Loading...
Resolution 7190006.190.012 JDW /naa 05/28/91 RESOLUTION NO. 719 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 RCW, the City Council of the City of Edmonds has previously adopted a Comprehensive Street Program, including an arterial street construction program, and thereafter periodically modified said Comprehensive Street Program by resolution, and WHEREAS, the City Council has reviewed the work accomplished under the said Program, determined current and future City street and arterial needs, and based upon these findings has prepared a Six -Year Transportation Improvement Program for the ensuing six (6) calendar years, and WHEREAS, a public hearing has been held on the said ' Six -Year Transportation Improvement Program, and WHEREAS, the City Council finds that there will be no significant adverse environmental impacts as a result of adoption or implementation of the Six -Year Transportation Improvement Program, NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. The Six -Year Transportation Improvement Program for the City of Edmonds, as JDW01191E -1- J I , revised and extended for the ensuing six (6) calendar years (1992 -1997, inclusive), a copy of which is attached hereto as Exhibit A and incorporated herein by this reference as if fully set forth, which Program sets forth the project location, type of improvement and the estimated cost thereof, is hereby adopted and approved. Section 2. Filing of Program. Pursuant to Chapter 35.77 RCW, the City Clerk is hereby authorized and directed to file a copy of this resolution forthwith,-together with the Exhibit attached hereto, with the Secretary of Transportation and a copy with the Transportation Improvement Board for the State of Washington. RESOLVED this 18th day of June , 1991. APPROVED: MAY S. NAUGHTEN ATTEST /AUTHENTICATED: CIT CLERK, JACQUELINE PARRETT FILED WITH THE CITY CLERK: June 18, 1991 PASSED BY THE CITY COUNCIL: June 18, 1991 RESOLUTION NO. 719 JDW01191E -2- SA 6 HI 0.11 14 X 75 62 FAGS 13 75 City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Item #1, Page #2) Hearing Date JUNE 4, 1991 PG #1 City No 0365 1992 -1998 0.10 16 96 Adoption Date DONE 18, 1991 96 County No. 31 Resolution No._ 719 ; 3 WOODWAY HIGH SCHOOL ENTRANCE and 100TH AVE. W. 6 I 0.10 16 X 96 80 P PROJECT IDENTIFICATION m T F C; PROJECT COSTS IN THOUSANDS OF DOLLARS r a 0 0 A; 10 ; i DESCRIPTION OF WORE jo work T L N R; OBLIGATION FUNDING SOURCE ;TOTAL o f code A E C R; SCHEDULE X 146 ;---------------------------- RRP r (Street name or number, c (s) L N TC Y; Y E A R ;FEDERAL ; RAP ; ;FONDS i Co. road name or number, lw G ML 0; - - - - - - - - - ; or ;Local; t termini beginning & end. ao T LA V;lst 2nd 3rd 4,5 ; Pro -;AMT OAB y Describe work to be done.) sr H S R;Annl 6th ;AMY gram; 96 No sk S R; Rlmt 1 2 3; 4 5 6 M 8 9 10 11 ; 12 13; 14 15; 16 ; 17 --------------------------------------------------------------------------------------------------------------------------------- TRAFFIC SIGNALIZATION, CHANNELIZATION PROJECTS ---------------------=-------------------------------- ------------------------------------------------------ 1 SR 99 and 216TH ST. S.W. 6 HI 0.11 14 X 75 62 FAGS 13 75 Install new signal 6 channelization on our half of intersection (see Item #1, Page #2) 2 212TH ST. S.W. and 72ND AVE. W. 6 flI 0.10 16 96 80 FAGS 16 96 Install traffic /pedestrian actuated signal 3 WOODWAY HIGH SCHOOL ENTRANCE and 100TH AVE. W. 6 I 0.10 16 X 96 80 FAGS 16 96 Replace timed controller with traffic /pedestrian actuated signal 4 220TH ST. S.W. and 9TH AVE. S. 6 H 0.10 16 10 10 10 Channelization improvements to enhance traffic safety 5 DAYTON STREET RAILROAD CROSSING IMPROVEMENTS 6 JE 0.01 17 X 146 137 RRP 9 146 Improve protection devices & approaches, lighting 6 CASPERS ST. and 7TH AVE. N. 3 G 0.01 19 3 3 3 Obtain easement, increase curb return radius, relocate sidewalk 7 WALNUT ST. and 9TH AVE. S. 6 HI 0.10 16 96 80 FADS 16 96 Install traffic /pedestrian actuated signal 8 220TH ST. S.W. and 9TH AVE. S. 6 HI 0.10 16 X 96 80 FADS 16 96 Install traffic /pedestrian actuated signal & channelization (see Item 14, page #2) 9 220TH ST. S.W. and 84TH AVE. W. 6 HI 0.10 17 96 80 FADS 16 96 Replace 4 -way flasher with actuated signal (see Item #4, Page #2) 10 MAIN ST. and 9TH AVE. 6 HI 0.10 16 96 80 FADS 16 96 Install traffic /pedestrian actuated signal 11 SR 524 and 88TH AVE. W. 6 HK 0.10 14 10 10 10 Channelization improvements 12 MAIN ST, and 7TH AVE. 6 JE 0.10 16 10 10 10 Install pedestrian actuated crosssing flasher 13 200TH ST. S.W. and 76TH AVE. W. 6 HI 0.10 16 48 40 FADS 8 48 Install new signal & channelization on our half of intersection (Lynnwood to do their half of $96,000 project) 14 224TH ST. S.W. and 76TH AVE. W. 6 HI 0.10 17 96 80 FADS 16 96 Replace 4 -way flasher with actuated signal 15 212TH ST. S.W. and BOTH AVE. W. 6 flI 0.10 16 96 80 FAGS 16 96 Install traffic /pedestrian actuated signal 16 PINE ST. and SR -104 6 HIET 0.10 14 96 80 FAGS 16 96 Install traffic /pedestrian actuated signal 17 CITY WIDE SIGNAL IMPROVEMENTS 6 flI 0.10 20 20 20 60 120 120 SA 2 BDFGH 2.30 14 0*0 12000 TIB 200 12200 City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Hearing Date JUNE 4, 1991 PG #2 City No 0365 1992 -1998 100 83 FAGS 17 Adoption Date JUNE 18, 1991 County No. 31 ----------------------------------------------------------------------------------------------------------------------------------- Resolution No._ 719 2 200TH ST. S.W. -- 88th Ave. W. to 76th Ave. W. 1 ADFGH ----------------------------------------------------------------------------------------------------------------------------------- P PROJECT IDENTIFICATION m T F C; PROJECT COSTS IN THOUSANDS OF DOLLARS r a 0 0 A 3 220TH ST. S.W. -- SR 99 to 76th Ave. W. 2 BFGH i DESCRIPTION OF WORE jo work T L N R; OBLIGATION FUNDING SOURCE ;TOTAL o f code A E C R; SCHEDULE ;---------------------------- 2 ADFGI r (Street name or number, c (s) L N TC Y; Y E A R ;FEDERAL ; RAP ; ;FONDS i Co. road name or number, lw G NL O; - - - - - - - - - ; or ;Local; t termini beginning A end. ao T LA V11st 2nd 3rd 4,5 ; Pro -;ANT UAB y Describe work to be done.) Br H S E;Annl 6th ;ANT gram; 1 ADFGI No 19 sk S R;Elmt New street connection into College Place area 1 2 3; 4 5 6 M 8 9 10 11 ; 12 13; 14 15; 16 ; 17 --------------------------------------------------------------------------------------------------------------------------------- ROADWAY CONSTRUCTION, RESTORATION PROJECTS ------------------------------------------------------ ------------------------------------------------------ 1 SR 99 -- 244th St. S.W. to 210th St. S.W. 2 BDFGH 2.30 14 0*0 12000 TIB 200 12200 Construct curb and gutter, overlay, widen to 7 lanes (Lynnwood lead) 2 200TH ST. S.W. -- Maplewood Dr. to 88th Ave. W. 1 ADFGH 0.15 17 100 83 FAGS 17 100 Reconstruct and realign, as indicated by study 2 200TH ST. S.W. -- 88th Ave. W. to 76th Ave. W. 1 ADFGH 0.75 19 500 500 500 Reconstruct and realign, as indicated by study 3 220TH ST. S.W. -- SR 99 to 76th Ave. W. 2 BFGH 0.21 17 80 80 80 Widen to 6 lanes 4 220TH ST.S.W. -- 9th Ave. S. to 84th Ave. W. 2 ADFGI 1.00 17 2000 1663 FADS 337 337 Arterial street widening with Snohomish County 5 MAIN ST. -- 9th Ave. to 84th Ave. W 5 DH 1.15 17 150 125 FADS 25 150 Grind pavement, overlay to strengthen, restore ride 6 72ND AVE. W. -- 210th St. S.W. to 212th St. S.W. 1 ADFGI 0.11 19 60 60 60 New street connection into College Place area 7 STREET OVERLAY PROGRAM FOR 1992 5 DH 3.50 19 160 160 160 Pavement overlays to strengthen, restore ride 8 76TH AYR. W. -- 212th St. S.W. to 196th St. S.W. 5 DH 1.00 17 100 83 FAGS 17 100 Grind pavement, overlay to strengthen, restore ride -- joint project with Lynnwood - they pay 1001 also 9 OLYMPIC VIEW DR. -- SR524 to 88th Ave. W. 5 DH 1.21 17 120 120 120 Pavement overlay to strengthen, restore ride 10 STREET OVERLAY PROGRAM FOR 1993 5 DH 3.50 19 160 160 160 Pavement overlays to strengthen, restore ride 11 74TH AVE. W. - -208th St. S.W. to 209th St. S.W. 5 DFGH1 0.06 19 8 8 8 Pavement overlay, widening, install curb A gutter 12 STREET OVERLAY PROGRAM FOR 1994 5 DH 3.50 19 160 160 160 Pavement overlays to strengthen, restore ride 13 ADMIRAL WAY LOOP TO SR -104 1 ADFGT 0.75 14 5000 5000 Construct roadway with grade separation to new ferry terminal 14 CITY WIDE STREET IMPROVEMENTS, RESTORATION 4 DH 5.00 17 25 25 25 75 150 150 15 CITY WIDE DRAINAGE IMPROVEMENTS, RESTORATION 4 B 5.00 17 25 25 25 75 150 150 sA 3 FN 0.60 19 75 Construct walkway on south side of roadway City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 35 45 45 Hearing Date JUNE 4, 1991 PG 13 City No 0365 1992 -1998 5 Construct walkway on one side of roadway Adoption Date JOKE 18, 1991 County No. 31 3 200TH ST. S.W. -- Maplewood Dr. to 86th Ave. W. 1 Resolution No._ 719 0.15 17 P PROJECT IDENTIFICATION m T F C, PROJECT COSTS IN THOUSANDS OF DOLLARS r S.W. -- 88tb Ave. W. to 76th Ave. W. a 0 U A 36 Construct i DESCRIPTION OF WORK jo work T L N R; OBLIGATION FUNDING SOURCE ;TOTAL o FN f code A E C R; SCHEDULE ;---------------------------- r (Street name or number, c (s) L N TC Y; Y E A R ;FEDERAL ; RAP ; ;FONDS i Co. road name or number, IN G NL 0; - - - - - - - - - ; or ;Local; t termini beginning A end. so T LA V;lst 2nd 3rd 4,5 ; Pro -;AMT UAB ; y Describe work to be done.) sr H S R;Annl 6th ;ANT gram; 3 No 0.25 sk S R; Rlmt 1 2 3; 4 5 6;7; 8 9 10 11 ; 12 13; 14 15; 16 ; 17 --------------------------------------------------------------------------------------------------------------------------------- STREET IMPROVEMENT /WALKWAY PROJECTS ------------------------------------------------------ ------------------------------------------------------ 1 N. NEADOWDALE RD. -- 75th Ave. W. to 68th Ave. W. 3 FN 0.60 19 75 Construct walkway on south side of roadway 130 108 FADS 22 130 35 35 35 45 45 2 CASPERS ST. -- Sunset Ave. to 3rd Ave. N. 3 FN 0.10 19 5 Construct walkway on one side of roadway 3 200TH ST. S.W. -- Maplewood Dr. to 86th Ave. W. 1 FN 0.15 17 7 Construct walkway on one side of roadway (See Item #2, Page 02) 3 200TH ST. S.W. -- 88tb Ave. W. to 76th Ave. W. 1 FN 0.75 19 36 Construct walkway on one side of roadway (See Item #2, Page #2) 4 MAPLEWOOD DR. -- Main St. to 200th St. S.W. 3 FN 0.50 17 X 24 Construct walkway on at least one side of roadway 5 PIONEER WAY -- Main St. to Shell Valley 1 ADFGK 0.40 19 X Alternate emergency services access /egress into Shell Valley 6 76TH AVE. W. -- N'dale Beach Rd. to N. M'dale Rd. 3 FN 0.80 17 X Construct walkway on at least one side of roadway 7 9TH AVE. N. -- Puget Dr. to Caspers St. 3 N 0.25 14 Construct walkway on west side of roadway 8 MEADOWDALE BEACH ED. -- 76th Ave. W. to OVD 3 FN 0.75 17 X Widen, finish walkway system 9 176TH ST. S.W. -- 72nd Ave. W. to Olympic View Dr. 3 FN 0.25 19 Construct walkway on at least one side of roadway 10 68TH AVE. W. -- N. Neadowdale Rd. to 160th St. S.W 3 FN 0.50 19 Widen, finish walkway system 11 80TH AVE. W. -- 218th St. S.W. to 220th St. S.W. 3 FN 0.10 19 Construct walkway on at least one side of roadway 12 SEAVIEW & SIERRA PARKS 3 N 0.25 19 Construct walkway 13 YOST & PINR RIDGE PARKS 3 N 0.40 19 Construct walkway 14 MAPLEWOOD PARK 3 N 0.40 19 Construct walkway 15 88TH AYR. W. -- 204th St. S.W. to 200th St. S.W. 3 FN 0.25 19 Widen and construct walkway on one side of road 16 102ND PL. S.W. -- Woodway H.S. to SR 104 3 N 0.25 17 Construct walkway 75 75 5 5 6 FADS 1 7 36 36 20 FAGS 4 24 200 LID 200 200 80 80 80 25 25 25 130 108 FADS 22 130 35 35 35 45 45 45 10 10 10 20 20 20 20 20 20 20 25 25 17 CITY -WIDE TRAIL SYSTEM 3 N 1.00 19 50 50 50 150 Construct pedestrian trails 18 CITY -WIDE BICYCLE SYSTEM 3 N 1.00 19 50 50 50 150 Construct bicycle paths 20 20 25 25 25 25 50 50 50 50 SA 6 HI 0.10 16 96 80 FAGS ; City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Hearing Date JUNE 4, 1991 PG N4 City No 0365 1992 -1998 - WOODWAY HIGH SCHOOL ENTRANCE and 100TH AVE. W. 6 I Adoption Date JUNE 18, 1991 X 96 County No. 31 16 96 Replace timed controller with traffic /pedestrian actuated signal Resolution No._ 719 P PROJECT IDENTIFICATION m T F C; PROJECT COSTS IN THOUSANDS OF DOLLARS r 10 a 0 U A i DESCRIPTION OF WORE jo Rork T L N R; OBLIGATION FUNDING SOURCE ;TOTAL o 12000 TIB 200 f code A E C R; SCHEDULE ;---------------------------- r (Street name or number, c (s) L N TC Y; Y E A R ;FEDERAL ; RAP ; ;FONDS i Co. road name or number, IN G HL 0; - - - - - - - - - ; or ;Local; t termini beginning A end. ao T LA V;lst 2nd 3rd 4,5 ; Pro -;ANT UAB y Describe work to be done.) sr H S E;Annl 6th ;ANT gram; No sk - 200TH ST. S.W. -- Maplewood Dr. to 76th Ave. W. S R; Rlmt 0.90 17 1 2 3; 4 5 6M 6 9 10 11 ;12 13; 14 15;16 ; 17 --------------------------------------------7------------------------------------------------------------------------------------ IMPROVEMENTS TO BE CONSTRUCTED IN 1992 ------------------------------------------------------ ------------------------------------------------------ - 212TH ST. S.W. and 72ND AVE. W. 6 HI 0.10 16 96 80 FAGS 16 96 Install traffic /pedestrian actuated signal - WOODWAY HIGH SCHOOL ENTRANCE and 100TH AVE. W. 6 I 0.10 16 X 96 80 FADS 16 96 Replace timed controller with traffic /pedestrian actuated signal - 220TH ST. S.W. and 9TH AVE. S. 6 H 0.10 16 10 10 10 Channeliaation improvements to enhance traffic safety - SR 99 -- 244th St. S.W. to 210th St, S.W. 2 BDFGH 2.30 14 12000 TIB 200 12200 Construct curb and gutter, overlay, widen to 7 lanes (Lynnwood lead) - DAYTON STREET RAILROAD CROSSING IMPROVEMENTS 6 JE 0.01 17 X 146 137 RRP 9 146 Improve protection devices & approaches, lighting - CASPERS ST. and 7TH AVE. N. 3 G 0.01 19 3 3 3 Obtain easement, increase curb return radius, relocate sidewalk - 200TH ST. S.W. -- Maplewood Dr. to 76th Ave. W. 1 ADFGH 0.90 17 600 83 FAGS 517 600 Reconstruct and realign, as indicated by study - 220TH ST. S.W. -- SR 99 to 76th Ave. W. 2 BFGB 0.21 17 80 80 80 Widen to 6 lanes - 220TH ST.S.W. -- 9th Ave. S. to 84th Ave. W. 2 ADFGI 1.00 17 2000 1663 FADS 337 2000 Arterial street widening with Snohomish County - MAIN ST. -- 9th Ave. to 84th Ave. W 5 DH 1.15 17 150 125 FAGS 25 150 Grind pavement, overlay to strengthen, restore ride - 72ND AVE. W. -- 210th St. S.W. to 212th St. S.W. 1 ADFGI 0.11 19 60 60 60 New street connection into College Place area - STREET OVERLAY PROGRAM FOR 1992 5 DH 3.50 19 160 160 160 Pavement overlays to strengthen, restore ride - H. NEADOWDALE RD. -- 75th Ave. W. to 68th Ave. W. 3 FM 0.60 19 75 75 75 Construct walkway on south side of roadway - CASPERS ST. -- Sunset Ave. to 3rd Ave. N. 3 FN 0.10 19 5 5 5 Construct walkway on one side of roadway - MAPLEWOOD DR. -- Main St. to 200th St. S.W. 3 FN 0.50 17 X 24 20 FAGS 4 24 Construct walkway on at least one side of roadway - CITY -WIDE TRAIL SYSTEM 3 N 1.00 19 50 50 50 Construct pedestrian trails - CITY -WIDE BICYCLE SYSTEM 3 N 1.00 19 50 50 50 Construct bicycle paths - CITY WIDE STREET IMPROVEMENTS, RESTORATION 4 DR 5.00 17 25 25 25 - CITY WIDE DRAINAGE IMPROVEMENTS, RESTORATION 4 B 5.00 17 25 25 25 - CITY WIDE SIGNAL IMPROVEMENTS 6 HI 0.10 20 120 120 SA 6 HI 0.11 14 X 75 62 FADS 13 City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (see Item 01, Page #2) Hearing Date JUNE 4, 1991 PG #5 City No 0365 1992 -1998 6 HI 0.10 16 Adoption Date JUNE 18, 1991 FAGS County No. 31 96 Install traffic /pedestrian actuated signal Resolution No._ 719 P PROJECT IDENTIFICATION m T F C; PROJECT COSTS IN THOUSANDS OF DOLLARS r 80 a 0 U All signal ; i DESCRIPTION OF WORE jo work T L N R; OBLIGATION FUNDING SOURCE ;TOTAL o 2000 f code A E C R; SCHEDULE ;---------------------------- r (Street name or number, c (s) L N TC Y; Y E A R ;FEDERAL ; RAP ; ;FONDS i Co. road name or number, lw G NL 0; - - - - - - - - - ; or ;Local; t termini beginning & end. ao T LA V;lst 2nd 3rd 4,5 ; Pro -;AMT UAB y Describe work to be done.) or H S Nnnl 6th ;ANT gran; No 60 sk S R;Elmt 1 2 3; 4 5 6;7; 8 9 10 11 112 13; 14 15; 16 ; 17 --------------------------------------------------------------------------------------------------------------------------------- IMPROVEMENTS TO BE CONSTRUCTED IN 1992 WITH FADS FUNDING --------------------------------------------------------------- --------------------------------------------------------------- - SR 99 and 216TH ST. S.W. 6 HI 0.11 14 X 75 62 FADS 13 75 Install new signal & channelization on our half of intersection (see Item 01, Page #2) - 212TH ST, S.W. and 72ND AVE. W. 6 HI 0.10 16 96 80 FAGS 16 96 Install traffic /pedestrian actuated signal - WOODWAY HIGH SCHOOL ENTRANCE and 100TH AVE. W. 6 I 0.10 16 X 96 80 FAGS 16 96 Replace timed controller with traffic /pedestrian actuated signal - 220TH ST.S.W. -- 9th Ave. S. to 84th Ave. W. 2 ADFGI 1.00 17 2000 1663 FAGS 337 337 Arterial street widening with Snohomish County - MAIN ST. -- 9th Ave. to 84th Ave. W 5 DR 1.15 17 150 125 FAGS 25 150 Grind pavement, overlay to strengthen, restore ride - 72ND AVE. W. -- 210th St. S,W. to 212th St. S.W. 1 ADFGI 0.11 19 60 60 60 New street connection into College Place area - DAYTON STREET RAILROAD CROSSING IMPROVEMENTS 6 JE 0.01 17 X 146 137 RRP 9 146 Improve protection devices & approaches, lighting - 200TH ST. S.W. -- Maplewood Dr. to 88th Ave. W. 1 ADFGH 0.15 17 100 83 FAGS 17 100 Reconstruct and realign, as indicated by study