Resolution 10410006.900000
JZL
4/17/03
RESOLUTION NO. 1041
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
EDMONDS, WASHINGTON, AMENDING THE FEE
SCHEDULE FOR THE CITY'S PLANNING, PUBLIC WORKS,
BUILDING AND OTHER FEE STRUCTURES, INCLUDING A
SAVINGS -CLAUSE, AND ESTABLISHING AN EFFECTIVE
DATE.
WHEREAS, ECDC 15.00.020 provides for the establishment and amendment of
certain fees charged by the City by resolution; and
WHEREAS, many, if not all fees established by the City have been subsidized by
the City's general revenue fund; and
WHEREAS, the City Council has previously established and affirms as its goal
that permit fees shall cover the costs of processing fees and such permit applications; and
WHEREAS, the City Council does, however, desire that parties utilizing the City's
administrative appeals procedures bear at least some of the City's incurred expenses in
processing and hearing such appeals; and
WHEREAS, the City Council finds that administrative appellants should assume
approximately 25 percent of the City's actual costs in processing appeals from notices of civil
violation; and
WHEREAS, the City Council finds that, except as provided herein, administrative
appellants should assume approximately 10 percent of the City's actual costs in processing
appeals from interpretations of the City's Building Official, appeals to the City's Hearing
Examiner, and appeals to the City Council; now, therefore,
{JZL542006.DOC;1/00006,900150/1 - 1 -
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON,
HEREBY RESOLVES AS FOLLOWS:
Section 1. The fees established pursuant to the attached Exhibit A shall be
effective on and after April 23, 2003. The fees and charges set forth on the attached Exhibit A
are hereby incorporated by reference as fully as if herein set forth and represent administrative
fees adopted pursuant to the authority of ECDC 15.00.020.
Section 2. If any section, sentence, clause, or phrase of this resolution or any
regulation adopted or amended hereby should be held to be invalid or unconstitutional by a court
of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or
constitutionality of any other section, sentence, clause or phrase of this resolution or any
regulation adopted or amended hereby. Provided, however, that if any tax rate, fee level or
structure thereof established by this resolution is declared invalid or illegal, or is otherwise struck
down, the tax rate, fee level or structure thereof in effect prior to the effective date of this
resolution shall be restored, revived, and brought to full force and effect.
RESOLVED this 22°a day of April, 2003.
APPROVED:
MA OR, GOY HAAKENSON
ATTEST/AUTHENTICATED:
',�.�±� -
I za�-M�� CITY CLERK, SANDRA S. CHASE
FILED WITH THE CITY CLERK: 04/18/2003
PASSED BY THE CITY COUNCIL: 04/22/2003
RESOLUTION NO. 1041
{7ZL542006.DOC;1/00006.900150/} - 2 -
Attachment A
Development Services Fees
Effective April 23, 2003
Permit Type
Definition
1; e e
This fee is charged for accessory structures greater than 120 square
Accessory Structure
feet and meeting zoning criteria in ECDC Chapter 16 and pursuant to
2002 Amended
(Greenhouse/Shed)
the adopted Building Valuation Fee Table. Includes Building,
UBC Table 1-A,
Planning and Engineering review.
w/o modifier
ADB - Administrative Approvals
Design review applications which require administrative approval.
$100
ADB - Major Project (SEPA
Design review applications which require approval by the ADB (the
required)
project exceeds the SEPA threshold).
$2,200
ADB - Minor Project (SEPA
Design review applications which require approval by the ADB (the
$400
Exempt)
project DOES NOT exceed the SEPA threshold).
ADB - Signs reviewed by ADB
Design review applications which require ADB approval -- SIGNS
$100
ONLY.
Fee assessed on a single family residence with no remodeling to
accommodate the ADU. This permit is only a compliance check of
ADU Compliance
building, planning and engineering requirements and the fee includes
$340
inspection. "Conditional Use Permit/Administrative Review" fee is
charged in addition to this "ADU Compliance" fee.
Fee assessed on a single family residence with no remodeling to
Adult Family Home
accommodate the Adult Family Home. This permit is only a
$370
compliance check of building and fire requirements and the fee
includes inspection.
This fee applies to any closure or disruption of an improved/developed
$140 plus
alley for construction activity such as field trailer, material storage,
charge/SF of
scaffolding, equipment, etc. which prevents full use of the alley for
alley/ month or
Alley Disruption/ Closure Fee
more than 72 hours. When this fee applies, it will be charged in
portion thereof in
addition to the ROW Construction Permit fee. (Monthly portion of
excess 72
Fee ($ per month) _ .5% of assessed land value per square foot of
hours
abutting property x area [SF] of alley disrupted/closed.)
Appeal - No Transcript Required
Appeal of Staff administrative decision to the Hearing Examiner.
$230
Appeal - Transcript Required
Appeals to City Council.
$205 plus actual
cost of transcript
Appeal of Building Official
This fee applies to formal appeals of written Building Official
$205
Interpretation
interpretations on the State adopted Building Codes.
Appeal of Notice of Civil Violation
This fee applies to formal appeals to Notices of Civil Violations
$605
issued pursuant to ECDC 20.110.
Applications Remanded to New
$45 + actual cost
Hearing Due to Improper Public
Applications Remanded to New Hearing Due to Improper Public
of new pub.
Notice by the Applicant
Notice by the Applicant
and/or mailing of
new notices
Base Building Permit Processing
This fee is assessed to all building permits that have a valuation. It is
$85
Fee
not assessed to flat rate permits.
Building Inspection
Fee rate for City Building Inspector for additional inspections not
$50
covered by permit fee. Charge is per inspection.
Cell Communications/ Cellular
2002 Amended
Facilities
This fee applies for maxi and mini cell communication facilities.
UBC Table 1-A,
w/o modifier
Page 1
Attachment A
Development Services Fees
Effective April 23, 2003
Permit Type
Definition
Fee
Change of Use
This fee is applied when a change of use is required pursuant to UBC
$410
3405 (with no remodeling).
This fee is applied for plan reviews performed by Building, Planning,
Changes to Approved Plans
Engineering and/or Fire on proposed changes to issued building
$50/hour
permits.
This fee is assessed to all issued permits for the exclusive purpose of
City Surcharge Fee
upgrading and maintaining the Eden permit tracking system, ECDC,
$15
and information technology.
This fee is applied any time a written interpretation of any code,
$180 + Actual
Code Interpretation
policy, etc. is requested from the Development Services Department
Cost of City
(Building, Planning or Engineering Division) Fire Department, or
Attorney
Public Works Department.
This fee is charged pursuant to the adopted Building Valuation Fee
2002 Amended
Commercial New Construction
Table. Includes Engineering Review; does not include Engineering
UBC Table 1-A,
Inspections.
w/o modifier
Comprehensive Plan Amendment
Comprehensive Plan Amendment
$1,875
Conditional Use Permits/
Conditional Use Permits/ Administrative Review
$490
Administrative Review
Conditional Use Permits/ Hearing
Conditional Use Permits/ Hearing Examiner Review
$1,165
Examiner Review
8.5 x 11 - $0.151
Copies
This fee is mandated by the State for public documents and is charged
page - 1" 5 free -
accordingly.
Plan Size $5 per
page
Covenant Recording Fee (normal
$15 base plus $19
filing)
Covenant Recording Fee (normal filing)
first pg/
$1 ea add
Critical Areas Checklist Review &
Critical Areas Checklist Review & Determination
$135
Determination
Critical Areas Steep Slope
Critical Areas Steep Slope Exemption
$670
Exemption
Critical Areas Study
Administration costs for Critical Areas studies/No peer review
$545
Administration
$1,145 + cost of
Critical Areas Variance
Critical Areas Variance
peer review for
steep slope areas
This fee is charged pursuant to the adopted Building Valuation Fee
2002 Amended
Deck, Stair, Ramp
Table.
UBC Table 1-A,
w/o modifier
Demolition (Primary)
This fee is charged for the demolition of primary buildings as defined
$235
in ECDC.
Demolition (Secondary)
This fee is charged for demolition of secondary buildings and
$60
structures that exceed 120 SF.
Page 2
Attachment A
Development Services Fees
Effective April 23, 2003
Permit Type
Definition
Fee
This fee is charged for outside consultant peer review services
$ 110 plus cost of
Development Project Peer Review
rendered when City staff lacks the expertise to review a specific
consultant review
project or aspect of a project.
$165 plus 2002
Dock/Marina/Floats
This fee is charged pursuant to the adopted Building Valuation Fee
Amended UBC
Table
Table 1-A, w/o
modifier
ECDC Amendment
This fee is charged when an entity other than the City requests an
$2,130
ECDC amendment.
Encroachment Permit
For any encroachment of a permanent nature in ROW City easement
$290
or City property. See Encroachment Permit handout.
Enginering Inspection Fee
Fee charged for each and every Engineering on -site inspection not
$50
specifically covered or included in a separate permit or inspection fee.
Fee is charged per inspection. This fee is charged in addition to the
applicable Building Permit or other permit fee. Examples include, but
are not limited to:
Single Family Construction
Fee charged for each and every Engineering on -site inspection
(including, but not limited to, erosion control, sewer, water, curb/
gutters/sidewalks, paving, traffic control, storm drainage & detention,
etc.) on any types of single family development (including, but not
limited to, new construction, additions, remodels, garages, carports,
side sewer, water lines, paving, etc.)
Erosion Control
Fee charged for each erosion control inspection required for
commercial, multi -family, subdivision/short plat or single family
development project. This fee will be charged for one inspection upon
issuance of permit (for commercial, multi -family or single family new
construction) or upon approval of civil drawings for
plats/subdivisions/short plats. Additionally, fee will be charged for
each time Engineering must respond to complaint or noted
deficiencies to ensure compliance with approved erosion control plan.
If erosion control is determined to be in compliance, this fee will not
be charged. This fee is charged in addition to other applicable
Engineering Inspection fees.
Traffic Control
Fee charged for each traffic control inspection required for
commercial, multi -family, subdivision/short plat or single family
development project. This fee will be charged for one inspection upon
issuance of permit (for commercial, multi -family or single family new
construction) or upon approval of civil drawings for
plats/subdivisions/short plats. Additionally, fee will be charged for
each time Engineering must respond to complaint or noted
deficiencies to ensure compliance with approved traffic control plan.
If traffic control is determined to be in compliance, this fee will not be
charged. This fee is charged in addition to other applicable
Engineering Inspection fees.
Page 3
Attachment A
Development Services Fees
Effective April 23, 2003
Permit Type
Definition
Fee
Engineering Inspection Fee
(Continued)
Partial Inspection
This fee is applied (in addition to the Engineering Inspection Fee
charged upon issuance of permit) each time a developer requests an
inspection of a partially completed task (e.g. sewer, water, storm, etc.)
Existing Commercial & Multi -Family
Fee charged for each and every Engineering on -site inspection
(including, but not limited to, erosion control, sewer, water,
curb/gutters/ sidewalks, paving, traffic control, storm drainage &
detention, etc.) on any work performed separate from a project for
new development of subdivision, short plat, commercial, multi -family..
(For example, side sewer inspection for converting from septic, side
sewer repair, grease interceptor, water service repair, tenant
improvements, parking, paving, etc.)
Right -of -Way Construction Restoration
Fee for each Engineering inspection of restoration of right-of-way
upon completion of any construction in the right-of-way.
Engineering Inspections - Site
Engineering inspections of construction of site improvements for all
Improvement (subdivision/short
subdivisions/short plats, commercial and multi -family. This fee is
2.2% of Bond
plats, commercial, multi -family)
charged in addition to the applicable Engineering Review or other
Amount
building permit fee(s).
Engineering Review -Site
Engineering review of civil plans for construction of site
Improvement (5 or more lots)
improvements for subdivision (5 or more lots) This fee is charged in
$1,310
addition to applicable Engineering Inspection fees.
Engineering Review -Site
Engineering review of civil plans for construction of site
Improvement (4 or less lots)
improvements for short plats (4 or less lots) This fee is charged in
$860
addition to applicable Engineering Inspection fees.
Extension of Time for an Approved
Planning Permit
Extension of Time for an Approved Planning Permit
$175
Factory Built Residential Structure
$500 plus Bid for
(Modular Panels to UBC)
This fee is assessed to State approved modular dwellings.
Foundation &
Roof
Fence
The fee charged when fence permits are required pursuant to ECDC
$50
17.40, the fee includes required inspections.
2002 Amended
Fire Alarm (Alteration)
This fee is charged pursuant to the adopted Building Valuation Table
UBC Table 1-A,
{Review & Inspection}
1-A. Includes Fire Dept. Review and Inspection.
w/o modifier,
plus $75
Fire Alarm (New)
The fee charged for new fire alarm systems. Includes Fire Dept.
{Review & Inspection)
review and inspection.
$200
Fire Connection Charge
(Review & Inspection)
The fee charged for fire connections. Includes review and inspection.
$345
Fire Damage
This fee is charged pursuant to the adopted Building Valuation Fee
2002 Amended
UBC Table 1-A,
Table.
w/o modifier
Page 4
Attachment A
Development Services Fees
Effective April 23, 2003
Permit 'Type
Definition
Fee
Fee assessed for each inspection performed by the City Fire Marshal
Fire Inspection Fee
or City Fire Inspector on construction projects. Fee charged per
$50
inspection.
Fee assessed for each hour of plan review performed by the City Fire
Fire Plan Review Fee
Marshal or City Fire Inspector on commercial or multifamily permit
$50 Per Hour
applications.
2002 Amended
Fire Sprinkler (Alteration)
This fee is charged pursuant to the adopted Building Valuation Fee
UBC Table 1-A,
{Review & Inspection}
Table. Includes review and inspection.
w/o modifier,
plus $100
2002 Amended
Fire Sprinkler (New)
This fee is charged pursuant to the adopted Building Valuation Fee
UBC Table 1-A,
{Review & Inspection)
Table. Includes review and inspection.
w/o modifier,
plus $200
This fee is charged for fire protection alterations or new system
Fire Suppression
installations on a Type I hood system, standpipe or other fire
$240
supression system.
Garage / Carport
This fee is charged pursuant to the adopted Building Valuation Fee
2002 Amended
UBC Table 1-A,
Table.
w/o modifier
Permit for site grading and/or shoring when separate from building
Amended UBC
Grading/Fill/ Shoring
permit; includes inspection. If Development Project Peer Review is
Appendix 33,
required, that fee will be charged in addition to Grading/Fill/Shoring
Table A-33A and
Permit Fee.
A-33B
This fee is assessed for exterior grease interceptors and includes
Grease Interceptor
review of the sizing criteria and inspection of interior connected
$350
plumbing fixtures and the exterior installation.
Grease Trap
This fee is assessed for interior grease traps and includes review of the
$150
sizing criteria and inspection of interior plumbing fixtures.
Hot Tub/Spa a Commercial
p (Commercial)
This fee is charged pursuant to the adopted Building Valuation Fee
2002 Amended
UBC Table 1-A,
Table.
w/o modifier
Hot Tub/Spa (Single -Family)
This fee is assessed for single family hot tubs and spas and includes
$100
the review and inspection fees.
Housing for the Elderly
Conditional Use Permit for Housing for the Elderly
$1,400
H dronic Heating
y g
This fee is assessed pursuant to the amended Mechanical Code Fee
$100 Per Unit
Table as adopted.
$65 or 1% of
Landscape Inspection Fee
Landscape Inspection Fee
landscape bid,
whichever is
greater
LID Sewer Fees (Outside of LID
Map)
Fees established by ordinance for each LID
$300 Minimum
Lot Line Adjustment
Lot Line Adjustment
$350
Page 5
Attachment A
Development Services Fees
Effective April 23, 2003
Permit Type
Definition
Fee
Manufactured Coach -Commercial
This permit fee is assessed on CUP approved commercial buildings
(Federal HUD Label)
that do not meet minimum Uniform Building, Mechanical, Plumbing
$240
or Barrier Free code requirements.
Manufactured Home Installation
This permit fee is assessed on Manufactured Dwellings installed in
(Federal HUD Label)
designated Mobile Home Parks and includes review and inspection.
$200
Meadowdale Administrative
This fee is assessed on Meadowdale development permits to account
Processing Fee
for the Building Officials review and administration of the
$2,385
Meadowdale development requirements.
Full reimburse -
Meadowdale Consultant Review
This fee is required by City Ordinance #3108 which requires full peer
ment of all
outside costs
review cost recovery on Meadowdale permit review.
(consultnt,
mailing, etc.)
Meadowdale Packets
Fee charged for each copy of the Meadowdale packet.
$30
$30 Base Fee
Mechanical Permit
This fee is assessed pursuant to the amended Mechanical Code Fee
plus 1997
Table as adopted.
amended UMC
Fee Table 1A
This fee is charged for commercial parking lot construction, alteration,
$180 plus 2002
Parkin Lot
g
expansion, stri in /restri mpaving/repaving,etc. ursuant to the
p p g p g' p
Amended UBC
adopted Building Valuation Fee Table.
Table 1-A, w/o
modifier
Parking -Joint Use Parking
Review and approval of Joint Use Parking Agreements pursuant to
Agreement
ECDC 20.30
$230
Parking -In -Lieu of Parking/Review
Parking -In -Lieu of Parking - Fee charged when code allows review
by Staff
and approval by Staff
$190
Parking In -Lieu -Parking - Review
Parking -In -Lieu of Parking - Fee charged when code allows review
by City Council
and approval by City Council
$485
$8,000 (new
Parking In -Lieu -Parking Fee (Per
Parking In -Lieu -Parking Fee (charge per space) - does not include
cnstrctn) $3,000
Space)
review fees (above)
(conversion of
Bldg. space)
This fee applies to any activity that occupies or closes parking
space(s), parking lanes(s) or other paved area of a street/road for more
than 72 hours. When this fee applies to construction -related activities,
$140 plus
it will be applied in addition to the ROW Construction Permit fee.
charge/SF of
Parking Disruption/ Closure Fee
(Monthly portion of Fee [$ per month] = 1 % of assessed land value
street/month or
per square foot of abutting property x area [SF] disrupted/closed.) If
portion thereof in
disruption/closure affects any portion of the area of a parking space,
excess 72
the area of disruption/closure is calculated based upon the area of a
hours
full parking space.
This fee is assessed pursuant to the amended Plumbing Code Fee
$30 plus 1997
Plumbing Permit
Table as adopted. Includes water service lines. Inspection fees are
amended UPC
charged in addition to this permit fee
Fee Table 1-1
Page 6
Attachment A
Development Services Fees
Effective April 23, 2003
Permit Type
Definition
Fee
PRD - Final Review
PRD - Final Review & Approval
$835
PRD - Preliminary Review
PRD - Preliminary Review
$5,710
PRD Amendment to an approved
PRD Amendment to an approved PRD
$825
PRD
Pre -Application Meeting
Fee charged for pre -application investigation, review and meeting
$565 (50%
applied toward
attendance. 50% of fee is applied toward the future plan check.
future plan check)
This fee is applied any time a builder/developer is not ready for
scheduled Building, Planning or Engineering or other inspection or if
Re -Inspection Fee
inspection fails two or more times and Building, Planning or
$50
Engineering or other inspector must return for a third or subsequent
follow-up inspection. Fee is charged for each re -inspection.
Reconsideration/Request for
This fee is charged for any request for reconsideration of staff
Reconsideration
decision. If result of reconsideration is reversal of previous staff
$150
decision, in favor of applicant, then the fee will be refunded.
Reconsideration by Hearing
Fee for formal request for reconsideration by Hearing Examiner
No Charge
Examiner
$220, plus
This fee is applied when buildings are moved into the City or when
$50/hour of
Relocation of Building
buildings are moved within the City or when buildings are moved
inspections
outside of the City.
outside City
limits
Request for Review of an
This fee is applied when a citizen challenges the validity of an issued
Approved Building Permit
Building Permit. The fee covers staff review and investigation time.
$500
Request for Review of an
This fee is applied when a citizen challenges the validity of an issued
Approved Discretionary Permit
discretionary permit. Fee covers staff review and investigation time.
$500
May include Hearing Examiner.
Request for Zoning Confirmation,
This fee applies to requests for zoning confirmation, compliance, or
Compliance, or Status Letter
status letter.
$100
Re -roof (Commercial)
This fee is charged pursuant to the adopted Building Valuation Fee
2002 Amended
UBC Table 1-A,
Table.
w/o modifier
This fee is charged for the re -roofing of exterior roofing materials only
Re -roof (Single-family)
on a single family dwelling with no structural changes. If structural
$65
changes are required, a "remodel' permit is required instead of this
Reroof Permit.
This fee is charged pursuant to the adopted Building Valuation Fee
2002 Amended
Residential - New Construction
Table. Includes Engineering Review; does not include Engineering
UBC Table 1-A,
Inspections.
w/o modifier
This fee is charged pursuant to the adopted Building Valuation Fee
2002 Amended
Residential -Addition/Remodel
Table. Includes Engineering Review; does not include Engineering
UBC Table 1-A,
Inspections. I
w/o modifier
Page 7
Attachment A
Development Services Fees
Effective April 23, 2003
Permit Type
Definition
Fee
After a permit application is complete and has completed three
Re -Submittal Plan Review
reviews, this is the charge for the administration and review of plans
$170
for the 4th and subsequent reviews. Fee is charged for each additional
review after the third review.
Rezone
Rezone
$1,770
Rezone - Contract
Contract Rezone
$2,375
Review and approval of ROW Construction Permit. Applies to any
construction -related activity in City ROW. See ROW Construction
Right -of -Way Construction Permit
Permit handout. Engineering Inspection Fee is charged in addition to
$160
Administrative Review
this fee for each inspection of restroation of the right-of-way upon
completion of construction. The number of required inspections will
be determined based upon the extent of the right-of-way disruption.
This fee is for administrative review and approval of
rockeries/retaining wall permit applications. A building inspection
Rockery/Retaining Wall
and/or engineering inspection fee is charged in addition to this
$265
rockery/retaining wall permit fee. A development project peer review
fee may also be required. See rockeries and retaining walls
information handouts.
SEPA Environmental Checklist
Fee charged for staff cost to review SEPA checklist
$420
Review
SEPA Environmental Impact
Full Cost
Statement
Fee charged for cost to review SEPA EIS.
(including staff
time)
SEPA Traffic Impact Analysis
Fee assessed for staff review of SEPA Traffic Impact Analysis/Study.
$40
Review Fee
See "SEPA Traffic Impact Analysis Requirements" handout.
Shoreline SDP Plus Either a
Shoreline Permit (can be a SDP, Conditional Use or Variance
Shoreline Conditional Use Permit
application) .
$1,600
or Shoreline Variance
$100 fee is for plan review and permit approval for commercial or
Side Sewer (Commercial & Multi-
multi -family side sewer installation. "See chart" is for sanitary sewer
$100 plus
Family)
connection charge. Engineering Inspection fee is charged in addition
See Chart
to this fee.
$30 fee is for plan review and permit approval for single family side
Side Sewer (Single Family)
sewer installation. $730 is for sanitary sewer connection charge.
$30 plus $730
Engineering Inspection fee is charged in addition to this fee.
$30 fee is for review and approval of permit for single family,
Side Sewer Repair Only
commercial or multi -family side sewer repairs or replacement in same
$30
location. Engineering Inspection fee is charged in addition to this fee.
This fee is charged in addition to other side sewer fees if side sewer
installation or repair involves special conditions, such as grinder
Side Sewer - Special Conditions
pumps, ejector systems, manholes, back flow preventors/check valve
$145
assemblies, etc. Separate 'Development Project Peer Review" fee is
charged in addition if review by outside consultant is required.
Page 8
Attachment A
Development Services Fees
Effective April 23, 2003
Permit Type
Definition
Fee
This fee applies to any sidewalk closure or disruption for construction
activity such as field trailer, material storage, equipment, etc. which
prevents full use of the sidewalk for more than 48 hours. When this
fee applies, it will be charged in addition to the ROW Construction
$140 plus
Permit fee. If applicant requests to provide and City approves
charge/SF of
Sidewalk Disruption or Closure
properly protected, channelized pedestrian routing within the parking
sidewalk/ month
lane of the street, a "Parking Disruption/Closure" fee will be charged
or portion thereof
based upon the parking or street area occupied by the pedestrian
in excess of 48
rerouting instead of this Sidewalk Disruption or Closure Fee.
hours
(Monthly portion of Fee ($ per month) = 1% of assessed land value
per square foot of abutting property x area (SF) of sidewalk
disrupted/closed.)
Sign (Per Sign)
Fee assessed for each sign requesting City approval. Fee charged for
$110
one side only.
Sign posting fee applies to any
This fee applies to sign posting for any Hearing Examiner review,
Hearing Examiner Review,
subdivisions, short plats, rezones and major ADB projects pursuant to
Full Cost, per
Subdivisions, Short Plats, Rezones,
City contract.
City contract
and Major ADB Projects
State Building Code Surcharge Fee
State Mandated Fee
State Mandated
Fee
Engineering Review of storm drainage for SFR construction of any
Storm Drainage (Engineering
type (e.g. new construction, remodel, additions, sealed decks, etc.)
Review Fee for Single Family
with > 5,000 SF new impervious surface or in critical area or
$50
Residence)
Meadowdale, or for infiltration or spreader trench release. This fee is
charged in addition to Building Permit or other permit fees.
Storm System Development Charge
Fee charged per equivalent service unit (ESU) added for each new
$428
private development project. See ECC 7.50.070.
Street Cut/Restoration for Water
Actual cost of street restoration performed by City. This is charged in
$100 plus actual
Meter Installation
addition to the water meter installation charge per ECC 7.30.030.C.2.
excess of
cost in $100 excexc
Street Map Amendment
Street Map Amendment
$2,120
This fee is applied to any use of public street of a temporary nature
Street Use Permit
(not covered by Encroachment Permit or ROW Construction Permit.)
$190
See Street Use Permit handout.
Street Vacation
This fee is applied to petitions to vacate City right-of-way, Includes
$1510 plus full
full cost of any outside appraisal.
cost of appraisal
Structural Review Fee
Consultant hourly rate plus administrative processing and mailing
$45 plus actual
cost of outside
charge.
consultant
Subdivision Plat - Preliminary
Subdivision Plat - Preliminary Approval
$3,390
Approval
Subdivision Plat - Final Approval
Subdivision Plat - Final Approval
$930
Short Subdivision - Preliminary
Short Subdivision - Preliminary Approval
$985
Approval
Short Subdivision - Final Approval
Short Subdivision - Final Approval
$220
Page 9
Attachment A
Development Services Fees
Effective April 23, 2003
Permit Type
Definition
Fee
Subdivision/ Minor Modification ol
Subdivision - Minor Modification of an Approved Plan
$730
an Approved Plan
Subdivision/Modification Request
Modification of zoning standards accompanying subdivision
Included with Subdivision
application.
$560
Application
Swimming Pool ( Pre-
Fee assessed for above ground swimming pools. This includes
Manufactured Above Ground)
building inspection fees.
$50
This fee is charged pursuant to the adopted Building Valuation Fee
2002 Amended
Swimming Pool (In -Ground)
Table. This includes building and cross connection inspection fees.
UBC Table 1-A,
w/o modifier
This fee is charged pursuant to the adopted Building Valuation Fee
2002 Amended
Tenant Improvement
Table.
UBC Table 1-A,
w/o modifier
Underground Tank less than
Administrative fee assessed for installation or decommissioning of
10,000 Gal (Fill, Remove, Install)
heating fuel or other tanks. Includes Fire Inspection Fee. Fee is
$40
charged per tank.
Underground Tank over 10,000
Fee assessed for installation or decommissioning of fuel storage tanks.
$255
Gal (Remove or Install)
Includes Fire Inspection Fee. Fee is charged per tank.
Variance from Underground
Fee charged for each request for variance from underground wiring
$395
Wiring
requirement.
Variance/ Administrative Review
Variance/ Administrative Review
$385
Variances- Hearing Examiner
Variances- Hearing Examiner Review
$1,155
Review
This fee is assessed against code violators at the discretion of the
$205, or up to 5
Violation Compliance Fee
Building Official, Planning Manager, City Engineer or Fire Marshall.
times Permit Fee
Fee is assessed only if violation(s) exist(s).
(whichever is
greater)
Water Connection Charge
Fee charged for each new customer connecting to the City's water
518" & 3/4"
system per Edmonds City Code 7.30.035
$908
1"$2270
1.5" 4540
2"$7264
3" $14,528
4" $22,700
6" $45,400
8" $72,640
Water Meter Installation Charge
Fee charged for new water service line and meter installation per
5/8" & 3/4"
Edmonds City Code 7.30.030
$550
1" $800
1.5" $1428
2" $2930
Page 10
BUILDING PERMIT FEE SCHEDULE
AMENDED 1997 UNIFORM BUILDING CODE
TABLE 1-A
Effective APRIL 23, 2003
$1-$500
$30
$501 to $2000........................................................................
$30 for the first $500 plus $3 for each additional $100, or fraction
thereof to and including $2000
$2001 to$25,000....................................................................
$75 for the first $2000 plus $14 for each additional $1,000 or
fraction thereof to and including $25,000
$25,001 to$50,000.................................................................
$400 for the first $25,000 plus $10 for each additional $1,000 or
fraction thereof to and including $50,000
$50,001 to $100,000
$650 for the first $50,000 plus $7 for each additional $1,000 or
fraction thereof to and including $100,000
$100,001 to $500,000
$1000 for the first $100,000 plus $6 for each additional $1,000 or
fraction thereof to and including $500,000
$500,001 to $1,000,000
$3,400 for the first $500,000 plus $5 for each additional $1,000 or
fraction thereof to and including $1,000,000
$1,000,001 and up
$5,900 for the first $1,000,000 plus $4 for each additional $1000 or
fraction thereof.
Other Fees:
1. Plan review fees in addition to building permit fees are assessed at a rate of 85% of the calculated building permit fee
(includes Building, Planning and Engineering for commercial/multi-family reviews and Building/Planning for
residential reviews).
2. Commercial Permits: All permits relating to other than residential permits as described below shall be calculated at
the rate established in the amended Building Permit Fee Schedule based on 120% of amended Table 1-A of the 1997
edition of the Uniform Building Code on file with the City Clerk and the Building Official.
3. Residential Permits: Permits for the construction (including remodels and additions) of single-family residences along
with accessory structures shall be calculated at the rate established in the Building Permit Fee Schedule based on
amended Table 1-A of the 1997 Uniform Building Code on file with the City Clerk and Building Official.
4. The determination of value or valuation under the provisions of the 1997 Uniform Building Code shall be based on the
Building Valuation Data with no regional modifier, published in the November -December 2002 issue of Building
Standards magazine published by the International Conference of Building Officials, on file with the City Building
Official.
5. Decks, stairs, ramps, covered porches with open exterior sides, and trellises are assessed at $17 per square foot for
valuation purposes.
6. Unheated sunrooms are assessed at $25 per square foot for valuation purposes.
7. After the 3rd review is complete on a permit application, additional reviews are charged at $170 per submittal.
8. Base building permit processing fee is $85 per permit.
9. Additional plan review required by changes, additions or revisions to approved plans $50 per hour (minimum charge
one hour).
IO.Building Inspections outside of normal business hours $50 per hour (minimum charge one hour).
11.Re-inspection fees and inspections for which no fee is specifically indicated, assessed under provisions of UBC 107 are
charged at $50 per hour (minimum charge one hour).
12.Development Project Peer Review: $110 plus cost of consultant review fee charged for outside consultant peer review
services when City staff lacks the expertise to review a specific project or aspect of a project.
13.City Surcharge fee is $15 assessed for each development permit the City issues.
14.State Building Code Council surcharge fee $4.50 per building permit, plus $2.00 per each dwelling unit.
15.Pre-A22lication Meeting $565, 50% applied toward future plan check fee for that s ecific project only.
C:\WORDATA\Resolutions\Development Services Dept Fees Exhibit 2.doc