2023-11-14 City Council PPW Packet1
2
OF BbMG
ti Agenda
Edmonds City Council
1,00
PARKS & PUBLIC WORKS - SPECIAL MEETING
CITY COUNCIL CONFERENCE ROOM
121 - 5TH AVENUE N, EDMONDS, WA 98020
NOVEMBER 14, 2023, 4:30 PM
COUNCIL COMMITTEE MEETINGS ARE WORK SESSIONS FOR THE COUNCIL AND CITY STAFF.
COMMITTEE MEETING AGENDAS DO NOT INCLUDE AUDIENCE COMMENTS OR PUBLIC HEARINGS.
PERSONS WISHING TO JOIN THIS MEETING VIRTUALLY IN LIEU OF IN -PERSON ATTENDANCE CAN
CLICK ON OR PASTE THE FOLLOWING ZOOM MEETING LINK INTO A WEB BROWSER USING A
COMPUTER OR SMART PHONE:
HTTPS://ZOOM. US/J/95798484261
OR JOIN BY DIAL -UP PHONE:
US: +1 253 215 8782
WEBINAR ID: 957 9848 4261
STAFF AND COUNCILMEMBERS ATTEND COMMITTEE MEETINGS VIRTUALLY, AND MEMBERS OF
THE PUBLIC ARE ENCOURAGED TO ATTEND THE SAME WAY.
IF MEMBERS OF THE PUBLIC CANNOT ACCESS THE VIRTUAL COMMITTEE MEETINGS WITH THEIR
PERSONAL DEVICES, A MONITOR IS PROVIDED ON CITY COUNCIL COMMITTEE NIGHTS FROM 3:30-
9:30 PM AT THE CITY COUNCIL CONFERENCE ROOM AT 121 5TH AVE N, EDMONDS WA.
COMMITTEE MEMBERS: DAVE TETZEL (CHAIR), DIANE BUCKSHNIS, COUNCIL PRESIDENT (EX-
OFFICIO MEMBER)
CALL TO ORDER
COMMITTEE BUSINESS
1. Committee Updates (30 min)
2. Public Works Update 3rd Quarter 2023 (0 min)
ADJOURNMENT: 5:30 PM
Edmonds City Council Agenda
November 14, 2023
Page 1
2.1
City Council Agenda Item
Meeting Date: 11/14/2023
Committee Updates
Staff Lead: Committee Chair CM Teitzel
Department: City Council
Preparer: Beckie Peterson
Background/History
The purpose of this standing agenda item is to allow a mechanism for staff to provide committees with
brief, verbal updates on an activity or project overseen by a department and so that the Council can be
more aware of what is happening around the city. Updates will facilitate a better set of expectations for
councilmembers, the public, and the staff.
Recommendation
N/A
Narrative
Requested Committee Updates for November 14, 2023:
1. Perrinville Creek
2. Sewer Odor Issue
Packet Pg. 2
2.2
City Council Agenda Item
Meeting Date: 11/14/2023
Public Works Update 3rd Quarter 2023
Staff Lead: Oscar Antillon
Department: Public Works & Utilities
Preparer: Royce Napolitino
Background/History
The Department of Public Works & Utilities is responsible for the operations and maintenance of the
City's physical infrastructure, including: street transportation networks, right-of-ways, and traffic control
systems; storm and surface water drainage systems and environmental pollutant discharge mitigation;
municipal -owned buildings and other facilities, potable water distribution systems and water quality
control, sewerage conveyance and collection systems; secondary wastewater treatment plant
management; and maintenance of the City's vehicle fleet.
Staff Recommendation
This report is intended to provide information. There is no recommendation.
Narrative
This 3rd Quarter 2023 report includes highlights, achievements, and other metrics for analysis. The
Public Works Department budget is comprised of multiple utility funds, operational and capital funds,
and the general fund. This report establishes an overview of these budgets with details of the successes,
accomplishments, and efforts made throughout the year.
Attachments:
PW&U Quarterly 2023 Q3 report
Packet Pg. 3
Mile v IN ley-, I IMLYNTAMMUCH
TAGE 2 244th to 210th
GATEWAY SIGNS
RAI 77 It
jp
LA
'PUBLIC WORKS
HAM,
0
AND UTILITIES
sw
tA
ED
"qm
/nc.
2.2.a
Organization
The Public Works Department provides care and maintenance to the City's physical
infrastructure. We strive to enhance reliability and performance of these systems
while maintaining a safe, clean, and healthy environment.
Our goal is to serve the community and to enhance the quality of life in the city. We
achieve this through a department that is community and customer focused. We
embrace leadership in environmental and energy design concepts & principles and
leverage technology & management principles to achieve operational effectiveness.
Budget Overview
Department
2022
2023
Engineering
$
2,847,103
$
3,211,439
Water
$
11,492,138
$
11,322,550
Sewer
$
31,340,523
$
15,368,746
Transportation
$
14,664,402
$
13,714,604
Stormwater
$
9,620,346
$
7,211,280
Facilities
$
3,450,275
$
2,364,445
Fleet
$
1,942,460
$
1,704,220
$
75,357,247
$
54,897,284
2 Packet Pg. 5
2.2.a
Facilities
People
Total positions approved
12
Loss
0
Gains
0
Current Vacancies
0
By The Numbers
Facilities
# of Buildings
21
Square footage
455,702
# Of restrooms maintained
36
Leases
Total SF of leased buildings
Energy Consumption
Q3 Highlights
Quarter three was highlighted by some milestone projects with eight new Public EV
Chargers installed at various locations across the City. The restoration of City Parks
maintenance yard parking and storage yard. Contracts were finalized and approved for
the Police parking lot fence, 7th Ave Sidewalk at Civic field, Anderson Center transom
window replacement, drinking fountains. City Hall is welcoming new staff and our
team facilitated the relocation of the Fire Districts fire marshal offices to the first floor
of City Hall and numerous office relocations and cubical reconfigurations for Planning
and Engineering. Construction mobilization and 50% completion of the Public Safety
solar plant. Completion of the updated Facilities Condition Assessment and beginning
of the Investment Grade Audit at the Anderson Center for required energy upgrades.
Summer preventative maintenance was performed on all City heating systems and
quarterly air filter changes were coupled with the beginning of cooling season in July.
Life Safety Systems (Fire Alarms, Sprinklers and Fire Extinguishers) were tested and re-
certified, and citywide carpet cleaning was performed
3 Packet Pg. 6
2.2.a
Training
Facilities completed training property PPE for carpentry tools, jobsites, raspatory and
eye protection and dark work site awareness. Single use proper labeling requirements
and proper disposal of e-waste. The Custodial staff Completed training in chemical
"right to know" awareness, and basic electrical safety in the workplace.
Projects
Library Upgrade:
Library remodel support is on -going, Facilities attend weekly construction meetings
and is advising Faber Construction as necessary to expedite re -opening efforts. Project
is making good progress with new lighting and ceiling work being installed.
Architectural details, FF&E and other supply chain issues are holding up re -grand
opening possibly until early 2024.
Active Projects
DP
Title
Notes
61
Anderson Center, Fire panel replacement
Complete, June 23
61
Anderson Center, Elevator refresh
Complete, June 23
61
Anderson Center, Gym Floor
Scheduled for Dec
61
Anderson Center, Transom Window replacement
Permit and submittal process
61
Anderson Center, Drinking Fountain Replacement (7)
Submittal and ADA review
process
61
Anderson Center, Radiator valve replacement
Cancelled. Completed in-
house
61
Historic Log Cabin, Roof Replacement
On Hold, no responsive bids
61
Fire Station 17, Apparatus ceiling replacement
Complete, July 23
61
B&G Club south windows and wall
Cancelled
61
Beach ranger station, electrical panel repairs
Pending scheduling
61
Beach ranger station, rollup door replacement
Cancelled. Parks plan to
replace with regular doors
61
Museum brick fagade, repair
Design in progress
61
City Park, Gazebo roof replacement
Complete
61
Meadowdale club house, interior painting
Complete, August
CF
22
Electric Vehicle public charging stations. (Seven Locations,
eight chargers)
Complete, September
CF
Fleet Infrastructure, Electric Vehicle Chargers (Two
locations, six chargers)
Complete
CF
Painting, Anderson Center Classrooms, Public Safety, City
Hall common areas, & PW common areas
Complete
CF
Public Safety Solar
50% complete
4 Packet Pg. 7
2.2.a
Police Campus fence Notice to proceed has been
issued and materials ordered,
final permit review in progress
Metrics
160
140
120
100
so
60
40
20
0
Facilities Service Calls
,I. .,_ 110
Jan Feb Mar
HE III mi.
Apr May Jun
• Contract ■ In House ■ PM's
.l
July
.1I
11
Aug Sept
M
a
M
N
O
N
CL
L
0
U_
7
a
0
0_
M
a
Cl)
N
O
N
L
L
CU
V
(L
c
a�
E
L)
a
5 Packet Pg. 8
2.2.a
Sewer and Water
Sewer
Total positions approved
7
Loss
0
Gains
0
Current Vacancies
0
By The Numbers
Sewer
Sewer pipes
186 Miles
Sewer lift stations
14
Residential grinder pumps
29
Accounts
9800
Manholes and cleanouts
3425
Sewer Comprehensive Plan
August 2013
Q3 Highlights
The Sewer Department is responsible for
the maintenance of 14 sanitary lift stations,
3200 sanitary sewer manholes and over 186
miles of sanitary sewer mains serving 9800
customer accounts. Seven FTE's are
responsible for these functions as well as
the maintenance of 26 residential grinder
pumps.
• Sewer Department continues to clean
and inspect sewer lines using the TV
truck, push cameras and visual
M
a
M
N
O
N
Q.
L
0
a
0
L
M
a
M
N
O
N
i
d
fU
a
a
c
a�
0
2
a
N.
Packet Pg. 9
2.2.a
inspection of manholes. During the
third quarter of 2023 they cleaned
and inspected 54,299 feet of sewer
main and inspected 615 manholes.
They also performed root cutting in
3448 linear feet of main.
• The Sewer Crew performed 748
utility locates in the third quarter.
• Crews replaced pump and motor at
LS 10.
• With the purchase of the new
shoring system in 2022, the sewer crew can perform sewer main repairs up to 8
feet in depth. Sewer Department crews repaired 4 sewer mains and 1 sewer
lateral during the third quarter which typically would have required an outside
contractor.
• Crews focused on sewer cleaning, TV inspection and pipe rating. Sewer crews
followed up with in-house main line repairs of pipe breaks identified during the
forementioned programs. .
Training
Sewer Staff have completed rigging and chainsaw safety training.
Projects
Crew continues to identify and correct system deficiencies utilizing the CCTV truck and
pipe rating system.
Packet Pg. 10
2.2.a
Metrics
Sewer Work Orders
Utility Locates
1000
800
705 748
700
654
800
600
600
500
400
400
300
200
200
50 44 53
100
0
�—
0
Q1 Q2 Q3
Q1 Q2 Q3
■ Pumps/Lift stations ■ Sewer line ■ Manholes
■ UULC ■ Private Request
60000
53127 53127
50000
40000
30000
20000
10000
0
CCTV and line Flush (LF)
33470 33470
Q1 Q2
■ CCTV (LF) ■ Pre Flushed / Jetted (LF)
54299 54299
Q3
M
d
M
N
0
N
d
r
ca
CL
N
L
O
2
3
a
O
Q
N
L
M
d
M
N
O
N
21
O
ca
3
a
D
06
a
c
am
E
t
t�
ca
w
w
Q
8 Packet Pg. 11
2.2.a
Water
People
Total positions approved
9
Loss
0
Gains
0
Current Vacancies
0
By The Numbers
Water
Reservoirs
4 total 7.5 MG (one 3M & three 1.5M)
Water Pipes
138 Miles
Service Connections
10,372
Pressure Reducing Stations
19
Valves
3129
Hydrants
1205
Blow -off
305
Backflow Assemblies
2692
Comprehensive Water System Plan
October 2017
Q3 Highlights
The Water Division is responsible for the maintenance
and operation of the City's water distribution system
for the constant and safe delivery of potable water to
over 10,372 accounts. The Water Division operates
and maintains all storage and conveyance
facilities including over 138 miles of distribution
mains, 18 pressure reducing stations, three
1,500,000-gallon reservoirs, and one 3,000,000
gallon reservoir and pumping station. Nine FTE's
are responsible for the above functions.
• The Water Department installed 5 new
water services during the third quarter,
1970's Era Polyethylene Water Service Leak
14
M
a
M
N
0
N
d
r�
Q.
L
0
a
0
L
M
a
M
N
O
N
i
d
r_
CU
a
a
c
E
0
a
9 Packet Pg. 12
2.2.a
• The Water Quality Department collected over 160 samples during the third
quarter.
• The Water Department had 19 afterhours calls for service during the third
quarter.
• Performed 748 utility locates.
• Replaced 108 water meters.
• This quarter we repaired 13 water service leaks, 7 of which we replaced the
entire service line. We also replaced an additional 8 Services that were adjacent
to leaking services.
• Preformed PFAS Sampling as required by the USEPA Unregulated Contaminate
Monitoring Rule 5 (UCMR 5), awaiting results.
Training
Water Staff have completed rigging and chainsaw safety training.
Projects
Water Crews continued to face many leaks in aging polyethylene service lines this
quarter. Crews continue to support the capital main replacement projects by
performing shutdowns and flushing as new water mains were tied into the existing
system.
Metrics
Services Turn off's
8 60
6
40
4
20
Jan Feb Mar Apr May Jun Jul Aug Sep Jan Feb Mar Apr May Jun Jul Aug Sep
■ Installed (New) ■ Replaced ■ Repaired ■ Drop In Meter Install ■ Deliquents / Non -pay ■ Customer Reqested
M
a
M
N
O
N
Q.
L
Q
a
0
0_
L
M
a
Cl)
N
O
N
i
CU
cY
(L
c
a�
L)
to
Q
10 Packet Pg. 13
2.2.a
60
50
40
30
20
10
0
60
50
40
30
20
10
0
Meter Exchanges
in. L — I-- In— II.. I ■■ I _
Jan Feb Mar Apr May Jun Jul Aug Sep
■ 3/4" ■ 1" ■ 1.5" ■ 2"
Dispatches
11
01
01
ICI
J
Jan
Feb
Mar Apr
May Jun Jul
■ Afterhours
■ Buisness Hours
Aug Sep
Locates
300
250
200
150
10 50
I I
0
Jan Feb Mar Apr May Jun Jul Aug Sep
■ UULC ■ Private
M
a
M
N
O
N
d
r�
Q
Y
L
O
a
O
O_
M
a
CI)
N
O
N
i
d
fU
CY
(L
c
a�
E
L)
a
11
Packet Pg. 14
2.2.a
Storm & Street
Storm
am$
Total positions approved
8
Loss
Gains
Current Vacancies
1
(Trevor 11/22) Storm Maintenance position
By The Numbers
Storm
Vegetation Control sites/locations
145
Stormwater catch basins
6971
Stormwater manholes
1682
Stormwater Culverts
2309
Detention Systems, Bio Swales & Rain
gardens
632
Miles of Stormwater pipe
140
Creek areas monitored weekly
56
Q3 Highlights
This time of the year we are finishing up the summer season programs and
transitioning into winter weather preparations. The Storm crew has been busy
preparing for winter storms by cleaning drain sumps and running both our sweepers to
try and keep pace with the fall season. We are doing creek checks multiple times a
week clearing vegetation and blocked trash racks from the fall foliage. Crews perform
extensive work on vegetation management to help prevent system blockages and to
maintain access to our storm system structures. Completed many basin repairs and
one storm system installation on OVD to help prevent flooding of private properties
and to improve the storm system overall. The rain gardens have been serviced to help
maintain proper functioning conditions. Hauling solid waste to maintain our yard
12 Packet Pg. 15
2.2.a
capacity. Many man-hours providing for community events such as The Taste of
Edmonds, Octoberfest, Porch-fest, Perrinville Palouze, Fourth of July, and Halloween.
Training
Nothing to report this period.
13 Packet Pg. 16
2.2.a
Metrics
Storm Drain
ON
700
600
500
400
300
200
100
0
Jan Feb Mar Apr May
■ Storm drain inlet maintenance (number of inlets maintained)
E L
Jun Jul Aug Sep
■ Lines of Storm drain lines flushed
M
a
M
N
0
N
d
Q
Cn
Y
0
(L
It
0
0_
m
L
M
a
CI)
N
O
N
i
d
fU
CY
a
c
a�
E
U
a
14
Packet Pg. 17
2.2.a
Street
People
Total positions approved
9
Loss
1
Gains
Current Vacancies
11
(Chuck 4/23) Signal Tech position open
By The Numbers
Street
Lane miles of Roads
290
Linear miles of painted lines
143
Crosswalks
497
Roadway symbols
4444
Signalized Intersections
25
Flashing signs
33
Rapid Flashing Beacons (RRFB's)
71
School Zone Flashers
24
Radar Feedback Signs
18
Traffic and street signs
7823
City Owned streetlights
59
Decorative Street lights
26
Sidewalks inspected (Miles)
93
Q3 Highlights
4
Street department also currently transitioning into winter weather programs. The paint
crew has completed our road markings program/painting is complete for this year. Our
crosswalk maintenance program has been completed with 3500 feet of hot tape being
applied focusing on schools and high pedestrian trafficked areas. Our signal
maintenance program has been completed servicing all of the signalized
intersections. The replacement RRFB's at 220th and 80th has been replaced twice due
to accidents. Other RFB and RRFB installations at 80th and 212th, 5th and Pine, 9th and
Edmonds, 76th and 231st, and 96th and 224th have been completed and are now
operational. Three hazardous tree projects have been completed. Many hours of
pothole repairs and pavement maintenance. Numerous trip hazards removed via
15 Packet Pg. 18
2.2.a
sidewalk panel replacement or
grinding focused on city owned
assets. One connectivity sidewalk
project completed at 2nd and Main.
Our street sign cleaning program has
been completed providing for better
reflectivity during winter months and
extending the life of our street sign
inventory. Ongoing vegetation
management to maintain line of sight
issues within the city's rights -of -way
and intersections. Many man-hours
providing for community events such
as The Taste of Edmonds,
Octoberfest, Porch-fest, Perrinville
Palouze, Fourth of July, and
Halloween.
Wait
A
M
a
M
N
O
(14
d
r�
Q.
0
U
a
0
0_
0
L
M
a
CI)
N
O
N
i
d
fU
a
0
a
c
a�
E
a
16
Packet Pg. 19
2.2.a
Training
Nothing to report this period.
Metrics
120
100
80
60
40
20
0
800
600
400
200
0
100
80
60
40
20
0
Service Calls, Tree, Traffic Lights & Signs
Jan Feb Mar Apr May Jun Jul Aug Sep
■ Customer service calls ■ Tree response issues ■ Traffic lights maintenance or repair ■ Signs repaired or replaced
Sidewalks & Pavement
0. Im I.
Jan Feb Mar Apr
■ Sidewalk repairs or new (SF)
1. . — L
May Jun Jul Aug
■ Pavement patch (potholes)
Special Events & After Hrs
0 E —EI— ELI. I. I=
Jan Feb Mar Apr May Jun
■ Special events support (Hrs) ■ Snow response (Hrs worked)
Sep
1 — I.
Jul Aug Sep
■ After hrs calls/Emergency
M
a
M
N
O
N
d
Q
Y
L
0
a
0
CL
L
M
a
CI)
N
O
N
a�
CU
a
a
c
a�
E
t
0
2
a
17
Packet Pg. 20
2.2.a
Wastewater Treatment Plant
People
Total positions approved
20
Loss
0
Gains
1
Current Vacancies
2
By The Numbers
Sewer Treatment Plant
Treatment capacity
11.8 MGD
Current Average flow
6.5 MGD Winter,
4 MGD Summer
Constructed
1957
Plant updated
1986-91
Plant update (carbon recovery)
2019-23
Service Area
Q3 Highlights
Staff:
WWTP Supervisor position was filled by internal
candidate.
Completed Projects:
• Schwing hydraulic sludge pump seals and
poppets replaced by contractor. CoE
maintenance staff trained with contractor so
future repairs can be done in house.
• Damaged NPW electrical control panel, NPW
flow meter, and WAS pump VFD panel
rebuild/replacements were completed.
• Vibration analysis and rebuild of LP Blower 304
completed.
• HP air system compressor parts on backorder (12 weeks), rental compressor
installed to supplement system until parts arrive.
FJ
18 Packet Pg. 21
2.2.a
• New cooling unit installed in 600 bldg. MCC
room.
• Tapped and ran camera through secondary
clarifier feed line looking for obstruction that
is limiting flow to the clarifier. Results showed
no obstruction at valve, will need to drain
clarifier and camera from the other direction
(inside the clarifier) to look for flow
impediment.
• 3000-gallon caustic solution tank in plant
parking lot during Nuvoda trial was removed.
r
IL2
Process:
The plant performed well during Q3. We processed over 320 million gallons of
wastewater this quarter and processed over 2662 wet tons of biosolids. Throughout
the dry season, as plant influent flows were reduced, we removed unnecessary tanks
and equipment from service to conserve energy and do annual maintenance and
inspections.
M
a
M
N
O
N
d
r�
Q
N
Y
O
7
a
0
a
m
L
M
M
N
O
N
i
d
r-
fU
O
a
0
a
c
a�
E
0
2
a
19 Packet Pg. 22
2.2.a
Odor Control:
Odor complaints along the Lake Ballinger sewer line were reduced this quarter. We
worked with King County and were able to change the pumping strategy so that more
KC flow was pumped during periods of low influent flow as to eliminate the larger flow
peaks that we suspect contributed to the excess odor. We also purchased and
installed several additional activated carbon manhole filters. We are working with
Bioair to conduct an overall system odor study which will evaluate the entire Lake
Ballinger sewer line and help us to determine proper odor control equipment and
sizing. We also continue to take odor readings at several locations along that line often
and try to respond to each odor complaint in a timely fashion. We will continue to be
proactive to try to minimize or eliminate these odors.
Carbon Recovery Project:
Modifications have been made to the conveyance system to improve functionality and
the 4 million BTU burner has been relocated to help eliminate stack discharge during
process startup. Commissioning has started back up and the contractor continues to
troubleshoot operational issues such as dust control on the new conveyance system,
issues processing influent screenings, sludge/mix plugs occurring at multiple locations
within the process, and chemical feed pump issues. We have produced and hauled
approximately 8 tons of flexchar with the system so far and potentially have two
businesses interested in beneficial reuse of the product depending on laboratory
analysis of the product.
20 Packet Pg. 23
2.2.a
Metrics
Operations and Maintenance.
90
80
70
60
50
40
30
20
10
0
3000
2500
2000
1500
1000
Maintenance & Repair
1 ■ ■ . on ■_ on ■_ ■d ■
Jan Feb Mar Apr May Jun Jul Aug Sep
■ Preventive Maintenance/total WO ■ Repairs/Corrective WO
Lab Work
500
o ■■■ ■■■ — — — — — —
NPDES PSNGP In-house Outsourced Biosolids BioAirTests: BCD/cBCD: TSS:
Compliance Compliance Analyses: Analyses: Tests:
Tests: Tests:
■ Q1 ■ Q2 ■ Q3
M
a
M
N
0
(14
d
Q
0
a
0
0-
0
L
M
a
Cl)
N
0
N
i
a�
CU
a
0
a
c
a�
t
co
Q
21
Packet Pg. 24
2.2.a
Solid Waste, Treatment
1200
1000
800 725.4 764.4
600
400
200
0
Biosolids to landfill
(Wet Tons including screenings)
1087.8
.922.6 970.6 884.1 891 931
Jan Feb Mar Apr May Jun
250
203.3
200
150
100
50
0
134.1
Treatment (Million Gal)
164.8
151.7
841
Jul Aug Sep
126.7
115.8 114
E — 104 103 —
Jan Feb Mar Apr May Jun
Jul Aug Sep
M
Cr
M
N
0
N
d
r
ca
CL
D
N
L
0
2
3
a
0
a
N
L
M
a
M
N
(D
N
a)
ca
3
a
D
06
a
C
a)
E
t
t�
ca
w
w
Q
22 Packet Pg. 25
2.2.a
Fleet
Q1 Highlights
Total positions approved
3
Loss
0
Gains
1
Current Vacancies
1
By The Numbers
Fleet
PD Vehicles
43
PW Vehicles
125
Heavy Equipment (tractors, excavators etc)
27
Dump trucks (plows)
10
Electric Vehicles
11
Hybrid Vehicles
15
Trailers
19
Sweepers
2
Special Vehicles (camera truck, Vacuum truck)
7
Generators
14
Fuel island capacity (Unleaded)
22,000
Fuel island capacity (Diesel)
9,600
EV chargers
9
Fleet has made many improvements throughout the course of 2023 so far. Notable
improvements include, critical software and systems upgrades, hiring an additional
Fleet Mechanic, implementing a new take home vehicle policy, purchasing and
upfitting a record number of vehicles and equipment, and securing new
interlocal agreements with Arizona State and Snohomish County. Leading into the 4th
quarter, Fleet will be finalizing the remaining new vehicle purchases and set ups.
Achievements — 3rd Quarter
Although we did receive the anticipated vehicles during this quarter, we were unable to
put them into service due to delays in the upfitting process. The notable achievements
23 Packet Pg. 26
2.2.a
during this quarter still reflect a very productive three months. It also provides for a
very promising conclusion to 2023.
• Updated fuel site management software
• Hired an additional Fleet Mechanic
• Put into service 3 new vehicles
• Received 17 new police vehicles
• Ordered the remaining 4 vehicles that were unavailable earlier in the year
• Completed a balanced budget for 2024 with minimal increases only in utilities
and salaries.
•
Goals-4t" Quarter
The arrival of 17 more vehicles was a great step forward towards fulfilling the 46-vehicle
schedule for this year. These vehicles are ready for upfitting and have not been put into
service yet but will be before the conclusion of 2024. Once we receive them from
Systems for Public Safety, the final onboarding will consume a large majority of this
quarter. We anticipate 3-5 vehicles will be carryforwards into 2024 because of
production delays.
The winter months in the 4t" quarter tend to be unpredictable and can quickly redirect
the focus of the Fleet division. Street sweepers, Vactors, and snow removal equipment
is always a priority focus during this period.
All major goals and objectives have been met or made significant progress towards
completion so far this year. The remaining goals for Fleet is to put into service the
remaining vehicle additions, implement a comprehensive Fleet Policy, and continue to
improve our work flow with the addition of a new Fleet Mechanic. The final quarter of
2023 show signs of a strong conclusion to this year.
24 Packet Pg. 27
2.2.a
Metrics
Work Orders by Work Type
2
2
ACCIDENT
L' COMPLETE ANNUAL
NEW VEHICLE SET UP
OUTSIDE AGENCY REPAIR
PREV MAINTANENCE
REPAIR
TRAILER SERVICE
L' WARIANTY
Fleet Maintenance & Repair Fuel and Miles
150 150000 122459 120474
97224
100 100000
50 ' . ' 50000 111380
E =
0 0 M
Q1 Q2 Q3 Q1 Q2 Q3
■ Preventive Maintenance (WO) ■ Repairs (WO) ■ Fuel used (GAI) ■ Total miles (all vehicles)
M
a
M
N
O
(V
d
IZ
to
Y
O
7
a
O
O_
d
L
M
a
Cl)
N
O
N
i
d
to
O
a
a
c
a�
E
0
a
25
Packet Pg. 28
2.2.a
New Vehicles Accidents
11
10 9 6
5 4
5 3 3
■ ■ ■ 2 ■
0 0
Q1 Q2 Q3 Q1 Q2 Q3
■ New Vehicles Received ■ New Vehicles setup ■ Accidents
Date
Vehicle
Department
Description
Repair Cost
Low speed accident in a parking lot.
1/12/2023
2016 Ford
PD
A vehicle backing out of a parking lot
$949.17
Explorer
hit the Explorer, damaging the rear
taillight
Low speed accident on the street.
2/10/2023
2015 Isuzu NPR
Parks
vehicle was rearended while stopped
$0.00
for pedestrians. No damage
2023 Toyota
PW
Police K9 damaged paint while
4/18/2023
RAV4
Facilities
vehicle was in storage.
$195.00
2021 Ford
PD
Curb damage at high speed.
4/26/2023
Explorer
Damaged subframe/wheels
$2,650.00
2020 Ford
PD
Hit concrete base of lightpole in
4/23/2023
Explorer
parking lot.
$17,915
PW Sewer
Vehicle was backed into by other city
6/1/2023
2021 F-150
vehicle @ PW
$4,130.00
2022 Ford
PD
Vehicle was backed into. Minor
6/4/2023
Explorer
damages.
$0.00
2017 Ford
PD
Hit oncoming vehicle, ran red light
7/1/2023
Explorer
responding to call.
2022 Ford
PD
Rear ended another vehicle while
7/12/2023
Explorer
looking at computer
2017 Ford
PD
Suspect rammed patrol vehicle
7/2/2023
Explorer
resisting arrest.
2016 Ford
PD
8/6/2023
Explorer
Drive away at fuel pump
2021 Utility
Parks
Tailgate made contact with trailer
8/4/2023
Trailer
turning too sharp
2016 Ford
PD
Passing vehicle too closely, minor to
8/8/2023
Explorer
no damage
M
d
M
N
O
N
m
r
c�
a
0)
0
3
a
0
a
M
d
M
N
O
N
21
ca
3
a
06
a
m
E
cU
w
Q
26 Packet Pg. 29
2.2.a
Engineering
Total positions approved
18.5
Loss
1
Gains
1
Current Vacancies
1
August
• Engineering reluctantly said goodbye to our student intern, Alexis, as she
returned to WSU for a new school year. We are planning to have her return to
help us again during her winter break in December.
September
• We welcomed our new Associate Engineer, Jenelle Ho. Jenelle is a junior
engineer and comes from Atwell (formerly Blueline Group), a local Civil
Engineering firm that has completed design projects for the City's Engineering
department. She has provided construction management support for the 2023
Utility Replacement project and will be helping with the City's Storm, Water, and
Sewer Replacement programs and assisting with updates to our construction
standards.
• Recruitment started for a new Capital Projects Manager.
Q3 Highlights
Contracts Awarded
July 2023
• Professional Services Agreement signed with Transpo Group for the Citywide
Lighting Study - $51,700 Contract
August 2023
• Professional Services Agreement - On -Call Stormwater Review for $80,000
awarded to Atwell (formerly The Blueline Group)
• 2023 Overlay Project awarded to Granite Construction ($759,599)
27 Packet Pg. 30
2.2.a
Training
July 2023
• Emiko Rodarte completed Basics of Managing Financial Records through the
Washington State Archives.
Capital Projects
• Storm & Surface Water Comprehensive Plan. Presentations were made to
Council on August 22nd to kick off the SCP update. A robust public outreach
campaign included a project web page, public survey, and two public workshops
(via Zoom) were planned for Q4 to gain public input.
• Utility Rate Analysis. A presentation was made to Council Committee in
September for our Utility Rate Analysis to update our utility rate charges for our
Drinking Water, Sewer and Storm Utilities. The funds generated are used solely
for each respective utility and is used to ensure the upkeep of the respective
utility so that reliable service is maintained.
• Utility General Facilities Charges. A presentation was made to Council
Committee in September to update the City's Utility GFCs that are assessed to
new customers who connect to our existing utilities or if existing customers
request a larger service connection.
• 2023 Overlay Project. Granite
Construction began work in September
to grind and pave approximately 1.2
lane -miles of asphalt streets. The
project included detouring northbound
traffic off 76t" Ave from Edmonds Way
to 238t" St SW so they could use two
side -by -side pavers simultaneously.
Granite will adjust iron lids and install
new striping in October.
• 2023 Utility Replacement Project.
Watermain and sewer main installations on Main Street have been completed,
with final site restoration to be completed Q4. Installation of sewer main on
Maple St. in progress and will be completed by mid -October.
28 Packet Pg. 31
2.2.a
2023 Pedestrian Safety Program. Three Rectangular Rapid Flashing Beacons
(RRFB's) were installed at --I—
the following locations:
o 224t" St. SW @ 96tn
Ave. W.,
o 216t" St. SW @ 72md
Ave. W, and
o 212th St. SW @ 80tn
Ave. W
I'JU16
• Highway 99 Revitalization
Stage 2 Project. The new
pedestrian HAWK signal on
Highway 99, north of 234tn
St, was activated in August.
The new signal shortened
the distance between
crosswalks on Highway 99
between the intersections
at 238th Street and 228th
Street.
• Citywide Bicycle Improvements & Elm Way
Walkway Project. The City's contractor started
work in August and built new ADA compliant
pedestrian curb ramps on Bowdoin
Way/Walnut St. and 9t" Ave/100t" Ave. Initial
traffic signal modifications and some pavement
striping for bike lanes on Bowdoin Way/Walnut
St were also completed.
_CFt
�J�molt
M
a
M
N
O
N
d
Q.
0
U
a
0
0_
M
a
M
N
O
N
i
d
fU
a
a
c
M
0
a
29 Packet Pg. 32
2.2.a
Private Development
Construction activity increased through the later summer months and a substantial
number of inspections were performed. Exceptional response time was provided and
all inspection requests were responded to within 24hrs or less. 13 development review
committee/Pre-Application meetings were held throughout the quarter, which
provides prospective developers, homeowners and business owners, one on one
meeting time with permit reviewing staff. Franchise negotiations with PSE are ongoing
as well as discussions with PUD on permitting procedures. Policy, Code and Comp plan
updates have also been completed and/or are underway.
Metrics
Private Development
Engineering Inspections
450
391
388
400
350
300
250
zoo
150
100
50
0
201
July August September
■ Engineering Inspections
# of Permits
20
15
10
]IN
N
INN
0
July
August September
■ Standard EUC
■ Minor EUC
■ New SFR - ENG
New SFR - Storm
■ New Commercial/Multi-Family
- ENG ■ New Commercial/Multi-Family - Storm
■ Repairs/Partial Replacements
Review Response Time (Days)
60
50
40
30
20
10
July August September
■ Standard EUC ■ Minor EUC
■ New SFR - ENG ■ New SFR - Storm
■ New Commercial/Multi-Family - ENG ■ New Commercial/Multi-Family - Storm
■ Repairs/Partial Replacements
Construction
M
a
M
N
O
(V
d
r�
t6
a
L
0
U
a
0
Q
L
M
a
Cl)
N
O
N
i
d
fd
0
a
a
c
a�
E
0
2
a
30 Packet Pg. 33
2.2.a
Active Contracts
4.5
4
4
3.5
3
2.5
2 2 2 2
2
1.5
1
1
0.5
0 0 0
0
Contracts under construction # of change orders completed # of RFI's answered
■Jun ■Jul ■Aug
Work in Place
$2,500,000.00
$2,184,649.59
$2,000,000.00
$1,500,000.00
$1,000,000.00 $690,188.75
$500 000.00 $432,421.51
1
■Jun ■Jul ■Aug
M
a
M
N
O
N
d
Q
Y
L
O
U
(L
It
O
Q
d
L
M
a
CI)
N
O
N
i
d
to
a
a�
(L
C
d
E
M
c)
O
Q
31
Packet Pg. 34
ENGINEERING PROJECT STATUS REPORT
2.2.a
Estimated Project Cost $366,843NIS
Expenditures to Date $41,657
Estimated Construction Date Q2 2025 W
Edmonds Marsh • Howell
Estimated Completion Date Q3 2025 a
3
Project Manager Russell Lynch C111,116-rk
Project Webpage o •
Project Description a
M
The project will be improving water quality of stormwater runoff by replacing existing catch basins along the west side of SR- N
104, along the frontage of the Edmonds marsh. The catch basins will be replaced with catch basins that include water quality
filter cartridges. Staff proposes this effort in order to provide water quality mitigation for all discharges that directly enter thl
marsh from these locations. The project will be divided into phases, with phase 1 replacing the catch basins on the west side �
of SR-104 and a future phase replacing the catch basins on the east side of SR-104. (n
L
0
Project Status
U
Preparation of Memorandum of Undertstanding between City and WSDOT is currently in progress. Preparation of a
Agreement between City and Department of Commerce to release appropriation funds is also currently in progress.
0
Right of Way StatusCL
Final Design 7 Construction Complete L
N/A a
M
N
Related Documents N
as
C�
City Council Actions
Design Contract Awarded 6/26/2023 a
Construction Contract Awarded
L)
Stormwater Utility Fund 422 $152,836 $152,836 Q
ARPA Funds
Secured Grants $214,007 $214,007
Unsecured Grants
Funding Source Total $366,843 $366,843
Packet Pg. 35
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost
Expenditures to Date
$100,000/yea r
Estimated Construction Date Q3 2023
Estimated Completion Date
Project Manager
Project Webpage
Project Description C1
M
Reducing scouring flows to reduce sediments load in Perrinville Creek was identified in a previous basin report completed in N
2015 as a critical element of restoring this creek which has been significantly impacted by urban development. The projects a,
funded by this program are incremental steps toward recovering this stream run as adequate fish habitat. These efforts have
CL
become even more critical given recent challenges around the Perrinville Creek outfall area. This program is a fund for
implementing projects within the Perrinville Creek basin to reduce scour flows in the creek. It allows staff flexibility to Y
respond to ad -hoc opportunities such as rain garden cluster projects, or ensure matching funds are available for chasing grar 0
applications for flow reductions projects.
Project Status a
SnoCo Conservation District Designing and constructing Raingardens in Perrinville on 83rd ave W between 188th & 190th. c
a
Right of Way Status M
Complete CJ
Pre -Design
-
a% M
� N
O
N
21
Related Documents
as
�a
3
a
06
City Council Actions a
Design Contract Awarded 3/16/2023
Construction Contract Awarded
CU
r
w
Q
Stormwater Utility Fund 422 $120,000 $100,000 $100,000 $100,000 $100,000 $520,000
ARPA Funds
Secured Grants
Unsecured Grants
Funding Source Total $120,000 $100,000 $100,000 $100,000 $100,000 $520,000
Packet Pg. 36
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost $7,050,000
Expenditures to Date $130,058
Estimated Construction Date TBD
Estimated Completion Date TBD
Project Manager Mike DeLilla
Project Webpage
Project Description C1
M
The purpose of this project is to improve the environmental health of the creek necessary to support fish habitat, and to N
restore the storm water capacity. The project consists of the modifications to three structures that currently prevent fish a,
passage and are undersized for the flows on the creek, (1) the culvert at the BNSF track, remove and replace with a fish-
CL
friendly culvert or bridge with adequate flow capacity, (2) return flow to the creek between the diversion structure and the
BNSF culvert by blocking the structure and restoring creek capacity and (3) culvert at Talbot Road, remove and replace with Z Y
fish -friendly culvert or bridge that provides adequate fish passage and storm water flow capacity. This project will increase 0
the resiliency of the watershed by building the structures that mimic the natural channel performance necessary for fish :
habitat and stormwater flow capacity. The project also includes time and effort to research and apply for
supplemental/additional funding sources for construction. Due to the project complexity and number of stakeholders, the a_
planning and design phase is estimated to be 2-years.
0
a
Project Status L
M
d
Construction easement negotiations with property owners & BNSF in progress. Preliminary stream alignment design in M
N
progress. N
J Right of Way Status
Final Design > > Construction Complete
L of
Related Documents 06
a
m
E
City Council Actions w
w
a
Design Contract Awarded
Construction Contract Awarded
Stormwater Utility Fund 422
ARPA Funds
Secured Grants
Unsecured Grants
Funding Source Total
6/16/2022
$68,884 $45,896
$681,116 $454,104
$797,937 $750,000
$192,464
$1,809,599 $2,250,000
$750,000 $500,000 $2,800,000 $3,000,000
$1,662,717
$1, 327, 684
$4,059,599
$7,050,000
Packet Pg. 37
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost $742,000
Expenditures to Date $747 811
Estimated Construction Date Q4 2022
Estimated Completion Date Q2 2023
Project Manager Russell Lynch
Project Webpage
Se iew Park
185th—St SW
w ■
a
_ 186th St SW
i_ _ 185th PI SW
L
is
Po
Off
I
Project Description a
M
Reducing scouring flows in order to reduce sediments load in Perrinville Creek was identified in a previous basin report N
completed in 2015 as a critical element of restoring this creek which has been significantly impacted by urban development.
The project is an incremental step toward recovering this stream run as an adequate fish habitat. The grant for this project
CL
has already been secured. This project proposes construction of an infiltration system in Seaview Park, almost identical to
the successful Phase 1 project which was completed in 2019, in order to infiltrate more runoff in the Perrinville Creek basin. Y
L
0
Project Status
U
Project closeout is in progress. The City secured a $557,025 grant from the State of Washington Department of Ecology to a
help fund the $415,643 construction contract amount.le-
Pre-Design Final Design Construction Complete •
Related Documents r
N
>,
L
L
V
City Council Actions
Design Contract Awarded 12/21/2020 a
Construction Contract Awarded 9/20/2022
Carry Forward / Budget Amendments $367,045 $367,045 Q
Stormwater Utility Fund 422 $2,500 $2,500
ARPA Funds
Secured Grants $7,500 $7,500
Unsecured Grants
Funding Source Total $377,045 $377,045
Packet Pg. 38
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost
Expenditures to Date
Estimated Construction Date Q2 2024
Estimated Completion Date
Project Manager
Project Webpage
Greg Malowicki
Project Description a
M
Annual storm drain replacement project for 2023 construction. Project proposes to replace or rehab storm drain N
infrastructure in several locations throughout the City. Location of work identified by City crews via first had knowledge or m
video inspection results. Much of Edmonds stormwater infrastructure is past its lifespan and requires routine replacement c
CL
repair in order to preserve the function of the storm drain system. Failure to conduct annual maintenance projects will
increase chances of a storm drain system failure. (n
L
Q
Project Status
t)
Site selection and design contract negotiation complete. Contract signed. Storm pipe CCTV complete. Design in progress a
- - nal Design Construction Complete fight of Way Status o-
L N/A L
M
a
Related Documents N
0
N
i
d
City Council Actions cY
Design Contract Awarded
a
Construction Contract Awarded
c
as
v
Stormwater Utility Fund 422 $290,000 $1,622,400 $1,912,400
ARPA Funds Q
Secured Grants
Unsecured Grants
Funding Source Total $290,000 $1,622,400 $1,912,400
Packet Pg. 39
ENGINEERING PROJECT STATUS REPORT
2.2.a
Estimated Project Cost $733,000
Expenditures to Date $250,726
Estimated Construction Date N/A
Estimated Completion Date Q3 2024
Project Manager Jerry Shuster
Project Webpage https://www.edmondswa.gov/c
Project Description a
M
This project would be a comprehensive evaluation of the City's storm drain system and operations with recommendations fc N
improvements or adjustments and recommended priorities for selecting future capital maintenance projects. No on -going
cost are anticipated except to implement any recommended improvements or projects, which will be done as new capital
CL
projects with due budget planning/process.
Project Status 0
• Stormwater Management Action Plan (SMAP) for Perrinville Creek basin was approved by City Council April 2023. 9
• Professional Services Agreement to update the Storm and Surface Water Comprehensive Plan approved June 2023. a
• Intital Community Engagement process underway.
m.
• Project Kick-off with consultant early July 2023. o
• Developemtn of community outreach materials August- September 2023 m
M
Right of Way Status C)
D. Public Draft Plan Public MeetinOutreachg
N/A N
L
Related Documents
CU
im
Stormwater Management Action Plan (SMAP) for Perrinville Creek CY
https://www.edmondswa.gov/UserFiles/Servers/Server_16494932/File/Perrinville%2OCreek-SMAP_20230329%20FINAL.pd 06
https://cdnsm5- a
hosted.civiclive.com/UserFiles/Servers/Server_16494932/File/Government/Departments/Public%2OWorks/`20and%2OUtiIil
s/Stormwater%20Utility%20System/Storm%20and%20Surface%20Water/Fina1_2010_SWM_Comp_PLan_Text.pdf
City Council Actions o
a
Design Contract Awarded 6/20/2023
Construction Contract Awarded
Stormwater Utility Fund 422 $600,000 $600,000
Funding Source Total $600,000 $600,000
Packet Pg. 40
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost
Expenditures to Date
Estimated Construction Date Q3 2023
Estimated Completion Date
Project Manager
Project Webpage City Overlay
Project Description a
M
Road pavement overlays to cover areas of roadways that were excavated and patched in previous years as part of the Annua N
Storm Maintenance Projects.
Project StatusCL
Substantial Completion expected in mid October Y
0
Right of Way Status 9
- - - Complete
N/A FZ
Related Documents a
M
a
M
N
O
City Council Actions ;,
L
d
Design Contract Awarded 12/16/2022
Construction Contract Awarded 8/15/2023 CY
r
a
Stormwater Utility Fund 422 $200,000 $200,000
ARPA Funds E
E
Secured Grants L)
Unsecured Grants
Q
Funding Source Total $200,000 $200,000
Packet Pg. 41
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost
Expenditures to
Estimated Completion Date
Project Manager
Project Webpage
Project Description
Russell Lynch
The project proposes to purchase an existing single family residential property located within the Lake
Ballinger flood plain. The City secured a $500,000 Department of Ecology grant to aid in this process. The home is the lowesl
property on the lake and is badly damaged from previous flooding to the point it is generally uninhabitable. It is also nearly
undevelopable due to the flood plain and critical area regulations onsite.
The City intends to remove the home and any pollution generating surfaces from the site as part of the initial effort on the
site. The grant has restrictions for allowing this parcel to be used for public use. After demolition of the structures and
impervious surfaces, the planned site use would be for public utility benefit only. Because the City storm drain line for SR-10,
cuts through in an easement immediately adjacent to this parcel, the City plans to pursue a future project to split appropriate
flows from the City system and provide water quality treatment to the maximum extent feasible. The future project would
provide water quality treatment for a very heavily trafficked highway (SR-104) and would make significant improvement in
water quality to Lake Ballinger and its downstream course to Lake Washington via McAleer Creek.
Project Status _M"
Appraisal of property received 8/23/23, showing property valuation of $480,000. Initial meeting with property owner
scheduled in October to review appraisal report and to discuss next steps.
Pre-DesignFinal Design Construction Complete
For >ZZ
Related Documents
City Council Actions
Design Contract Awarded
Construction Contract Awarded
Right of Way Status
N/A
Stormwater Utility Fund 422 $250,000 $250,000
Secured Grants $500,000 $500,000
Unsecured Grants
Funding Source Total $750,000 $750,000
M
a
M
N
0
N
m
Q.
L
0
0
a
0
0_
m
L
M
a
Cl)
N
O
N
L
a�
CU
0
a
a
c
E
0
a
Packet Pg. 42
ENGINEERING PROJECT STATUS REPORT
2.2.a
Estimated Project Cost TBD
Expenditures to Date
Estimated Construction Date N/A FA
Estimated Completion Date Q3 2024 ae►nnvdk
Cr Lynnwood
Project Manager Mike DeLilla 1
Project Webpage
Project Description a
M
Supplemental study to update Perrinville Creek 2015 basin analysis that determined possible locations for projects that woul N
help decrease the peak storm flows during high rain events.
Project will be updated to reflect projects completed and also determine if there are other locations within the basin to aid ii
CL
the reduction of peak flows in the basin.
Y
Project Status 0
Update to 2015 Perri nville Flow Reduction Study Analysis. RFQto hire consultant will be advertised Q3 2023. Have receives .2
notice from DOE that we will be receiving a $469,200 grant that will be available for this projects. Proceeds will be shared a
with the City of Lynnwood so that this can be reviewed basin wide. Interlocal Agreement being drafted between Lynnwood
and Edmonds. RFQ for the study to be published Q4 2023. o
a
L
Pre -Design Final Design Construction �ompleteRight of Way Status a
L N/A N
O
N
Related Documents
as
C�
City Council Actions a
Design Contract Awarded
Construction Contract Awarded s
Q
Stormwater Utility Fund 422 $150,000 $150,000
ARPA Funds
Secured Grants
Unsecured Grants
Funding Source Total $150,000 $150,000
Packet Pg. 43
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost
Expenditures to Date
Estimated Construction Date Q2 2022
Estimated Completion Date
Project Manager
Project Webpage
Greg Malowicki
Project Description
a
Per the approved 2013 Sewer Comprehensive Plan, the project will replace pipe and related appurtenances at various
M
N
locations throughout the City due to old age, being undersized, need to increase capacity, or more prone to breakage due to
its material properties.
Project Status IND
Q-
Y
L
Majority of work completed, awaiting delivery of cured in place pipe materials to complete work in alley. Striping complete,
O
3:
CIPP of alley complete.
2
Right of Way StatusPre-Design, Final Design Construction Complete
a
N/A
O
Q
d
Related Do
L
a
M
N
O
N
City Council Actions
i
d
a
Design Contract Awarded 3/9/2021
Construction Contract Awarded 5/25/2022
a
• • •
c
a)
E
Carry Forward / Budget Amendments $650,000 $650,000
v
Sewer Fund 423 $30,000 $30,000
Q
Funding Source Total $680,000 $680,000
Packet Pg. 44
ENGINEERING PROJECT STATUS REPORT
2.2.a
Estimated Project Cost
Expenditures to Date
Estimated Construction Date Q2 2023
Estimated Completion Date
Project Manager
Greg Malowicki
Project Webpage 2023 Utility Replacement
Project Description
Per the approved 2013 Sewer Comprehensive Plan, the project will replace pipe and related appurtenances at various
locations throughout the City due to old age, being undersized, need to increase capacity, or more prone to breakage due to
its material properties.
Project Status Imb
Contract awarded, construction underway.
Pre -Design rFinal Design Construction>= -
Related Documents
City Council Actions
i
Design Contract Awarded 3/22/2022
Construction Contract Awarded 4/26/2023
Sewer Fund 423 $1,689,212 $1,689,212
Funding Source Total $1,689,212 $1,689,212
Packet Pg. 45
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost
Expenditures to Date
Estimated Construction Date Q2 2024
Estimated Completion Date
Project Manager
Project Webpage
Greg Malowicki
rroject Description Cl
M
Per the approved 2013 Sewer Comprehensive Plan, the project will replace pipe and related appurtenances at various N
locations throughout the City due to old age, being undersized, need to increase capacity, or more prone to breakage due to u,
its material properties.
a
Project Status Y
L
O
Sites selected. Design at 60%. Design expected to be complete late 2023 or early 2024.
Pre -Design- :xi Construction Complete a
N/A ....
O
Q
Related Docume" L
M
CY
M
N
O
N
City Council Actions
MM
�a
Design Contract Awarded 4/20/2023 CY
Construction Contract Awarded 06
a
c
Sewer Fund 423 $349,S17 $1,964,780 $2,314,297
E
Funding Source Total $349,517 $1,964,780 $2,314,297 Jj--
Q
Packet Pg. 46
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost
Expenditures to Date
Estimated Construction Date Q2 2023
Estimated Completion Date
Project Manager
Greg Malowicki
Project Webpage 2023 Utility Replacement
Project Description a
M
Per the approved 2013 Sewer Comprehensive plan and current video inspections of sewer mains, the project will line existini N
sewer mains that are subject root intrusion, infiltration and inflow, and damage that can be repaired by this trenchless
method. `6
Q-
Project Status Y
L
O
Contract awarded, construction underway.
U
Right of Way Stc �
- - - . truction Complete a
N/A . .
O
Related Documents
M
a
M
N
O
N
City Council Actions
i CU
Design Contract Awarded 8/10/2021 CY
Construction Contract Awarded 4/26/2023
a
Project Funding 2023 2024 2025 2026 2027 2028 23-28 Total
Sewer Fund 423 $423,710 $423,710
E
Funding Source Total $423,710 $423,710 0
Q
Packet Pg. 47
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost
Expenditures to Date $5,460
Estimated Construction Date Q3 2023
Estimated Completion Date
Project Manager F
Project Webpage City Overlay
Project Description
Road pavement overlays to cover areas of roadways that were excavated and patched in previous years as part of the
Sanitary Sewer Replacement Projects.
Project Status
Substantial Completion expected in mid October
Complete Right of Way Status
Pre -Design -
N/A
01
Related Documents
City Council Actions
Design Contract Awarded 12/16/2022
Construction Contract Awarded 8/15/2023
Sewer Fund 423
Funding Source Total
$200,000
$200,000
$200,000
$200,000
M
a
M
N
0
N
m
Q.
0
U
7
a
0
0_
0
M
a
M
N
O
N
L
L
CU
CY
a.
c
d
E
Q
Packet Pg. 48
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost $1,126,000 (2023)
Expenditures to Date $77 568
Estimated Construction Date Q3 2023
Estimated Completion Date Q4 2023
Project Manager Ryan Hague
Project Webpage City Overlay
Project Description
Annual pavement preservation program to maintain City streets.
Project Status
Substantial Completion expected in mid October
Right of Way Status
Pre -Design - Complete
N/A
PF
Related Documents
City Council Actions
Design Contract Awarded 12/16/2022
Construction Contract Awarded 8/15/2023
Carry Forward / Budget Amendments
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
$126,000 $126,000
$150,000 $150,000 $150,000 $450,000
$500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $3,000,000
$500,000 $500,000 $500,000 $500,000 $500,000 $500,000 $3,000,000
$500,000 $500,000 $500,000 $500,000 $500,000 $2,500,000
$1,126,000 $1,500,000 $1,500,000 $1,650,000 $1,650,000 $1,650,000 $9,076,000
M
a
M
N
0
N
d
r�
Q.
L
0
a
0
0_
m
L
M
a
M
N
0
N
i
as
a
a
c
d
E
t
v
Q
Packet Pg. 49
ENGINEERING PROJECT STATUS REPORT
Estimated Project Cost $2 583 000 ��3 § SW
�
/ / -� O YMP��J�O^ �$ 3 3 te6hvnna. sWesm'vssw
Expenditures to Date $2,228,537
a
teem vi.Sw 188TH ST SW i
Estimated Construction Date Q3 2022
h'P 3 an sry � n !
5 5 � 9DM--St SW
Estimated Completion Date Q2 2023 3 3 z w rn=W
iszw.eisw a„r
Project Manager Ryan Hague
e = _ 196TH ST SW
Project Webpage e City Overlay 'G11T &[ /
Project Description CY
M
Pavement overlay of 76th Ave. W from 196th St. SW to Olympic View Dr. with pedestrian curb ramp upgrades and addition c N
a bike lane for the northbound movement. This is a joint project funded by the Cities of Edmonds and Lynnwood, since the a,
west half of the street is in the City of Edmonds and the east half is in the City of Lynnwood.
a
Project Status Y
L
O
Construction is Substantially Complete 3:
2
Ilk 1�
11 Pie -Design Final Design 4�
Construction Complete
a
N/A v
O
Q
Related Docume" L
M
d
M
N
O
N
21
City Coial Actions
�a
Design Contract Awarded 4/29/2021 CY
Construction Contract Awarded 7/26/2022 06
a
Project Funding 2023 2024 2025 2026 2027 2028;
c
Carry Forward / Budget Amendments $1,613,415 $1,613,415
E
Street Fund 112 - Gas Tax & Multi -modal
c�
REET Fund 125 w
Q
REET Fund 126 $3,315 $3,315
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants $11,685 $11,685
Other
Unsecured Funding
Funding Source Total $1,628,415
Packet Pg. 50
ENGINEERING PROJECT STATUS REPORT
Estimated Project Cost $937,500
Expenditures to Date $32,515
Estimated Construction Date Q3 2024
Estimated Completion Date Q3 2024
Project Manager Ryan Hague
Project Webpage
=dmonds Police and c.rvu: Play9eld �.
Count Municipal C
Veteran's ;_� r AZ Z �
Plaza -- v a
Bell St
_
F
rn�
Ear
_ Sno-Isle Frances Anderson
Library Anderson Center
N
o Center Field
W
Dayton St
Zhristian
Science
ch.—H
I
Project Description Cl)
M
Pavement overlay along Main St. from 6th Ave. to 8th Ave. with pedestrian curb ramps upgrades. The project will be funded N
with a federal grant (funds available in 2023) and City funds for a local match. a;
c�
Project StatusCL
Design is ongoing and the project to adverise for bids in May 2024
0
Pre-Den a I Design Construction Complete Right of Way Status
N/A a
Related Documents °a
a�
L
M
d
M
N
O
City Council Actions ;,
a�
Design Contract Awarded 6/26/2023 ICU
3
Construction Contract Awarded a
06
Project Funding 2023 2024• •26 2027 20283:
a
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125 $31,400 $156,000 $187,400 E
REET Fund 126
ca
Transportation Impact Fees Q
General Fund
Stormwater Utility Fund 422
Federal Grants $125,600 $624,500 $750,100
State Grants
Unsecured Funding
Funding Source Total $157,000 $780,500 $937,500
Packet Pg. 51
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost $9,891,000 Q ROW,M a U�PQ 212TH51S4y Expenditures to Date 8 642 870
p$ 3 3 220TH si SW
Estimated Construction Date Q2 2022 P = 3 -
o a _
Estimated Completion Date 8/23/23
1
Project Manager Jaime Hawkins 236TH ST SW
Project Webpage Highway 99 - Stage 2
Project Description
a
M
Installation of raised landscaped median along Highway 99 corridor from 244th St. SW to 212th St. SW, addition of "Gateway N
signage on both ends of the corridor, and a new pedestrian HAWK signal just north of 234th St. SW. The project is funded
m
from state funds provided by the Connecting Washington Transportation program, as well as REET funds.
Project Status
Q-
Y
L
The HAWK signal became operational in August. The Construction Phase is complete and the contractor is responsible for
O
3:
plant establishment until summer 2024.
2
Right of Way Status
a
Pre -Design• • �.
100 %
p
d
L
Related Documents
u
M
N
O
N
City Council Actions
i
d
CU
a
Design Contract Awarded 7/21/2020
Construction Contract Awarded 5/3/2022
a
• • •
c
a)
E
Carry Forward / Budget Amendment $2,820,000 $2,820,000
v
REET Fund 125
Q
REET Fund 126 $81,000 $81,000
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants $2,565,000 $2,565,000
Unsecured Funding
Funding Source Total $5,466,000 $5,466,000
Packet Pg. 52
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost
$32 870 000
Expenditures to Date
$329,963
Estimated Construction Date
Q2 2027
Estimated Completion Date
Q4 2028
Project Manager
Bertrand Hauss
Project Webpage Highway 99 - Stage 3
238TH ST S
o�
�2
�s
9
__. 244TH ST SW
W 'q
S
LAKE BALLINGER WA
P�
oti I
Y �`s WAY LAKE BALLINGE4
Project Description CY
M
The Stage 3 Highway 99 project limits are from 244th St SW to 238th St. SW. The project will add a planter strip on both side N
of the street, new street lighting, improved stormwater facilities, targeted utility replacements, potential undergrounding of a,
overhead utilities, landscaping and other softscape treatments. The Design and right of way phases are funded through M
CL
secured Connecting Washington funds.
Project Status
Borings were completed at various locations along this segment where geotechnical information is needed. Stormwater, 2
water quality, environmental , and left turn storage length requirements are being determined in order to make design n
progress. The 30% Design Plans are scheduled to be completed in Q4 2023.
0
Right of Way Status
Final Design > > Construction Complete L
a% M
d
M
N
Related Documents N
21
as
�a
3
a
City Council Actions 06
Design Contract Awarded 6/1/2022 a
Construction Contract Awarded
w
w
S d 2 G & I' d I Q
treet Fun 11 - as Tax Mu L -mo a
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Water Utility Fund 421
$20,000
$20,000 $135,000 $100,000
$275,000
Stormwater Utility Fund 422
Sewer Utility Fund 423
$10,000
$10,000 $10,000 $30,000
$60,000
Federal Grants
State Grants $2,010,000
$2,578,000
$1,470,000 $14,765,000 $6,381,000
$27,204,000
Unsecured Funding
$5,241,000
$5,241,000
Funding Source Total $2,010,000
$2,608,000
$1,500,000 $14,910,000 $11,752,000
$32,780,000
Packet Pg. 53
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost $42,534,000 3 = - - 220T"STSW rQ
Expenditures to Date $208 432 �.�
3� a.* �� zz P1SI•
■ mi � r T �''w t w
Estimated Construction Date 012029 `a � " ' Ism 3
zz�a s sw-^ a 0r it
0.
Estimated Completion Date Q4 2030 I 0� r w : ^ �a
. Z
.:T� r ■ 0
Project Manager Bertrand Hauss �'F:_w I ,
elp"k. y
2241 - _-1.
244q Sc SW — /
Project Webpage Highway 99 - Stage 4
Project Description
CY
The Stage 4 Highway 99 project limits are from 224th St SW to approximately 500 feet north of 220th St. SW. The project wi
M
N
add a planter strip on both sides of the street, new street lighting, improved stormwater facilities, targeted utility
a,
replacements, potential undergrounding of overhead utilities, landscaping and other softscape treatments. The intersection
of Highway 99 and 220th St. will be widened to add capacity and improve the level of service. The Design and right of way
CL
phases are funded through secured Connecting Washington funds, a federal grant and local traffic impact fees.
Y
L
Project Status
O
3:
Geotechnical borings were completed at various locations along this segment. Progress has been completed on the
n
stormwater, water quality, environmental , and left turn storage length requirements in order to make design progress. The
"
30% Design Plans are scheduled to be submitted to the City in Q4 2023.
c
a
Pre -Design Final Design ConstructioLnJComplete> Right of Way Status M
°% M
0
N
21
Related Documents
as
�a
3
a
06
City Council Actions a
Design Contract Awarded 6/1/2022
Construction Contract Awarded
CU
w
w
Q
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
Water Utility Fund 421
Stormwater Utility Fund 422
Sewer Utility Fund 423
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
$704,000
$365,000 $269,000 $1,917,000
$40,000 $40,000
$20,000 $20,000
$375,000 $1,284,000 $1,523,400
$1,087,000 $143,600
$740,000 $2,700,000 $4,348,000
$565,000 $1, 269, 000
$727,000 $3,278,000
$300,000 $300,000 $680,000
$150,000 $150,000 $340,000
$970,000 $4,152,400
$1, 230, 600
$15,984,000 $15,550,000 $31,534,000
$2,262,000 $16,434,000 $16,000,000 $42,484,000
Packet Pg. 54
ENGINEERING PROJECT STATUS REPORT LNIIIIIIIIIIII
Estimated Project Cost $9,000,000
219th St SW
4W
U
w
Expenditures to Date $583,485
a
im
"
^ — 21919
STARBUCKI
Estimated Construction Date Q1 2027
Estimated Completion Date Q4 2027
Lf Jr a
220TH ST SW
f * * �3
w
j n
Q 7514
�� Q
Project Manager Bertrand Hauss�
,
r3
w
A
Project Webpage 76th @ 220th Intersection
�•� , ,M,k es A .1st PI sw
LYNWOOD I
Project Description a
M
Reconfigure eastbound lanes to a left turn lane and through / right turn lane. Add eastbound and westbound dedicated left N
turn lanes with a protected -permitted phase. Provide right turn overlap for westbound movement during southbound left m
turn phase. (Additional improvements include wider sidewalk, bike lanes, and various utility improvements (including
CL
potential conversion overhead utility lines to underground). ROADWAY PROJECT PRIORITY 41 in 2015 Transportation Plan
Y
Project Status
Progress was made on the 60% PS&E. Those documents are scheduled to be submitted in October 2023. The Environmental .2
documents were submitted to WSDOT in August 2023 and their response is still pending. a
Right of Way Status
' - - D - an Construction Complete a
L 0% L
M
a
Related Documents c
N
i
d
CU
City Council Actions cY
Design Contract Awarded 6/3/2021 3:
a.
Construction Contract Awarded
c
as
v
Street Fund 112 - Gas Tax & Multi -modal
Q
REET Fund 125
REET Fund 126
$316,000
$316,000
Transportation Impact Fees
$308,500
$108,000
$181,000
$597,500
General Fund
Stormwater Utility Fund 422
Water Utility Fund 421
$30,000
$30,000
$7,000 $500,000
$567,000
Federal Grants
$372,750
$346,000
$274,750
$993,500
State Grants
Unsecured Funding
$6,173,000
$6,173,000
Funding Source Total
$711,250
$800,000
$462,750 $6,673,000
$8,647,000
Packet Pg. 55
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost $2,394,000
Expenditures to Date $145,573
Estimated Construction Date TBD a
Estimated Completion Date TBD 3
Project Manager Bertrand Hauss o
0
Project Webpage w
228TH ST SW,
32-11
21I�h
1s IVI L
H.Ny _„ Q�
�a11 11 1
Project Description C1
M
Installation of an Adaptive System along SR-104 from 236th St. SW to 226th St. SW (total of five traffic signals along this N
stretch / spaced % mile from each other). No signal communication currently exists between any of the existing traffic a,
signals. (SR-104 @ 236th St. SW, SR-104 @ 232nd St. SW, SR-104 @ 95th PI. W, SR-104 @ 100th Ave. W, and SR-104 @ 226th
CL
St. SW). Possible future addition to this project may include addition of a traffic management center (TMC) at the Public
Works Facility and connection of the Adaptive System to the TMC. Y
L
O
Project Status 3:
Additional survey work was completed along 212th St. SW and 72nd Ave. W (to be incorporated into the 30% Design Plans). a
A TIB grant for Construction funds was submitted in August'23. An RFI for all Adaptive System vendors has been drafted an( "
will soon go out to determine the possibilities. The 30% Design Plans will be submitted in Q4 2023. c
a
Pre -Design nal Design Construction Complete Right of Way Status a
0% M
N
O
N
21
Related Documents
as
Ca
n
a
M
06
City Council Actions a
Design Contract Awarded 6/29/2022
Construction Contract Awarded
CU
w
w
Q
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125 $32,865
$32,865
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants $210,575
$210,575
State Grants
Unsecured Funding $1,984,000
$1,984,000
Funding Source Total $243,440 $1,984,000
$2,227,440
Packet Pg. 56
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost $1,160,000
Expenditures to Date $4 742
Estimated Construction Date
Estimated Completion Date
Project Manager Russell Lynch
Project Webpage
.. ,
3a� _ �., 27�111 11
ueu
nP
`a
■ f.�p'
i�� Christ m
■ BBIM1
■ ■ ���9
�235,h PI 54v o
- Lutheran
f .• ti i
_
-L0 U_Church41
�' zamM1 s sw
_
Park and Ride o"Ice f
-,E,
qL aaio
anv,�mvice
a
•z.,em s _�. H
238TH ST SW
Project Description
Install sidewalk along 84th Ave. W from 238th St .SW to 234th St. SW, with curb and gutter. This project ranked #5 in the
Long Walkway List of the 2015 Transportation Plan.
Project Status
This project has been suspended.
Pre-DesignFinal Design
For' I
L
Related Documents
City Council Actions
Design Contract Awarded
Construction Contract Awarded
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
ARPA Funds
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
Construction TZC
omplete
$160,000
$1,000,000
$160,000 $1,000,000
Right of Way Status
N/A
$160,000
$1,000,000
$1,160,000
M
a
M
N
0
N
m
Q.
D
0
U
(L
0
0_
a�
L
M
a
Cl)
N
O
N
L
L
CU
a
a
a
d
E
t
0
Q
Packet Pg. 57
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost
Expenditures to Date
Estimated Construction Date 8/7/2023
Estimated Completion Date
Project Manager
Jaime Hawkins
Project Webpage Citywide Bike
Project Description a
M
Installation of bike lanes or sharrows along various street segments as identified on the Proposed Bike Facilities map of 2015 N
Transportation Plan. Bike lanes or sharrows will be added along 100th St. SW / 9th Ave. from 244th St. SW to Walnut St,
Bowdoin Way from 9th Ave. to 84th Av., 228th St. SW from 80th Ave. to 78th Ave., and 80th Ave. from 228th St. SW to 220tf
CL
St. SW. RRFB's will be added at various crossings along the Bowdoin and 9th Ave. / 100th St. SW corridors. D
Y
Project Status 0
Construction began in August. All curb ramps upgrades identified in contract have been completed along Bowdoin and along .2
9th Ave. S from Walnut to Elm St / 2220th St. SW (except SW corner of 9th Ave. S @ 220th). The addition of bike lanes has a
been completed on Bowdoin Ave. / Walnut St. Work has started along the 228th St. SW segment. Winter suspension of
work anticipated. o
a
0
- - • struction >2Complete
N/A Right of Way Status
(�
' N
O
N
Related Documents
as
Parking and Traffic Report -
https://www.edmondswa.gov/UserFiles/Servers/Server_16494932/File/Government/Departments/Public%2OWorks%20an CY
%20UtiIities/Citywide%20Bicycle%201mprove me nts/Citywide%20Bicycle%201mprove ments%20Parking%20and%200peratic 06
s%20Report%2020210119.pdf a
City Council Actions
E
Design Contract Awarded 11/4/2020
Construction Contract Awarded 6/27/2023 a
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125 $522,347 $522,347
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Other (Sound Transit Grant) $1,249,500 $1,249,500
Funding Source Total $1,771,847
Packet Pg. 58
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost $33,130
Expenditures to Date $22,726
Estimated Construction Date Q4 2023
Estimated Completion Date
Project Manager Bertrand Hauss
Project Webpage Traffic Calming
Wroject Description
Install traffic calming devices (such as Radar Feedback signs, speed cushions, or other elements).
roject
Based on new requirements, the 85th percentile only has to be 5 mph over the speed limit in order to move on in the
evaluation (compared to 8 mph previously). Out of (17) petitions submitted, (8) met this new criteria. Those (8) stretches
have been ranked with proposed traffic calming improvements. Most stretches will be addressed in 2024 (since material
needs to be ordered with considereable lead time / striping revisions need facorable weather conditions and will be
completed in Spring'24).
LL Right of Way Status
Pre -Design Final Design Construction Complete I
N/A
y
Related Documents
City Council Actions
Design Contract Awarded
Construction Contract Awarded
Carry Forward / Budget Amendments
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
$30,000
$30,000
$33,130 $18,000 $18,000 $18,000 $18,000 $18,000 $123,130
$63,130 $18,000 $18,000 $18,000 $18,000 $18,000 $153,130
Cl)
Cl
M
N
0
N
a
Y
0
a
O
Q
L
M
CJ
M
N
O
N
L
4)
M
M
CY
06
3.1
a�
E
s
M
Q
Packet Pg. 59
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost $425,000
Expenditures to Date $63,673
Estimated Construction Date n/a
Estimated Completion Date
Project Manager Bertrand Hauss 1 f� f"
Project Webpage
tea• , �� i
Project Description C1
M
Update the City's long range transportation plan. N
m
Project Status
a
The consultant completed the evaluation of the Traffic Calming Criterias (used as part 2023 Traffic Calming Program). All the N
existing conditions have been laid out and mapped out. Coordination has started with the consultant working on the
0
Comprehensive Plan. A press release went out in search of Transportation Committee members. 3:
Goat and Right of Way Status 3
•. Draft Plan Public Meeting Adopt d
Public Outreach
N/A v
O
Q
Related Documents L
M
d
M
N
O
N
21
City Col Actions
�a
Design Contract Awarded 5/20/2023 CI
Construction Contract Awarded 06
a
c
Street Fund 112 - Gas Tax & Multi -modal $170,000 $255,000 $425,000
E
REET Fund 125
v
REET Fund 126 w
Q
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Funding
Funding Source Total
$170,000 $255,000
$425,000
Packet Pg. 60
ENGINEERING PROJECT STATUS REPORT
Estimated Project Cost
$1,032,000
Expenditures to Date
$176,154
Estimated Construction Date
8/7/2023
Estimated Completion Date
11/21/2023
Project Manager
Jaime Hawkins
Project Webpage Citywide Bike
ME � e ILU
y I yea Vista P�
7ch end C A�= > '
Elm Park Vista PI
a
Ar F , ■ --
Elm St AP 220TH ST SW
v y -
a �
�` t L
F�qLUL 1
= a
Elm PI ~o
Ania W°c^
ay I
roject Description a
The walkway project is ranked #6 on the short walkway list from the 2015 Transportation Plan. The project will install N
approximately 700 feet of new sidewalk, six pedestrian curb ramps and modify the existing stormwater system on Elm Way y
between 8th Ave. S and 9th Ave. S.
a
Project Status 'e
L
O
Contractor is working on storm drainage improvements.
_2
M
- - Construction Complete a
N/A ....
O
Q
Related Docume" ;y
M
CY
M
N
O
N
City Council Actions
�a
Design Contract Awarded 5/26/2021 CY
Construction Contract Awarded 6/27/2023 06
a
c
Street Fund 112 - Gas Tax & Multi -modal
E
REET Fund 125 s
REET Fund 126 $552,047 $552,047 Q
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422 $349,927 $349,927
Federal Grants
State Grants
Unsecured Funding
Funding Source Total $901,974 $901,974
Packet Pg. 61
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost
Expenditures to Date
Estimated Construction Date Q3 2023
Estimated Completion Date
Project Manager
Project Webpage
Bertrand Hauss
troject Description Cl)
M
Upgrade traffic signal equipment at selected signalized intersections with new equipment within signal cabinet, new vehiculz N
detection, new vehicle heads, and/or new pedestrian heads. u,
R
a
ww"W"
The addition of Flashing Yellow Arrows for the northboud and southvound left turns along SR-104 will be completed at SR- L
0
104 @ 236th St. SW signalized intersection. Construction is scheduled to take place in December'23 (TO UPDATE
FOLLOWING DARREN DISCUSSION) 2
M
1
Right of Way Status a
Pre-DesignFinal Design Construction Complete
N/A 0
Q
d
L
Related Documents cJ
M
N
O
N
L
4)
City Council Actions
CY
Design Contract Awarded
06
Construction Contract Awarded
a
� - ro j t ■1-unding 21,1123 2122 4212b2112�6 21112/244166fi23-2 yTotal■ d
E
Street Fund 112 - Gas Tax & Multi -modal s
v
REET Fund 125 $30,280 $30,280
REET Fund 126 Q
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Grants
Funding Source Total $30,280 $30,280
Packet Pg. 62
ENGINEERING PROJECT STATUS REPORT
2.2.a
Estimated Project Cost
Expenditures to Date
Estimated Construction Date Q3 2023
Estimated Completion Date
Project Manager
Project Webpage
Bertrand Hauss
troject Description Cl
M
Addition of Rectangular Rapid Flashing Beacons (RRFB) and/or flashing LED lights around regulatory signs at selected N
locations throughout the City. This project will also be adding striping and signage. P
Project Stat
RRFB's have been added at the following locations: 1) 224th @ 96th 2) Walnut @ 3rd Ave. S, 3) 212th St. SW @ 80th Ave.
W and 4) 216th @ 72nd Ave. W. RRFB's still need to be added at 5th Ave. @ Howell Way and 5th Ave. S @ Pine St.
(scheduled to be completed in November 2023 / to be updated once get update from Darren)
Pre-DesignFinal Design Construction Complete Right of Way Status
OF' >
Related Documents
City Council Actions
Design Contract Awarded
Construction Contract Awarded
Street Fund 112 - Gas Tax & Multi -modal
REET Fund 125 $80,780 $80,780
REET Fund 126
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Grants
Funding Source Total $80,780 $80,780
Packet Pg. 63
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost $60,000
Expenditures to Date $3,262
Estimated Construction Date
Estimated Completion Date Q4 2024
Project Manager Russell Lynch
Project Webpage
Wroiect Descriptia� Cl
M
The study will evaluate and inventory the City's existing street lighting system and identify gaps in service. The study will also N
develop a priority list of improvements and cost estimates, standard details for street and pedestrian lighting and policies foi r,
the addition of street lights on private developments and addition of street lights within residential neighborhoods.
a
Project Status Y
L
O
Professional Services Agreement was signed with Transpo in August. The lighting study will evaluate the existing City light 3:
system and determine areas where lighting may be added. 2
Right of Way Status a
• - - nal Design Construction Complete
N/A Q
Q
d
L
Related Documents cJ
M
N
O
N
L
City Council Actions
CY
Design Contract Awarded
Construction Contract Awarded
a
m
E
Street Fund 112 - Gas Tax & Multi -modal s
v
REET Fund 125 $60,000 $60,000
REET Fund 126 Q
Transportation Impact Fees
General Fund
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Grants
Funding Source Total $60,000 $60,000
Packet Pg. 64
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost
Expenditures to Date $934
Estimated Construction Date Q3 2023
Estimated Completion Date
Project Manager
Project Webpage
Bertrand Hauss
Project Description C1
M
Install guardrails along selected stretches throughout the City with steep drop-offs and other safety issues. N
m
Project Status
a
One location has been identified. The work is anticipated to be complete by the end of the year. N
L
Right of Way Status 0
Pre -Design Design Construction > Complete
N/A
3
a_
Related Documents
0
a
m
L
M
d
M
City Council Actions N
21
Design Contract Awarded
Construction Contract Awarded 3
a
Project Funding
2023 2024• •26 2027 202806
Street Fund 112 - Gas Tax & Multi -modal a
REET Fund 125 $20,190 $20,190
REET Fund 126 m
E
t
Transportation Impact Fees
General Fund Q
Stormwater Utility Fund 422
Federal Grants
State Grants
Unsecured Grants
Funding Source Total $20,190 $20,190
Packet Pg. 65
ENGINEERING PROJECT STATUS REPORT
2.2.a
Estimated Project Cost
Expenditures to Date
Estimated Construction Date Q2 2023
Estimated Completion Date
Project Manager
Greg Malowicki
Project Webpage 2023 Utility Replacement
Project Description
Per the approved 2017 Water Comprehensive Plan, the project will replace/maintain pipe and related appurtenances at
various locations throughout the City due to old age, being undersized, need to increase flow or pressure, or more prone to
breakage due to its material properties.
Project Status
Contract awarded, construction underway.
Right of Way Stc
- - - Complete
N/A
Related Documents
City Council Actions
i
Design Contract Awarded 2/4/2022
Construction Contract Awarded 4/26/2023
Water Fund 421 $1,700,000 $1,700,000
Funding Source Total $1,700,000 $1,700,000
Packet Pg. 66
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost
Expenditures to Date
Estimated Construction Date Q2 2024
Estimated Completion Date
Project Manager
Project Webpage
Project Description
Greg Malowicki
Per the approved 2017 Water Comprehensive Plan, the project will replace/maintain pipe and related appurtenances at
various locations throughout the City due to old age, being undersized, need to increase flow or pressure, or more prone to
breakage due to its material properties.
Project Status
Site selection complete. Contract in place. Design expected to be complete late 2023 or early 2024.
Pre -Design - an ` Construction Complete
Related Documents
City Council Actions
i
Design Contract Awarded
Construction Contract Awarded
Water Fund 421
Funding Source Total
3/29/2023
$506,128 $3,525,379
$506,128 $3,525,379
Right of Way St 910
N/A
$4,031,507
$4,031,507
M
a
M
N
0
N
m
Q-
0
(L
r_
O
Q
M
a
Cl)
N
O
N
i
CU
a
(L
c
a�
E
t
L)
Q
Packet Pg. 67
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost
Expenditures to Date $1 403
Estimated Construction Date Q3 2023
Estimated Completion Date
Project Manager Ryan Hague
Project Webpage 2023 Utility Replacement
Project Description
Road pavement overlays to cover areas of roadways that were excavated and patched in previous years as part of the
Waterline Replacement Projects.
Project Status
Substantial Completion expected in mid October
Complete Right of Way Status
Pre -Design -
N/A
01
Related Documents
City Council Actions
Design Contract Awarded 12/16/2022
Construction Contract Awarded 8/15/2023
Water Fund 421
Funding Source Total
$50,000
$50,000
$50,000
$50,000
M
a
M
N
0
N
m
Q.
0
U
7
a
0
0_
0
M
a
M
N
O
N
L
L
CU
CY
a.
c
d
E
Q
Packet Pg. 68
ENGINEERING PROJECT STATUS REPORT 2.2.a
Estimated Project Cost $9,600,000
Expenditures to Date $160,243
Estimated Construction Date TBD
Estimated Completion Date TBD
Project Manager Greg Malowicki
Project Webpage
Project Description C1
M
This work is being done to provide structural upgrades, repair leakages, and upgrades to our two underground potable water N
storage reservoirs. Preliminary findings completed in early 2022 were used to determine order of magnitude/preliminary a,
costs and next steps for the now planned repairs and upgrades project. Preliminary report for the Yost Reservoir, which is
CL
complete, shows that it will need a major structural and seismic retrofit, plus repairs to address leakage from the reservoir.
Preliminary report for the Seaview Reservoir, which is in the process of being finalized, shows similar issues as the Yost Y
Reservoir, but to a somewhat lesser scale. 0
Project Status
3
a
Draft geotechnical report completed. Consultant/designer under contract to begin design up to 30%. Supplemental contrac
to finish design in progress. Findings show that replacement is the most cost effective solution to address structural code c
deficiencies, piping maintenance needs and overall system function. m
M
Right of Way Status CY
Pre -Design n a I Design Construction Complete N
40 > > N/A N
21
L
Related Documents
�a
3
a
06
City Council Actions a
as
Design Contract Awarded 6/23/2022 E
Construction Contract Awarded w
w
a
Water Fund 421 $805,000 $805,000
Funding Source Total $805,000 $805,000
Packet Pg. 69