Loading...
Resolution 1377RESOLUTION NO. 1377 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, AMENDING THE FEE SCHEDULE FOR THE CITY'S DEVELOPMENT -RELATED FESS AND CHARGES FOR SERVICES, INCLUDING A SAVINGS CLAUSE, AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, ECDC 15.00.020 provides for the establishment and amendment of certain fees charged by the City by resolution; and WHEREAS, extensive effort has been made by City Staff to analyze the full costs associated with City permitting and service activities; and WHEREAS, the City Council has previously established and affirms as its goal that permit fees shall be set to cover the costs of processing and issuing permits and requests for service; and WHEREAS, the City Council does, however, desire that parties utilizing the City's administrative appeals procedures bear a smaller burden of the costs of processing those appeals in order to afford access to the appeals process; now, therefore, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. The fees and charges for services set forth in the schedule attached as Exhibit A to this Resolution are hereby adopted, along with the referenced tables which are also included therein, and shall be effective on and after January 1, 2017. Section 2. If any section, sentence, clause or phrase of this resolution or any fee or charge for service adopted or amended hereby should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section, sentence, clause or phrase, or any fee or charge adopted or amended hereby. 1 RESOLVED this 22nd day of November, 2016. APPROVED: MAYOR DAVE EARLING ATTEST: CLERK, SCb—lYPASSEY FILED WITH THE CITY CLERK: November 18, 2016 PASSED BY THE CITY COUNCIL: November 22, 2016 RESOLUTION NO. 1377 2 EXHIBIT A Permit Type Notes Fee General Credit Card Transaction Fee Applied to total charge amount 3% City Technology Fee (charged per permit) Charge for each permit applied fo $35 (Hourly Charge Rate If a charge/rate is not otherwise listed $100 Preapplication Meeting 1/2 refunded to Building Permit fee $1,000 DRC Meeting Development Review Committee $0 Development Project Peer Review Charged for projects requiring outside pee review $100/hr (min. 1 hr) + actual cost of peer Other (fee not categorized) Billed at staff hourly ratel $100/hr The Mayor or designee may authorize the refunding of: 1. 100% of any fee erroneously paid or collected. 2. Up to 80% of the permit fee paid when no work has been done under a permit issued according to the (Edmonds Community Development Code. :3. Up to 80% of the plan review fee paid when an application for a permit is withdrawn or canceled before any (plan review work has been done. 4. A fee may not be authorized for refunding except on written application filed by the original permittee, and not Ilater than 180 days after the date of fee payment. Impact Fees 'Transportation Impact Fee Fee per Ordinance or as determined by independent fee calculation. Fee per Ordinance Transportation Impact Fee Review - Independent Fee Calculation Fee charged when an independent fee calculation is submitted to the City fo review. $240 Transportation Impact Fee Admin: Single (Family When Transportation Impact Fees apply $50 'Transportation Impact Fee Admin. Commercial/MF When Transportation Impact Fees apply $100 nsportation Impact Fee Deferral Only for IRC structures $50 ks Impact Fee Fee per Ordinance. Fee per Ordinance ks Impact Fee Admin: Single Family When Parks Impact Fees apply $50 ks Impact Fee Admin: Commercial/MF I When Parks Impact Fees apply $100 ks Impact Fee Deferral Only for IRC structures $50 Edmonds Fee Schedule Page 1 December 2016 Permit Type Notes Fee Building Fire Alarm (Alteration) up to 5 initiating devices No plans. Subject to field inspection. Does not include replacement of FACP. $165 Fire Alarm (Alteration) 6 or more initiating vices $100 + COE Table 1 e Alarm (New) $100 + COE Table 1 tributed Antenna Radio System (DAS) [Fire $100 + COE Table 1 e Connection permit $500 e Damage COE Table 1 Inspection Fee 'Per Hour $100 Fire Operational permit $60 Firework Display permit $30 Fire Plan Review fee Per Hour $100 Fire Sprinkler Commercial (Alteration) up to 5 sprinklers Applies to Commercial and Multifamily $200 Fire Sprinkler Commercial (Alteration) more than 5 sprinklers Applies to Commercial and Multifamily $150 + Table 1 Fire Sprinkler Commercial (New) Applies to Commercial and Multifamily $300 + Table 1 Fire Sprinkler Residential (Alteration) Applies to IRC structures $200 Fire Sprinkler Residential (New) Applies to IRC structures $400 Fire Protection System permit $315 Underground Tank 600 gallons or less (fill or remove) $100 Underground Tank 600 gallons or less (new installation) $150 Underground Tank more than 600 gallons (fill, remove, install) $300 Accessory Structure (Greenhouse/Shed) Table 1 ADU Compliance $405 Adult Family Home $500 .Appeal of Building Official Interpretation $810 Base Building Permit Processing Fee $100 Building Inspection $100 Cell Communications/ Cellular Facilities Table 1 Change of Use $510 Changes to Approved Plans $100/hr Commercial New Construction Table 1 Deck, Stair, Ramp Table 1 Demolition (Primary) $300 Edmonds Fee Schedule Page 2 December 2016 Permit Type Notes Fee Demolition (Secondary) $150 Dock/Marina/Floats $200 + Table 1 Fence $60 Garage / Carport Table 1 Grading/Fill Table 2 + peer review Grease Interceptor $700 Grease Trap $200 Hot Tub/Spa (Commercial) Table 1 Hot Tub/Spa (Single -Family) $200 Hydronic Heating $135 Manufactured Coach -Commercial (Federal HUD Label) $500 Manufactured Home Installation (Federal HUD Label) $550 IESLHA Administrative Processing Fee $2,385 IESLHA Minor Project Administrative (Processing Fee $300 IESLHA Consultant Review Full cost of peer review IESLHA Packets INo labor in current fee $15 (Mechanical Permit Table 4 (Parking Lot $200 + Table 1 (Plumbing Permit Table 3 IRe-inspection Fee (Building) $100 (Relocation of Building $500 + $100/hr outside city Re -roof (Commercial) Table 1 Re -roof (Single-family) :Includes sheathing. $100 Residential - New Construction Table 1 Residential -Addition/Remodel Table 1 Re -Submittal Plan Review after 3rd review $100/hr Retaining Wall (Commercial) $675 + peer review Retaining Wall (Residential) $265 + peer review Edmonds Fee Schedule Page 3 December 2016 Permit Type Notes Fee Sign (Per Sign) .Excluding specific sign categories listed below $150 .Sign (Blade Sign) Includes all blade signs in proposal $75 :Sign (Pedestrian Sign) !Includes all pedestrian signs in proposal $125 Sign (Pole Sign) $750 'Solar/Photovoltaic (Residential) $120 'Solar/Photovoltaic (Commercial) 'Valuation does not include cost of solar anels or inverters Table 1 'State Building Code Surcharge Fee $4.50 Swimming Pool (Pre -Manufactured Above Ground) $120 'Swimming Pool (In -Ground) Table 1 Tenant Improvement Table 1 Violation Compliance Fee .5240 or up to 5 times permit fee $240 or 5x permit fee 'Window Replacement (Single Family) $150 Edmonds Fee Schedule Page 4 December 2016 Permit Type Notes Fee Planning 'Type 1 :Staff decisions, no notice $250 'Type 2 (A or B) 'Staff decisions w/ notice ICIutdoor $880 Type 3A Hearing Examiner $1820 + HE* Type 3A - Specific Applications dining; Amateur radio $250 Type 3B Hearing Examiner / ADB $1 820 + HE* Type 4A 'Subdivision / PRD final approval $3 720 'Type 4B Rezone $6,350 Type 5 Plan, ECDC amendments $6 350 .ADB Design Review - Signs ADB consideration of departure from sign standard er code $880 'Staff Design Review if project exceeds SEPA threshold $880 Lot Line Adjustment $950 ,Short Subdivision 82,930 ,Short Subdivision Final Approval $1,440 ,Subdivision Prelim Approval (+ HE) :Staff time plus actual HE cost billed to a licant $5,920 + HE* Subdivision Final Approval Same as Type 4A $3.720 Modification Request $880 Minor change to approved plat $100 hr Major change to approved plat 'Same as original application See Note PRD Preliminary Approval $5 920 PRD Final Approval $3,720 'SEPA Review $670 EIS Review Cost Critical Areas Checklist $100 Critical Areas Checklist Update $50 Critical Areas Study Admin $100/hr (min. 1 hr) Critical Areas Contingent Review ECDC 23.40.195 for more detail on Lalicable fees $880 Critical Areas Var / Reasonable Use :staff time plus actual HE cost billed to a licant $6,945 + HE* Appeal of Staff Decision (1 or 2) I. $400 .Appeal of Type 3B Decision $500 Appeal of Notice of Civil Violation $880 Request for Reconsideration $250 Edmonds Fee Schedule Page 5 December 2016 Permit Type Notes Fee Planning Inspection Fee Landscape plan inspection bsed on estimated cost of landscape installation 1% of est. Recording Fee Recording documents w/ County 5100 + cost *When permit application is heard by Hearing Examiner (HE), cost of HE hearing is billed to applicant. Edmonds Fee Schedule Page 6 December 2016 Permit Type Notes Fee Engineering Alley Disruption/ Closure Fee Fee charged for closure of alley in excess of $200 base fee plus ROW 72hrs. Closure fee based on (assessed value permit fee plus closure per square foot of abutting property) x fees (right-of-way area (SF)). iackflow Prevention Compliance Fee Fee to assist in ensuring voluntary $125 compliance with backflow prevention program & ECC 7.20 (Developers Agreements $300 Application Fee plus $100/hr staff time plus City Attorney Fees (Development Project Peer Review $300 base fee plus Cost of Peer Review Drainage Permit (pool, hot tub, jacuzzi) This permit is for drainage of pools, hot tub, $50 jacuzzi and other facilities designed or intended to hold more than 50 gallons of water. Encroachment Permit $300 application fee plus recording fees Engineering Inspection Fee (Single Family, Fee is charged per inspection. $100 each Existing Comm/MF, right of way) Engineering Inspection Fees - Civil Site Engineering inspection during construction 3.3% of Bond Amount Improvements (subdivisions, commercial, of site improvements for all multi -family) subdivisions/short plats, commercial and multi -family. This fee is charged in addition to the applicable Engineering Review or other building permit fees . Subdivision - Civil Review Engineering review of civil plans for $4,265 construction of site improvements for subdivision. Edmonds Fee Schedule Page 7 December 2016 Permit Type Notes Fee 'Short Subdivision -Civil Review Engineering review of civil plans for $2,785 construction of site improvements for short subdivision. Latecomers Agreement $300 Application Fee plus $100/hr and City Attorney Fees LID Sewer Fees (Outside of LID Map) $300 Application Fee plus $100/hr and City Attorney Fees Parking Disruption/ Closure Fee Fee applies to any activity that occupies or $200 base fee plus ROW closes parking space(s), parking lanes(s) or permit fee plus closure other paved area of a street/road for more fees than 72 hours. Monthly portion of Fee [$ per month] _ (1% of assessed value per square foot of abutting property) x (right of way area [SF] disrupted/closed). If disruption/closure affects any portion of the area of a parking space, the area of disruption/closure is calculated based upon the area of a full parking space. Re -Inspection Fee $100 each Right -of -Way Construction Permit $300 application fee plus inspection fees Right of Way Minor Construction Permit Applies to smaller projects that cause only $100 application fee minor disturbance to the right of way e.g. plus inspeciton fees residential driveway replacement, tree trimming 'Sewer General Facility Charge Fee Der Ordinance :Side Sewer (Commercial & Multi -Family) Sanitary sewer installation - new $200 application fee commercial or multi -family. plus general facility charge per Ordinance 'Side Sewer (All Single Family & Sanitary sewer installation - new or repair. $100 application fee Commercial/Multi-family repairs) plus general facility charge per Ordinance Edmonds Fee Schedule Page 8 December 2016 Permit Type Notes Fee 1 Side Sewer - Special Conditions e.g. grinder Fee charged in addition to side sewer $200 application fee pumps, ejectors.. permit fee when special conditions exist, plus $120/hr for Utility such as grinder pumps, sewer ejector Engineer review systems, etc. 'Sidewalk Disruption or Closure Fee charged for closure of sidewalk in $200 base fee plus ROW excess of 72hrs. Closure fee based on permit fee plus closure (assessed value per square foot of abutting fees property) x (right-of-way area (SF)). Stormwater Engineer Review Stormwater reivew by P.E. Fee will also be $120/hr applied for review of storm drainage for SFR construction of any type (e.g. new construction, remodel, additions, sealed decks, etc.) :Stormwater Permit Fee for review of stormwater regulated $300 application fee activity when another permit (building plus inspection fees permit, subdivision, right-of-way, etc.) is not required. 'Storm System General Facility Charge General Facility Charge per Ordinance 'Street Restoration for Water Meter Fee charged when City performs street $1000 plus Street (Installation restoration after water service and meter Overlay Cut Fee if install. applicable Street Overlay Cut Fee Fee for cutting into a road that was overlaid $200 base fee plus ROW within the last 5 years. permit fee plus addt'I per SgYd charge times overlay cut multiplier Street Use Permit This fee is applied to any use of public right- $100 application fee of -way in a temporary nature (not covered plus Bistro Dining fees by Encroachment permit or ROW per Ordinance if construction permit) applicable. Transportation Engineer Review Transportation review by P.E. $120/hr Utility Engineer Review Water or sewer utility review by P.E. $120 hr Utility Company Agreement Fee charged for review time associated with $100/hr (min. 1 hr) plus agreements such as Franchise, Master Use, City Attoney Fees and Lease. 'Variance from Underground Wiring Fee charged for each request for variance $300 application fee from underground wiring requirement. plus $100/hr plus City Attorney Fees Edmonds Fee Schedule Page 9 December 2016 Permit Type Notes Fee I Water Meter General Facility Charge Fee per Ordinance Water Meter Fee (Based on Size) New service line and meter installation charges 3/4" 52,920 V 52.970 1.51, 56,220 2" 55,390 Edmonds Fee Schedule Page 10 December 2016 CITY OF EDMONDS BUILDING PERMIT FEE SCHEDULE — TABLE 1 Based on building construction valuation Effective January 1 2017 $14500 $30 $501 to $2000 $30 for the first $500 plus $3 for each additional $100, or fraction thereof to and including $2000 $2001 to $25,000 $75 for the first $2000 plus $14 for each additional $1,000 or fraction thereof to and including $25,000 $25,001 to $50,000 $400 for the first $25,000 plus $10 for each additional $1,000 or fraction thereof to and including $50,000 $50,001 to $100,000 $650 for the first $50,000 plus $7 for each additional $1,000 or fraction thereof to and including $100,000 $100,001 to $500,000 $1000 for the first $100,000 plus $6 for each additional $1,000 or fraction thereof to and including $500,000 $500,001 to $1,000,000 $3,400 for the first $500,000 plus $5 for each additional $1,000 or fraction thereof to and including $1,000,000 $1,000,001 and up $5,900 for the first $1,000,000 plus $4 for each additional $1000 or fraction thereof. Other Fees: 1. Plan review fees in addition to building permit fees are assessed at a rate of 85% of the calculated building permit fee (includes Building, Planning and Engineering for commercial/multi-family reviews and Building/Planning for residential reviews). 2. Commercial Permits: All permits relating to other than residential permits as described below shall be calculated at the rate established in the amended Building Permit Fee Schedule based on 120% of above valuation chart. The determination of value or valuation shall be based on the Building Valuation Data table, published by the International Code Council, on file with the City Building Official. The Building Valuation Data table shall be updated on January 1st of each year to the latest version as published by ICC. 3. Residential Permits: Permits for the construction (including remodels and additions) of single-family residences, including accessory structures shall be calculated at the rate established in the amended Building Permit Fee Schedule based on the above valuation chart. The determination of value or valuation shall be based on the Building Valuation Data, published by the International Code Council, on file with the City Building Official. The Building Valuation Data table shall be updated on January 1st of each year to the latest version as published by ICC. 4. Decks, stairs, ramps, covered porches with open exterior sides, and trellises are assessed at $20 per square foot for valuation purposes. 5. Unheated sunrooms are assessed at $28 per square foot for valuation purposes. 6. After the 3rd review is complete on a permit application, additional reviews are charged at $100 per hour per reviewing division/department. 7. Base building permit processing fee is $100 per permit. 8. Additional plan review required by changes, additions or revisions to approved plans $100 per hour (minimum charge one hour) per reviewing department/division. 9. Building Inspections outside of normal business hours $100 per hour (minimum charge one hour). 10.Re-inspection fees and inspections for which no fee is specifically indicated, are charged at $100 per hour (minimum charge one hour). 11.Development Project Peer Review: $100 per staff hour plus cost of consultant review fee charged for outside consultant peer review services when City staff lacks the expertise to review a specific project or aspect of a project. 12.City Technology fee of $35 assessed for each development permit the City issues. 13. State Building Code Council surcharge fee $4.50 per building permit, plus $2.00 per each dwelling unit. 14.Pre-Application Meeting $1000, 50% applied toward future plan check fee for that specific project only. * The above table is based on the 1997 Uniform Building Code Table 1-A amended. L:\Fees\2016 Building Permit Fee Schedule_final.doc CITY OF EDMONDS GRADING PERMIT FEE SCHEDULE - TABLE 2 Effective January 1, 2017 GRADING PLAN REVIEW FEES 50 cubic Zards 38.2 m' or less, when located in a designated critical area........................................................................ $ 30.00 51 to 100 cubic yards 40 m' to 76.5 m' . $ 60.00 .................................................................................................................................. 101 to 1,000 cubic yards 77.2m' to 764.6 m'........................................................................................................................... $120.00 1,001 to 10,000 cubic yards (765.3 m' to 7645.5 m')................................................................................................................. $240.00 10,001 to 100,000 cubic yards (7646.3 m' to 76 455 m')--$240.00 for the first 10,000 cubic yards (7645.5 m'), plus $100.00 for each additional 10,000 vards 7645.5 m') or fraction thereof. 100,001 to 200,000 cubic yards (76 456 m' to 152 911 m')--$1140.00 for the first 100,000 cubic yards (76 455 m'), plus $100.00 for each additional 10,000 cubic vards 7645.5m' or fraction thereof. 200,001 cubic yards (152 912 m') or more--$2040.00 for the first 200,000 cubic yards (152911m3), plus $100.00 for each additional 10,000 cubic yards 7645.5 m' or fraction thereof. Other Fees: Additional plan review required by changes, additions or revisions to approved plans....................................$100.00 per hour minimum charge - one -hour) GRADING PERMIT FEES Base permit fee. . $30.00 ............................................................................................................................................................................ 50 cubic vards 38.2m' or less, when located in a designated critical area............................................................................. $60.00 51 to 100 cubic vards (40 m' to 76.5m') ....................................................................................................................................... $60.00 101 to 1,000 cubic yards (77.2m' to 764.6 m')--$120.00 for the first 100 cubic yards (76.5 m') plus $20.00 for each additional 100 cubic yards (76.5 m') or a fraction thereof. 1,001 to 10,000 cubic yards (765.3 m' to 7645.5 m')--$300.00 for the first 1,000 cubic yards (764.6 m'), plus $40.00 for each additional 1,000 cubic yards (764.6 m') or fraction thereof. 10,001 to 100,000 cubic yards (7646.3 m' to 76 455 m')--$660.00 for the first 10,000 cubic yards (7645.4 m'), plus $60.00 for each additional 10,000 cubic vards 7645.5 m' or fraction thereof. 100,001 cubic yards (76 456 m') or more--$1200.00 for the first 100,000 cubic yards (76 455 m'), plus $90.00 for each additional 10.000 cubic yards 7645.5 m' or fraction thereof. Other Inspections and Fees: 1. Inspections outside of normal business hours (minimum charge - one hour)...............................................$100.00 per hour 2. Re -inspection fees assessed under provisions of UBC Section 108.8..............................................................$100.00 per hour 3. Inspections for which no fee is specifically indicated minimum charge - one-hour...................................$100.00 per hour L:\temp\building\fees\2014 fees\2014 grading fee schedule CITY OF EDMONDS PLUMBING PERMIT FEE SCI IEDULE - TABLE 3 Effective January 1, 2017 Base Permit Fee for Processing 1. For the issuance of each plumbing permit...........................................................................................$40.00 Unit Fee Schedule (NOTE: Base permit issuing fee not included) 1. For each plumbing fixture on one trap or a set of fixtures on one trap (including water, drainage piping)..................................................................................................................................................$12.00 2. For repair or alteration of drainage or vent piping or water piping, each fixture.......................$12.00 3. For each building sewer and each trailer park sewer (does not include trunk or LID charges) $60.00 4. Rainwater systems - per drain (within footprint of building)........................................................$12.00 5. For each cesspool (where permitted).................................................................................................$50.00 6. For each private sewage disposal system..........................................................................................$60.00 7. For each water heater, including expansion tank............................................................................$12.00 8. For each gas -piping system of one to five outlets.............................................................................$24.00 9. For each additional gas piping system outlet, per outlet.................................................................$ 2.00 10. For each installation or alteration of water treating equipment....................................................$30.00 11. For each lawn sprinkler system on any one meter incl. backflow protection devices thereof ........... NC 12. For atmospheric -type vacuum breakers not included in item 11: 1 to 5.....................................................................................................................................................$12.00 over5, each...........................................................................................................................................$ 2.00 13. For each backflow protective device other than atmospheric type vacuum breakers: 2 inch diameter and smaller...............................................................................................................$30.00 over2 inch diameter ................ ........................................................................................................... $40.00 14. For each graywater system or reclaimed water system (in addition to fixture fees as above) ..... $60.00 15. For each annual cross -connection testing of a reclaimed water system (excluding initial test) ... $30.00 16. For each medical gas piping system serving one to five inlet(s)/outlet(s) for a specific gas .......$100.00 17. For each additional medical gas inlet(s)/outlet(s).............................................................................$12.00 18. For each grease trap ... ..................................................................................................................... $200.00 19. For each grease interceptor..............................................................................................................$700.00 20. For each industrial waste pretreatment interceptor including its trap and vent, except kitchen - type grease interceptors functioning as fixture traps (oil/water separator, etc.) ........................$100.00 Other Inspections and [Fees 1. Re -inspection fee..................................................................................................................................$100.00 2. Inspections for which no fee is specifically indicated.......................................................................$100.00 3. Plan review fee per hour charge (minimum charge - one hour)..........................................................$100.00 4. Additional plan review required by changes, additions or revisions to approved plans, per hour charge (minimum charge-one-hour)...............................................................................................$100.00 L:\temp\building\fees\2014 fees\2014 plumbing fee schedule CITY OF EDMONDS MECHANICAL PERMIT FEE SCHEDULE - TABLE 4 Effective January 1, 2017 Base Permit Fee for Processing 1. For the issuance of each mechanical permit..................................................................................................................... $40.00 Unit Fee Schedule (Note: Base permit fee for processing not included.) 1. Furnaces For the installation/relocation of each forced -air or gravity -type furnace or burner, including ducts and appliance vent up to and including 100,000 Btu/h (29.3kW)............................................................................................................... $20.00 For the installation/relocation of each forced -air or gravity -type furnace or burner, including ducts and appliance vent over 100,000 Btu/h(29.3kW)....................................................................................................................................... $30.00 For the installation/relocation of each floor furnace, including vent.................................................................................... $20.00 For the installation/relocation of each suspended heater, recessed wall heater or floor -mounted unit heater ...................... $25.00 2. Appliance Vents For the installation, relocation/replacement of each appliance vent installed (i.e., Type B, BW, L gas vent, etc.) .............. $10.00 3. Repairs or Additions For the repair, alteration or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls ............................... $15.00 4. Boilers, Compressors and Absorption Systems/Air Conditioning Systems, including Heat Pumps For the installation/relocation of each boiler or compressor up to and including 3 horsepower (10.6kW), or each absorption system up to and including 100,000 Btu/h (29.3kW)......................................................................................... $20.00 For the installation/relocation of each boiler or compressor over 3 horsepower (I0.6KW) up to and including 15 horsepower (52.7kW), or each absorption system over 100,000 Btu/h (29.3kW) up to and including 500,000 Btu/h (146.6kW)............................................................................................................................................................................ $30.00 For the installation or relocation of each boiler or compressor over 15 horsepower (52.7kW) up to and including 30 horsepower (105.5kW), or each absorption system over 500,000 Btu/h (146.6kW) to and including 1,000,000 Btu/h (293.1 kW)......................................................................................................................................... ..... $40.00 .............................. For the installation or relocation of each boiler or compressor over 30 horsepower (105.5kW) up to and including 50 horsepower (176 kW), or each absorption system over 1,000,000 Btu/h (293.1 kW) to and including 1,750,000 Btu/h (512.9 kW) ....................................... ........................................................................... ....................................................... .. $60.00 For the installation or relocation or each boiler or compressor over 50 horsepower (176 kW), or each absorption system over 1,750,000 Btu/h (512.9 kW)............................................................................................................................. $95.00 5. Air Handlers For each air -handling unit up to and including 10,000 (cfm) (4719 Us), including ducts (i.e., diffusers, blowers, etc.)..... $20.00 For each air -handling unit over 10,000 cfm (4719 L/s) including ducts.............................................................................. $30.00 6. Evaporative Coolers For each evaporative cooler other than portable type........................................................................................................... $15.00 7. Ventilation and Exhaust For each ventilation fan connected to single duct (i.e., bath, laundry, kitchen exhaust, etc.) ............................................... $10.00 For each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit........ $10.00 For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood (i.e. Type 1 and Type 2 hoods, fume hoods, etc.).................................................................................................................................................. $100.00 8. Incinerators For the installation or relocation of each domestic type incinerator..................................................................................... $20.00 For the installation or relocation of each commercial or industrial -type incinerator............................................................ $50.00 9. Miscellaneous For each appliance or piece of equipment regulated by the IMC for which no other fee is listed (i.e. fire dampers, ductless mini - splitsystems, etc.)................................................................................................................................................................ $20.00 Other Insnections and Fees 1. Re -inspection fees assessed at a per hour charge (minimum charge -one hour).................................................................. $100.00 2. Inspections for which no fee is specifically indicated, per hour charge (minimum charge -one -hour) ............................... $100.00 3. Plan review fee per hour charge (minimum charge - one hour).........................................................................................$100.00 4. Additional plan review required by changes, additions or revisions to plans or to plans for which an initial review has been completed per hour charge (minimum charge -one hour).................................................................................... $100.00 L:\temp\building\fees\2014 fees\2014 mechanical fee schedule