Loading...
Resolution 1180RESOLUTION NO. 1180 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, APPROVING A TRANSPORTATION IMPROVEMENT PLAN (TIP), AND DIRECTING FILING OF THE ADOPTED PROGRAM WITH THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION. WHEREAS, RCW 35.77.010 and 36.81.121 require that each city and town is required to adopt a Transportation Improvement Plan (TIP) and update it annually, prior to adoption of the budget, and file a copy of such adopted program with the Washington State Department of Transportation (WSDOT); and, WHEREAS, a public hearing was held on the TIP on September 2, 2008; and, WHEREAS, the City Council wishes to adopt such a program stating its desire and intent that the staff pursue additional forms of funding in order to accelerate street overlay/ improvements and walkway, sidewalk and bike way improvements in the City if such funds can be obtained; now, therefore, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. A Transportation Improvement Plan is hereby adopted pursuant to the requirements of RCW 35.77.010 and 36.81.121 to be effective on September 2, 2008 and to continue in full force and effect until amended. A copy of such Transportation Improvement Plan for the years 2009 to 2014 is attached hereto as Exhibit A and incorporated by this reference as fully as if herein set forth. -1- Section 2. The City Clerk is hereby requested and directed to file a certified copy of . the Transportation Improvement Plan with the Washington State Department of Transportation. RESOLVED this 2nd day of September, 2008. APPROVED: MAY R, G Y HAAKENSON y � ATTEST/AUTHENTICATED: ITY CLERK, SANDRA S. CHASE FILED WITH THE CITY CLERK: 08/29/2008 PASSED BY THE CITY COUNCIL: 09/02/2008 RESOLUTION NO. 1180 -2- CITY OF EDMONDS Six -Year (2009.2014) Transportation Improvement Program (TIP) Grant Opportunity Project (2009-2014) 1 Project Name Purpose Grant/Date Phase Total Cost Source 2009 2010 2011 2012 2013 2014 Edmonds Crossing Protect: Professional Services - Design Scoping $13,120,000 (Federal) $2,400,000 $2,400,000 $2,400,000 $2.400,000 $1,760,000 $1,760,000 $3,280,000 State / Federal Grants (State) $600.000 $600,000 $600,000 $600,000 $440,000 $440.000 $0 Local Pine St. to Ferry Right -of -Way Acquisition Engineering $0 (Federal) State Federal Grants $1,100,000 (State) $1,100,000 $0 Edmonds Crossing Local Construction Construction $0 (Federal) State/Federal Grants $0 (State) $0 Local Preservation/Maintenance Proiects: Local Funds Only Engineering $0 (Federal) $0 (State) Annual Street Overlays Grind pavement, overlay $180,000 Local Fund 412 $30,000 $30,000 $30,000 $30,000 $30.000 $30,000 Local Funds Only Construction $0 (Federal) $0 (State) $1,065,000 Local Fund 412 $165,000 $165,000 $165,000 $190,000 $190,000 $190,000 City W ide Pavement maintenance to Local Funds Only Engineering $0 (Federal) Street improvements increase roadway life $0 (State) $45,000 Local $15,000 $15,000 $15,000 Citywide Upgrades to existing signals, for Local Funds Only Engineering $0 (Federal) Signal Improvements maintenance & technology $0 (State) $15,000 Local $5,000 $5,000 $5,000 City Wide Upgrades to existing traffic signal cabinet elements for Local Funds Only Construction $0 (Federal) Cabinet and maintenance & technology $0 (State) $15,000 Controller Upgrades Local $5,000 $5,000 $5,000 Local Funds $0 (Federal) Puget & Olympic View Drive Signal rebuild & Construction $99,000 (State, unsecured) $99,000 $99,000 Possible Grant Local $99,000 Downtown Parking Add bicycle parking at different locations Construction $0 (Federal) Citywide Local Funds Only $0 (State) Nonmotorized I throughout the city where high bike traffic is noticed $60,000 Local $20,000 $20,000 $20,000 238th @ 100th Av. Signal Upgrades Rebuild complete signal system Local Funds Construction $0 (Federal) and install video detection & & $118,000 (State Unsecured) $118,000 $118,000 Possible Grant En ineerin Local $118,000 Safety / Capacity Analysis: 80th Avenue West Analyze 80th Avenue West for vehicle, bicycle Engineering $0 (Federal) $0 Sight Distance Improvements and pedestrian safety. Local Funds Only & (State) Construction $292,000 Local $292,000 76th Av. @ 212th Intersection Re -Design intersection to make the traffic signal work more Local Funds Engineering (Federal) Improvements & $250,000 (State, unsecured) $250,000 $250,000 efficiently and improve Capacity / Level of Service Possible Grant Construction Local $250,000 Project scoping for roundabout, signal, or other intersection Scoping $0 (Federal) SR 524 (196th St. SW)/ improvement Local Funds Only $0 (State) 88th Ave W. Intersection $0 Local Improvements Design intersection improvement Local Funds/ Design $0 (Federal) $0 (State) $0 Possible Grant Local Construct intersection improvement Construction $0 (Federal) Possible Grant $0 (State) $10,000 Local $10,000 Page 1 CITY OF EDMONDS Six -Year (2009-2014) Transportation Improvement Program (TIP) Grant Opportunity Project (2009-2014) Project Name Purpose Grant/Date Phase Total Cost Source 2009 2010 2011 2012 2013 2014 Project scoping for roundabout, signal, or other intersection Scoping $0 (Federal) $0 212th/84th (5 Comers) improvement Local Funds Only (State) Intersection Improvements $10,000 Local $10,000 Design intersection improvement Engineering $0 (Federal) Possible Grant $75,000 (State, unsecured) $75,000 $25.000 Local $25,000 Construct intersection improvement Construction $0 Federal Possible Grant $450,000 (State, unsecured) $450.000 $150,000(Local) $150,000 Engineering $100,000 (Federal, unsecured) $100,000 238th St SW Improvements Widen to three lanes and add sidewalks to improve Possible Grant $100,000 (State, unsecured) $100,000 $0 84th Ave W to vehicular safety per Pine Street Ferry Access Study Local Construction $800,000 (Federal, unsecured) $800,000 SR 104 $800,000 Possible Grant (State, unsecured) $800,000 $300,000 Local $300.000 Engineering $0 (Federal) Signal Improvements Install fully actuated signal and channelization Possible Grant $0 (State) SR 104 & 238th St to improve vehicular safety $0 Local Construction $0 (Federal) Possible Grant $120,000 (State, unsecured) $120,000 $120,000 Local $120,000 Possible Grant Engineering $0 (Federal) SR 99776th Way Realign highly skewed intersection State/Federal $0 (State) $80.000 Safety Improvements to address safety and improve operations; Local $80,000 Possible Grant Construction $1,250,000 (Federal, unsecured) $1,250,000 includes new signal @ SR99/2281h State/Federal $0 (State) $250,000 Local / traffic impact fees $250,000 SR 99/220th Street SW Contruct westbound right turn lane Engineering $400,000 (Federal, unsecured) $400,000 Capacity Imrovements per SR99 Study recommendations Local & Grant & $0 (State) Construction $80,000 Local $80,000 SR 99 / 216th Street SW Construct additional lanes on 216th Engineering $800,000 (Federal, unsecured) $800,000 Capacity Improvements per SR99 Study recommendations Local & Grant & $0 (State) $160,000 Construction Local $160,000 SR 99 / 212th Street SW Construct additional lanes on 212th Engineering $800,000 (Federal, unsecured) $800,000 Capacity Improvements per SR99 Study recommendations Local & Grant & $0 (State) Construction $160,000 Local $160,000 TIB Grant Engineering $10,000 (Federal, unsecured) $10,000 9th Ave & Caspers Install roundabout, signal, or other intersection $10,000 (State, unsecured) $10,000 $10,000 Intersection Improvements improvement No Local Match Local $10,000 TIB Grant Construction $80,000 (Federal, unsecured) $80,000 $80,000 (State. unsecured) $80,000 No Local Match $80,000 Local $80,000 Hwy 99 Illumination Project Improve roadway safety with Illumination HES Grant/2009 Construction $100,000 (Federal, unsecured) $100,000 $200,000 (State. unsecured) S200,000 $100,000 No Local Match Local $100,000 Project scoping for roundabout, signal, or other intersection Scoping $0 (Federal) Olympic View Drive/76th improvement Local Funds Only $0 (State) $10,000 Intersection Improvements Local $10,000 Design intersection improvement Engineering $0 (Federal) Local Funds Only $0 State Construct intersection improvement $0 (Federal) Possible Grant Construction $0 State Walnut St. @ 9th Av. South Intersection improvements Construction $122,500 (Federal, unsecured) $122,500 Possible Grant & $0 (State) Engineering $122,500 Local $122,500 Main @ 3rd Signal Upgrade Upgrade traffic signal and lessen likehood to be hit Possible Grant Engineering $0 (Federal) by trucks & & $69,000 (State, unsecured) $69,000 Local Funds Construction $69,000 Local $69,000 Main @ 9th Av. Install signal at intersection to reduce injury and $100,000 (Federal unsecured) $100.000 property damage accidents Possible Grant Construction $100,000 (State unsecured) $100,000 $60,000 Local $60,000 Page 2 CITY OF EDMONDS Six -Year (2009-2014) Transportation Improvement Program (TIP) Grant Opportunity Project (2009-2014) Project Name Purpose Grant/Date Phase Total Cost Source 2009 2010 2011 2012 2013 2014 Annual School Zone Maintenance and improvements of pedestrian $7.500 (Federal, unsecured) $2.500 $2,500 $2,500 Improvements facilities in school zones Possible Grant $7,500 (State, unsecured) $2,500 $2,500 $2,500 $15,000 Local $5,000 $5,000 $5,000 Arterial Street Traffic Coordinate the different traffic signal less than 1/2 mile away Engineering $0 (Federal) Signal Coordination Improvements from each other. Local Funds & $0 (State) Construction $40.000 Local Traffic Impact Fee $50,000 Non -motorized Pedestrian/Bicycle Proiects: Main St. Pedestrian Lighting Improve street lighting for pedestrian safety on Local Funds Only Engineering $0 (Federal) Main St. between 5th Av. and 6th Av. & & $0 (State) Possible Grant Construction $275,000 Local $275,000 75th/76th Ave Walkway Construct sidewalk; Construction $0 (Federal) Meadowdate Beach Road to No Grants $0 (State) North Meadowdale Road walkway will be constructed on one side of the street $1,500.000 Local Fund 125 $1,500,000 ADA Curb Ramps Improv. Construct ADA compliant curb ramps where Engineering $0 (Federal) Citywide Local Funds Only & $0 (State) facilities do not exist Construction $60,000 Local $20,000 $20,000 $20,000 Interurban Trail Pave, sign & connect regional segment from CMAO 2007 Engineering $250,000 (Federal secured) $250,000 244th to 228th and possible RCO & $577,000 (State unsecured) $577,000 Shoreline to Mountlake Terrace giant Construction $577,000 Local Fund 132 $577,000 Bikeway Projects Engineering $0 (Federal) Citywide Per 2000 Bikeway Comp Plan Local Funds Only & $o (State) $22,500 Construction Local $7,500 $7,500 $7,500 Walkway Improvements Fed School Zone 2 $0 (Federal) Citywide Per 2002 Walkway Plan $0 (State) $22,500 Local Local $7,500 $7,500 $7,500 Olympic View Drive Construct sidewalks City Match to Lynnwood Construction $0 (Federal) Sidewalk Improvements $0 (State) 76th Ave. to 168th Street Project $125,000(Local) $125.000 Pedestrian Lighting Improve lighting at crosswalks and intersections Construction $0 (Federal) Citywide $0 (State) to improve pedestrian safety No Local Match $15,000 Local $5,000 $5,000 $5,000 Meadowdale Beach Walkway Construct asphalt walkway on one side of street Engineering $0 (Federal) 76th Ave W to No Grants & $0 (State) Olympic View Drive Construction $30,000 Local $30,000 9th Ave & Caspers Walkway Construct a cement concrete sidewalk Pedestrian and Bicycle Engineering $435,000 (Federal, secured) $435,000 9th Ave N (Puget to Caspers) along west side of 9th and the north side of Caspers; Safety grant and & $250,000 (State, unsecured) $250,000 Caspers St 7th to 9th Ave Complete the missing a in the walkway network possible TIB grant Construction $190,000 Local, Fund 125 $190,o0o Pioneer Way to Alternate emergency services ingress & egress, Local Funds Only Engineering $0 (Federal) Shell Valley $0 (State) $0 bikeway/ walkwa Local Pioneer Way to Alternate emergency services ingress & egress. Local Funds Only Construction $0 (Federal) Shell Valley $0 (State) bikewa l walkway $400,000 Local $400,000 72nd Av. W Pedestrian Construct asphalt walkway on 72nd Av. Design $0 (Federal) Improvements .. Possible Grant $180,000 (State, unsecured) $180,000 $180,000 Local $180,000 80th Av. W from 206th to Provide safe and desirable walking route. $0 (Federal) Construction $110,000 21116 80th Possible Grant (State, unsecured) $110,000 $110,000 Local $110,000 80th Av. W from 188th St. SW to Provide safe and desirable route to Passible Safe Engineering $460 000 (Federal, unsecured) $562,000 Olympic View Dr. Routes to & $0 (State) Seaview Elementary and parks. School Grant Construction $240,000 Local $261,000 226th St. SW Walkway Provide safe pedestrian missing link between SR-104 and Possible Federal Engineering $150,000 (Federal, unsecured) $150,000 105th Pl. W, creating safer access to & $0 (State) Sherwood Elementary and residential net hbhoods. Safety Grant Construction $0 Local Madrona Elementary School Improve pedestrian safety with installation of new Possible Pedestrian and Engineering $0 (Federal) and Bicycle & $460,000 (State, unsecured) S460,000 crosswalks to gain easy access to school. Safe Grant Construction $226,000 Local $226,000 Page 3 CITY OF EDMONDS Six -Year (2009-2014) Transportation Improvement Program (TIP) Grant Opportunity Project (2009-2014) Project Name Purpose Grant/Date Phase Total Cost Source 2009 2010 2011 2012 2013 2014 Constituent Responses/Low Cost Enhancement Projects: City Wide Operational Striping, channelization, ccurb, Design $0 (Federal) Enhancement Projects signing Local Funds Only & $0 (State) Construction $45,000 Local $15.000 1 $15,000 $15,000 Traffic Calming Projects: Residential Neighborhood Traffic cirlaes, speed humps, Design $0 (Federal) Traffic Calming -Your Speed" signs, etc. Local Funds Only & $0 (State) Construction $30,000 Local $10,000 $10,000 $10,000 Traffic Piannina Proiects: Transportation Plan Update Update Transportation Plan every six years. Engineering $0 (Federal) address GMA revisions yearly, revise street map, Local Funds Only & $0 (State) perform yearly earltraffic counts and modeling Planning $76,000 Local $76,000 Total Total for Edmonds Crossina Terminal Total Without Edmonds Crossing Total Federal (Secured) Total Federal (Unsecured) Total State (Secured) Total State (Unsecured) Total Local (Fund 1121 Total Local (Traffic Impact Fees) Total Local (Fund 12" Total Local (Fund 132) Total Fund (Fund 4121 Page 4 $8,505,000 $3,491,000 $4,695.000 $7,393,000 $6,246,000 $5,338,000 $4,100,000 $3,000,000 $3,000,000 $3,000,000 $2,200,000 $2,200,000 $4,405,000 $491,000 $1,695,000 $4,393,000 $4,046,000 $3,138,000 $685,000 $0 $0 $0 $0 $0 $150,000 $0 $1,250,000 $954,500 $925,000 $2,002,500 $0 $0 $0 $0 $0 $0 $827,000 $118,000 $0 $1,216.500 $1,712,500 $181,500 281000 $128,000 $125,000 $1,710,000 $1,188,500 $954,000 $0 $50,000 $125,000 $0 $0 $0 $1,690,000 $0 $0 $0 $0 $0 $577,000 $0 $0 $0 $0 $0 $195,000 $195,000 $195,000 $220,000 $220,000 $220,000