Loading...
Resolution 700'p { 0006.190.012 - DAS/naa/crd 05/16/90 RESOLUTION NO. 700 A RESOLUTION OF THE CITY,COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 RCW, the City Council of the City of Edmonds has previously adopted a Comprehensive Street Program, including an arterial street construction program, and thereafter periodically modified said Comprehensive Street Program by resolution, and WHEREAS, the City Council has reviewed the work accomplished under the said Program, determined current and future City street and arterial needs, and based upon these findings has prepared a Six -Year Transportation Improvement Program for the ensuing six (6) calendar years, and WHEREAS, a public hearing has been held on the said Six -Year Transportation Improvement Program, and WHEREAS, the City Council finds that there will be no significant adverse environmental impacts as a result of adoption or implementation of the Six -Year Transportation Improvement Program, NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. The Six -Year Transportation Improvement Program for the City of Edmonds, as DAS00007E 1 -1- revised and extended for the ensuing six (6) calendar years (1991 -1996, inclusive), a copy of which is attached hereto as Exhibit A and incorporated herein by this reference as if fully set forth, which Program sets forth the project location, type of improvement and the estimated cost thereof, is hereby adopted and approved. Section 2. Filing of Program. Pursuant to Chapter 35.77 RCW, the City Clerk is hereby authorized and directed to file a copy of this resolution forthwith, together with the Exhibit attached hereto, with the Secretary of Transportation and a copy with the Transportation Improvement Board for the State of Washington. RESOLVED this 19th day of dune , 1990. ATTEST /AUTHENTICATED: ITY CLERK, JACQ ELINE PARRETT APPROVED: FILED WITH THE CITY CLERK: 5�lI� %9b PASSED BY THE CITY COUNCIL: („(19190 RESOLUTION NO. 700 DAS00007E -2- r SA , City of EDNORDS SIX YEAR TRANSPORTATION IMPROVENENT PROGRAM Hearing Date JUNE 5, 1990 PG 11 ; City No 0365 1991 -1997 Adoption Date JUNE 19, 1990 ; County No. 31 Resolution No. P PROJECT IDENTIFICATION m T F C; PROJECT COSTS IN THOUSANDS OF DOLLARS ; r a 0 D All It ; i DESCRIPTION OF WORE jo work T L M R; OBLIGATION 1 FUNDING SOURCE ;TOTAL ; o f code A E C R; SCHEDULE ; ----------------------- - - - - - ; ; r (Street name or number, c (a) L N TC I; Y E 6 R ;FEDERAL ; RAP ; ;FONDS ; i Co. road name or number, If G ML 0; - - - - - - - - - ; or ;Local; ; t termini beginning & end. ao T LA V;1st 2nd 3rd 4,5 ; Pro -;AMT UAB y Describe work to be done.) sr H S E;Annl 6th ;ANT gram; ; No sk S R1 111t ---------------------------------------------------------------------------------------------------------------------------------- 1 ------------------------------------------------------------------------------------------------------------------------------------ 2 3; 4 5 6;7; 8 9 10 11 ; 12 13; 14 15; 16 ; 17 ; TRAFFIC SIGNALIZATION, CHANNELIZATION PROJECTS ------------------------------------------------------ ------------------------------------------------------ 1 SR 99 and 216TH ST. S.W. 6 HI 0.11 14 % 75 62 FAGS 13 75 Install new signal A channelisation on our half of intersection (see Item 11, Page 12) 2 SR-524 and OLYMPIC VIEW DRIVE 6 HI 0.10 14 96 80 FAUS 16 96 Install traffic /pedestrian actuated signal 3 220TH ST. S.W. and 9TH AYR. S. 6 H 0.10 16 10 10 10 Channelisation improvements to enhance traffic safety 4 212TH ST. S.W. and 72ND AYR. W. 6 HI 0.10 16 96 80 FAGS 16 96 Install traffic /pedestrian actuated signal 5 WALNUT ST. and 9TH AYR. S. 6 HI 0.10 16 96 80 FAGS 16 96 Install traffic /pedestrian actuated signal 6 220TH ST. S.W. and 9TH AYR. S. 6 HI 0.10 16 % 96 80 FAGS 16 96 Install traffic /pedestrian actuated signal A channelisation (see Item 17, page 12) 7 220TH ST. S.W. and 84TH AYE. W. 6 HI 0.10 17 96 80 FAGS 16 96 Replace 4 -way flasher with actuated signal (see Item 17, Page 12) 8 MAIN ST. and 9TH AYE. 6 HI 0.10 16 96 80 FADS 16 96 Install traffic /pedestrian actuated signal 9 DAYTON STREET RAILROAD CROSSING IMPROVEMENTS 6 J1 0.01 17 1 146 137 RRP 9 146 Improve protection devices & approaches, lighting 10 SR 524 and 88TH AYR. W. 6 HI 0.10 14 10 10 10 Channelisation improvements 11 WOODWAY HIGH SCHOOL ENTRANCE and 100TH AYE. W. 6 I 0.10 16 E 96 80 FAGS 16 96 Replace timer controller with traffic /pedestrian actuated signal 12 RAIN ST. and 7TH AYR. 6 JE 0.10 16 10 10 10 Install pedestrian actuated crossing flasher 13 200TH ST. S.W. and 76TH AYR. W. 6 HI 0.10 16 48 40 FAGS 8 48 Install new signal A channelisation on our half of intersection (Lynnwood to do their half of $96,000 project) 14 224TH ST. S.W. and 76TH AYR. W. 6 HI 0.10 17 96 80 FAGS 16 96 Replace 4 -way flasher with actuated signal 15 212TH ST. S.W. and 80TH AVE. W. 6 HI 0.10 16 96 80 FAGS 16 96 Install traffic /pedestrian actuated signal 16 READOWDALE BEACH RD. and 76TH AYR. W. 6 HI 0.10 17 96 80 FAGS 16 96 Install traffic /pedestrian actuated signal 17 PINE ST. and SR -104 6 HIRT 0.10 14 96 80 FAGS 16 96 Install traffic /pedestrian actuated signal 18 CITY WIDE SIGNAL IMPROVEMENTS 6 HI 0.10 20 20 20 60 120 120 • • r sA City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Hearing Date JUNE 5, 1990 PG 42 City No 0365 1991 -1997 Adoption Date JUNE 19, 1990 County No. 31 ----------------------------------------------------------------------------------------------------------------------------------- Resolution No. ----------------------------------------------------------------------------------------------------------------------------------- P PROJECT IDENTIFICATION m T F C; PROJECT COSTS IN THOUSANDS OF DOLLARS r a 0 0 A; 11 ; i DESCRIPTION OF WORK jo work T L N R; OBLIGATION ; FUNDING SOURCE ;TOTAL o f code A E C R; SCHEDULE ; ----------------------- - - - - - ; r (Street name or number, c (s) L N TC Y; Y E A R ;FEDERAL ; RAP ; ;FONDS i Co. road name or number, lw G NL 0; - - - - - - - - - ; or ;Local; t termini beginning A end. ao T LA V;lst 2nd 3rd 4,5 ; Pro -;ANT DAB Y Describe work to be done.) or H S E;Annl 6th ;ANT gram; No ----------------------------------------------------------------------------------------------------------------------------------- sk S R; Elmt ----------------------------------------------------------------------------------------------------------------------------------- 1 2 3; 4 5 6;7; 8 9 10 11 12 13; 14 15; 16 ; 17 ------------------------------------------------------------------------------------------------------- ROADWAI CONSTRUCTION, RESTORATION PROJECTS ------------------------------------------------------ ------------------------------------------------------ 1 SR 99 -- 244th St. S.W. to 210th St. S.N. 2 BDFGH 2.30 14 1200 Construct curb and gutter, overlay, widen to 7 lanes (Lynnwood lead) 2 MAIN ST. -- Sunset Ave. to 9th Ave. 5 DH 0.72 16 1 150 125 FADS Fabric over cracks, overlay after grinding edges 3 5TH AVE. S. -- SR 104 to Main St. 5 DR 0.73 16 130 108 FAGS Fabric over cracks, overlay after grinding edges 4 96TH 171, N. -- 220th St. S.W. to Bowdoin NY. 4 DFGHK 0.41 19 130 Construct store sever system, pavement overlay, and walkway 5 200TH ST. S.N. -- Maplewood Dr. to 88th Ave. N. 1 ADFGH 0.15 17 16 13 FAGS Reconstruct or realign, as study indicates 5 200TH ST. S.W. -- 88th Ave. W. to 76th Ave. W. 1 ADFGH 0.75 19 200 Reconstruct or realign, as study indicates 6 STREET OVERLAY PROGRAM FOR 1991 5 DH 3.50 19 200 Pavement overlays to strengthen, restore ride 7 220TH ST.S.W. -- 9th Ave. S. to 84th Ave. W. 2 ADFGI 1.00 17 750 Arterial street widening with Snohomish County 8 76TH AVE. W. -- 212th St. S.W. to 196th St. S.W. 5 DH 1.00 17 100 83 FADS Grind pavement, overlay to strengthen, restore ride -- joint project with Lynnwood - they pay 100E also 9 OLYMPIC VIEW DR. -- SR524 to 88th Ave. W. 5 DH 1.21 17 120 Pavement overlay to strengthen, restore ride 10 STREET OVERLAY PROGRAM FOR 1992 5 DH 3.50 19 200 Pavement overlays to strengthen, restore ride 11 74TH AVE. W. - -208th St. S.W. to 209th St. S.W. 5 DFGHE 0.06 19 8 Pavement overlay, widening, install curb & gutter 12 STREET OVERLAY PROGRAM FOR 1993 5 DR 3.50 19 200 Pavement overlays to strengthen, restore ride 13 ADMIRAL NAY LOOP TO SR -104 - 1 ADFGI 0.75 14 5000 Construct roadway with grade separation to new ferry terminal 14 CITY WIDE STREET IMPROVEMENTS, RESTORATION 4 DH 5.00 17 25 25 25 75 15 CITY WIDE DRAINAGE IMPROVEMENTS, RESTORATION 4 B 5.00 17 25 25 25 75 --------------- - - - - -- 960 TIB 240 1200 25 150 22 130 130 130 3 16 200 200 200 200 600 UAB 150 750 17 100 120 120 200 200 8 8 200 200 5000 150 150 150 150 SA LID 200 200 75 75 75 City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 130 60 Hearing Date JUNE 5, 1990 PG 03 City No 0365 1991 -1997 35 35 45 Adoption Date JUNE 19, 1990 45 County No. 31 ----------------------------------------------------------------------------------------------------------------------------------- 80 80 Resolution No. 10 10 ----------------------------------------------------------------------------------------------------------------------------------- P PROJECT IDENTIFICATION a T F C; PROJECT COSTS IN THOUSANDS OF DOLLARS r 20 a 0 U A; 20 ; i DESCRIPTION OF WORE Jo work T L N R; OBLIGATION 1 FUNDING SOURCE ;TOTAL o f code A E C R; SCHEDULE ;---------------------------- r (Street name or number, c (s) L N TC Y; Y E A R ;FEDERAL ; RAP ; ;FUNDS i Co. road name or number, lw G NL 0; - - - - - - - - - ; or ;Local, t termini beginning & end. so T LA V;lst 2nd 3rd 4,5 ; Pro -;ANT UAB y Describe work to be done.) or H S E;Annl 6th ;ANT gram; ; No ----------------------------------------------------------------------------------------------------------------------------------- sk S Billet ; ----------------------------------------------------------------------------------------------------------------------------------- 1 2 3 ; 4 5 6 17; 8 9 10 11 12 13 ; 14 15 ; 16 17 STREET IMPROVEMENT/WALIWAY PROJECTS ----------------------------------- ----------------------------------- 1 MAPLEWOOD DR. -- Main St. to 200th St. S.W. 3 IN 0.50 17 X 24 Construct walkway on at least one side of roadway 2 200TH ST. S.W. -- Maplewood Dr. to 88th Ave. W. 1 IN 0.15 17 Construct walkway on one side of roadway (See Item $6, Page $2) 2 200TH ST. S.W. -- 88th Ave. W. to 76th Ave. W. 1 FN 0.75 19 Construct walkway on one side of roadway (See Item $6, Page 12) 3 CASPERS ST. -- Sunset Ave. to 3rd Ave. N. 3 IN 0.10 19 Construct walkway on at least one side of roadway 4 PIONEER WAY -- Bain St. to Shell Valley 1 ADFGI 0.40 19 X Alternate emergency services access /egress into Shell Valley 5 N. MEADOWDALE RD. -- 75th Ave. W. to 68th Ave. W. 3 IN 0.60 19 Construct walkway on at least one side of roadway 6 111DONDILI BRACE RD. -- 76th Ave. W. to OYD 3 FR 0.75 17 X Widen, finish walkway system 7 72ND AVE. W. -- 210th St. S.W. to 212th St. S.W. 1 ADFGI 0.11 19 New street connection into College Place area 8 176TH ST. S.W. -- 72nd Ave. W. to Olympic View Dr. 3 FN 0.25 19 Construct walkway on at least one side of roadway 9 68TH AVE. W. -- N. Meadowdale Rd. to 160th St. S.W 3 IN 0.50 19 Widen, finish walkway system 10 76TH AVE. W. -- M'dale Beach Rd. to N. M'dale Rd. 3 IN 0.80 17 X Construct walkway on at least one side of roadway 11 80TH AVE. W. -- 218th St. S.W. to 220th St. S.W. 3 IN 0.10 19 Construct walkway on at least one side of roadway 12 9TH AVE. N. -- Puget Dr. to Caspers St. 3 N 0.25 14 Construct walkway on one side of roadway 13 SEAVIRW & SIERRA PARIS 3 N 0.25 19 Construct walkway 14 YOST & PINE RIDGE PARIS 3 N 0.40 19 Construct walkway 15 MAPLEWOOD PARK 3 N 0.40 19 Construct walkway 16 88TH AVE. W. -- 204th St. S.W. to 200th St. S.N. 3 IN 0.25 19 Widen and construct walkway on one side of road 17 102ND PL. S.N. -- Woodway H.S. to SR 104 3 N 0.25 17 Construct walkway 7 36 5 20 FAGS 4 5.0 6 FAGS 1 16 36 80 5 20 200 LID 200 200 75 75 75 130 108 FAGS 22 130 60 60 60 35 35 35 45 45 45 80 80 80 10 10 10 25 25 25 20 20 20 20 20 20 20 20 20 25 25 40 25 25 25