Loading...
Resolution 1369RESOLUTION NO. 1369 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, APPROVING THE 2017-2022 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND DIRECTING FILING OF THE ADOPTED PROGRAM WITH THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION. WHEREAS, RCW 35.77.010 and 36.81.121 require that each city and town is required to adopt a Transportation Improvement Program (TIP) and file a copy of such adopted program with the Washington State Department of Transportation (WSDOT); and WHEREAS, the TIP identifies all planned projects over the next 6 years, along with the appropriate funding source; now, therefore, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. The Transportation Improvement Program is hereby adopted pursuant to the requirements of RCW 35.77.010 and 36.81.121 to be effective on June 81h, 2016 and to continue in full force and effect until amended. A copy of such Transportation Improvement Program for the years 2017 to 2022 is attached hereto as Exhibit A and incorporated by this reference as fully as if herein set forth. Section 2. The City Clerk is hereby requested and directed to file a certified copy of the Transportation Improvement Program with the Washington State Department of Transportation. -1- RESOLVED this 6th day of September, 2016. ATTEST/AUTHENTICATED: CLERK,. ASSEY FILED WITH THE CITY CLERK: September 2, 2016 PASSED BY THE CITY COUNCIL: September 6, 2016 RESOLUTION NO. 1369 -2- City of Edmonds Six Year Transportation Improvement Program (2017-2022) Project Name Purpose Grant OpportuniTy Project Phases) (2017-2022) Total Cost Sources) 2017 2018 2019 1 -20 1 2021 2022 M9w tin nOr lnWyaed M XSi�ia21 mA Svcurvd •nl �[rwv 30f BQ027 Tl>s ILctm wnmlrre4 9.nt Propryat-onfINLipntaninbe PlOilli Pnnaa=SLees Presetvotoa Grma pavement, overlay, chip seal, Possible Grant Engineering 51.sco.00o (Federal, unsecured) $900,000 51,000,000 Program & & SO (State) and slumv seal Local Funds Construction 510.97i.COO ILdca1_ General Fund) $1.190 dog $1 420.000 $200o.Ono $2,n6n nnn g? 12n nnn $2186 nnn 84th Ave W Overlay From Possible Grant Engineering 5756000 (Federal, secured) $750.000 220th St SW to 212th St SW G:evd ilavMy#%&' ovmtiy & & srr7 (State) oral Fiindc Canclrnrfin^ s7g017o0 .GierleralF plan nnn Citywde Signal upgrade trarilc signal cabinets and Possible Gram Engineering S&50A0o (Federal, unsecured) 5325,000 $325,000 Improvements & & SO (State) twhirbrilial 1.0call Purdc (:nnctriictinn to ILdrall Puget Dr. a OVD Signal Upgrades Possible grant Engineering s2E7.5114 '(Federal, unsecurea7 $37,500 $250,OW Upgrade traffic signal 8 & so (State) oral Fiin,As Construction . 4i75nn A17c nnn 23M (M 100th Ave Signal Upgrades Rebuffatraffic signal system Engineering so (Federan with new signal mast arms, cabinet, and Possible Grant & Si6S. (State, unsecured) $765,000 vil deferfidn Construcion Sq ll oral) Main St@ Srd Signal Upgrades Possmte grant Engineering s2075O0 (Federal, unsecured) $37,500 $250,O00 Upgrade traffic signal & & so (State) Local Funds Construction S$7,e0p ILoca1) $37,500 S50.000 TQtAc 52.130,000 1 S1A20_Opp 32.500.000 1 5-`1 53.845 DOo 52.486.000 228th St SW Corridor Safety Construct missing roadway link on 228th St SW between Secured grant $10.000 (Federal, securec) s10,000 Improvements Hwy 99 and 76th Ave W, with various utility upgrades. & Construction W (State) 1 -1 Fiind_c so II -) 228m St. SW from Widen roadway to add two-way left turn lane along strewn or P-me grant $50000 eoerar, unsecured) 550,000 Hwy 99 to 95th PI W left turn lanes at specific intersections & Design so (State) Install sidewalk and bike lanes L_o_cal Funds 550.000 (Local) $Sfl,fln0 76th Av W @ 212th St SW Intersection Re -design intersection to reduce intersection delay and $3.006.500 (Federal, secured) $2,920,000 $86,500 i1.93o.827 (State, unsecured) $1,930,827 $113.500 Improvements improve level of service (LOS) Various utility Secured Grant (Local, Traffic Impact Fees) 5100,000 $13,500 improvements are also included in the project & Construction $778475 (Local, Fund 421) $776,475 54511 Local Funds (Local, Fund 422) $450,528 5710.9e6 ILot Fvnd 4231 s71AA- HwY'99-Safety improvements Install C-Curb along this section cf Hwy 99 to restrict lefttums into Local Funds / Design, rs6.012 OW (Federal, unsecured) $300.000 $700,000 $474,000 $2,538,000 from 216th St. SW to 224th St SW driveway from the two-way left turn lane and add left turn pockets Possible Grant ROW, & $0 (State, secured) in certain areas Construction 5282000 Lout $eeggl Furritb $262 non SR-99 Gateway / Revitalization Install gateway elements and safety improvements Engineering $0 (Federal) along the SR-99 Corridor Grant secured & $5.00 om (State, secured) $500,000 $4,500,000 Construction so ILocall SR 524 (196th St SW) 9 Design intersection improvements and addition of guardrail on Design s0 (Federal) 88th Ave W Intersection the west side of Intersection due to 12'vertical drop (grade Possible Grant 5772.OW (State, unsecured) $122,000 Improvements adii ictment trim cinnr. dictancP to he cnncidredl nrnROW sit,pp0 (Local_ traffic inroad fees) $71 000 acquisition ROW sp (Federal) & $87 500 (State, unsecured) $87,500 $07.500 Lagrl $87,500 Complete intersection improvements Construction ssss Opp (Federal, unsecured) $586,000 Local Funds So t8ta'e] 5o t Main St @9tn Ave ingiillatq or lfaRlc spool or minr.rarr:datoiig Possible grant Engineering ll75e.0W (Federal, unsecured) s118,000 $670,000 & & so (State) Local Funds Construction s12?o00 !Local) $18 nnn $1n5 nnn 76m Av W @ 220th St SW Installation or new traffic signal to convert existing split phasing for new Possible Grant Engineering, Ss,'{66,000 (Federal, unsecured) $951,500 $951,500 $3,283, 000 Intersection Improvements eastbound and movements to concurrent lei turn phasing 8 ROW, B SO (State) ygtl aad)Iron er nl ltlrn tamipr tlfOfaUrIICOWfa movemera lnr al Flinrlc (:nnctrurtinn �.� (Local) $14e soD $lae sn_D Ss_12 Dd_d_ '220th St SW Traffic Signal Coordination Coordinate the traffic signals along 76th Ave W Engineering 57o0 flop (Federal, unsecured) $300,000 from Hwy 99 to 76th Ave W from Hwy. 99 to 76th Ave W to Possible Grants 8 z (State) imbrove corridor efficiencies through adaptive system Constructign so cosh rtwy 99 @ 212m St SW Widen 212th St SW to add a WB and EB left turn lane Possible Grants Engineering, $-24Z7 m (Federal, unsecured) $152,OD0 s943,000 s1,332, 000 Intersection Improvements Provide protected / permissive Ieftturn phasing for both & ROW, & 50 (State) mdVLnvvlf llgiefed WAditem will • orL nnwoeci Local Funds Construction IF, !Local w/ CRv of Lynnwood) s23 non .%14A nnn cone non Page 1 City of Edmonds Six Year Transportation Improvement Program (2017-2022) Grant Opportunity Project (2017-2022) Project Name Purpose Phases) Total Cost Source(s) 2017 2018 2019 2020 2021 2022 Hwy 99 @ 21 Sin St SW Widen 216th St SW to add a WS antl EB leftturn lane Possible Grants Engineering, $2.021.000 (Feaerat, unsecured) 1142,000 $289,000 $1,590,000 Intersection Improvements Provide protected / permissive left turn phasing for both & ROW, & so (State) movements moral "wridc Conctri ion $y10_L47Q (I oral wl CRv of Lynrwnorlj $22 000 S45 000 S247 000 Hwy 99 @ 220th St SW Widen 220th St SW to add westbound right turn lane and Possible Grants Engineering, $2783.000 (Federal, unsecured) $152,000 $939,000 $1,692,000 IrileftdCbon Irltprptymetda Hwy 99 to add 2nd southbound left turn lane & ROW, & $0 (State) oral Fu_nrlc C-ontrus',hon SAW 91313 fin- wl CiN Mountlake Tena_rPl $23 000 $146 000 1 $263 000 SR-104 @ 226th St SW / 15th St SW Extend SR-104 Westbound left turn lane and complete pedestrian Possible Grants En@oeer.g, $179 000 (Federal, unsecured) 111,101 1164,000 Intersection Improvements and bicycle improvements with signage and traffic signal & & s0 (State) Improvements, I_nral Funds Condon awn $15,00o (Local) $15 000 SR-104 @ 95th PI W Modify existing signal timing to include protected left turn phasing Possible Grants Er"rmp, $420.000 (Federal, unsecured) $65,000 $355,000 Intersection Improvements and provide C-Curb with leftturn channelization & & $0 (State) for access management LOGAI Purdc CpWrycllon 975.000 (Local) $10,000 $65,000 SR-104 @ 236th St SW Install traffic signal and other Possible Grants Engineering, $1.157,000 (Federal, unsecured) $173,000 $984,000 Intersection Improvements improvement intersections & ROW, & $0 (State) Irma)Furi Construction $161,000 (Local) $27.000 $154000 Type 2 Rolled Pa,awnt Install Type2 Raised Pavement Markers Engineering S1XO(lo (Federal, unsecured) $100,000 Markers along the centerline of arterials and collectors, improving Possible Grant & s0 I (State) n_a_r1v_✓av c. 00%y dnrino night hours and on rainy days Construction `$0 (Local) Trackside Warning Sy term Install Wayside Hcrns SO (Federal) at Dayton St and Main St at (2) railroad crossings, reducing noise levels Local Funds Only Construction so (State) railroad coins - -- - - fwithin Downtown Edmonds) during train crossings -I i Lptat Gdnerm Pura $)moon TOTAL 97, 516,9.3 $890_D'a7 S47A. D70 55; 168, 000 96.7a000 $14 312 000 Pedestrian Protects: Sunset Ave Walkway Provide walkway on the west side of Sunset Av, Secured Grant, Engineering UA,00o (Federal, secured) $44,000 from Bell St to Caspers St w/ various utility upgrades $667.M (Federal, unsecured) $687.000 1610000 Unsecured Grant,& & (Local, Fund 421) $75,000 $575,000 $200.000 (Local, Fund 423) $50,000 $150,000 I nral Rind. Construction $M2t700 (Locan $5,000 $687000 )Ap*wood WW" horn k1wiri Iti Instan siaewark on hlaplewood Sr- from Main St. to 200M St. SW, Engineering S1,991,000 (Federal, unsecured) $100,000 $130,000 $1,361,000 200th St SW creating connection to Maplewood Elementary and Yost Park Possible Grant & $0 (State) Construction so n gran Elm Way Walkway from 81n Ave. S Install sidewalk on Elm Way from Bth Ave S to 9th Ave S, creating Engineering 37MO 0. (Federal, unsecured) $66,00C $600,000 $733,000 to 9th Ave S connections to Westgate and Sherwood Elementary Schools Possible grant & $o (State) Conotrnnion so ttonq fth An. W WaliAM from InSO edvmlilk on WIM A,* W Rom W2 St to 24Gth St SW, Engineering $1.449.000 1Fbdilrlljl tiNst`culld! $100,000 $110,000 $1,239,000 212th St SW to 206th St SW creating connections to Chase Lake and College Place Possible Grant & so (State) Ekinvirptaty $Oook Construction So (Local) Ci"ae Pedestrian Add Flashing pedestrian beacons, HAWK signal, or pedestrian actuations Engineering S7 310.0w (Federal, unsecured) $100,000 $800,000 $410,000 Crossing Enhancements existing signal at various location throughoutthe City Possible Grants & W (State) to mprove Dedestrlan safety. Construction so Utica!) psm PI. $w wiiik Jy Aonr Install sidewalk on 95th PI W from Engineering 50 (Federal) 224th St SW to 220th Sit SW 224th St SW to 220th St SW Possible Grants & $458.000 (State, unsecured) $80,000 $388,000 to improve pedestrian safety Conti in_n Si V.M final 570 000 S97 0o0 Dayton St Walkway from 7th Ave 5 to Install sidewalk on time soutn side of Dayton $t Possible Grant Engineering 537,500 (fiederar, unsecured) $37,500 Bin Ave S & & So (State) Local Funds Construction 537 `JW (Local) .1500 232nd Si SW from 100th Ave Wto Install sidewalk on one side of 232nd St SW Possible Grant Engineering s1,055 ow (Federal, unsecured) $100,000 $955,000 SR-104 & & 0(State) Local Funds Construction 525000o (Local) $100.000 $15n non 236th St SW Walkway from SR-104 to Prdwde sdawdk do eeAh Wan123SM SS Secured Grant S10,000 (Fetleral, secured) $10,000 Madrona Elementary & Construction 50 (State) I oral Fnndc $50,p00 ll oral Fiind d221 $1n nnn 36tn St SW Walkway from -104 [o Provde Wrxalk on ono r7dEo12367i & SW Possible Grant Engineering 9697 Soo (Feaeral,unsecured) S106,600 $591,000 97th PI W & & $0 (State) Local Funds Construction 1697.600 (Local) S106500 $591.000 84m Ave W Watkway from 23M St SW to Provide sidewalk on one side of 84th Ave W Possible Grant Engineering $45it?W (Federal,unsecured) $45,000 234th St SW & & SO (State) Local Funds Construction 145,000 (Local) $45.000 2MAYE SwalkwaylromJunes St Engineering so iFedaral} to Main St Provide sidewalk along short missing link Local Funds Only & s0 (State) DnnctniTtlon &3aoW Itocall %3n rin0 Page 2 City of Edmonds Six Year Transportation Improvement Program (2017-2022) Grant Opportunity Project (2017-2022) Project Name Purpose Phases) Total Cost Source(s) 2017 2018 2019 2020 2021 2022 Z15tn St SWWalkway from Mh Ave Wto Possible Grant Engineering 50f500o (Federal, unsecured) $100,000 $515,000 Install sidewalk along missing link & & $0 (State) 84th Ave W Local Funds Construction 5600.W0 (Local) S1 n;1 nnn F5n_n nnn Wanut St Walkway from 3rd Ave to 4tn Ave Engineering e.0 (Federal) Install sidewalk along short missing link Possible Grant & $11m 00 (State, unsecured) $105,000 r nstnininn so (Local) 211 SWWankwayrmrn Hwy 99 uWan 3IW radii Oft Gm rgrlwide of 216Ih 51. SYJ Possile Grant Engineering 5137.000 (Federal, unsecured) 5137,000 to 72nd Ave W & & y0 fSt") from Hwv 99 to 72nd Ave W Local Funds Construction 520,00o Lopl] .520 0n0 238th St SW Walkway from SR-104 Install 81 of sidewalk on the north side of 238th St SW Secured Grant Engineering so (Federal) to Hwy 99 & & 329i•pp0 (State, secured) $294,000 from SR-104Iv .94 Local Funds Construction 5t &M (Local) $95,000 15m SL 5W from etn Ave 5 to 9m Ave 5 Irntall sidesiI the Wutn fide of 1Sd15t RW kom Engineering so (Federal) Local Funds & 50 (State) SM Ave r; to 9Lh Ave S Coolunion $200,000 If o-h $200 nnn 4th Ave Corridor Enhancement Create corridor rmprovementsio encourage pedestrian Possible Grant Engineering 53490.0Lo (Federal, unsecured) 5100,000 $1,000,000 $2,350,000 Walkway activity along 4th Ave. N from Main St to & & SO (State) 3rd Ave N (from Downtown retail to Pdmoods Center for the Ansl oral Funds f`nncrnrninn y; 5_opp ILMI. Fvnd 1251 $100 000 $150 000 $425 000 Minor Sidewalk Complete sidewalk missing links (from Snort WaNvray fist of Engineering $0 (Federal) Program 2015 Transportation Plan or other identified projects) Local Funds & so (State) ['.onto lotion 51,00 ol70 (Lord general PUnd) g2nn non $200000 $200,000 $200000 $200,000 ADA Curb Ramps Improvements Construct Citywide ADA compliant curb ramps where osslble Grant Engineering $0 (Federal) facilities don't exist nor meet current standards & & S7S7000 (State, unsecured) $250,000 $250,000 $250,000 Local Funds Construction (Local General Fund) $60 OOn .LSD nnn $5n nnn $?Sn nil nnn L25n nnn A.Gete Pei 1nytap aLl peaeoriall egrw% to Engineering So (Federal) Signals pedestrians heads at signalized intersections to improve Possible Grant 8 SO (State) vedestrians with disabilities safety Construction i25.000 ILoca0 525,000 FRL 51,314ALL 52375.occ 5793.0U0 s617g,000 53.4 ,000 SS.bg:.;4] complete missing links (such as along 76th Ave W, 212th St SW ) I Secured grant I Construction s o00 (Verdant grant) 1 $560,000 1 1 1 1 1 1 Trlift r,41—UC 1 t=n W Qo IIW Transo ilztldn $Amy F,cid"s: Tramc Calming Program / Traffic circles, speed cushions, Engineering s0 (Federal) Non -Motorized Transportation radar feedback signs, bulb -outs, etc Local Funds only & So (State) S aft•. v shn i�ipn I $15maw (Local General Fund) 520.000 $20000 $20I $20000 $20000 $20000 Ferry Projects Perry Swap ImpmmmenIS It= Provide additional ferry storage area closer to the Ferry Terminal Engineering $357,000 (Federal, unsecured) $357,o0U Dayton St to Pine St (through striping revisions / C-Curb addition ) Possible Grant 8 $0 (State) Construction $0 (Local) Trnfflc PLI—m Prolacta• Edmi Well study; 1) Waterfront Access issues emphasizing and priontizing near term solutions h Engineering so Port of Edmonds Analysis providing emergency access; 2) Atyrade conflicts where Main and Dayton St intarl Unsecured Grant and & S0 (State) BNSF rail lines; 3) Pedestrian / Bicycle Access; 4) Options to the Edmonds Crossing$i565 (Federal, unsecured) $200,000 $665,000 000 Mullimotlal Terminal Pm _et fid-dif: d as Modified Alternative 2) within the 2904 EllLocal Fund Plannjm 113$,000 llgtal rrer4l F�lna Lit inn $104 000 Cnywde Complete an compliance evaluation of all existing ADA Engineering 50 (Federan Transition Plan curb ramps, as well as long range plan on how to address Local Funds Only & So (State) those (effinienoles Plannlnd SW ow !Local General Funds) $50000 Pavement Rating Analyse me pavement condition or all arterial, collector, and Tocal streets So (Federal) Study to determine the stretches to be repaved as part of future Local Funds Only Planning 50 (State) _annual overlays $3[ i (Local / General Funds) $30.000 Transportation Plan Update Engmeenng so (Federal) Update Transportation Plan Local Funds Only & I S0 (State) Pla_ri 5175,000 LJ] $175000 TQT4L $175.000 50 Total $73.228,515 $11,851,515 $5,384,000 $4,187,000 $14,949,000 $14,354,000 $22,503,000 Page 3 City of Edmonds Six Year Transportation Improvement Program (2017.2022) Grant Opportunity Project L I (2017-2022) Project Name Purpose Phase(s) Total Cost Source(s) 2017 201E 2019 T020 2021 2022 Total Federal $5,190,000 $3,091,500 $1,917,000 $8,794,000 58,699,000 $12,647,000 'cra �a=e�CFro::��^.:'M $3,734,000 $66,500 $0 $0 $0 $0 �aI Fygenl Ill-s±cmcd] $1,456, 000 53,005,000 $1,917,000 $8,794,000 $8,699,000 $12,647,000 Total State $2,304,827 5388,000 $0 $1,242,000 $837500 $4,750000 Total State (Secured) $294,000 $0 $0 $0 $500:000 $4,500:000 :ewe S:x. ulMccu29V $2,010,627 $368,000 $0 $1,242,000 $337,500 $250,000 Total Verdant $560,000 $0 $0 $0 $0 $0 7 1 r M $560,000 $0 $0 $0 $0 $0 Term Pwr of Edmonds SD SO $0 $0 SO $0 Total Local Fund $4,096,688 $1,904,500 $2.270.000 $4,913,000 $4,671,500 $5,106,000 Total Local fFund 112) Total $125,000 $0 $0 137,000 $1,738,500 $1,307,000 Total 6-0 iF Ilr'd 1251 $0 s0 $0 $100,000 $150,000 $425,000 Toal Local (Fund 421) $851,475 $0 $0 $575,000 $0 $0 Total Local (Fund 422) $460,528 $0 $0 $0 $0 $0 Total Local (Fund 423) $768,685 $0 $0 $150,000 $0 $0 Tatlr Lvc4l y.,1A 7it1S+�rrg7i-�:-r s0 $0 $0 $68,000 $339,000 $716,000 TCGIILyaI fT.alF�lmcwc[FeR41 $100,000 $13,500 $0 $71,000 $0 $0 Tsai Lneat:G�uru FevAf $1,571,000 $1,794,000 $2.270.000 $2,812,000 $2,370,000 $2,436,000 Page 4