Resolution 1339RESOLUTION NO. 1339
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
EDMONDS, WASHINGTON, APPROVING THE 2016-2021
TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND
DIRECTING FILING OF THE ADOPTED PROGRAM WITH
THE WASHINGTON STATE DEPARTMENT OF
TRANSPORTATION.
WHEREAS, RCW 35.77.010 and 36.81.121 require that each city and town is
required to adopt a Transportation Improvement Program (TIP) and file a copy of such adopted
program with the Washington State Department of Transportation (WSDOT); and
WHEREAS, the TIP identifies all planned projects over the next 6 years, along
with the appropriate funding source; now, therefore,
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON,
HEREBY RESOLVES AS FOLLOWS:
Section 1. The Transportation Improvement Program is hereby adopted pursuant
to the requirements of RCW 35.77.010 and 36.81.121 to be effective on September 2°d, 2015 and
to continue in full force and effect until amended. A copy of such Transportation Improvement
Program for the years 2016 to 2021 is attached hereto as Exhibit A and incorporated by this
reference as fully as if herein set forth.
Section 2. The City Clerk is hereby requested and directed to file a certified copy
of the Transportation Improvement Program with the Washington State Department of
Transportation.
-1-
RESOLVED this 1st day of September, 2015.
ATTEST/AUTHENTICATED:
r
4 5 .
FILED WITH THE CITY CLERK: August 28, 2015
PASSED BY THE CITY COUNCIL: September 1, 2015
RESOLUTION NO. 1339
-2-
City of Edmonds
Six Year Transportation Improvement Program (2016-2021)
Grant Opportunity
Project
(2016-2021)
I
1
1
Project Name Purpose
Phase(s)
Total Cost
Sources)
2016
2017
2018
2019
Annual Street Preservation
Grind pavement, overlay, chip seal,
Possible Grant
Engineering
S2.700 000
(Federal, unsecured-)
$t1Ull,IIUU
$9uu' 1UU
Program
&
&
50
(State)
and slurry seal
Local Funds
Construction
S10320000
Local General Fund)
S1340.000
$1.380 00
$1.420000
$2,000.000
22uth Si. SW Overlay from
S10.1100
(Federal, secured)
$1u'uuU
788r Ave. W To 841h Ave. W
Grind pavement and overlay
Secured Grant
Construction
s0
(Slate)
50
(Local)
Citywide Signal
Upgrade (ralticsignal cabinets and
Possible Grant
Enginaannp
3650.000
(Federai, unsecured-)
>SL3,000
Improvements
&
&
$4
(State)
Imp-rcimlech"Mmy
Local Funds
CdnWde ion
525.000
Local
$25.000
Puget Or, (?,) OVD Signal Upgrades
Po bla grant
Erione r-a
Sia7 500
(reaerai, unsecured)
$37,500
Upgrade traffic signal
&
8.
50
(State)
Local Funds
Construction
5212.500
'Local,
Local
S37S00
rs8m Cw i 0utn Ave. Signal Upgrades
Rebuild traffic signal system
Errgne40rrg
$0
(Federal)
with new signal mast arms, cabinet, and
Possible Grant
&
57.50.000
(Slate, unsecured)
$750,000
video detection
Carlahucbon
5o
(Local)
Main SI. 0 3rd Skim it Upgrades
Possible grant
Erlpilmedng
5287.500
(Federal, unsecured)
Upgrade traffic signal
&
&
SD
(State)
Local Funds
Conshucben
587,sw
(Local)
TOTAL
s1375.Ot10
SZ$30,D50
S3.42F1
54mom
Safety I Capacity Protects:
LL6tn St SW. Corridor safety
Construct missing roadway link on 228th St. SW between
Secured grant
$88S'wo
(Federal, secured)
$0135000
Improvements
Hwy. 99 and 76th Ave W, with various utility upgrades
&
Construction
S100.000
(State, secured)
$100:000
Local Funds
S15000
(Local)
S15000
228fn St, 9W. from
Hwy 99 to 95th PI W
Widen roadway to add two-way left turn lane along stretch or
left turn lanes at specific intersections
Possibe grant
&
Design
550 000
SO
(Federal, unsecured)
(State)
Install sidewalk and bike lanes
Local Funds
550 000
Local
76th Av W @ 212th St. SW Intersection
Re -design Intersection to reduce intersecion delay and
SM.=
(Federal, segued)
$150,000
Improvements
improve level of service (LOS). Various utility
improvements are also included in the project
Secured Grants
ROW
so
(State)
(Local)
SQ
$281$000
(Federal, secured)
$2,816,000
&
$225.000
(Local, Traffic Impact Fees)
$225,000
Local Funds
Construction
S491,000
(Loral, Fund 421)
$491,000
S224 513
(Local, Fund 422)
$2.24,513
$590 000(Local.
Fund 423
$590.000
Frye Cemars ROlmdabdUr
Installation of a roundabout with various utility upgrades
Secured grant
$8.650
(Federal, secured)
$8,650
(84th Ave W (a? 212th St SW)
&
Construction
$U
(State)
Local Funds
$1 350
Local
$1.350
SR-99 Gateway) Rmaluallon
Install gateway elements and safety improvements
Engineering
W
(Federal)
along the SR-99 Corridor.
Possible Grant
&
510A00.(1(10
(State, unsecured)
$500,000
Construction
SU
SR 624 (196th St. SW) (0,)
Design Intersection Improvements and addition of guardrail on
Design
5o
(Federal
88th Ave W. IMUMCIPon
the west side of intersection due to 12'vertical drop (grade
Possible Grant
S1 0M
(Stale, unsecured)
$122,000
$71.000
Improvements
adjustment to improve sight distance to be considered)
oval, traffic mpati(oast
$71.000
Row acquGrnon
ROW
s0
(Federal)
&
W71500
(State, unsecured)
S570500
(Local
Complete Intersection Improvements
Construction
S585.000
(Federal, unsecured)
Local Funds
$O
(State)
50
4L.c.11
Main St @ 9th Ave
installation of traffic signal or mini -roundabout.
Possioie grant
Erhlinaenng
S7W— OW
(Federal, unsecured)
$118,000
&
&
S0
(State)
Local Funds
Consvuceon
s123000
Local
S18000
%8th Av. Vv @ 22uth St. SW
Convert spin phasing for eastbound and westbound movement
Possible Grant
Engineering,
S3.732.000
(Federal, urtsecutodi
$206,000
Intersection Improvements
to protective I permissive left tum phasing. Right turn overlap
&
ROW, &
W
(State)
would be added for the right trim movements.
Local Funds
Construction
SS 000
(Locaft
$32 000
Arterial Street Signal Coordination
Coordinate lne ualTlc signals within lit mile of each other
Engineering
s0
(Federal)
Improvements
along 76th Ave W, 21211 St SW, and 220th St SW to
Local Funds Only
&
50
(State)
un ova corridor efficiencies
Construction
550000
Local
$50,000
Hwy, 99 @ 2i 2tn St SW
widen 2ian 5- Svv to aaa a we ana eft ieft turn iane
Possibie Grants
Engineering,
52.427.000
(Federal, unsecured)
Si 52,000
Intersection Improvements
Provide protected / permissive left tum phasing for both
&
ROW, 8
S0
(State)
5379.OW
movements ared'urisdiction with City of Lynnwood)
Local Funds
Construction
Local wl City of Lynnwood)
523.000
Page 1
City of Edmonds
Six Year Transportation Improvement Program (2016-2021)
Grant Opportunity
Project
(2016-2021)
Project Name
Purpose
Phase(s)
Total Cost
Sources)
2016
2017
2018
2019
Hwy 99 ice. 216th St SW
Widen 21M SL SW to add a WB and ES left turn lone.
Possible Grants
Enonaemp,
VA2T 000
(Federal, unsecured)
$142,000
Intersection Improvements
Provide protected / permissive left turn phasing for both
&
ROW, &
so
(State, unsecured)
movements.
Local Funds
Con3nLction
6314.DW
Local. w/ CityofL --d
$22.0oo
Hwy 99 @ 220th St SW
Widen 220th St SW to add westbound right turn lane and
Possible Grants
Engineering,
52.783 000
(Federal, unsecured)
$152,000
Intersection Improvements
Hwy, 99 to add 2nd southbound left turn lane.
&
ROW, &
$0
(State)
Local Funds
Construction
S432,000
(Local. w/ Citv Mountlake Terrace)
$23.000
SR-104 @ 226Yh St SW / 15th St SW
Extend SR-104 Westbound left turn lane and complete pedestrian
Possible Grants
Engineering.
sin.ow
(Federal, unsecured)
$15,000
Intersection Improvements
and bicycle improvements with signage and traffic signal
&
&
$0
(State)
irrinrwerrents.
Local Funds
COn9trud4dn
S15.000
ca
$15-000
SR-104 @ 95th PI. W
Modify existing signal timing to include protected left turn phasing
Possible Grants
Engineering.
$420 000
(Federal, unsecured)
$65,000
Intersection Improvements
and provide C-Curb with left turn channelization
&
&
$0
(State)
for sagas MnageRVIDL
Local Funds
Cw9huceon
575.000
ca
$10-000
SR-104 @ 238th St. SW
Install traffic signal and other
Possibie Grants
Engineering,
51157 WO
(Federal, unsecured)
$113,000
Intersection Improvements
improvement intersections
&
ROW,&
$0
(State)
Local Funds
Construction
$181,000
Local
$27.000
Citywide protected / permissive traffic
Conversion from protected left -turn phasing
Engineering
S0
(Federal)
signal conversion
to protective -permissive phasing at signalized
Local Funds Only
&
SO
(State)
intersections to reduce intersection delayConstruction
$20,000
Local, General Fuod
$20 000
Type 2 Raised Pavement
Irrstoll Type 2 Raised Payemdnl Markers
Enginecnn0
S100 Dw
(Federal, unsecured)
$1100,000
Markers
along the ceniNtine of arterials and collectors, improving
Possible Grant
&
so
(State)
roadwa safe du to hours and do ra- da
Con5lludiun
50
Local
Trackside Warning Systerm
Ios7all Woyside Homo
so
(Fetleral)
at Dayton St, and Main St
at (2) railroad crossings, reducing noise levels
Local Funds Only
Construction
so
(State)
railroad crossings
within Downtown Edmonds during train crossings.
530o-DIX
Local. General Fund
$300.000
TOTAL
S5.826,513
$0
$0
$2A36.000
Pedestrian Prom@=
Sunset Ave. Walkway
Provide muin-use pain on the west slae of Sunset Av. ,
Secured Grant,
Engineering
552.850
(Federal, secured)
$8,650
$44,000
from Bell St to Caspers St.
w/various utility upgrades
5887 00o
(Federal, unsecured)
$687,000
S650-
Unsecured Grant, &
&
(Local, Fund 421)
$75,000
$575,000
$2WW DDW
(Local, Fund 423)
S50,000
$150,000
Local Funds
Construction
SM 350
Local
$1,250
$6-000
$687,000
Oayp In St. WeOrway From 701 Avg. S to
Install sidewalk on the south side of Dayton St
Possible Grant
Engineering
537.50W
(Federal, unsecured)
537,50-
Ifth Ave. S
&
&
$0
(State)
Local Funds
Construction
S37 500
Local
$37 500
232nd St- SW from WOth Ave W to
Install sidewalk on one side of 232nd St. SW
Possible Grant
Engineering
S1,D55,DOD
(Federal, unsecured)
SR-104
&
&
$o
(State)
Loral Funds
Construction
5250000
cal,
238th St SW Walkway from 100th Ave. W to
Provide sidewalk on the north side of 238th St SW
Secured Grant
SD
(Federal)
104th Ave W
from 100th Ave. W to 104th Ave. W, along with Stormwater
&
Construction
=1000
(State, secured)
$200,000
improvements
Local Funds
5100 000
cal. Fund
$100.000
23801 SL SW Walkway ffom SR- 104Id
Provide sidewaFk on south side of 236th St
Secured Grant
5308.Dw
(Federal,secured)
$366,000
Madrona Elementary
&
Construction
So
(State, secured)
Local Funds
5177900
Lac.L Fund
$177,000
236th St. SW Walkway from SR-104 to
Provide sidewalK on one side of 236th St SW
Possible Grant
Engineering
%9?mc
(Federal, unsecured)
$106500
97th PI.W
&
&
$o
(State)
Local Funds
Construction
5697.500
Local
$loe.SDo
84th Ave W Walkway from 238th St. SW to
Prpyde sklewalk on vno aria a} 84rh Ava W
Possible Grant
Engin5,ON
(Fedeml,unsecured)
234th St SW
&
&
i0
(State)
Local Funds
Construction
S45.0D0
Local
80th Ave W Walkway from 206th St. SW to
Install sklWvalk to Wovlde aafl and dattirabta route to
Possible Grant
Engineering
s0
(Fetleral,
212nd St. SW
Edmonds-Woodway High Schon) and packs-
&
&
54SD.DOW
(State, unsecured)
$30,000
Local Funds
Construction
$450,W (f
Local
S30 000
2nd Ave S Walkway from James St
Engineering
so
Federal)
to Main St
Provide sidewalk along short missing link
Local Funds Only
&
so
(State)
Construction
S30000
Local
$20.000
Maplewood Walkway from Main St to
Install sidewalk on Maplewood St from Main St to 200th St SW,
Possible Grants
Engineering
S1 7115.000
(Federal, unsecured)
200th St SW
creating connection to Maplewood Elementary and Yost Park.
&
&
$17090W
(State, unsecured)
Local Funds
Construction
I 5170 DDD
(Local)
Page 2
City of Edmonds
Six Year Transportation Improvement Program (2016-2021)
Grant Opportunity
Project
(2016-2021)
Project Name
Purpose
Phase(s)
Total Cost
Source(s)
2016
2017
2010
2019
2i8th St. S1W Walkway from ietn Ave. W to
Possibie Grant
Engineering
S615 000
(Federal, unsecured)
lrey931 sidewalk along nrissinq link
&
&
so
(State)
84th Ave. W
Local Funds
Construction
V" DDO(Local)
WAU SL Wap3way from 3td An. 10 4M Are.
Engineering
5D
(Federal)
k1e1911 We lk along short miswlp fink
Possible Grant
&
5105 D%
(State, unsecured)
$105,000
Construction I
so
Local)
21%h SL SW Walkway from Hey, 99
Igrtall 300'sldewalk m the north tide of 2t01h St SW
Possible Grant
Engineering
5137,D(ID
(Federal, unsecured)
$137,000
to 72nd Ave. W
&
&
so
(State)
from Hwy, 99 to 72nd Ave. W
Local Funds
Construction
$20.000
Local
$20 000
231110t'SL Still Walkway from W104
Install UV nI sldewdk on the north side of 238th St SW
Possible Grant
Enpin"(*
s0
(Federal)
to Hwy 99
&
&
s4DD.OW
(State, unsecured)
S400,000
from SR. 104 to Hwf. 99
Local Funds
Consruction
$100.000
(Local)
S100.000
4th Ave. Corridor Enhancement
Create corridor improvements to encourage pedestrian
Possible Grant
Ernpineerinp
s8 4'A U00
(-Federal, unsecured)
$100,000
Walkway
activity along 4th Ave. N from Main St to
&
&
50
(State)
3rdAy N ftm Dorrnlavn MM nds 4Unler kN the Artil
Local Funds
Construction
$675,000
Local, Fund 125
$100 000
i-Kw. 99 Enhanaemanl "ed
instaifation of luminaires along Sit-99 from [e0th St Sw to
St0 ODD
(Federal, secured)
$10,000
(Phase 3)
212th St. SW, improving pedestrian and vehicular safety
Secured grant
Construction
50
(State)
ibahm camarucled wl 228th St- SW Corridor impm, Pfu a
$D(L.229
Minor Sidewalk
Complete slaewaik missing imks (from tihort'.ivaiicway list of
Engineering
s0
(Federal)
Program
2015 Transportation Plan or other identified projects)
Local Funds
&
s0
(State)
Construction
5300,000
axaC General Fu
$50-000
$50-000
$50-000
$50-000
ADA Curb Ramps improvements
conzun Cdywide AOA compeaal Curb ramps what*
Possible Grant
Engineering
50
(Federal)
facilities don't exist nor meet current standards
&
&
VSI)-MO
(State, unsecured)
$250,000
Local Funds
Construction
. General Fund
$25,000
$25,000
$25-000
$250-000
Audible Pedestrian
Install audible pedestrian signals to
Engineering
$25,000
�rederai, unsecuretl)
$25,000
Signals
pedestrians heads at signalized intersections to improve
Possible Grant
&
$0
(State)
pedestrians with disabilities safety
Construction
i so
(Local
TOTAL
S938-000
S252.000
$75-000
54-014OW
Bicycle projects
Bike -Link Install bike lanes and sharrows at key bicycle locations to Engineering lreaerag
complete missing links (such as along 76th Ave. W, 212th St SW...) Secured grant & 562B. &10 (Verdant grant) $626,840
Traftc Catrrdno r Fton-LlWoriaed Tonoaartasian Ss1eN Prafec�.:
Traffic Calming Program / Traffic circles, speed cushions, Engineering 50 (Federal)
Non -Motorized Transportation radar feedback signs, bulb -outs, etc Local Funds only 8 so (State)
Safe Constru 'on I st20.000 Local -General Fund $20000 1 $20000 1 $20000 1 $20.000
Ferry Projects
Ferry Storage Imprwements from Provide additional ferry storage area closer to the Ferry Terminal Engineering 1,357 M (Federal, unsecured) $357,000
Dayton St. to Pine St (through striping revisions / C-Curb addition..,). Possible Grant & s0 (State)
Consuuction so (Local)
7rAiFj �la!fAifiAPJ4147:i1;'
Edmonds Waterfront
Study:)) Waterfront Access issues emphasizing and priontizing near term solutions to
Port of Edmonds,
Engineering
S25,000
(Port of Edmonds)
$12,5ub
$12,500
Analysis
providing emergency access; 2) At -grade conflicts where Main and Dayton St intersect
Secured Grant, and
&
$500 000
(State, secured)
$250,000
$250,000
so
BNSF rail lines; 3) Pedestran / Bicycle Access; 4) Options to the Edmonds Crossing
(Federal)
MultimodatTwmirul Pr 'act IdW6 d as 44od�rd AMcmatiw2 wAL. the 2004 Ets
Local Furls
Plannin
SiO0 000
a1 Goriorai Funda
$50-000
$50-000
Cffmde
as Mod - mad Alternative 7) within the 2004 Final Environmental impact Statement
Engineering
50
(Federal)
Transition Plan
curb ramps, as well as long range plan on how to address
Local Funds Only
&
So
(State)
those defficiencies-
Plannina
580,000
Mocp1. General Furrde3
S80.000
Transportation Plan Update
Engineering
s0
(Federal)
Update Transportation Plan
Local Funds Only
&
$0
(State)
Planning
5175.000
(Local)
TOTAL
S30250D
1 $312.500
$0
10
Total $66,995,353
Total Federal
Toil Fedora) )Sec mw
Tolel Finneran rVro e�}
Total State
Total State (Secured)
$9,178 853 $2 764,500 $A.515.0.00 $10 477 000
$4,44 245,650 $8,000 $0 $3,478,500
$4,245,650 $44,000 $0 $0
$0 $800,000 $0 $3,478,500
$550,000 S25D,000 $0 $2,157,000
$550,000 $250,000 $0 $0
Page 3
City of Edmonds
Six Year Transportation Improvement Program (2016-2021)
Grant Opportunity
Project
(2016-2021)
Project Name
Purpose
Phases)
Total Cost
Sources)
1.1111
16
2017
2018
2019
S.Rgi 5taI4Lf� WS@
Total Verdant $626,840
Total Verdant (secured) $626,840
R 157., 7M
Total Port of Edmonds
$12,500
$12,500
So
$0
Total Local Fund
$3,708,863
$1,608,000
$1.465.000
$4,333,500
Total Loral (Fund 112)
$41.350
$8,000
$0
$1,238,500
Total Local (Fund 125)
$0
$0
$0
$100,000
Toal Local (Fund 421)
$491,000
$75,000
s0
$575,000
$501,513
$0
$0
$0
Total Local (Fund 423)
$590,000
$50,000
so
$150,000
Total Local (traffic Impact Fees)
$250,000
$0
$0
$0
T�El11.4rx91iGPOkfHIF�791
$1,835,000
$1,475,000
$1465000
$2,270,000
Page 4
City of Edmonds
Six Year Transportation Improvement Program (2016-2021)
2020 2021
S2.060.000
$1,000,000
$2120.000
$325,000
$25U,000
$175.000
$37,600
7 500
$250,000
$50000
fit 6l15 000
$3.420.000
Page 5
City of Edmonds
Six Year Transportation Improvement Program (2016-2021)
$100,000
S100.000
$955,000
I S150.000
$591,o6o
S591.000
$45,000
$45.000
$37,000
S37,000
$383.000
S363.000
$170.000
S170.000
$1,768,000
Page 6
City of Edmonds
Six Year Transportation Improvement Program (2016-2021)
320 000 I $20.000
$175.000
50 5175am
$17,410.000 $25.650.000
$7,722,500 $14,683,000
$0 $0
$7,722,500 $14,683,000
$5,044.600 $5,633,000
$0 $0
Page 7
City of Edmonds
Six Year Transportation Improvement Program (2016-2021)
2020 1 202t
S5,044.500 $5,633 oo
$4,593,000 $5:24:010
$2,113,000 $24:90.0
$150,000 $425,000
$0 $0
$0 $0
$0 $0
$0 $0
$2,330,000 $2,390,000
Page 8