONS OF ECC SECTION 7.30.040 UTILITY CHARGES - SANITARY SEWER, RELATING TO UTILITY RATES OF UNMETERED SANITARY SEWER SERVICES, AND THE PROVISIONS OF ECC SECTION 7.50.050 RATES AND CHARGES, RELATING TO UTILITY RATES FOR STORM AND SURFACE WATER MANAGEMENT SERVICES, IN ORDER TO INCREASE SUCH RATES, CLARIFY WHEN NEW RATES SHALL TAKE EFFECT, AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. The full text of this Ordinance will be mailed upon request. DATED this day of 92023. CITY CLERK, SCOTT PASSEY 4840-7251-8158, v. 1 Packet Pg. 8 3.1.a d CU C cu C L 0 d Ncu Lf� D r u r E cu Q E U m Q Packet Pg. 9 3.1.b s 2023 Utility Rate Update i,, • I �;)` AL •:;> FCS GROUP Solutions -Oriented Consulting • Packet Pg. 10 3.1.b •:;> Agenda Background Revenue Requirement (Financial Plan) Update Methodology/Assumptions Summary of Key Drivers Sample Bill Comparison Questions/Discussion FCS GROUP Packet Pg. 11 3.1.b •:;> Why Are We Doing This? City utilities are enterprise funds that need to be self-sufficient Revenues need to cover costs in the long run City utilities have substantial infrastructure replacement needs 30 — 40% of City's mains have exceeded standard useful life estimates Delaying needs increases operating costs and risk of failure Main breaks Inflow and infiltration (accelerates need for sewer treatment plant expansions) Goal is to recover an equitable share of costs from existing/future customers Delays can lead to "snowballing" needs that have adverse rate impacts Debt can be used to spread costs of large projects over time Rates should support ongoing capital projects (e.g. main replacement program) Term of debt is limited to the expected useful life of the facilities being funded FCS GROUP QlMrAnl Packet Pg. 3.1.b •:;> Overview of Financial Plan Defines "cost -based rates" as rates based on aggregate obligations Operating costs Capital project expenditures Debt service payments Other financial needs Establishes a multi -year financial plan beyond the current budget cycle Key Elements of Financial Plan: Defining revenues and expenses Developing capital funding strategy Establishing fiscal policy "framework" FCS GROUP A Packet Pg. 3.1.b •:;> Fiscal Policip&ft City does not have formal policies Recommendation: Draft policies for Council consideration/adoption next year Financial plans assume each utility maintains combined operating/capital balance equal to at least 180 days of operating expenses Policy recommended by bond rating agencies Falling short of this standard could lead to higher interest costs/reserve requirements Helps mitigate cash -flow issues during construction season FCS GROUP Packet Pg. 14 3.1.b •:;> Key Drivers of Water Rate Increases Recent inflation (higher than long-term averages) Increased operating costs Water purchases from Alderwood WWD (8% annual increases projected from Everett) Capital needs Capital Costs by Year (2023 - 20321 $10.0 $8.0 c $6.0 $4.0 $2.0 $0.0 Total- 154.5M M -:I- Lf) Cfl I` CO M O N N N N CV N N CV M M M O O O O O O O O O O N N N N N N N N N N Yost & Seaview Reservoirs ($9.6M) u Main Replacements ($44.9M) Capital Funding Strategy (2023 - 2032) Expected to increase annua, r- debt service by $803, 000 U) 2 IL N C N t V R r.+ i C E a FCS GROUP Packet Pg. 15 3.1.b •:;� Key Drivers of Stormwater Rate Increases Recent inflation (higher than long-term averages) Less funding available for main replacement program and other needs Capital needs Need to generate $2.5M in local matching funds for large stormwater projects Staff proposes setting aside matching funds from existing balances and issuing bonds to fund other capital projects Capital Costs by Year (2023 - 2032) $10.0 $8.0 0 $6.0 $4.0 $2.0 $0.0 Total: $37.3M M ;3- U-) Cfl I- CO M O CV O O O O O O O O O O N N N N N N N N N N LA Main Replacements ($22.9M) i Other Projects ($14.4M) Capital Funding Strategy (2023 - 2032) Grants/ ARPA $M Expected to 23 23% Debt increase annul $2.5 M 7% debt service b _ --$218, 000 FCS GROUP 7 Packet Pg. 3.1.b •:;> Key Drivers of Sewer Rate Increases Recent inflation (higher than long-term averages) Less funding available for main replacement program and other needs Capital needs Capital Costs by Year (2023 - 20321 $40.0 $35.0 $30.0 $25.0 o_ $20.0 $15.0 $10.0 $5.0 $0.0 Total: $127.2M M :t U") CO I` M M O - CV O O O O O O O O O O N N N N N N N N N N Capital Funding Strategy (2023 - 2032) L nnwood WWTP Projects 28.2M Edmonds WWTP Projects 58.0M F— Edmonds share is 50% u Other City Sewer Projects ($7.2M) ® Main Replacements ($33.9M) Expected to increase annua, debt service by $3.6M FCS GROUP QlMrAn Q Packet Pg. 3.1.b •:;> Bimonthly Single -Family Bill @ 14 ccf Mountlake Terrace $153.49$55.92 $158.62 Woodinville [1] $146.16 $34.671 $166.42 Lake Stevens $99.08 $42.83 $198.00 Bothell $99.70 L$37.52 1 $202.22 Monroe $101.06 J-$38.44 $184.30 Bainbridge Island $65.28 $37.67 $210.40 $368.03 $347.25 $339.91 1 $339.44 $323.80 $313.35 Shoreline [2] T $133.77 �$107.40 $295.99 Edmonds (Updated) i : • $286.33 Edmonds (Existing) i : - : , - . • i i • $261.49 Bremerton L $67.52 JIMP$43.00 $149.92 I $260.44 Mukilteo $74.74 $49.67--UW $134.96 I $259.37 Alderwood WWD [3] $64.06 $22.00 $156.94 I $243.09 Lynnwood 1 $77.28 , $31.69I $132.35 ( $241.32 i Water Rate i Stormwater Rate i Sewer Rate [1] Woodinville Water District's sewer rate includes King County's wastewater treatment rate ($104.22 bimonthly) [2] Shoreline sewer rate assuming Edmonds wastewater treatment. [3] Stormwater bill shown for Alderwood WWD assumes Snohomish County's stormwater rate ($132.54 per year) applies. FCS GROUP a Packet Pg. 3.1.b •:J Cost Impacts to Low -Income Households Affordability assessment based on industry metrics City of Edmonds Affordability Threshold 1.2% 6.3 4.5% 8.0 City offers low-income discount program 5.0% 10.0% Established by City Ordinance No. 3629; currently published on City website Human Services is aware and helps advertise program to eligible customers Customers can qualify for a rate reduction based on income levels 30% rate reduction if disposable income is 50 — 60% of County MHI 50% rate reduction if disposable income is <_ 50% of County MHI 95 —100 customers participate in program on average FCS GROUP Packet Pg. 19 3.1.b •:;> Recommendations Adopt proposed rate increases for 2024 - 2026 Water: 9.0% per year Stormwater: 8.5% per year » Sewer: 10.0 -10.5% per year Water Bill $108.48 $118.19 $128.95 $140.52 $153.08 $166.94 $180.21 Stormwater Bill 46.90 50.89 55.21 59.90 65.00 66.62 68.29 Sewer Bill 106.11 117.25 129.56 142.52 156.77 172.45 189.69 Total Bill $261.49 $286.33 $313.72 $342.94 $374.85 $406.01 $438.19 Change from Prior Year +$24.84 +$27.39 +$29.22 +$31.91 +$31.16 +$32.18 Percent Change from Prior Year +9.5% +9.6% +9.3% +9.3% +8.3% +7.9% Monitor financial status regularly, considering adjustments as needed Revisit 2027 - 2029 rate increases sometime around 2026 FCS GROUP QIIAO 1 Packet L V •:;> FCS GROUP Solutions -Oriented Consulting Packet Pg. 21 3.2 City Council Agenda Item Meeting Date: 10/17/2023 Presentation of Amendment with Consor North America, Inc for Yost and Seaview Reservoir Repairs and Upgrades Project Staff Lead: Rob English Department: Engineering Preparer: Emiko Rodarte Background/History On June 21, 2022, City Council approved a professional services agreement with MurraySmith to complete preliminary design work. On October 10, 2023, staff presented this item to the Parks and Public Works Committee and it was forwarded to the October 17th City Council meeting for presentation and action. Staff Recommendation Approve amendment. Narrative The City issued a Request for Qualifications (RFQ) in March 2022 to hire a consultant to provide design engineering services for the Yost and Seaview Reservoir Repairs and Upgrades. The City received statements of qualifications from two (2) engineering firms. The staff selection committee selected MurraySmith based on their qualifications and experience and received council approval on June 21, 2022, for the mayor to sign an agreement to provide preliminary design engineering services for the project. Since the signing of the first phase of the contract, MurraySmith has undergone a merger with design engineering firm Consor. Other than the change in name, the design team offices and overall consultant staff working on the project have not changed. The proposed contract will take the design of the project from 30% to a 100% level. As part of this work, the design will address needed structural upgrades to bring both structures up to current code standards and replace piping and appurtenances in both reservoirs, repair water leaks in the Yost Reservoir and provide any other upgrades required by the state department of health. The final design is scheduled for completion by late 2024, with construction tentatively planned to start in 2025. When the project design approaches completion, a separate scope and fee/supplement will be drafted for support services during construction and submitted to City Council for approval. Per the attached negotiated scope of services, the cost to complete final design is $422,634, bringing the total project design costs to $675,575. All project costs will be funded by the 421 Water Utility Fund. Attachments: Packet Pg. 22 3.2 Attachment 1 - Amendment Attachment 2 - Presentation Packet Pg. 23 3.2.a Al� ov eU,11 6 1� CITY OF EDMONDS 121 5T" AVENUE NORTH • EDMONDS, WA 98020 425-771-0220 • FAX 425-672-5750 Website: www.edmondswa.gov 18go ia�° PUBLIC WORKS DEPARTMENT Engineering Division AMENDMENT NO. 1 TO PROFESSIONAL SERVICES AGREEMENT Yost and Seaview Reservoirs Repairs and Upgrades MIKE NELSON MAYOR WHEREAS, the City of Edmonds, Washington, hereinafter referred to as the "City," and Murraysmith, hereinafter referred to as the "Consultant," entered into an underlying agreement for design, engineering, and consulting services with respect to a project known as Yost and Seaview Reservoirs Repairs and Upgrades project, dated June 23, 2023 ("Underlying Agreement"); and WHEREAS, the Consultant has undergone a corporate name change and the parties desire to document the Consultant's official name and its agreement to undertake the responsibilities of the Underlying Agreement; and WHEREAS, additional tasks to the original Scope of Work have been identified with regard to providing engineering services; NOW THEREFORE, in consideration of mutual benefits accruing, it is agreed by and between the parties thereto as follows: 1. The Underlying Agreement of June 23, 2023 between the parties, incorporated by this reference as fully as if herein set forth, is amended in, but only in, the following respects: 1.1 Consultant Name. The Consultant, formerly known as Murraysmith, is now doing business as Consor North America, Inc. The Consultant hereby agrees to undertake all of the obligations and responsibilities of the Consultant set forth in the Underlying Agreement and any amendments thereto. 1.2 Scope of Work. The Scope of Work set forth in the Underlying Agreement is hereby amended to include the additional services and material necessary to accomplish the stated objectives as outlined in the attached Exhibit A incorporated by this reference as fully as if herein set forth. Packet Pg. 24 3.2.a 1.3 Payment. The $253,941 amount set forth in paragraph 2A of the Underlying Agreement and stated as an amount which shall not be exceeded, is hereby amended to include an additional not to exceed amount of $422,634 for the additional scope of work identified in Exhibit A to this Amendment No. 1. As a result of this Amendment No. 1, the total contract amount is increased to a new total not -to -exceed amount of $676,575 ($253,941 plus $422,634). 1.4 Fee Schedule. Exhibit B to the Underlying Agreement consisting of the rate and cost reimbursement schedule is hereby amended to include the form set forth on the attached Exhibit B, incorporated by this reference as fully as if herein set forth. 2. In all other respects, the Underlying Agreement between the parties shall remain in full force and effect, amended as set forth in this Amendment No. 1 but only as set forth herein. DONE this day of , 2023. CITY OF EDMONDS CONSOR NORTH AMERICA, INC. Michael Nelson, Mayor ATTEST/AUTHENTICATE: Scott Passey, City Clerk APPROVED AS TO FORM: Office of the City Attorney Printed Name: Title: Packet Pg. 25 3.2.a STATE OF WASHINGTON) )ss COUNTY OF ) On this day of , 2023, before me, the undersigned, a Notary Public in and for the State of Washington, duly commissioned and sworn, personally appeared , to me known to be the of the corporation that executed the foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said corporation, for the uses and purposes therein mentioned, and on oath stated that he/she was authorized to execute said instrument and that the seal affixed is the corporate seal of said corporation. WITNESS my hand and official seal hereto affixed the day and year first above written. NOTARY PUBLIC My commission expires: Packet Pg. 26 3.2.a EXHIBIT A SCOPE OF SERVICES YOST AND SEAVIEW RESERVOIRS REPAIRS AND UPGRADES PHASE 2 — FINAL DESIGN & BIDDING SUPPORT CITY OF EDMONDS Project Overview and Understanding Consor has developed the following Scope of Services and accompanying fee estimate to provide final design and bidding support services for the City of Edmonds (City) Yost and Seaview Reservoirs Repairs and Upgrades project. The scope and the fee have been developed based on discussions with City staff and our understanding of the project from the previously completed tasks, which included an assessment of both reservoirs, and Phase 1, which included an evaluation of alternative improvements and 30% preliminary design for the selected improvements. Services during construction will be included in a scope of services for the next phase of the project. The following is a list of the primary rehabilitation improvements to be designed for each reservoir. Other needed work and replacements addressed in the June 16, 2023 Alternatives Workshop and documented in the project reports will also be included in the final design. ➢ Install Fiberglass Reinforced Plastic (FRP) to the roof and walls ➢ Install roof -to -wall anchor brackets ➢ Non-structural rehabilitation of the reservoirs' interior to address leakage ➢ Replace existing 18-inch diameter Yost Reservoir outlet valve near Maple Street & 96th Ave W ➢ Repairs and upgrades to the reservoir piping Scope of Services The Scope of Services includes the following work tasks. ➢ Task 1— Project Management ➢ Task 2 — Subconsultant Coordination and Review ➢ Task 3 — Final Design ➢ Task 4 — Permitting and Agency Review Support ➢ Task 5 — Bidding Support Services ➢ Task 6—SubconsultantServices ➢ Task 7 — Unanticipated Task Reserve (As Needed) Detailed descriptions of each major work task follow. Consor • October 2023 • City of E Yost & Seaview Reservoir Repairs & Upgr Packet Pg. 27 3.2.a Task 1 - Project Management Objective Coordinate, monitor, and control the project resources to meet the technical, communication, and contractual obligations required for developing and implementing the project scope. 1.1 Invoices and Progress Reports Prepare and submit electronic monthly invoice for review and approval by the City. Each invoice shall include the following information. ➢ Billing period (start and end date) included in the invoice ➢ Description of work accomplished for the billing period ➢ Name, billing rate and hours for each resource that worked on each task ➢ Percent spent (by task if appropriate to the project) ➢ Potential out -of -scope work items 1.2 Project Team Management Consor's Project Manager will manage project staff and subconsultants in conformance with the scope of services, fee estimate, and schedule. 1.3 Quality Assurance (QA) Consor's Project Manager will manage in-house quality control reviews of deliverables. Provided by the City ➢ Timely review and processing of consultant invoices Task Deliverables ➢ Monthly invoices and progress reports Assumptions ➢ Consultant assumes a Notice to Proceed date in late October 2023 or early November 2023. ➢ The total length of this phase of the project is estimated to be up to fifteen (15) months. Task 2 — Subconsultant Coordination and Review Objective Work under this task includes coordinating subconsultant work tasks and review of subconsultant work products. 2.1 Structural Coordination and Review Manage subconsultant task orders and coordinate with subconsultant. Coordinate structural tasks with Peterson Structural Engineers and review structural deliverables. Consor • October 2023 • City of Edmonds Yost & Seaview Reservoir Repairs & Upgrades • 2 Exh A - Yost Seaview Reservoirs Design Bidding Scope 10-4-23 Packet Pg. 28 3.2.a Task 3 — Final Design Objective Produce bid -ready documents including final design plans, specifications, and an opinion of probable construction cost (OPCC or "estimate") (PS&E) for the project per the 30% preliminary plans and design elements documented in the Project Report from Phase 1 of the project. Final Bid -Ready PS&E will incorporate prior City review comments and be suitable for bidding. Subconsultant services to be incorporated into the design process are described under Task 6. 3.1 60% Design Plans will be developed at a 1"=20' scale and include details. Specifications in WSDOT format will include the City's front-end contract documents and general conditions, and Consor's technical specifications for all improvements except the reservoir improvements. Consor's technical specifications in CSI format will be used for the reservoir. PS&E developed by subconsultants will be reviewed for design consistency and quality prior to incorporating into the design submittal. The OPCC will be updated based on the 60% design and formatted to reflect the bid items in the bid schedule of the contract documents. The OPCC shall include a breakdown of improvements with unit quantities and cost estimates in more detail than the contract bid items. Include temporary erosion and sediment control (TESC) details and notes. Perform a constructability review of the 60% design. Perform quality reviews of deliverables. 3.2. 95% Design Further develop the PS&E to the 95% completion level based on the 60% design submittal and modifications from the City's review comments. PS&E developed by subconsultants will be reviewed for design consistency and quality prior to incorporating into the design submittal. The OPCC will be updated based on the 95% design and formatted to reflect the bid items in the bid schedule of the contract documents. The OPCC shall include a breakdown of improvements with unit quantities and cost estimates in more detail than the contract bid items. Include temporary erosion and sediment control (TESC) details and notes. Perform quality reviews of deliverables. 3.3 Final Bid -Ready Documents Further develop the PS&E to the 100% completion level based on the 95% design submittal and modifications from the City's review comments. Submit stamped and signed bid -ready contract documents and plans to the City. Update bid proposal quantities to reflect a bid -ready design package. PS&E developed by subconsultants will be reviewed for design consistency prior to incorporating into the final submittal. The OPPC will be updated based on the 100% design and formatted to reflect the bid items in the bid schedule of the contract documents. The OPCC shall include a breakdown of improvements with unit quantities and cost estimates in more detail than the contract bid items. Consor • October 2023 • City of Edmonds Yost & Seaview Reservoir Repairs & Upgr Packet P 29 Exh A - Yost Seaview Reservoirs Design Bidding g• 3.2.a Perform quality reviews of deliverables. 3.4 Design Review Workshops Prepare for and attend up to two (2) design review workshops with City staff after the City's review of the 60% and 95% design deliverables. 3.5 Public Outreach Support Prepare exhibits for City's project mailers. Provided by the City ➢ Attendance and participation in workshops. ➢ Complete technical review of the design submittal documents and provide one compiled written set of comments for each submittal prior to the review workshops. ➢ Standard front-end contract documents and specifications in MS Word format ➢ Workshop scheduling ➢ Review of agenda and meeting summary prepared by Consor for each workshop Assumptions ➢ Specifications will be in WSDOT format for the City's front-end contract documents and general conditions, and Consor's technical specifications of all improvements except the reservoir improvements. Consor's technical specifications will be in CSI format for the reservoir. ➢ City standard details will be included as an appendix to the contract documents and not included in the plans. ➢ City review period is assumed to be three weeks for each design submittal. ➢ Each workshop will be attended by up to three (3) Consor staff; will last for up to two hours; and will be held at Edmonds City Hall or remotely via Teams. ➢ Exhibits will be prepared for City public outreach mailers, based on estimated 10 hours of effort as shown in the fee estimate. Consultant Deliverables ➢ Submission of 60% and 95% design packages includes: o An electronic copy (PDF format) of the half size (11x17) plan set, specifications, and engineer's OPCC with a detailed breakdown of improvements; including MS Word documents of the specifications ➢ Submission of Final Bid -Ready package includes: Consor • October 2023 • City of Edmonds Yost & Seaview Reservoir Repairs & Upgrades • 4 Exh A - Yost Seaview Reservoirs Design Bidding Scope 10-4-23 Packet Pg. 30 3.2.a o An electronic copy (PDF format) of plan set (11x17 and 22x34), specifications, and engineer's OPCC with a detailed breakdown of improvements; including MS Word documents of the specifications and design drawings in AutoCAD ➢ Agenda for each workshop (draft and final) ➢ Summary of each workshop (draft and final) ➢ Exhibits for City public outreach mailers. Task 4 — Permitting and Agency Review Support Objective Support the City by providing information and figures for permit applications and agency approvals. City will take the lead preparing and submitting permits. 4.1 Support City During Permitting Provide information to the City in support of the permit requirements for the project and assist with responses to agency review comments. Listed below are anticipated for the project. ➢ City Clearing and Grading Permit with SWPPP ➢ DOH Construction Documents Review ➢ Structural/Building Permit ➢ Storm Permit 4.2 Stormwater Analysis Perform stormwater analysis, as required, for each site based on the Department of Ecology Stormwater Management Manual and the City's Stormwater Management Code. Provided by the City ➢ Preparation of permit applications and payment of permitting fees. Assumptions ➢ The Clearing and Grading Permit application package is anticipated to be submitted following the 60% design submittal. ➢ The Structural/Building Permit and Storm Permit applications are anticipated to be submitted following the 60% design submittal. ➢ The Construction Documents package is anticipated to be submitted following the 95% design submittal. ➢ If additional permits beyond those listed are required, a scope of services and fee amendment will be needed. Consor • October 2023 • City of Edmonds Yost & Seaview Reservoir Repairs & Upgr Packet P 31 Exh A - Yost Seaview Reservoirs Design Bidding g 3.2.a Consultant Deliverables ➢ Project information and figures for permit application packages. ➢ Responses to agency review comments. ➢ Stormwater technical report for each site Task 5 — Bidding Support Services Objective Assist the City on an as -needed basis during bidding and award of the project. 5.1 Bidder Inquiries and Addenda Assist the City in responding to bidders' questions and in documenting conversations; prepare addenda to clarify the contract documents. 5.2 Pre -bid Conference Attend a pre -bid conference for the project and provide support to the City for specific agenda items. 5.3 Bid Award Review Provide supplemental support in reviewing bids, contacting references, verifying qualifications, and recommending bid award. Assumptions ➢ The City will coordinate with Builders Exchange for bid advertisement. ➢ The City will take the lead in tasks associated with bid advertisement, addenda distribution, plan holder administrations, bid evaluation, bid tabulation etc. ➢ The City will be the lead in receiving questions from bidders, subcontractors, equipment suppliers and other vendors. Upon referral from the City, Consor will respond to questions. The fee estimate is based on approximately ten (10) questions, though this quantity could vary depending on the complexity of the questions. Questions related to confirmed errors or omissions of Consor's will be answered without being charged to the project. ➢ Up to two (2) draft addenda will be prepared for the City. ➢ The Pre -bid Conference will be attended by up to two (2) Consor team members. Consultant Deliverables ➢ Draft addenda for the City to distribute to plan holders. ➢ Written responses to bidder's questions as required. Consor • October 2023 • City of Edmonds Yost & Seaview Reservoir Repairs & Upgrades • 6 Exh A - Yost Seaview Reservoirs Design Bidding Scope 10-4-23 Packet Pg. 32 3.2.a Task 6 — Subconsultant Services Objective Subconsultant services will be provided in support of the final design. 6.1 Structural Engineering (Peterson) Consor subconsultant, Peterson Structural Engineers (Peterson), will provide structural engineering services for final design of the two reservoirs. A more detailed description of services is provided in Peterson's attached scope and fee estimate. Subconsultant Deliverables ➢ 60% and 95% structural drawings and specifications ➢ Stamped, bid ready structural calculations package ➢ Stamped, bid ready structural drawings and specifications ➢ Structural addenda for the City to distribute to plan holders Task 7 — Unanticipated Task Reserve (As Needed) A reserve budget amount has been included in the fee estimate for work under this task, which may include additional unanticipated work not specifically identified in the scope of work tasks defined above. Such work items will be undertaken only after written authorization from the City. Fee Estimate Work will be performed on a time and expense basis with a total not to exceed amount as shown on the attached Fee Estimate (Exhibit B). Schedule Estimate Below is the estimated schedule for the project. Activity Notice to Proceed 60% Design Submittal 95% Design Submittal Final Bid -Ready Submittal Bidding & Award Construction — 1'T Reservoir Construction — 2nd Reservoir Estimated Completion Late October —early November 2023 March 2024 July 2024 October 2024 January 2025 2025 2026 Consor • October 2023 • City of Edmonds Yost & Seaview Reservoir Repairs & Upgr Packet P 33 Exh A - Yost Seaview Reservoirs Design Bidding g• 3.2.a EXHIBIT B YOST AND SEAVIEW RESERVOIRS REPAIRS AND UPGRADES -FINAL DESIGN & BIDDING SUPPORT CITY OF EDMONDS FEE ESTIMATE LABOR CLASSIFICATION (HOURS) Principal Engineer VI $309 Principal Engineer V $298 Professional Engineer VII $222 Technician IV $182 Cost Estimator III $287 Engineering Designer III $182 Administrative III $132 Hours Labor Subconsultants Subconsultant Total with Markup Expenses Structural- Peterson Task 1 - Project Management Task 1.1 - Invoices and Progress Reports 8 15 8 30 61 $ 11,695 $ - $ $ 11,E Task 1.2 - Project Team Management 26 12 38 $ 11,153 $ - $ $ 11,1 Task1.3- Qua lity Assurance 24 24 $ 7,731 $ - $ $ 7,7 Task 1 Subtotal 58 0 27 0 0 8 30 123 $ 30,579 $ - $ $ $ 30,5 Task 2 - Sub Coordination & Review Task 2.1 - Structural Coordination and Review 8 4 24 6 42 $ 10,513 $ - $ $ 10,5 Task 2 Subtotal 8 4 24 0 0 6 0 42 $ 10,513 $ - $ $ $ 10,5 Task 3 - Final Design Task 3.1 - 60% Design 24 30 90 80 6 210 8 448 $ 95,799 $ - $ 1,840 $ 97,E Task 3.2 - 95% Design 18 16 90 80 4 210 6 424 $ 88,644 $ - $ 1,640 $ 90,2 Task 3.3 - Final Bid -Ready Documents 8 6 60 60 2 100 4 240 $ 49,834 $ - $ 1,180 $ 51,C Task 3.4 - Design Review Workshops 8 12 16 36 $ 8,390 $ - $ 100 $ 8,4 Task 3.5 - Public Outreach Support 1 2 4 2 1 10 $ 2,061 $ - $ $ 2,C Task 3 Subtotal 59 52 254 224 12 538 19 1158 $ 244,728 $ - $ - $ 4,760 $ 249,4 Task 4- Permitting Support Task 4.1- Support City During Permitting 8 35 70 113 $ 23,959 $ $ $ 23,9 Task 4.2 - Stormwater Analysis 2 20 20 40 82 $ 16,634 $ - $ $ 16,E Task 4 Subtotal 8 2 55 20 0 110 0 195 $ 40,593 $ - $ - $ - $ 40,5 Task 5 - Bidding Support Services Task 5.1 - Bidder Inquiries and Addenda 3 6 9 18 $ 4,063 $ - $ $ 4,C Task 5.2 - Pre -bid Conference 4 4 8 $ 1,685 $ - $ 200 $ 1,8 Task 5.3 - Bid Award Review 2 4 4 10 $ 2,329 $ - $ $ 2,3 Task S Subtotal 5 0 14 0 0 17 0 36 $ 8,076 $ - $ 200 $ 8,2 Task 6- Subconsultant Services Task 6.1 - Structural Engineering (Peterson) 0 $ - $ 39,260 $ 43,186 $ $ 43,1 Task 6Subtotal 1 0 0 0 0 0 0 0 0 $ - $ 39,260 $ 43,186 $ $ 43,1 Task 7;:Unanticipated Task Reserve anticipated Task Reserve (As Task 7.1eded) 1 0 $ - $ - $ 40,000 $ 40,C Task 7Subtotal 0 0 0 0 0 0 0 1 0 $ - $ - $ - $ 40,000 $ 40,0 OTAL-ALL TASKS 0 74 244 49 1 1554 $ 334,488 1 $ 39,260 $ 43,186 $ 44,960 $ 412,6 City of Edmonds Yost & Seaview Reservoirs September 2023 Consor Packet Pg. 34 Exh B - Yos[ &Seaview Reservoirs Design &Bidding Fee 9-26-23.xlsx .._ S ' • iJr• ' y• 1 0 r .. ew,.- v I �u Improvements Evaluation �r �w!%..,1xArAL October 17, 2023 City Council Meeting �6 %V •0 ... err 10 �• 1 OV E-D44 v Inc. 1 R90 _ 1 Aft .?G. Agenda N 3.2.b c O 3 C d y O i a N C d E t 0 m w Q r.+ C O E t V m r.+ a Packet Pg. 36 z , Roof loads per code exceed, .e capacity by 300% • Wall flexural capacity p Y exceeded by 14% • No roof to wall connection • Foundation insufficient to provide fixity on wall base for seismic loading 3 Roof to wall interface, • r N • -'N Tuberculat?MPE • Failure of join-, or • Joint sealants failing, reservoir leakage in exceedance of allowable per AWWA D110 • No flexibility on pipes connected to resery • 18-inch gate valve reaching the end of service life • Tuberculation on reservoir piping • Corroded silt stop • Ponding against reservoir perimeter_ D r--T--q L.J.- - L _.&a Minor cracking in wall Roof to wall interface • Roof loads per code exceed capacity by 200 • Wall flexural capacity exceeded by 48% in seismic condition • No roof to wall connection • Foundation insufficient to provide fixity on wall base for seismic loadinLy Reservc Tuberculation �s y f-. Drain outlet' • No flexibility on pipes connected to reservo • Tuberculation on reservoir piping • No silt stop on drain outlet • Trees within 50 feet of reservoir • Hatch hardware corroding • Vault ladder not per code • Minor cracking allowing infiltration 1%- • Igo 11Laaat: Fiberglass Reinforced Polymers (FRP) • Unidirectional reinforcement • Applied to reservoir walls and roof le FRP application to concrete It ��`aa 6 Roof to Wall Bracket Allows for movement for thermal while preventing lateral movemei roof and wall �M "Vnz;�& n. expansion it between Example roof -to -wall bracket Nq os T=@9 M1 Ah *Acknowledges merger of Consulting firms - MurraySmith and Consor North America *Scope of Work - Complete Final Design on both reservoirs *Amendment Fee - $422,634 (Includes $40,,000 Management Reserve) - $675,575 total design cost for both reservoirs • Schedule - 2025 Ist reservoir - 2026 2nd reservoir Oj E a Quest*ions °