Resolution 1377RESOLUTION NO. 1377
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
EDMONDS, WASHINGTON, AMENDING THE FEE
SCHEDULE FOR THE CITY'S DEVELOPMENT -RELATED
FESS AND CHARGES FOR SERVICES, INCLUDING A
SAVINGS CLAUSE, AND ESTABLISHING AN EFFECTIVE
DATE.
WHEREAS, ECDC 15.00.020 provides for the establishment and amendment of
certain fees charged by the City by resolution; and
WHEREAS, extensive effort has been made by City Staff to analyze the full costs
associated with City permitting and service activities; and
WHEREAS, the City Council has previously established and affirms as its goal
that permit fees shall be set to cover the costs of processing and issuing permits and requests for
service; and
WHEREAS, the City Council does, however, desire that parties utilizing the
City's administrative appeals procedures bear a smaller burden of the costs of processing those
appeals in order to afford access to the appeals process; now, therefore,
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON,
HEREBY RESOLVES AS FOLLOWS:
Section 1. The fees and charges for services set forth in the schedule attached as
Exhibit A to this Resolution are hereby adopted, along with the referenced tables which are also
included therein, and shall be effective on and after January 1, 2017.
Section 2. If any section, sentence, clause or phrase of this resolution or any fee or
charge for service adopted or amended hereby should be held to be invalid or unconstitutional by
a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the
validity or constitutionality of any other section, sentence, clause or phrase, or any fee or charge
adopted or amended hereby.
1
RESOLVED this 22nd day of November, 2016.
APPROVED:
MAYOR DAVE EARLING
ATTEST:
CLERK, SCb—lYPASSEY
FILED WITH THE CITY CLERK: November 18, 2016
PASSED BY THE CITY COUNCIL: November 22, 2016
RESOLUTION NO. 1377
2
EXHIBIT A
Permit Type
Notes
Fee
General
Credit Card Transaction Fee
Applied to total charge amount
3%
City Technology Fee (charged per permit)
Charge for each permit applied fo
$35
(Hourly Charge Rate
If a charge/rate is not otherwise listed
$100
Preapplication Meeting
1/2 refunded to Building Permit fee
$1,000
DRC Meeting
Development Review Committee
$0
Development Project Peer Review
Charged for projects requiring outside pee
review
$100/hr (min. 1 hr) +
actual cost of peer
Other (fee not categorized)
Billed at staff hourly ratel
$100/hr
The Mayor or designee may authorize the refunding of:
1. 100% of any fee erroneously paid or collected.
2. Up to 80% of the permit fee paid when no work has been done under a permit issued according to the
(Edmonds Community Development Code.
:3. Up to 80% of the plan review fee paid when an application for a permit is withdrawn or canceled before any
(plan review work has been done.
4. A fee may not be authorized for refunding except on written application filed by the original permittee, and not
Ilater than 180 days after the date of fee payment.
Impact Fees
'Transportation Impact Fee
Fee per Ordinance or as determined by
independent fee calculation.
Fee per Ordinance
Transportation Impact Fee Review -
Independent Fee Calculation
Fee charged when an independent fee
calculation is submitted to the City fo
review.
$240
Transportation Impact Fee Admin: Single
(Family
When Transportation Impact Fees apply
$50
'Transportation Impact Fee Admin.
Commercial/MF
When Transportation Impact Fees apply
$100
nsportation Impact Fee Deferral
Only for IRC structures
$50
ks Impact Fee
Fee per Ordinance.
Fee per Ordinance
ks Impact Fee Admin: Single Family
When Parks Impact Fees apply
$50
ks Impact Fee Admin: Commercial/MF
I
When Parks Impact Fees apply
$100
ks Impact Fee Deferral
Only for IRC structures
$50
Edmonds Fee Schedule Page 1 December 2016
Permit Type
Notes
Fee
Building
Fire Alarm (Alteration) up to 5 initiating
devices
No plans. Subject to field inspection. Does
not include replacement of FACP.
$165
Fire Alarm (Alteration) 6 or more initiating
vices
$100 + COE Table 1
e Alarm (New)
$100 + COE Table 1
tributed Antenna Radio System (DAS)
[Fire
$100 + COE Table 1
e Connection permit
$500
e Damage
COE Table 1
Inspection Fee
'Per Hour
$100
Fire Operational permit
$60
Firework Display permit
$30
Fire Plan Review fee
Per Hour
$100
Fire Sprinkler Commercial (Alteration) up to
5 sprinklers
Applies to Commercial and Multifamily
$200
Fire Sprinkler Commercial (Alteration) more
than 5 sprinklers
Applies to Commercial and Multifamily
$150 + Table 1
Fire Sprinkler Commercial (New)
Applies to Commercial and Multifamily
$300 + Table 1
Fire Sprinkler Residential (Alteration)
Applies to IRC structures
$200
Fire Sprinkler Residential (New)
Applies to IRC structures
$400
Fire Protection System permit
$315
Underground Tank 600 gallons or less (fill or
remove)
$100
Underground Tank 600 gallons or less (new
installation)
$150
Underground Tank more than 600 gallons
(fill, remove, install)
$300
Accessory Structure (Greenhouse/Shed)
Table 1
ADU Compliance
$405
Adult Family Home
$500
.Appeal of Building Official Interpretation
$810
Base Building Permit Processing Fee
$100
Building Inspection
$100
Cell Communications/ Cellular Facilities
Table 1
Change of Use
$510
Changes to Approved Plans
$100/hr
Commercial New Construction
Table 1
Deck, Stair, Ramp
Table 1
Demolition (Primary)
$300
Edmonds Fee Schedule Page 2 December 2016
Permit Type
Notes
Fee
Demolition (Secondary)
$150
Dock/Marina/Floats
$200 + Table 1
Fence
$60
Garage / Carport
Table 1
Grading/Fill
Table 2 + peer review
Grease Interceptor
$700
Grease Trap
$200
Hot Tub/Spa (Commercial)
Table 1
Hot Tub/Spa (Single -Family)
$200
Hydronic Heating
$135
Manufactured Coach -Commercial (Federal
HUD Label)
$500
Manufactured Home Installation (Federal
HUD Label)
$550
IESLHA Administrative Processing Fee
$2,385
IESLHA Minor Project Administrative
(Processing Fee
$300
IESLHA Consultant Review
Full cost of peer
review
IESLHA Packets
INo labor in current fee
$15
(Mechanical Permit
Table 4
(Parking Lot
$200 + Table 1
(Plumbing Permit
Table 3
IRe-inspection Fee (Building)
$100
(Relocation of Building
$500 + $100/hr
outside city
Re -roof (Commercial)
Table 1
Re -roof (Single-family)
:Includes sheathing.
$100
Residential - New Construction
Table 1
Residential -Addition/Remodel
Table 1
Re -Submittal Plan Review after 3rd review
$100/hr
Retaining Wall (Commercial)
$675 + peer review
Retaining Wall (Residential)
$265 + peer review
Edmonds Fee Schedule Page 3 December 2016
Permit Type
Notes
Fee
Sign (Per Sign)
.Excluding specific sign categories listed
below
$150
.Sign (Blade Sign)
Includes all blade signs in proposal
$75
:Sign (Pedestrian Sign)
!Includes all pedestrian signs in proposal
$125
Sign (Pole Sign)
$750
'Solar/Photovoltaic (Residential)
$120
'Solar/Photovoltaic (Commercial)
'Valuation does not include cost of solar
anels or inverters
Table 1
'State Building Code Surcharge Fee
$4.50
Swimming Pool (Pre -Manufactured Above
Ground)
$120
'Swimming Pool (In -Ground)
Table 1
Tenant Improvement
Table 1
Violation Compliance Fee
.5240 or up to 5 times permit fee
$240 or 5x permit fee
'Window Replacement (Single Family)
$150
Edmonds Fee Schedule Page 4 December 2016
Permit Type
Notes
Fee
Planning
'Type 1
:Staff decisions, no notice
$250
'Type 2 (A or B)
'Staff decisions w/ notice
ICIutdoor
$880
Type 3A
Hearing Examiner
$1820 + HE*
Type 3A - Specific Applications
dining; Amateur radio
$250
Type 3B
Hearing Examiner / ADB
$1 820 + HE*
Type 4A
'Subdivision / PRD final approval
$3 720
'Type 4B
Rezone
$6,350
Type 5
Plan, ECDC amendments
$6 350
.ADB Design Review - Signs
ADB consideration of departure from sign
standard er code
$880
'Staff Design Review if project exceeds SEPA
threshold
$880
Lot Line Adjustment
$950
,Short Subdivision
82,930
,Short Subdivision Final Approval
$1,440
,Subdivision Prelim Approval (+ HE)
:Staff time plus actual HE cost billed to
a licant
$5,920 + HE*
Subdivision Final Approval
Same as Type 4A
$3.720
Modification Request
$880
Minor change to approved plat
$100 hr
Major change to approved plat
'Same as original application
See Note
PRD Preliminary Approval
$5 920
PRD Final Approval
$3,720
'SEPA Review
$670
EIS Review
Cost
Critical Areas Checklist
$100
Critical Areas Checklist Update
$50
Critical Areas Study Admin
$100/hr (min. 1 hr)
Critical Areas Contingent Review
ECDC 23.40.195 for more detail on
Lalicable fees
$880
Critical Areas Var / Reasonable Use
:staff time plus actual HE cost billed to
a licant
$6,945 + HE*
Appeal of Staff Decision (1 or 2)
I.
$400
.Appeal of Type 3B Decision
$500
Appeal of Notice of Civil Violation
$880
Request for Reconsideration
$250
Edmonds Fee Schedule Page 5 December 2016
Permit Type Notes
Fee
Planning Inspection Fee Landscape plan inspection bsed on
estimated cost of landscape installation
1% of est.
Recording Fee Recording documents w/ County
5100 + cost
*When permit application is heard by Hearing Examiner (HE), cost of HE hearing is billed
to applicant.
Edmonds Fee Schedule Page 6 December 2016
Permit Type
Notes
Fee
Engineering
Alley Disruption/ Closure Fee
Fee charged for closure of alley in excess of
$200 base fee plus ROW
72hrs. Closure fee based on (assessed value
permit fee plus closure
per square foot of abutting property) x
fees
(right-of-way area (SF)).
iackflow Prevention Compliance Fee
Fee to assist in ensuring voluntary
$125
compliance with backflow prevention
program & ECC 7.20
(Developers Agreements
$300 Application Fee
plus $100/hr staff time
plus City Attorney Fees
(Development Project Peer Review
$300 base fee plus Cost
of Peer Review
Drainage Permit (pool, hot tub, jacuzzi)
This permit is for drainage of pools, hot tub,
$50
jacuzzi and other facilities designed or
intended to hold more than 50 gallons of
water.
Encroachment Permit
$300 application fee
plus recording fees
Engineering Inspection Fee (Single Family,
Fee is charged per inspection.
$100 each
Existing Comm/MF, right of way)
Engineering Inspection Fees - Civil Site
Engineering inspection during construction
3.3% of Bond Amount
Improvements (subdivisions, commercial,
of site improvements for all
multi -family)
subdivisions/short plats, commercial and
multi -family. This fee is charged in addition
to the applicable Engineering Review or
other building permit fees .
Subdivision - Civil Review
Engineering review of civil plans for
$4,265
construction of site improvements for
subdivision.
Edmonds Fee Schedule Page 7 December 2016
Permit Type
Notes
Fee
'Short Subdivision -Civil Review
Engineering review of civil plans for
$2,785
construction of site improvements for short
subdivision.
Latecomers Agreement
$300 Application Fee
plus $100/hr and City
Attorney Fees
LID Sewer Fees (Outside of LID Map)
$300 Application Fee
plus $100/hr and City
Attorney Fees
Parking Disruption/ Closure Fee
Fee applies to any activity that occupies or
$200 base fee plus ROW
closes parking space(s), parking lanes(s) or
permit fee plus closure
other paved area of a street/road for more
fees
than 72 hours. Monthly portion of Fee [$
per month] _ (1% of assessed value per
square foot of abutting property) x (right of
way area [SF] disrupted/closed). If
disruption/closure affects any portion of
the area of a parking space, the area of
disruption/closure is calculated based upon
the area of a full parking space.
Re -Inspection Fee
$100 each
Right -of -Way Construction Permit
$300 application fee
plus inspection fees
Right of Way Minor Construction Permit
Applies to smaller projects that cause only
$100 application fee
minor disturbance to the right of way e.g.
plus inspeciton fees
residential driveway replacement, tree
trimming
'Sewer General Facility Charge
Fee Der Ordinance
:Side Sewer (Commercial & Multi -Family)
Sanitary sewer installation - new
$200 application fee
commercial or multi -family.
plus general facility
charge per Ordinance
'Side Sewer (All Single Family &
Sanitary sewer installation - new or repair.
$100 application fee
Commercial/Multi-family repairs)
plus general facility
charge per Ordinance
Edmonds Fee Schedule Page 8 December 2016
Permit Type
Notes
Fee
1
Side Sewer - Special Conditions e.g. grinder
Fee charged in addition to side sewer
$200 application fee
pumps, ejectors..
permit fee when special conditions exist,
plus $120/hr for Utility
such as grinder pumps, sewer ejector
Engineer review
systems, etc.
'Sidewalk Disruption or Closure
Fee charged for closure of sidewalk in
$200 base fee plus ROW
excess of 72hrs. Closure fee based on
permit fee plus closure
(assessed value per square foot of abutting
fees
property) x (right-of-way area (SF)).
Stormwater Engineer Review
Stormwater reivew by P.E. Fee will also be
$120/hr
applied for review of storm drainage for SFR
construction of any type (e.g. new
construction, remodel, additions, sealed
decks, etc.)
:Stormwater Permit
Fee for review of stormwater regulated
$300 application fee
activity when another permit (building
plus inspection fees
permit, subdivision, right-of-way, etc.) is not
required.
'Storm System General Facility Charge
General Facility Charge
per Ordinance
'Street Restoration for Water Meter
Fee charged when City performs street
$1000 plus Street
(Installation
restoration after water service and meter
Overlay Cut Fee if
install.
applicable
Street Overlay Cut Fee
Fee for cutting into a road that was overlaid
$200 base fee plus ROW
within the last 5 years.
permit fee plus addt'I
per SgYd charge times
overlay cut multiplier
Street Use Permit
This fee is applied to any use of public right-
$100 application fee
of -way in a temporary nature (not covered
plus Bistro Dining fees
by Encroachment permit or ROW
per Ordinance if
construction permit)
applicable.
Transportation Engineer Review
Transportation review by P.E.
$120/hr
Utility Engineer Review
Water or sewer utility review by P.E.
$120 hr
Utility Company Agreement
Fee charged for review time associated with
$100/hr (min. 1 hr) plus
agreements such as Franchise, Master Use,
City Attoney Fees
and Lease.
'Variance from Underground Wiring
Fee charged for each request for variance
$300 application fee
from underground wiring requirement.
plus $100/hr plus City
Attorney Fees
Edmonds Fee Schedule Page 9 December 2016
Permit Type
Notes
Fee
I
Water Meter General Facility Charge
Fee per Ordinance
Water Meter Fee (Based on Size)
New service line and meter installation
charges
3/4"
52,920
V
52.970
1.51,
56,220
2"
55,390
Edmonds Fee Schedule Page 10 December 2016
CITY OF EDMONDS
BUILDING PERMIT FEE SCHEDULE — TABLE 1
Based on building construction valuation
Effective January 1 2017
$14500
$30
$501 to $2000
$30 for the first $500 plus $3 for each additional $100, or fraction
thereof to and including $2000
$2001 to $25,000
$75 for the first $2000 plus $14 for each additional $1,000 or
fraction thereof to and including $25,000
$25,001 to $50,000
$400 for the first $25,000 plus $10 for each additional $1,000 or
fraction thereof to and including $50,000
$50,001 to $100,000
$650 for the first $50,000 plus $7 for each additional $1,000 or
fraction thereof to and including $100,000
$100,001 to $500,000
$1000 for the first $100,000 plus $6 for each additional $1,000 or
fraction thereof to and including $500,000
$500,001 to $1,000,000
$3,400 for the first $500,000 plus $5 for each additional $1,000 or
fraction thereof to and including $1,000,000
$1,000,001 and up
$5,900 for the first $1,000,000 plus $4 for each additional $1000 or
fraction thereof.
Other Fees:
1. Plan review fees in addition to building permit fees are assessed at a rate of 85% of the calculated building permit fee
(includes Building, Planning and Engineering for commercial/multi-family reviews and Building/Planning for
residential reviews).
2. Commercial Permits: All permits relating to other than residential permits as described below shall be calculated at
the rate established in the amended Building Permit Fee Schedule based on 120% of above valuation chart. The
determination of value or valuation shall be based on the Building Valuation Data table, published by the
International Code Council, on file with the City Building Official. The Building Valuation Data table shall be updated
on January 1st of each year to the latest version as published by ICC.
3. Residential Permits: Permits for the construction (including remodels and additions) of single-family residences,
including accessory structures shall be calculated at the rate established in the amended Building Permit Fee Schedule
based on the above valuation chart. The determination of value or valuation shall be based on the Building Valuation
Data, published by the International Code Council, on file with the City Building Official. The Building Valuation
Data table shall be updated on January 1st of each year to the latest version as published by ICC.
4. Decks, stairs, ramps, covered porches with open exterior sides, and trellises are assessed at $20 per square foot for
valuation purposes.
5. Unheated sunrooms are assessed at $28 per square foot for valuation purposes.
6. After the 3rd review is complete on a permit application, additional reviews are charged at $100 per hour per
reviewing division/department.
7. Base building permit processing fee is $100 per permit.
8. Additional plan review required by changes, additions or revisions to approved plans $100 per hour (minimum charge
one hour) per reviewing department/division.
9. Building Inspections outside of normal business hours $100 per hour (minimum charge one hour).
10.Re-inspection fees and inspections for which no fee is specifically indicated, are charged at $100 per hour (minimum
charge one hour).
11.Development Project Peer Review: $100 per staff hour plus cost of consultant review fee charged for outside
consultant peer review services when City staff lacks the expertise to review a specific project or aspect of a project.
12.City Technology fee of $35 assessed for each development permit the City issues.
13. State Building Code Council surcharge fee $4.50 per building permit, plus $2.00 per each dwelling unit.
14.Pre-Application Meeting $1000, 50% applied toward future plan check fee for that specific project only.
* The above table is based on the 1997 Uniform Building Code Table 1-A amended.
L:\Fees\2016 Building Permit Fee Schedule_final.doc
CITY OF EDMONDS
GRADING PERMIT FEE SCHEDULE - TABLE 2
Effective January 1, 2017
GRADING PLAN REVIEW FEES
50 cubic Zards 38.2 m' or less, when located in a designated critical area........................................................................ $ 30.00
51 to 100 cubic yards 40 m' to 76.5 m' . $ 60.00
..................................................................................................................................
101 to 1,000 cubic yards 77.2m' to 764.6 m'........................................................................................................................... $120.00
1,001 to 10,000 cubic yards (765.3 m' to 7645.5 m')................................................................................................................. $240.00
10,001 to 100,000 cubic yards (7646.3 m' to 76 455 m')--$240.00 for the first 10,000 cubic yards (7645.5 m'), plus
$100.00 for each additional 10,000 vards 7645.5 m') or fraction thereof.
100,001 to 200,000 cubic yards (76 456 m' to 152 911 m')--$1140.00 for the first 100,000 cubic yards (76 455 m'), plus
$100.00 for each additional 10,000 cubic vards 7645.5m' or fraction thereof.
200,001 cubic yards (152 912 m') or more--$2040.00 for the first 200,000 cubic yards (152911m3), plus $100.00 for
each additional 10,000 cubic yards 7645.5 m' or fraction thereof.
Other Fees:
Additional plan review required by changes, additions or revisions to approved plans....................................$100.00 per hour
minimum charge - one -hour)
GRADING PERMIT FEES
Base permit fee. . $30.00
............................................................................................................................................................................
50 cubic vards 38.2m' or less, when located in a designated critical area............................................................................. $60.00
51 to 100 cubic vards (40 m' to 76.5m') ....................................................................................................................................... $60.00
101 to 1,000 cubic yards (77.2m' to 764.6 m')--$120.00 for the first 100 cubic yards (76.5 m') plus $20.00 for each
additional 100 cubic yards (76.5 m') or a fraction thereof.
1,001 to 10,000 cubic yards (765.3 m' to 7645.5 m')--$300.00 for the first 1,000 cubic yards (764.6 m'), plus $40.00
for each additional 1,000 cubic yards (764.6 m') or fraction thereof.
10,001 to 100,000 cubic yards (7646.3 m' to 76 455 m')--$660.00 for the first 10,000 cubic yards (7645.4 m'),
plus $60.00 for each additional 10,000 cubic vards 7645.5 m' or fraction thereof.
100,001 cubic yards (76 456 m') or more--$1200.00 for the first 100,000 cubic yards (76 455 m'), plus $90.00
for each additional 10.000 cubic yards 7645.5 m' or fraction thereof.
Other Inspections and Fees:
1. Inspections outside of normal business hours (minimum charge - one hour)...............................................$100.00 per hour
2. Re -inspection fees assessed under provisions of UBC Section 108.8..............................................................$100.00 per hour
3. Inspections for which no fee is specifically indicated minimum charge - one-hour...................................$100.00 per hour
L:\temp\building\fees\2014 fees\2014 grading fee schedule
CITY OF EDMONDS
PLUMBING PERMIT FEE SCI IEDULE - TABLE 3
Effective January 1, 2017
Base Permit Fee for Processing
1. For the issuance of each plumbing permit...........................................................................................$40.00
Unit Fee Schedule (NOTE: Base permit issuing fee not included)
1. For each plumbing fixture on one trap or a set of fixtures on one trap (including water, drainage
piping)..................................................................................................................................................$12.00
2. For repair or alteration of drainage or vent piping or water piping, each fixture.......................$12.00
3. For each building sewer and each trailer park sewer (does not include trunk or LID charges) $60.00
4. Rainwater systems - per drain (within footprint of building)........................................................$12.00
5. For each cesspool (where permitted).................................................................................................$50.00
6. For each private sewage disposal system..........................................................................................$60.00
7. For each water heater, including expansion tank............................................................................$12.00
8. For each gas -piping system of one to five outlets.............................................................................$24.00
9. For each additional gas piping system outlet, per outlet.................................................................$ 2.00
10. For each installation or alteration of water treating equipment....................................................$30.00
11. For each lawn sprinkler system on any one meter incl. backflow protection devices
thereof ........... NC
12. For atmospheric -type vacuum breakers not included in item 11:
1 to 5.....................................................................................................................................................$12.00
over5, each...........................................................................................................................................$ 2.00
13. For each backflow protective device other than atmospheric type vacuum breakers:
2 inch diameter and smaller...............................................................................................................$30.00
over2 inch diameter ................ ........................................................................................................... $40.00
14. For each graywater system or reclaimed water system (in addition to fixture fees as above) ..... $60.00
15. For each annual cross -connection testing of a reclaimed water system (excluding initial test) ... $30.00
16. For each medical gas piping system serving one to five inlet(s)/outlet(s) for a specific gas .......$100.00
17. For each additional medical gas inlet(s)/outlet(s).............................................................................$12.00
18. For each grease trap ... ..................................................................................................................... $200.00
19. For each grease interceptor..............................................................................................................$700.00
20. For each industrial waste pretreatment interceptor including its trap and vent, except kitchen -
type grease interceptors functioning as fixture traps (oil/water separator, etc.) ........................$100.00
Other Inspections and [Fees
1. Re -inspection fee..................................................................................................................................$100.00
2. Inspections for which no fee is specifically indicated.......................................................................$100.00
3. Plan review fee per hour charge (minimum charge - one
hour)..........................................................$100.00
4. Additional plan review required by changes, additions or revisions to approved plans, per hour
charge (minimum charge-one-hour)...............................................................................................$100.00
L:\temp\building\fees\2014 fees\2014 plumbing fee schedule
CITY OF EDMONDS
MECHANICAL PERMIT FEE SCHEDULE - TABLE 4
Effective January 1, 2017
Base Permit Fee for Processing
1. For the issuance of each mechanical permit..................................................................................................................... $40.00
Unit Fee Schedule (Note: Base permit fee for processing not included.)
1. Furnaces
For the installation/relocation of each forced -air or gravity -type furnace or burner, including ducts and appliance
vent up to and including 100,000 Btu/h (29.3kW)............................................................................................................... $20.00
For the installation/relocation of each forced -air or gravity -type furnace or burner, including ducts and appliance
vent over 100,000 Btu/h(29.3kW).......................................................................................................................................
$30.00
For the installation/relocation of each floor furnace, including vent....................................................................................
$20.00
For the installation/relocation of each suspended heater, recessed wall heater or floor -mounted unit heater ......................
$25.00
2. Appliance Vents
For the installation, relocation/replacement of each appliance vent installed (i.e., Type B, BW, L gas vent, etc.) ..............
$10.00
3. Repairs or Additions
For the repair, alteration or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit,
or each heating, cooling, absorption or evaporative cooling system, including installation of controls ............................... $15.00
4. Boilers, Compressors and Absorption Systems/Air Conditioning Systems, including Heat Pumps
For the installation/relocation of each boiler or compressor up to and including 3 horsepower (10.6kW), or each
absorption system up to and including 100,000 Btu/h (29.3kW)......................................................................................... $20.00
For the installation/relocation of each boiler or compressor over 3 horsepower (I0.6KW) up to and including 15
horsepower (52.7kW), or each absorption system over 100,000 Btu/h (29.3kW) up to and including 500,000 Btu/h
(146.6kW)............................................................................................................................................................................
$30.00
For the installation or relocation of each boiler or compressor over 15 horsepower (52.7kW) up to and including 30
horsepower (105.5kW), or each absorption system over 500,000 Btu/h (146.6kW) to and including 1,000,000 Btu/h
(293.1 kW)......................................................................................................................................... ..... $40.00
..............................
For the installation or relocation of each boiler or compressor over 30 horsepower (105.5kW) up to and including 50
horsepower (176 kW), or each absorption system over 1,000,000 Btu/h (293.1 kW) to and including 1,750,000 Btu/h
(512.9 kW) ....................................... ........................................................................... .......................................................
.. $60.00
For the installation or relocation or each boiler or compressor over 50 horsepower (176 kW), or each absorption
system over 1,750,000 Btu/h (512.9 kW).............................................................................................................................
$95.00
5. Air Handlers
For each air -handling unit up to and including 10,000 (cfm) (4719 Us), including ducts (i.e., diffusers, blowers, etc.).....
$20.00
For each air -handling unit over 10,000 cfm (4719 L/s) including ducts..............................................................................
$30.00
6. Evaporative Coolers
For each evaporative cooler other than portable type...........................................................................................................
$15.00
7. Ventilation and Exhaust
For each ventilation fan connected to single duct (i.e., bath, laundry, kitchen exhaust, etc.) ............................................... $10.00
For each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit........
$10.00
For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood (i.e. Type 1
and Type
2 hoods, fume hoods, etc.)..................................................................................................................................................
$100.00
8. Incinerators
For the installation or relocation of each domestic type incinerator.....................................................................................
$20.00
For the installation or relocation of each commercial or industrial -type incinerator............................................................ $50.00
9. Miscellaneous
For each appliance or piece of equipment regulated by the IMC for which no other fee is listed (i.e. fire dampers, ductless
mini -
splitsystems, etc.)................................................................................................................................................................
$20.00
Other Insnections and Fees
1. Re -inspection fees assessed at a per hour charge (minimum charge -one hour).................................................................. $100.00
2. Inspections for which no fee is specifically indicated, per hour charge (minimum charge -one -hour) ............................... $100.00
3. Plan review fee per hour charge (minimum charge - one hour).........................................................................................$100.00
4. Additional plan review required by changes, additions or revisions to plans or to plans for which an initial review
has been completed per hour charge (minimum charge -one hour).................................................................................... $100.00
L:\temp\building\fees\2014 fees\2014 mechanical fee schedule