Loading...
Resolution 1192RESOLUTION NO. 1192 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, AMENDING THE FEE SCHEDULE FOR THE CITY'S PLANNING, PUBLIC WORKS, BUILDING AND OTHER FEE STRUCTURES, INCLUDING A SAVINGS CLAUSE, AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, ECDC 15.00.020 provides for the establishment and amendment of certain fees charged by the City by resolution; and, WHEREAS, many, if not all fees established by the City have been subsidized by the City's general revenue fund, and WHEREAS, the City Council has previously established and affirms as its goal that permit fees shall cover the costs of processing fees and such permit applications, WHEREAS, the City Council does, however, desire that parties utilizing the City's administrative appeals procedures bear at least some of the City's incurred expenses in processing and hearing such appeals; and WHEREAS, the City Council finds that administrative appellants should assume approximately 25 percent of the City's actual costs in processing appeals from notices of civil violation; and WHEREAS, the City Council finds that, except as provided herein, administrative appellants should assume approximately 10 percent of the City's actual costs in processing appeals from interpretations of the City's Building Official, appeals to the City's Hearing Examiner, and appeals to the City Council; now, therefore, {JZL542006.DOC;1/00006.900150/} - 1 - THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. The fees established pursuant to the attached Exhibit A shall be effective on and after February 20, 2009. The fees and charges set forth on the attached Exhibit A are hereby incorporated by reference as fully as if herein set forth and represent administrative fees adopted pursuant to the authority of ECDC 15.00.020. Section 2. If any section, sentence, clause, or phrase of this resolution or any regulation adopted or amended hereby should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section, sentence, clause or phrase of this resolution or any regulation adopted or amended hereby. Provided, however, that if any tax rate, fee level or structure thereof established by this resolution is declared invalid or illegal, or is otherwise struck down, the tax rate, fee level or structure thereof in effect prior to the effective date of this resolution shall be restored, revived, and brought to full force and effect. RESOLVED this 17th day of February, 2009. APPROVED: M OR, OkRY HAAKENSON ATTEST/AUTHENTICATED : ITY CLERK, SANDRA S. CHASE FILED WITH THE CITY CLERK: 2/12/2009 PASSED BY THE CITY COUNCIL: 2/17/2009 RESOLUTION NO. 1192 {JZL542006.DOC;1/00006.900150/1 - 2 - of ED�o EXHIBIT A 'S't"" 9 0 Permit Fee Sheet NOTE: Multiple Permit Fees may apply to a particular pro ec Permit T e , Fee Accessory Structure (Greenhouse/Shed) City of Edmonds Fee Table 1 Accessory Dwelling Unit Compliance $395 Adult Family Home Compliance $430 Alley Disruption/Closure Fee $160 plus closure area charge Amateur Radio Towers Application to install an amateur radio antenna pursuant to ECDC 16.20.050(E) $110 Request for waiver -technological impracticability pursuant to ECDC 16.20.050(F) $110 Application for interactive process to consider less burdensome alternatives pursuant to ECDC 16.20.050(F)(2) $110 Appeal - no transcript required (Includes Staff decision) $365 Appeal — transcript required (Includes Staff decision) $330 plus actual cost of transcript Appeal of Building Official Interpretation $330 Appeal of Notice of Civil Violation $705 Applications remanded to new hearing due to improper public notice by the applicant $45 plus actual cost of new publication and/or mailing of new notices Base Building Permit Processing Fee $100 Building Inspection $60 Per Inspection Cell Communications/Cellular Facilities City of Edmonds Fee Table 1 Change of Use (No Remodeling) $410 Changes to Approved Plans (Bldg/Eng/Plan/PW/Fire) $60 Per Hour, per Division City Surcharge Fee $15 Per Permit Code Interpretation by Building Official, Planning Manager, City Engineer, Fire Dept., Public Works Dept. $210 plus actual cost of City Attorney Commercial New Construction City of Edmonds Fee Table 1 Compliance Permit $135 V:\WORDATA\Resolutions\Resolutions 1100 - 1199\Reso 1192 Exhibit A.doc Comprehensive Plan Amendment $2,175 Conditional Use Permits/ Administrative Review $570 Conditional Use Permits/ Hearing Examiner Review $1,350 Copies 8.5 x 11 - $0.15/first 5 copies free Plan Size $5 Per Page Covenant Recording $20 base, plus Snohomish County recording fee Critical Areas Checklist Review & Determination $155 plus peer review when applicable Critical Areas Study Administration (no peer review) $630 Critical Areas Variance and/or Reasonable Use Exception $1,325 plus peer review when applicable Deck,Stair,Ramp City of Edmonds Fee Table 1 Demolition $235 Primary $60 Secondary Developers Agreement $60 per hour, per division, plus attorney fees (New) Dock/Marina/Floats $190 plus City of Edmonds Fee Table 1 Design Review G1 General Design Review - Projects that do not increase the footprint or height of a building and that require Administrative design approval $115 G2 General Design Review - All other projects requiring Administrative design approval (i.e. Admin approvals not encompassed by S 1 or G 1) $265 G3 General Design Review - Minor Project (SEPA exempt) $465 G4 General Design Review - Major Project (SEPA required) $2,530 S 1 General or District -Based Design Review - Signs $115 D1 District -Based Design Review — Projects that do not increase the footprint or height of a building and that require Administrative design approval $115 D2 District -Based Design Review — Projects requiring SEPA that require Administrative design approval $570 D3 District -Based Design Review — All other projects requiring Administrative design approval (i.e. Admin approvals not encompassed by S 1, D 1 or D2) $265 D4 District -Based Design Review— Projects requiring SEPA that require ADB design approval $2,530 Development Project Peer Review $125 plus consultant review ECDC Amendment $2,470 Encroachment Permit $335 plus recording fees Engineering Inspection Fee $60 Per Inspection Engineering Inspection Fee — Civil Site Improvements (subdivisions & new commercial/multifamily) 2.2% of Bond Amount Engineering Review- Formal Plat $1,520 Engineering Review- Short Subdivision $1000 V:\WORDATA\Resolutions\Resolutions 1100 - 1199\Reso 1192 Exhibit A.doc Fence Permit $60 Fire Alarm (Alteration) $75 plus City of Edmonds Fee Table 1 Fire Alarm (New) $200 Fire Connection Charge $345 Fire Damage City of Edmonds Fee Table 1 Fire Inspection Fee $60 Per Inspection Fire Permit $40 Fire Plan Review Fee $60 Per Hour Fire Sprinkler (Alteration) $100 plus City of Edmonds Fee Table 1 Fire Sprinkler (New) $200 plus City of Edmonds Fee Table 1 Fire Suppression $240 Garage/Carport City of Edmonds Fee Table 1 Grading/Fill/Shoring City of Edmonds Fee Table 2 plus peer review when applicable Grease Interceptor $350 Grease Trap $150 Hot Tub/Spa (Commercial) City of Edmonds Fee Table 1 Hot Tub/Spa (Single -Family) $100 Housing for the Elderly $1,400 Hydronic Heating $100 Per Unit Landscape Inspection Fee $75 or 1 % of landscape bid, whichever is greater Latecomers Agreements $60 per hour, per division, plus attorney fees LID Sewer Fees (Outside of LID map) Fee established by ordinance $300 Minimum Lot Line Adjustment $405 Manufactured Coach -Commercial (Federal HUD Label) $280 Manufactured Home Installation (Federal HUD Label) $280 ESLHA Administrative Processing Fee $2,385 ESLHA Consultant Review Full cost of peer review ESLHA Packets $30 Mechanical Permit $40 Base Fee plus City of Edmonds Fee Table 4 Parking Lot $180 plus City of Edmonds Fee Table 1 Parking -Joint Use Parking Agreement $265 Parking Disruption/Closure Fee $160 plus closure charge Plumbing Permit $40 plus City of Edmonds Fee Table 3 PRD - Final Review $970 PRD - Preliminary Review $6,620 PRD Amendment to an approved PRD $2,280 Pre -Application Meeting $655 (50% applied toward future plan check) Re -inspection Fee (Building/Planning/Engineering/Fire) $60 Per Inspection Reconsideration/Request for Reconsideration $175 V:\WORDATA\Resolutions\Resolutions 1100 - 1199\Reso 1192 Exhibit A.doc Relocation of Building $500 within City limits $500 plus $60/hour outside City limits Request for Zoning Confirmation, Compliance, Exemption or Status Letter $140 Re -roof (Commercial) City of Edmonds Fee Table 1 Re -roof (Single-family) $65 no structural changes, City of Edmonds Fee Table 1 if structural Residential - New Construction City of Edmonds Fee Table 1 Residential - Addition/Remodel City of Edmonds Fee Table 1 Re -Submittal Review fee after third plan review $170 per reviewing Division/Department Rezone $2,050 Rezone = Contract $2,755 Right -of -Way Permit $185 plus Engineering Inspection Fees Retaining Wall $265 plus peer review when applicable SEPA Environmental Checklist Review $485 SEPA Environmental Impact Statement Full cost (including staff time) Shoreline SDP $2,050 Shoreline SDP plus either a Shoreline Conditional Use Permit or Shoreline Variance $2,755 Shoreline Exemption Request $115 Side Sewer (Commercial & Multi -Family) $115 plus Connection Charge Side Sewer (Single Family) $35 plus $730 Connection Charge Side Sewer Repair $95 Side Sewer -Special Conditions (grinder pump, etc.) $170 Sidewalk Disruption/Closure $160 plus closure charge Sign Permit $125 Sign Posting Fee applies to any Hearing Examiner Review, Subdivisions, Short Plats, Rezones, and Major ADB projects Full cost, per City Contract Special Agreements for Private Utilities in City Right -of- Way $60 per hour plus attorney fees (new) State Building Code Surcharge Fee $4.50 Storm Drainage (Engineering Review Fee for Single Family Residence) $60 Storm System Development Charge $428 per ESU Street Cut/Restoration for Water Meter Installation $115 plus actual cost in excess of $115 Street Map Amendment $2,460 Street Use Permit $85 Street Vacation $1,750 plus recording fees Structural Review Fee $60/hr plus cost of outside consultant Street Disruption Fee (explanation: fee charged for open cuts in streets within 5 years of the improvement of a street.) 5 times construction cost during first year after completion of street improvement. V:\WORDATA\Resolutions\Resolutions 1100 - 1199\Reso 1192 Exhibit A.doc 4 times during the second year 3 times during the third year 2 times during the fourth year Equal to the cost during the fifth year Construction Cost Calculator: $100 plus $15 for each additional square yard beyond 2 sq. yards. Subdivision Plat — Preliminary Approval $3,930 Subdivision Plat — Final Approval $1,080 Short Subdivision — Preliminary Approval $1,140 Short Subdivision — Final Approval $405 Staff Decision — Miscellaneous staff decisions not $115 otherwise listed Subdivision/Minor Modification of an Approved Plan $845 Subdivision/Modification Request $845 Swimming Pool (Pre manufactured Above Ground) $60 Swimming Pool (In -Ground) City of Edmonds Fee Table 1 Traffic Impact Analysis Review (review of traffic study) $60 per hour Traffic Impact Fee — Per Rate Study ECDC Chapter 18.82 Traffic Impact Fee — Independent Calculation ECDC Chapter 18.82 Tenant Improvement City of Edmonds Fee Table 1 Underground Tank less 10,000 gal (fill, remove, install) $60 Per tank Underground Tank over 10,000 gal (fill, remove, install) $255 Per tank Variance from Underground Wiring $460 Variance/Administrative Review $445 Variances/Hearing Examiner Review $1,340 Violation Compliance Fee $240, or up to five times Permit Fee (whichever is greater) Waiver request as allowed per ECDC Title 18. $60 per hour, per division Water Connection Charge 5/8" & 3/4" $908 1 " $2,270 1.5" $4,540 2" $7,264 3" $14,528 4" $22,700 6" $45,400 8" $72,640 Water Meter Installation Charge 5/8" & 3/4" $550 1" $800 1.5" $1,428 2" $2,930 N" based on time & mat.) V:\WORDATA\Resolutions\Resolutions 1100 - 1199\Reso 1192 Exhibit A.doc