Resolution 917RESOLUTION NO. 917
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF EDMONDS, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM AND
DIRECTING THE SAME TO BE FILED WITH THE STATE
SECRETARY OF TRANSPORTATION AND THE
TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26
RCW, the City council of the City of Edmonds has previously adopted a Comprehensive
Street program, including an arterial street construction program, and thereafter
periodically modified said Comprehensive Street program by resolution, and
WHEREAS, the City Council has reviewed the work accomplished under
the said Program, determined current and future City street and arterial needs, and
based upon these findings has prepared a Six -Year Transportation Improvement
Program for the ensuing six (6) calendar years, and
WHEREAS, A PUBLIC HEARING HAS BEEN HELD ON THE SAID Six-
Year Transportation Improvement Program, and
WHEREAS, the City Council finds that there will be no significant adverse
environmental impacts as a result of adoption of the Six -Year Transportation
Improvement Program, NOW, THEREFORE,
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON,
HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. The Six -Year Transportation Improvement
Program for the City of Edmonds, as revised and extended for the ensuing six (6)
calendar years (1999 -2004, inclusive), a copy of which is attached hereto as Exhibit A
and incorporated herein by this reference as if fully set forth, which Program sets forth
the project location, type of improvement and the estimated cost thereof, is hereby
adopted and approved.
Section 2. Filing of Program. Pursuant to Chapter 35.77 RCW, the City
Clerk is hereby authorized and directed to file a copy of this resolution forthwith, together
with the Exhibit attached hereto, with the Secretary of Transportation and a copy with the
Transportation Improvement Board for the State of Washington.
RESOLVED this 16th day of June, 1998
APPROVED:
MAYOR, BARBARA S. FA EY
ATTEST /AUTHENTICATED:
CITY CLERK, SANDRA S. CHASE
FILED WITH THE CITY CLERK: 06/12/98
PASSED BY THE CITY COUNCIL: 06/16/98
RESOLUTION NO. 917
P",
ROADWAY CONSTRUCTION PROJECTS - OUTSIDE FUNDING
City No. 0365
County No. 31 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (1999 -2004)
MPO PSRC
Hearing Date 06/02/98
Adoption Date 06/16/98
Resolution No. 917
F
U
N C
C L
T A
I S
O S
N
A
L
P
R N
I U
0 M
R B
I E
T R
Y
PROJECT IDENTIFICATION
A. FEDERAL AID NO.
B. BRIDGE NO.
C. PROJECT TITLE
D. STREET /COUNTY ROAD NAME OR NUMBER
E. TERMINAL BEGINNING AND END
F. DESCRIBE WORK TO BE DONE
I
M
P
R T
O Y
V P
E E
M S
N
T
S T L
T O E
A T N
T A G
U L T
S H
U
T C
1 0
L D
I E
T S
Y
PROJECT COSTS IN THOUSANDS OF DOLLARS
120.0
120.0
::: %::::
PROJECT
PHASE
MONTH/
YEAR
PHASE
STARTS
FUND SOURCE INFORMATION
EIS
CE
EA
NA
EXPENDITURE SCHEDULE
(Local Agency)
FEDERALLY FUNDED
PROJECTS ONLY
FEDERAL FUNDING
RAP,
CAPP,
TIA,
UATA,
OTHER
STATE
FUNDS
LOCAL
FUNDS
TOTAL
FEDERAL
FUND
CODE
FEDERAL
COST
BY
PHASE
ENVIR.
TYPE
RNV REQ
Y/N
DATE
MONTH/YR
1st
2nd
3rd
4th
THRU
6th
14
INTERMODAL FACILITY - Relocate and improve SR 104; 1 01 1 1 0.75 1 PGW
construct safe, split rail crossing; construct ferry terminal and holding lanes;
Construct distibution facility for ferry, Community Transit, AMTRAK, commuter
rail, pedestrians, bicycles, and Park and Ride
P.E.
Jan -95
FTA
STP
8000.0
TIA
WSDOT
CPDPTA
CT
1000.0
1000.0
10000.0
::::::;:4...
:::::::k9
zR
300.0
0.0
0.0
300.0
500.0
0.0
200.0
500.0
0.0
EIS _X_
CE
EA
NA
YES
DATE
Jan -01
RNV
Jan -01
8000.0
1000.0
1000.0
10000.0
CONST
Jun -02
90000.0
30000.0
0.0
120000.0
TOTAL
106000.0
32000.0
2000.0
140000.0
:'::::Ai►48'
300.0
800.0
700.0
TOTAL
SR 99 -244TH ST. S.W. to 210TH ST. S.W. 1 02 1 1 2.30 JCPT
Construct curb /gutter and sidewalks, overlay, widen to 7lanes
Cost share with Lynnwood, MLT, CT, & WSDOT
(Lynnwood lead agency)
P.E.
Jan -95
STP
1340.0
TIB
WSDOT
ISTEA
20.01
375.0
1605.0
::;`::::::::::::`
280.0
280.0
280.0
EIS X
CE
EA
NA
YES
GATE
6/95
R/W
Jun -96
::::j
500.0
500.0
CONST
Dec-97
12860.0
2200.0
4125.0
19185.0
TOTAL
14200.0
2200.0
5000.0
21400.0
;:;:;:,>�¢q. ;Q
280.0
280.0
280.0
17 2a
76TH AVE. W. - SR 99 to 220TH ST. S.W. 1 04 1 1 0.381
Grind pavement, overlay to strengthen, restore ride
P.E.
Jan -01
STP(L)
14.0
::::i::::?1II9A:
0.01
14.0
28.0
14.0
56.0
EIS
CE _X
EA
NA
NO
DATE
RNV
0.0
CONST
Jun -01
56.0
70.0
56.0
112.0
TOTAL
70.0
140.0
0.0
0.0
70.0
0.0
17 2b
76TH AVE. W. - SR 104 to SR 99 1 04 1 1 1.141
Grind pavement overlay to strengthen, restore ride
P.E.
Jan -01
STP(L)
15.0
15.0
- 30.0
15.0
135.0
EIS
CE X
EA
NA
Y/N
DATE
RNV
CONST
Jun -01
135.0
135.0
270.0
TOTAL
150.0
150.0
300.01
0.01
0.01
150.01
0.0
17 3
220TH ST. S.W. - 9TH AVE. S. to 84TH AVE. W. 1 03 1 1 1.00 jCPTG
Arterial street widening to 44 feet with
sidewalks and stone drainage
P.E.
Jan -02
STP(E)
270.0
TIA
67.5
337.5
1.0
1.0
67.5
495.0
EIS
CE _X_
EA
NA
NO
DATE
RNV
0.0
CONST
Jun -02
1980.0
495.0
2475.0
TOTAL
2250.0
562.51
2812.5
1
562.5
ROADWAY CONSTRUCTION PROJECTS - LOCAL FUNDING
19
ANNUAL STREET OVERLAY PROGRAM 1 04 1 1 241
Pavement overlays to strengthen, restore ride
P.E.
Jan -99
120.0
120.0
::: %::::
20.0
150.0
20.0
150.0
60.0
450.0
EIS
CE
EA
NA
Y/N
DATE
RNV
CONST
Jun -99
900.0
900.0
::: j
TOTAL
0.0
1020.0
1020.0
:::::
170.0
170.0
510.0
CITYWIDE STREET IMPROVEMENTS 04 600
Pavement maintenance to increase roadway life
P.E.
Jan -99
30.0
30.0
::'s:::::::::ff
5.0
15.0
5.0
15.0
15.0
45.0
EIS
CE
EA
NA
Y/N
DATE
RNV
::::3 @
CONST
Jun -99
0.0
90.0
90.0
TOTAL
120.01
120.0
:::::
20.01
20.01
60.0
76TH AVE W. ROCKERY 1 04 1 1 0.131
Replacement of rock retaining wall in public right- of-way between
19000 and 19200 block.
P.E.
Jan -97
::::j
EIS
CE _X
EA
NA
NO
DATE
RN/
CONST
Jun -99
100.0
TOTAL
0.0
0.0
0.0
100.0
::::i::::?1II9A:
0.01
0.01
0.0
City of Edmonds ITRAFFIC SIGNALIZATION PROJECTS - OUTSIDE FUNDING
City No. 0365
County No. 31 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (1999 -2004)
MPO PSRC
Hearing Date 06 102/98
Adoption Dale 06 /16/98
Resolution No. 917
F
U
N C
C L
T A
I S
0 S
N
A
L
P
R N
I U
0 M
R B
1 E
T R
Y
PROJECT IDENTIFICATION
A. FEDERAL AID NO.
B. BRIDGE NO.
C. PROJECT TITLE
D. STREET /COUNTY ROAD NAME OR NUMBER
E. TERMINAL BEGINNING AND END
F. DESCRIBE WORK TO BE DONE
I
M
P
R T
0 Y
V P
E E
M S
N
T
S T L
T 0 E
A T N
T A G
U L T
S H
U
T C
1 0
L D
I E
T S
Y
PROJECT COSTS IN THOUSANDS OF DOLLARS
PROJECT
PHASE
MONTH/
YEAR
PHASE
STARTS
FUND SOURCE
INFORMATION
EXPENDITURE SCHEDULE
(Local Agency)
FEDERALLY FUNDED
PROJECTS ONLY
FEDERAL FUNDING
RAP,
, CAPP,
TIA,
DATA,
OTHER
STATE
FUNDS
LOCAL
FUNDS
TOTAL
FEDERAL
FUND
CODE
FEDERAL
COST
BY
PHASE
ENVIR.
TYPE
R/W REQ
Y/N
DATE
MONTH/YR
1st
2nd
3rd
4th
THRU
6th
17
1
DAYTON ST. RAILROAD CROSSING IMPROVEMENTS 15 0.01
Improve protection devices and lighting
P.E.
Jan -00
$T(RRP)
17.0
2.7
19.7
4.0
16.2
EIS
CE
EA
NA
NO
DATE
RNV
CONST
Jun -00
69.5
10.8
80.3
TOTAL
86.5
13.5
100.0
0.0
20.2
0.0
rO
16 Za
220TH ST. S.W. and 100TH AVE. W. 12 1 T-0-1-0TC-PT
Replace 4-way stop and flasher with
fully actuated signal and channelization
(see item #4, roadway projects, outside funding for related project)
P.E.
Jan -02
STP
26.0
TIA
4.0
30.0
4.0
16.2
EIS
CE
EA
NA
NO
DATE
R1W
CONST
Jun -02
103.8
16.2
120.0
TOTAL
129.6
0.0
20.2
150.0
0.0
0.0
0.0
20.2
16 2b
220TH ST. S.W. and 84TH AVE. W. 1 12 1 1 0.10 JCPT
Replace 4-way stop and flasher with
fully actuated signal and channelization
(see item #4, roadway projects. outside funding for related project)
P.E.
Jan -02
STP
26.0
TIA
4.0
30.0
4.0
16.2
EIS
CE
EA
NA
NO
DATE
RAN
CONST
Jun -02
103.8
129.8
16.2
120.0
TOTAL
0.0
20.2
150.0
0.0
0.0
0.0
20.2
16 3a
WALNUT ST. and 9TH AVE. S. 12 0.10 CPT
Replace 4 -way stop and flasher with
fully actuated signal and channelization
P.E.
Jan -02
STP
26.0
4.0
30.0
4.0
16.2
EIS
CE
EA
NA
NO
DATE
RAN
CONST
Jun -02
103.8
16.2
120.0
TOTAL
129.8
0.0
20.2
150.0
0.0
0.0
0.0
20.2
16 3b
MAIN ST. and 9TH AVE. 12 0.10 CPT
Replace 4 -way stop and flasher with
fully actuated signal and channelization
P.E.
Jan -02
STP
26.0
4.0
30.0
4.0
16.2
EIS
CE
EA
NA
Y/N
DATE
RM/
CONST
Jun -02
103.8
16.2
120.0
TOTAL
129.8
0.0
20.2
150.0
0.0
0.0
0.0
20.2
14 3c
SR524 and 88TH AVE. W. 1 12 1 1 0.15 JCPT
Install fully actuated signal & channelization
to improve vehicular safety.
P.E.
Jan -02
STP
26.0
4.0
30.0
4.0
16.2
EIS
CE
EA
NA
Y/N
DATE
RIW
CONST
Jun -02
103.8
16.2
120.0
TOTAL
129.8
0.0
20.2
150.0
0.0
0.0
0.0
20.2
17 F3d
76TH AVE. W. and 200TH ST. S.W. 1 12 1 1 0.10 JCPT
Install fully actuated signal & channelization
to improve vehicular safety.
Cost share with Lynnwood
P.E.
Jan -02
STP
26.0
4.0
30.0
2.0
8.1
EIS
CE
EA
NA
Y/N
DATE
RAW
CONST
Jun -02
103.8
16.2
120.0
TOTAL
129.8
0.0
20.2
150.0
0.0
0.0
0.0
10.1
16 3e
212TH ST. S.W. and 80TH AVE. W. 12 0.10 CPT
Install fully actuated signal & channelization
to improve vehicular safety.
P.E.
Jan -02
STP
26.0
4.0
30.0
4.0
16.2
EIS
CE
EA
NA
Y/N
DATE
R/W
CONST
Jun -02
103.8
16.2
120.0
TOTAL
129.8
0.0
20.2
150.0
0.0
0.0
0.0
20.2
14 3f
SR 104 and 240TH ST. S.W. 12 0.10 CPT
Install fully actuated signal & channelization
to improve vehicular safety.
P.E.
Jan -02
STP
34.6
5.4
40.0
5.4
21.6
EIS
CE
EA
NA
Y/N
DATE
.
RNV
CONST
Jun -O
138.4
21.6
160.01
TOTAL
173.0
0.01
27.0
1 200.01
0.01
0.0
0.0
27.0
City of Edmonds ITRAFFIC SIGNALIZATION PROJECTS - LOCAL FUNDING
City No. 0365
County No. 31 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (1999 -2004)
MPO PSRC
Hearing Date 06/02/98
Adoption Date 06 /16/98
Resolution No. 917
F
U
N C
C L
T A
I S
0 S
N
A
L
P
R N
I U
0 M
R B
I E
T R
Y
PROJECT IDENTIFICATION
A. FEDERAL AID NO.
B. BRIDGE NO.
C. PROJECT TITLE
D. STREET /COUNTY ROAD NAME OR NUMBER
E. TERMINAL BEGINNING AND END
F. DESCRIBE WORK TO BE DONE
I
M
P
R T
0 Y
V P
E E
M S
N
T
S T L
T O E
A T N
T A G
U L T
S H
U
T C
1 0
L D
I E
T S
Y
PROJECT COSTS IN THOUSANDS OF DOLLARS
5.0
5.0
PROJECT
PHASE
MONTH/
YEAR
PHASE
STARTS
FUND SOURCE INFORMATION
EIS
CE
EA
NA
EXPENDITURE SCHEDULE
(Local Agency)
FEDERALLY FUNDED
PROJECTS ONLY
FEDERAL FUNDING
RAP,
CAPP,
TIA,
DATA,
OTHER
STATE
FUNDS
LOCAL
FUNDS
TOTAL
FEDERAL
FUND
CODE
FEDERAL
COST
BY
PHASE
-
ENVIR.
TYPE
RNV REO
Y/N
DATE
MONTHNR
1st
2nd
3rd
4th
THRU
6th
0.0
CITY -WIDE SIGNAL IMPROVEMENTS 1 121 1 ICPT
P.E.
Jan -99
60.0
0.0
120.0
19 tb
3.0
3.0
:::::: ;:;:
<:
: <::::;F
3.0
12.0
3.0
12.0
9.0
36.0
EIS
CE
EA
NA
YM
DATE
6.3
RAN
6.3
25.0
EIS
CE
EA
INA
0.0::::::x::
CONST
Mar -99
12.0
12.0
TOTAL
CONST
0.0
15.0
15.0
*K:K» 3 $;
15.0
15.0
45.0
NORTH SEATTLE ATMS IMPROVEMENTS 12 CPT
Install peripherals to existing signal systems to enhance
traffic movement by means of an advance transportation
managements stem on primary arterials.
P.E.
Jun -99
31.3
0.0
0.0
19 1c
SEAVIEW & SIERRA PARKS 05 0.25
Construct walkway
0.0
Jan -00
EIS
CE
EA
NA
Y/N
DATE
5.0
R/W
5.0
25.0
EIS
CE
EA
NA
0.0
<:::::::::::tfk8'
CONST
Mar -99
10.0
10.0
TOTAL
Jun-00
0.0
70
10.0
::::::;::{t; @'
0.0
0.0
0.0
14 -:. ix:::
ADVANCED VEHICLE IDENTIFICATION 127-T--7C PT
Install peripherals to existing signal systems on SR -99
to enhance traffic movement by means of an advance
transportation managements stem.
P.E.
Jan -95
0.0
0.0
17 2
MEADOWDALE BEACH RD. - 76TH AVE. W. to OVD 1 05 0.75 CPT
Widen, finish walkway system
P.E.
0.0
:::
EIS
CE
EA
NA
Y/N
DATE
R/W
9.4
37.5
EIS
CE
EA
NA
0.0
CONST
Mar -99
10.0
10.0
<::::::k9
TOTAL
0.0
I
1 10.0
1 10.0
::::::::: 1
o.ol
oni
0.0
OTHER ENHANCEMENT PROJECTS - LOCAL FUNDING
19 1 to
CITYWIDE WALKWAY AND BIKEWAY SYSTEM 05 1 1 1.00 ICPT
Construct bikeways and pedestrian walkways
throughout City per 1992 Comprehensive
Bikeway and Walkway Plan
P.E.
Jan-00
5.0
5.0
10.0
50.0
20.0
100.0
EIS
CE
EA
NA
Y/N
DATE
RAN
0.0
CONST
May-00
25.0
25.0
TOTAL
0.0
30.0
30.0
0.0
60.0
0.0
120.0
19 tb
88TH AVE. W. -204TH ST. S.W. to 200TH ST. S.W. 1 05 1 1 0.251
Construct pedestrian walkway to complete gap in walkway system.
Road settlement issues must be resolved prior to construction.
P.E.
Jan-00
6.3
6.3
6.3
25.0
EIS
CE
EA
INA
Y/N
DATE
RNV
0.0
CONST
Jun -00
25.0
25.0
TOTAL
0.0
31.3
31.3
0.01
31.3
0.0
0.0
19 1c
SEAVIEW & SIERRA PARKS 05 0.25
Construct walkway
P.E.
Jan -00
5.0
5.0
5.0
25.0
EIS
CE
EA
NA
Y/N
DATE
R/W
0.0
CONST
Jun-00
25.0
25.0
TOTAL
0.0
30.0
30.0
0.0
30.0
0.0
0.0
17 2
MEADOWDALE BEACH RD. - 76TH AVE. W. to OVD 1 05 0.75 CPT
Widen, finish walkway system
P.E.
Jan -01
9.4
9.4
9.4
37.5
EIS
CE
EA
NA
Y/N
DATE
RNV
0.0
CONST
Jun -01
37.5
37.5
TOTAL
0.0
1 46.91
46.9
1 0.01
0.01
46.91
0.0
19 3
PIONEER WAY - MAIN ST. to SHELL VALLEY 01 0.40
Alternate emergency services access/egress
into Shell Valley (Possible LID)
P.E.
Jan -02
20.0
20.0
20.0
100.0
EIS
CE
EA
NA
Y/N
DATE
R1W
0.0
CONST
Jun -02
100.0
100.0
TOTAL
0.0
126.-0T--
20.0
120.01
0.01
0.01
0.01
120.0