Loading...
Resolution 917RESOLUTION NO. 917 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 RCW, the City council of the City of Edmonds has previously adopted a Comprehensive Street program, including an arterial street construction program, and thereafter periodically modified said Comprehensive Street program by resolution, and WHEREAS, the City Council has reviewed the work accomplished under the said Program, determined current and future City street and arterial needs, and based upon these findings has prepared a Six -Year Transportation Improvement Program for the ensuing six (6) calendar years, and WHEREAS, A PUBLIC HEARING HAS BEEN HELD ON THE SAID Six- Year Transportation Improvement Program, and WHEREAS, the City Council finds that there will be no significant adverse environmental impacts as a result of adoption of the Six -Year Transportation Improvement Program, NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. The Six -Year Transportation Improvement Program for the City of Edmonds, as revised and extended for the ensuing six (6) calendar years (1999 -2004, inclusive), a copy of which is attached hereto as Exhibit A and incorporated herein by this reference as if fully set forth, which Program sets forth the project location, type of improvement and the estimated cost thereof, is hereby adopted and approved. Section 2. Filing of Program. Pursuant to Chapter 35.77 RCW, the City Clerk is hereby authorized and directed to file a copy of this resolution forthwith, together with the Exhibit attached hereto, with the Secretary of Transportation and a copy with the Transportation Improvement Board for the State of Washington. RESOLVED this 16th day of June, 1998 APPROVED: MAYOR, BARBARA S. FA EY ATTEST /AUTHENTICATED: CITY CLERK, SANDRA S. CHASE FILED WITH THE CITY CLERK: 06/12/98 PASSED BY THE CITY COUNCIL: 06/16/98 RESOLUTION NO. 917 P", ROADWAY CONSTRUCTION PROJECTS - OUTSIDE FUNDING City No. 0365 County No. 31 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (1999 -2004) MPO PSRC Hearing Date 06/02/98 Adoption Date 06/16/98 Resolution No. 917 F U N C C L T A I S O S N A L P R N I U 0 M R B I E T R Y PROJECT IDENTIFICATION A. FEDERAL AID NO. B. BRIDGE NO. C. PROJECT TITLE D. STREET /COUNTY ROAD NAME OR NUMBER E. TERMINAL BEGINNING AND END F. DESCRIBE WORK TO BE DONE I M P R T O Y V P E E M S N T S T L T O E A T N T A G U L T S H U T C 1 0 L D I E T S Y PROJECT COSTS IN THOUSANDS OF DOLLARS 120.0 120.0 ::: %:::: PROJECT PHASE MONTH/ YEAR PHASE STARTS FUND SOURCE INFORMATION EIS CE EA NA EXPENDITURE SCHEDULE (Local Agency) FEDERALLY FUNDED PROJECTS ONLY FEDERAL FUNDING RAP, CAPP, TIA, UATA, OTHER STATE FUNDS LOCAL FUNDS TOTAL FEDERAL FUND CODE FEDERAL COST BY PHASE ENVIR. TYPE RNV REQ Y/N DATE MONTH/YR 1st 2nd 3rd 4th THRU 6th 14 INTERMODAL FACILITY - Relocate and improve SR 104; 1 01 1 1 0.75 1 PGW construct safe, split rail crossing; construct ferry terminal and holding lanes; Construct distibution facility for ferry, Community Transit, AMTRAK, commuter rail, pedestrians, bicycles, and Park and Ride P.E. Jan -95 FTA STP 8000.0 TIA WSDOT CPDPTA CT 1000.0 1000.0 10000.0 ::::::;:4... :::::::k9 zR 300.0 0.0 0.0 300.0 500.0 0.0 200.0 500.0 0.0 EIS _X_ CE EA NA YES DATE Jan -01 RNV Jan -01 8000.0 1000.0 1000.0 10000.0 CONST Jun -02 90000.0 30000.0 0.0 120000.0 TOTAL 106000.0 32000.0 2000.0 140000.0 :'::::Ai►48' 300.0 800.0 700.0 TOTAL SR 99 -244TH ST. S.W. to 210TH ST. S.W. 1 02 1 1 2.30 JCPT Construct curb /gutter and sidewalks, overlay, widen to 7lanes Cost share with Lynnwood, MLT, CT, & WSDOT (Lynnwood lead agency) P.E. Jan -95 STP 1340.0 TIB WSDOT ISTEA 20.01 375.0 1605.0 ::;`::::::::::::` 280.0 280.0 280.0 EIS X CE EA NA YES GATE 6/95 R/W Jun -96 ::::j 500.0 500.0 CONST Dec-97 12860.0 2200.0 4125.0 19185.0 TOTAL 14200.0 2200.0 5000.0 21400.0 ;:;:;:,>�¢q. ;Q 280.0 280.0 280.0 17 2a 76TH AVE. W. - SR 99 to 220TH ST. S.W. 1 04 1 1 0.381 Grind pavement, overlay to strengthen, restore ride P.E. Jan -01 STP(L) 14.0 ::::i::::?1II9A: 0.01 14.0 28.0 14.0 56.0 EIS CE _X EA NA NO DATE RNV 0.0 CONST Jun -01 56.0 70.0 56.0 112.0 TOTAL 70.0 140.0 0.0 0.0 70.0 0.0 17 2b 76TH AVE. W. - SR 104 to SR 99 1 04 1 1 1.141 Grind pavement overlay to strengthen, restore ride P.E. Jan -01 STP(L) 15.0 15.0 - 30.0 15.0 135.0 EIS CE X EA NA Y/N DATE RNV CONST Jun -01 135.0 135.0 270.0 TOTAL 150.0 150.0 300.01 0.01 0.01 150.01 0.0 17 3 220TH ST. S.W. - 9TH AVE. S. to 84TH AVE. W. 1 03 1 1 1.00 jCPTG Arterial street widening to 44 feet with sidewalks and stone drainage P.E. Jan -02 STP(E) 270.0 TIA 67.5 337.5 1.0 1.0 67.5 495.0 EIS CE _X_ EA NA NO DATE RNV 0.0 CONST Jun -02 1980.0 495.0 2475.0 TOTAL 2250.0 562.51 2812.5 1 562.5 ROADWAY CONSTRUCTION PROJECTS - LOCAL FUNDING 19 ANNUAL STREET OVERLAY PROGRAM 1 04 1 1 241 Pavement overlays to strengthen, restore ride P.E. Jan -99 120.0 120.0 ::: %:::: 20.0 150.0 20.0 150.0 60.0 450.0 EIS CE EA NA Y/N DATE RNV CONST Jun -99 900.0 900.0 ::: j TOTAL 0.0 1020.0 1020.0 ::::: 170.0 170.0 510.0 CITYWIDE STREET IMPROVEMENTS 04 600 Pavement maintenance to increase roadway life P.E. Jan -99 30.0 30.0 ::'s:::::::::ff 5.0 15.0 5.0 15.0 15.0 45.0 EIS CE EA NA Y/N DATE RNV ::::3 @ CONST Jun -99 0.0 90.0 90.0 TOTAL 120.01 120.0 ::::: 20.01 20.01 60.0 76TH AVE W. ROCKERY 1 04 1 1 0.131 Replacement of rock retaining wall in public right- of-way between 19000 and 19200 block. P.E. Jan -97 ::::j EIS CE _X EA NA NO DATE RN/ CONST Jun -99 100.0 TOTAL 0.0 0.0 0.0 100.0 ::::i::::?1II9A: 0.01 0.01 0.0 City of Edmonds ITRAFFIC SIGNALIZATION PROJECTS - OUTSIDE FUNDING City No. 0365 County No. 31 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (1999 -2004) MPO PSRC Hearing Date 06 102/98 Adoption Dale 06 /16/98 Resolution No. 917 F U N C C L T A I S 0 S N A L P R N I U 0 M R B 1 E T R Y PROJECT IDENTIFICATION A. FEDERAL AID NO. B. BRIDGE NO. C. PROJECT TITLE D. STREET /COUNTY ROAD NAME OR NUMBER E. TERMINAL BEGINNING AND END F. DESCRIBE WORK TO BE DONE I M P R T 0 Y V P E E M S N T S T L T 0 E A T N T A G U L T S H U T C 1 0 L D I E T S Y PROJECT COSTS IN THOUSANDS OF DOLLARS PROJECT PHASE MONTH/ YEAR PHASE STARTS FUND SOURCE INFORMATION EXPENDITURE SCHEDULE (Local Agency) FEDERALLY FUNDED PROJECTS ONLY FEDERAL FUNDING RAP, , CAPP, TIA, DATA, OTHER STATE FUNDS LOCAL FUNDS TOTAL FEDERAL FUND CODE FEDERAL COST BY PHASE ENVIR. TYPE R/W REQ Y/N DATE MONTH/YR 1st 2nd 3rd 4th THRU 6th 17 1 DAYTON ST. RAILROAD CROSSING IMPROVEMENTS 15 0.01 Improve protection devices and lighting P.E. Jan -00 $T(RRP) 17.0 2.7 19.7 4.0 16.2 EIS CE EA NA NO DATE RNV CONST Jun -00 69.5 10.8 80.3 TOTAL 86.5 13.5 100.0 0.0 20.2 0.0 rO 16 Za 220TH ST. S.W. and 100TH AVE. W. 12 1 T-0-1-0TC-PT Replace 4-way stop and flasher with fully actuated signal and channelization (see item #4, roadway projects, outside funding for related project) P.E. Jan -02 STP 26.0 TIA 4.0 30.0 4.0 16.2 EIS CE EA NA NO DATE R1W CONST Jun -02 103.8 16.2 120.0 TOTAL 129.6 0.0 20.2 150.0 0.0 0.0 0.0 20.2 16 2b 220TH ST. S.W. and 84TH AVE. W. 1 12 1 1 0.10 JCPT Replace 4-way stop and flasher with fully actuated signal and channelization (see item #4, roadway projects. outside funding for related project) P.E. Jan -02 STP 26.0 TIA 4.0 30.0 4.0 16.2 EIS CE EA NA NO DATE RAN CONST Jun -02 103.8 129.8 16.2 120.0 TOTAL 0.0 20.2 150.0 0.0 0.0 0.0 20.2 16 3a WALNUT ST. and 9TH AVE. S. 12 0.10 CPT Replace 4 -way stop and flasher with fully actuated signal and channelization P.E. Jan -02 STP 26.0 4.0 30.0 4.0 16.2 EIS CE EA NA NO DATE RAN CONST Jun -02 103.8 16.2 120.0 TOTAL 129.8 0.0 20.2 150.0 0.0 0.0 0.0 20.2 16 3b MAIN ST. and 9TH AVE. 12 0.10 CPT Replace 4 -way stop and flasher with fully actuated signal and channelization P.E. Jan -02 STP 26.0 4.0 30.0 4.0 16.2 EIS CE EA NA Y/N DATE RM/ CONST Jun -02 103.8 16.2 120.0 TOTAL 129.8 0.0 20.2 150.0 0.0 0.0 0.0 20.2 14 3c SR524 and 88TH AVE. W. 1 12 1 1 0.15 JCPT Install fully actuated signal & channelization to improve vehicular safety. P.E. Jan -02 STP 26.0 4.0 30.0 4.0 16.2 EIS CE EA NA Y/N DATE RIW CONST Jun -02 103.8 16.2 120.0 TOTAL 129.8 0.0 20.2 150.0 0.0 0.0 0.0 20.2 17 F3d 76TH AVE. W. and 200TH ST. S.W. 1 12 1 1 0.10 JCPT Install fully actuated signal & channelization to improve vehicular safety. Cost share with Lynnwood P.E. Jan -02 STP 26.0 4.0 30.0 2.0 8.1 EIS CE EA NA Y/N DATE RAW CONST Jun -02 103.8 16.2 120.0 TOTAL 129.8 0.0 20.2 150.0 0.0 0.0 0.0 10.1 16 3e 212TH ST. S.W. and 80TH AVE. W. 12 0.10 CPT Install fully actuated signal & channelization to improve vehicular safety. P.E. Jan -02 STP 26.0 4.0 30.0 4.0 16.2 EIS CE EA NA Y/N DATE R/W CONST Jun -02 103.8 16.2 120.0 TOTAL 129.8 0.0 20.2 150.0 0.0 0.0 0.0 20.2 14 3f SR 104 and 240TH ST. S.W. 12 0.10 CPT Install fully actuated signal & channelization to improve vehicular safety. P.E. Jan -02 STP 34.6 5.4 40.0 5.4 21.6 EIS CE EA NA Y/N DATE . RNV CONST Jun -O 138.4 21.6 160.01 TOTAL 173.0 0.01 27.0 1 200.01 0.01 0.0 0.0 27.0 City of Edmonds ITRAFFIC SIGNALIZATION PROJECTS - LOCAL FUNDING City No. 0365 County No. 31 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (1999 -2004) MPO PSRC Hearing Date 06/02/98 Adoption Date 06 /16/98 Resolution No. 917 F U N C C L T A I S 0 S N A L P R N I U 0 M R B I E T R Y PROJECT IDENTIFICATION A. FEDERAL AID NO. B. BRIDGE NO. C. PROJECT TITLE D. STREET /COUNTY ROAD NAME OR NUMBER E. TERMINAL BEGINNING AND END F. DESCRIBE WORK TO BE DONE I M P R T 0 Y V P E E M S N T S T L T O E A T N T A G U L T S H U T C 1 0 L D I E T S Y PROJECT COSTS IN THOUSANDS OF DOLLARS 5.0 5.0 PROJECT PHASE MONTH/ YEAR PHASE STARTS FUND SOURCE INFORMATION EIS CE EA NA EXPENDITURE SCHEDULE (Local Agency) FEDERALLY FUNDED PROJECTS ONLY FEDERAL FUNDING RAP, CAPP, TIA, DATA, OTHER STATE FUNDS LOCAL FUNDS TOTAL FEDERAL FUND CODE FEDERAL COST BY PHASE - ENVIR. TYPE RNV REO Y/N DATE MONTHNR 1st 2nd 3rd 4th THRU 6th 0.0 CITY -WIDE SIGNAL IMPROVEMENTS 1 121 1 ICPT P.E. Jan -99 60.0 0.0 120.0 19 tb 3.0 3.0 :::::: ;:;: <: : <::::;F 3.0 12.0 3.0 12.0 9.0 36.0 EIS CE EA NA YM DATE 6.3 RAN 6.3 25.0 EIS CE EA INA 0.0::::::x:: CONST Mar -99 12.0 12.0 TOTAL CONST 0.0 15.0 15.0 *K:K» 3 $; 15.0 15.0 45.0 NORTH SEATTLE ATMS IMPROVEMENTS 12 CPT Install peripherals to existing signal systems to enhance traffic movement by means of an advance transportation managements stem on primary arterials. P.E. Jun -99 31.3 0.0 0.0 19 1c SEAVIEW & SIERRA PARKS 05 0.25 Construct walkway 0.0 Jan -00 EIS CE EA NA Y/N DATE 5.0 R/W 5.0 25.0 EIS CE EA NA 0.0 <:::::::::::tfk8' CONST Mar -99 10.0 10.0 TOTAL Jun-00 0.0 70 10.0 ::::::;::{t; @' 0.0 0.0 0.0 14 -:. ix::: ADVANCED VEHICLE IDENTIFICATION 127-T--7C PT Install peripherals to existing signal systems on SR -99 to enhance traffic movement by means of an advance transportation managements stem. P.E. Jan -95 0.0 0.0 17 2 MEADOWDALE BEACH RD. - 76TH AVE. W. to OVD 1 05 0.75 CPT Widen, finish walkway system P.E. 0.0 ::: EIS CE EA NA Y/N DATE R/W 9.4 37.5 EIS CE EA NA 0.0 CONST Mar -99 10.0 10.0 <::::::k9 TOTAL 0.0 I 1 10.0 1 10.0 ::::::::: 1 o.ol oni 0.0 OTHER ENHANCEMENT PROJECTS - LOCAL FUNDING 19 1 to CITYWIDE WALKWAY AND BIKEWAY SYSTEM 05 1 1 1.00 ICPT Construct bikeways and pedestrian walkways throughout City per 1992 Comprehensive Bikeway and Walkway Plan P.E. Jan-00 5.0 5.0 10.0 50.0 20.0 100.0 EIS CE EA NA Y/N DATE RAN 0.0 CONST May-00 25.0 25.0 TOTAL 0.0 30.0 30.0 0.0 60.0 0.0 120.0 19 tb 88TH AVE. W. -204TH ST. S.W. to 200TH ST. S.W. 1 05 1 1 0.251 Construct pedestrian walkway to complete gap in walkway system. Road settlement issues must be resolved prior to construction. P.E. Jan-00 6.3 6.3 6.3 25.0 EIS CE EA INA Y/N DATE RNV 0.0 CONST Jun -00 25.0 25.0 TOTAL 0.0 31.3 31.3 0.01 31.3 0.0 0.0 19 1c SEAVIEW & SIERRA PARKS 05 0.25 Construct walkway P.E. Jan -00 5.0 5.0 5.0 25.0 EIS CE EA NA Y/N DATE R/W 0.0 CONST Jun-00 25.0 25.0 TOTAL 0.0 30.0 30.0 0.0 30.0 0.0 0.0 17 2 MEADOWDALE BEACH RD. - 76TH AVE. W. to OVD 1 05 0.75 CPT Widen, finish walkway system P.E. Jan -01 9.4 9.4 9.4 37.5 EIS CE EA NA Y/N DATE RNV 0.0 CONST Jun -01 37.5 37.5 TOTAL 0.0 1 46.91 46.9 1 0.01 0.01 46.91 0.0 19 3 PIONEER WAY - MAIN ST. to SHELL VALLEY 01 0.40 Alternate emergency services access/egress into Shell Valley (Possible LID) P.E. Jan -02 20.0 20.0 20.0 100.0 EIS CE EA NA Y/N DATE R1W 0.0 CONST Jun -02 100.0 100.0 TOTAL 0.0 126.-0T-- 20.0 120.01 0.01 0.01 0.01 120.0