Loading...
Resolution 9400006.900000 WSS /aaf 12/11/98 RESOLUTION NO. 940 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, AMENDING FEES ADOPTED PURSUANT TO CHAPTER 15.00 OF THE EDMONDS COMMUNITY DEVELOPMENT CODE, AND RESOLUTION NOS. 865 AND 852 TO AMEND THE FEE SCHEDULE FOR APPLICATIONS AND PERMITS PROCESSED BY THE PLANNING, PUBLIC WORKS, BUILDING AND ENGINEERING DEPARTMENTS AS ORIGINALLY ESTABLISHED BY RESOLUTION NO. 852 AND AMENDED BY RESOLUTION NO. 865, AUTHORIZING THE COMMUNITY SERVICES DIRECTOR OR HIS DESIGNEE TO INCORPORATE SUCH CHANGES IN A CONSOLIDATED FEE SCHEDULE AND FIXING A TIME WHEN THE SAME SHALL BECOME EFFECTIVE. WHEREAS, the Edmonds City Council has determined it appropriate to establish fees annually by resolution and to increase such application or permit fees based upon periodic review of such fees; and, WHEREAS, the City Council fmds that it is appropriate to increase certain fees as set forth in attached Exhibit A; and WHEREAS, the City Council finds that the increased revenue generated from such fees should be utilized to pay the additional costs of processing permits in order to speed the permitting process and thereby benefit the development community who will pay the increased fees; now, therefore, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: 218870 -1- Section 1. The City Council hereby amends the fee schedule adopted pursuant to Resolution No. 852 and amended by Resolution No. 865 by adopting the attached Exhibit A Schedule of Fees for the various actions, permits and applications described therein. The Community Services Director or his designee is hereby authorized to consolidate such amendments in a new schedule of fees incorporating the fees originally established by Resolution No. 852 and amended by Resolution No. 865 and this Resolution. Section 2. This Resolution shall take effect with respect to applications for permits filed on or after January 1, 1999. RESOLVED this 15th day of December, 1998. APPROVED: MAYOR, BARBARA S. FAHEY ATTEST /AUTHENTICATED: "0 . excc.c.. CITY CLERK, SANDRA S. CHASE FILED WITH THE CITY CLERK: 12/11/98 PASSED BY THE CITY COUNCIL: 12/15/98 RESOLUTION NO. 940 218870 -2- EXHIBIT A )PLANNING PERMIT FEES "NOTE: Fees listed are for the first permit application (e.g. an application for a variance for reduction of street setback). If additional requests included in the application (e.g. a variance for another setback reduction), then the fee for each additional permit request shall be 50% of the normal application fee, except as provided for consolidated permits. ADB Review -Administrative Waivers $0.00 ADB Review - Major Project (SEPA required) $275.00 ADB Review - Minor Project (SEPA exempt) - Other than signs. $75.00 ADB Review - Minor Project (SEPA exempt) - Signs only. $35.00 Appeals - No transcript required $100.00 Appeals - Transcript required $100.00 +$200.00 deposit for transcript preparation Request for Reconsideration $25.00 Comprehensive Plan Amendments $500.00 Concurrent Permit Applications (ADB and Hearing Examiner) Fee for primary Hearing Examiner permit + 50% of ADB application fee Conditional Use Permit - Reviewed by Hearing Examiner $0.00"` Conditional Use Permit - Reviewed by Hearing Examiner (Other $700.00 than RS zones Conditional Use Permit - Reviewed by Hearing Examiner (RS $350.00 ?ones Conditional Use Permit - Subject to staff review only $100.00 Critical Areas Variance RS Zones $350.00 Critical Areas Variance Other than RS zones $700.00 Critical Areas Reasonable Use Exception RS Zones $350.00 Critical Areas Reasonable Use Exception Other than RS zones $700.00 Critical Areas Reasonable Use Exception - if processed in $400.00 conjunction with a Critical Areas Variance RS Zones Critical Areas Reasonable Use Exception - if processed in $750.00 conjunction with a Critical Areas Variance Other than RS zones ECDC Text Amendment Request $500.00 Environmental Checklist Review $85.00 base fee + billable rate for staff time exceeding 2.5 hrs. Environmental Impact Statement Full cost of city review or preparation Extension of Time (approved permits) $50.00 Housing for the Elderly $50.00 In- Lieu - Parkin Council review only) $75.00 Joint Use of Parking $50.00 Lot Line Adjustment $95.00 + actual recording cost charged by the County Applications which are remanded to a new hearing date for Actual cost of new publication improper /inadequate public notice resulting from application and /or mailing. material, or requests by the applicant to postponed a hearing $50.00 that has already been advertised. $45.00 Planned Residential Development - PRD (Preliminary Review) $800.00 + $25.00 per each unit proposed Planned Residential Development - PRD Final Review $50.00 Request for Review of an Approved Permit $200.00 Rezone $400.00 Rezone - Contract $450.00 Shoreline Substantial Development Permit RS Zones $450.00 Shoreline Substantial Development Permit (Other than RS $750.00 zones Shoreline Conditional Use Permit RS Zones $450.00 Shoreline Conditional Use Permit Other than RS zones $750.00 Shoreline Variance RS Zones $450.00 Shoreline Variance Other than RS zones $750.00 Shoreline Substantial Development Permit - Request for $50.00 Amendment to an approved permit Shoreline Substantial Development Permit - Request for $50.00 Exemption Street Map Change $375.00 Street Vacation $369.00 + cost of appraisal Subdivision - Formal (Preliminary review $700.00 + $25.00 per lot Subdivision - Formal (Final review) $50.00 (+ actual recording cost charged by the County) Subdivision - Formal (If filed with a PRD applic.) $106.00 + $25.00 per lot (+ actual recording cost charged by the County) Subdivision - Short $225.00 (+ actual recording cost charged by the County) Variance - Signs only Other than RS zones $350.00 Variance Other than RS zones $700.00 Variance RS Zones $350.00 Engineering PERMIT FEES Right-of-Way Construction Permit $70.00 Storm Drainage Fee $50.00 Engineering Inspection Fee $50.00 Re-inspection Fee $45.00 AMENDED 1997 UNIFORM BUILDING CODE TABLE 1 -A BUILDING PERMIT FEES $1 -$500 $30 Q1 to $2000 ......................................... ............................... $30 for the first $500 plus $3 for each additional $100, or fraction thereof to and including $2000 $2001 to $25,000 ..................................... ............................... $75 for the first $2000 plus $14 for each additional $1,000 or fraction thereof to and including $25,000 $25,001 to $50,000 .................................. ............................... $400 for the first $25,000 plus $10 for each additional $1,000 or fraction thereof to and including $50,000 $50,001 to $100,000 $650 for the first $50,000 plus $7 for each additional $1,000 or fraction thereof to and including $100,000 $100,001 to $500,000 $1000 for the first $100,000 plus $6 for each additional $1,000 or fraction thereof to and including $500,000 $500,001 to $1,000,000 $3,400 for the first $500,000 plus $5 for each additional $1,000 or fraction thereof to and including $1,000,000 $1,000,001 and up $5,900 for the first $1,000,000 plus $4 for each additional $1000 or fraction thereof. Other Fees: 1. Plan review fees in addition to building permit fees are assessed at a rate of 65% of the calculated building permit fee. 2. Inspections outside of normal business hours $45 per hour (minimum charge one hour). 3. Re- inspection fees and inspections for which no fee is specifically indicated, assessed under provisions of UBC 305.8, $45 per hour (minimum charge one hour). 4. Additional plan review required by changes, additions or revisions to plans $45 per hour (minimum charge one hour). " For use of outside consultants for plan checking and i inspections, or both, based on actual costs including supervision, overhead, equipment, hourly wages and fringe benefits of employees involved. AMENDED 1997 UNIFORM BUILDING CODE TABLE A -33 -A GRADING PLAN REVIEW FEES 50 cubic yards (38.2 m) or less, when located in a designated critical area ................................................ ............................... $ 30.00 51 to 100 cubic yards (40 m3 to 76.5 m3) ...................................................................................................... ............................... $ 60.00 101 to 1,000 cubic yards (77.2m3 to 764.6 m3) .......... ............ $120.00 ........................................................................ ............................... 1,001 to 10,000 cubic yards (765.3 & to 7645.5 m3) ............................................................ ............................... ........................$240.00 10,001 to 100,000 cubic yards (7646.3 m3 to 76 455 m3) -- $240.00 for the first 10,000 cubic yards (7645.5 m3), plus $100.00 for each additional 10,000 yards (7645.5 m3) or fraction thereof. 100,001 to 200,000 cubic yards (76 456 m3 to 152 911 m3) 41140.00 for the first 100,000 cubic yards (76 455 m3), plus $100.00 for each additional 10,000 cubic yards (7645.5m3) or fraction thereof. 200,001 cubic yards (152 912 m3) ormore -- $2040.00 for the first 200,000 cubic yards (152911m3), plus $100.00 for each additional 10,000 cubic yards (7645.5 m3) or fraction thereof. Other Fees: Additional plan review required by changes, additions or revisions to approved plans ................. ............................... $75.00 per hour (minimum charge - one -hour) AMENDED 1997 UNIFORM BUILDING CODE TABLE A -33 -B GRADING PERMIT FEES Basepermit fee ....................................................................................................................... ............................... .........................$30.00 50 cubic yards (38.2m3) or less, when located in a designated critical area ............................ ............................... .........................$60.00 51 to 100 cubic yards (40 m3 to 76.5m3) .......................................................................................................... ............................... $60.00 101 to 1,000 cubic yards (77.2m3 to 764.6 m3) -- $120.00 for the first 100 cubic yards (76.5 m3) plus $20.00 for each additional 100 cubic yards (76.5 m3) or a fraction thereof. 1,001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3) -- $300.00 for the first 1,000 cubic yards (764.6 m3), plus $40.00 for each additional 1,000 cubic yards (764.6 m3) or fraction thereof. 10,001 to 100,000 cubic yards (7646.3 m3 to 76 455 m3) -- $660.00 for the first 10,000 cubic yards (7645.4 m3), plus $60.00 for each additional 10,000 cubic yards (7645.5 m3) or fraction thereof. 100,001 cubic yards (76 456 m3) or more -- $1200.00 for the first 100,000 cubic yards (76 455 m3), plus $90.00 for each additional 10,000 cubic yards (7645.5 m3) or fraction thereof. Other Inspections and Fees: 1. Inspections outside of normal business hours (minimum charge - one hour) .......................... ............................... $45.00 per hour 2. Re- inspection fees assessed under provisions of UBC Section 108. 8 ....................................... ............................... $45.00 per hour 3. Inspections for which no fee is specifically indicated (minimum charge - one - hour) .............. ............................... $45.00 per hour AMENDED FEE SCHEDULE 1997 UNIFORM PLUMBING CODE TABLE 1 -1 PLUMBING PERMIT FEES Base Permit Fee for Processing 1. For the issuance of each plumbing permit ......... ............................... ..................... ............................... $30.00 2. For the issuance of each plumbing permit not associated with a current building permit ................... $60.00 Unit Fee Schedule (NOTE: Base permit issuing fee not included) 1. For each plumbing fixture on one trap or a set of fixtures on one trap (including water, drainage Other Inspections and Fees 1. Re- inspection fee ................................................................................................... ............................... $45.00 2. Inspections for which no fee is specifically indicated ........................................... ............................... $45.00 3. Additional plan review required by changes, additions or revisions to approved plans per hour charge (minimum charge -one -hour) ..................................................................... ............................... $45.00 4. For swimming pool, spa, etc. permit fees refer to 1997 Swimming Pool, Spa and Hot Tub Code Table 1 -1. drainage piping and backflow protection) ............................................................. ............................... $10.00 2. For each building sewer and each trailer park sewer (does not include trunk or LID charges) ........... $60.00 3. Rainwater systems - per drain (inside building) ................................................... ............................... $30.00 4. For each cesspool where permitted) ............................... $50.00 5. For each private sewage disposal system .............................................................. ............................... $60.00 6. For each water heater and/or vent and each expansion tank ................................. ............................... $10.00 7. For each gas - piping system of one to five outlets ................................................. ............................... $20.00 8. For each additional gas piping system outlet, per outlet ....................................... ............................... $ 2.00 9. For each industrial waste pretreatment interceptor including its trap and vent, except kitchen - type grease inceptors functioning as fixture traps ................................................. ............................... $30.00 10. For each installation, alteration or repair of water piping and/or water treating equipment, each....... $30.00 11. For each repair or alteration of drainage or vent piping, each fixture ................... ............................... $10.00 ' ^ For each lawn sprinkler system on any one meter including backflow protection devices thereof..... $30.00 For atmospheric -type vacuum breakers not included in item 12: 1 to 5 ...................................................................................................................... ............................... $10.00 over5, each ............................................................................................................. ............................... $ 2.00 14. For each backflow protective device other than atmospheric type vacuum breakers: 2 inch (51 mm) diameter and smaller .................................................................... ............................... $30.00 over2 inch (51 mm) diameter ............................................................................... ............................... $40.00 15. For each graywater system .................................................................................... ............................... $60.00 16. For initial installation and testing for a reclaimed water system ........................... ............................... $60.00 17. For each annual cross - connection testing of a reclaimed water system (excluding initial test) .......... $30.00 18. For each medical gas piping system serving one to five inlet(s) /outlet(s) for a specific gas ............... $90.00 19. For each additional medical gas inlet(s) /outlet(s) ................................................. ............................... $10.00 20. For each grease trap less than 55 gallons per minute ............................................ ............................... $30.00 21. For each grease trap greater than 55 gallons per minute ....................................................................... $80.00 22. For each grease interceptor .......................................................... ............................... I....................... $120.00 Other Inspections and Fees 1. Re- inspection fee ................................................................................................... ............................... $45.00 2. Inspections for which no fee is specifically indicated ........................................... ............................... $45.00 3. Additional plan review required by changes, additions or revisions to approved plans per hour charge (minimum charge -one -hour) ..................................................................... ............................... $45.00 4. For swimming pool, spa, etc. permit fees refer to 1997 Swimming Pool, Spa and Hot Tub Code Table 1 -1. AMENDED FEE SCHEDULE 1997 UNIFORM MECHANICAL CODE TABLE 1 -A MECHANICAL PERMIT FEES Base Permit Fee for Processing 1. For the issuance of each mechanical permit .......................................................................................... ............................... $30.00 2. For the issuance of each mechanical permit not associated with a current building permit .................. ............................... $90.00 Unit Fee Schedule (Note: Base permit fee for processing not included.) 1. Furnaces For the installation/relocation of each forced -air or gravity -type furnace or burner, including ducts and appliance vent up to and including 100,000 Btu/h (29.3kW) ........................................................ ............................... ..........................20.00 For the installation/relocation of each forced -air or gravity -type furnace or burner, including ducts and appliance ventover 100,000 Btu/h ( 29. 3kW) ................................................................................ ............................... ..........................30.00 For the installation/relocation of each floor furnace, including vent ............................. ............................... ..........................20.00 For the installation/relocation of each suspended heater, recessed wall heater or floor - mounted unit heater ........................25.00 2. Appliance Vents For the installation, relocation/replacement of each appliance vent installed (i.e., Type B, BW, L gas vent, etc.) ................10.00 3. Repairs or Additions For the repair, alteration or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls ...... ..........................15.00 4. Boilers, Compressors and Absorption Systems /Air Conditioning Systems For the installation/relocation of each boiler or compressor up to and including 3 horsepower (10.6kW), or each absorption system up to and including 100,000 Btu/h (29.3kW) .................................. ............................... ..........................20.00 For the installation/relocation of each boiler or compressor over 3 horsepower (10.6KW) up to and including 15 horsepower (52.7kW), or each absorption system over 100,000 Btu/h (29.3kW) up to and including 500,000 Btu/h (146.6kW) ..................................................................................................................... ............................... ...........................30.00 For the installation or relocation of each boiler or compressor over 15 horsepower (52.7kW) up to and including 30 horsepower (105.5kW), or each absorption system over 500,000 Btu/h (146.6kW) to and including 1,000,000 Btu/h (293.1kW) ..................................................................................................................... ............................... ..........................40.00 For the installation or relocation of each boiler or compressor over 30 horsepower (105.5kW) up to and including 50 horsepower (176 kW), or each absorption system over 1,000,000 Btu/h (293.1 kW) to and including 1,750,000 Btu/h (512.9 kW) .................................................................................................................... ............................... ..........................60.00 For the installation or relocation or each boiler or compressor over 50 horsepower (176 kW), or each absorption system over 1,750,000 Btu/h (512.9 kW) ...................................................................... ............................... ..........................95.00 5. Air Handlers For each air - handling unit up to and including 10,000 (cfrn) (4719 L /s), including ducts (i.e., diffusers, blowers, etc.) ......20.00 For each air - handling unit over 10,000 cfm (4719 L /s) including ducts ....................... ............................... ..........................30.00 6. Evaporative Coolers For each evaporative cooler other than portable type .................................................... ............................... ..........................15.00 7. Ventilation and Exhaust For each ventilation fan connected to single duct (i.e., bath, laundry, kitchen exhaust, etc.) ....................... ..........................10.00 For each ventilation system which is not a portion of any heating or air - conditioning system authorized by a permit ......... 10.00 For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood ......................30.00 8. Incinerators For the installation or relocation of each domestic type incinerator .............................. ............................... ..........................20.00 For the installation or relocation of each commercial or industrial -type incinerator ............................... ............................... 50.00 9. Miscellaneous For each appliance or piece of equipment regulated by the UMC for which no other fee is listed (i.e. fire dampers, etc.) ... 20.00 Other Inspections and Fees 1. Re- inspection fees assessed under provisions of UMC Section 116.6, per hour charge (minimum charge -one hour) ..........45.00 2. Inspections forwhich no fee is specifically indicated, per hour charge (minimum charge— one -hour) ......... ..........:..............45.00 3. Additional plan review required by changes, additions or revisions to plans or to plans for which an initial review has been completed per hour charge minimum charge—one hour ......... ..........................45.00 Edmonds Community Development Code Chapter 15.00 C. Building Fees 1. Fees are established pursuant to Title 19 of the Edmonds Community Development Code. Unless provided otherwise by this section the established fees shall apply. The following fees shall govern applications for permits specified below: 2. Building Permits fees shall be charged at the following rate: a) Commercial Permits: All permits relating to other than residential permits as described below shall be calculated at the rate established in the amended Building Permit Fee Schedule based on 120% of Table 1 -A of the 1997 edition of the Uniform Building Code on file with the City Clerk and City Building Official. b) Residential Permits: Permits for the construction including remodels and additions of single - family residences along with accessory structures such as carports shall be calculated at the rate established in the amended Building Permit Fee Schedule based on Table 1 -A of the Uniform Building Code on file with the City Clerk and City Building Official. c) The determination of value or valuation under the provisions of the 1997 Uniform Building Code shall be based on the latest edition of Building Valuation Data as published in Building Standards or Codes Forum magazine, on file with the City Building Official. d) Plan Review fees: When submittal documents require a plan review, a fee shall be paid at the time of application submittal. Plan review fees shall be 65% of the calculated building permit fee, are non- refundable, and are separate and in addition to, all other applicable review and building permit fees. 3. Adult Family Home Compliance permit: $120. 4. Base Building Permit Processing Fee: $30. 5. Cellular Communications permit: Fee based on licensed contractors bid, based on the amended fee schedule of Table 1 -A of the 1997 Uniform Building Code. 6. Change of Use permit: $90. 7. Deck, dock, sport court, stair and ramp: The construction valuation shall be calculated at $12 per square foot and the fee shall be based on the amended building permit fee schedule of Table 1 -A of the 1997 Uniform Building Code. 8. Demolition permit: $180 for primary structure, $50 for secondary structures (i.e., carports, sheds, garages, etc.) 9. Drainage Inspection Fee: $50 per inspection. 10. Drainage Review Fee: $45 per hour, one hour charge minimum. 11. Drainage of Swimming Pool into City Sewer System permit: $50. 12. Factory Built Structure permit: $360 base fee. Foundation and roof framing construction valuation based on licensed contractors bid based on the amended building permit fee schedule of Table 1 -A of the 1997 Uniform Building Code. 13. Fence permit: $40. 14. Fire Alarm permit: $150. 15. Fire Sprinkler permit: Fees based on licensed contractors bid for the work, based on the amended building permit fee schedule of Table 1 -A of the 1997 Uniform Building Code. 15. Grading and fill permit fees: Fees established per the amended Grading Permit Fee Table 33 -A and A -33 -B of the 1997 edition of the 1997 Uniform Building Code. Copy on file with the City Clerk and City Building Official. 16. Grease Interceptor: $120. 17. Grease Trap: $60. 18. Hot Tub and Spa: $50 for single family use provided the unit is above grade. Licensed contractors bid for all other installations based on the amended building permit fee schedule of Table 1 -A of the 1997 Uniform Building Code. 19. Housing Compliance Inspection: $90 per unit. 20. Hourly Inspection Rate: $45 per hour, one hour minimum. 21. In -Lieu of Parking Inspection Fee: $45 per hour, one hour minimum. 22. Investigation Fee: Investigation fees are in addition to permit fees and are required whenever work for which a permit is required has been commenced without first obtaining a permit. The investigation fee shall be equal to the amount of the permit fee. 23. Landscaping Inspection fee: 1% of approved landscaping bond amount. 24. Lawn SprinklerBackflow Check Valve Inspection: $30. 25. Manufactured Coach permit (commercial applications only with valid Conditional Use Permits): $360. 26. Meadowdale Landslide Ordinance review fees at full cost to applicant. 27. Meadowdale Landslide Ordinance Administrative Processing Fee: $150.00. 28. Mechanical Permits: Fees shall be charged based on the amended Mechanical Permit Fee schedule of the 1997 Uniform Mechanical Code. Fee table on file with the City Clerk and City Building Official. 29. Mobile Home Installation permit: $120 when located within designated mobile home parks. 30. Parking Lot permit: Fee based on licensed contractors bid, based on the amended building permit fee schedule of Table 1 -A of the 1997 Uniform Building Code. 31. Plumbing Permits: Fees shall be charged based on the amended Plumbing Permit Fee schedule of the 1997 Uniform Plumbing Code. Fee table on file with the City Clerk and City Building Official. 32. Relocation of Building permit: $100 within City limits, $100 plus $45 per hour outside City limits, one hour minimum. 33. Re- inspection Fee: $45 per hour, 'one hour minimum. 34. Re- Roofmg: Fee for commercial buildings based on licensed contractors bid and based on the amended building permit fee schedule of Table 1 -A of the 1997 Uniform Building Code. For single family re -roofs with no structural changes the fee is $25,' if structural changes occur the permit fee is based on a licensed contractors bid. 35. Rockery and Retaining Wall: $90 base fee plus structural plan review fee when applicable at $45 per hour. 36. Satellite Television Antenna: In addition to any fee imposed by ECDC 16.20.030 a flat fee of $30- shall be charged for inspection of satellite television and antenna installations for single family applications. Commercial projects shall be based on a licensed contractors bid and be based on the amended building permit fee schedule of Table 1 -A of the 1997 Uniform Building Code. 37. Sign Permit: $60 base fee plus $2 per square foot of sign area. Additional structural review fees may be charged when applicable (i.e., free standing pole signs, monument signs, etc.). 38. Street Use Permit: $50 issued on a three year cycle (the next cycle ends January 1, 1999). Street Use permit renewal fee $25 annually. 39. Swimming Pool: In ground pool fees based on licensed contractors bid and based on the amended building permit fee schedule of Table 1 -A of the 1997 Uniform Building Code. Above grade single family private pools $50. 40. Underground Tank (fill, remove, install): $40 per tank. 41. Woodstove/Insert/Pellet Stove permit: $40. i