Resolution 700'p {
0006.190.012 -
DAS/naa/crd
05/16/90
RESOLUTION NO. 700
A RESOLUTION OF THE CITY,COUNCIL OF THE CITY
OF EDMONDS, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM AND DIRECTING
THE SAME TO BE FILED WITH THE STATE SECRETARY OF
TRANSPORTATION AND THE TRANSPORTATION
IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of Chapters 35.77
and 47.26 RCW, the City Council of the City of Edmonds has
previously adopted a Comprehensive Street Program, including an
arterial street construction program, and thereafter periodically
modified said Comprehensive Street Program by resolution, and
WHEREAS, the City Council has reviewed the work
accomplished under the said Program, determined current and
future City street and arterial needs, and based upon these
findings has prepared a Six -Year Transportation Improvement
Program for the ensuing six (6) calendar years, and
WHEREAS, a public hearing has been held on the said
Six -Year Transportation Improvement Program, and
WHEREAS, the City Council finds that there will be no
significant adverse environmental impacts as a result of adoption
or implementation of the Six -Year Transportation Improvement
Program, NOW, THEREFORE,
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON,
HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. The Six -Year
Transportation Improvement Program for the City of Edmonds, as
DAS00007E 1 -1-
revised and extended for the ensuing six (6) calendar years
(1991 -1996, inclusive), a copy of which is attached hereto as
Exhibit A and incorporated herein by this reference as if fully
set forth, which Program sets forth the project location, type of
improvement and the estimated cost thereof, is hereby adopted and
approved.
Section 2. Filing of Program. Pursuant to Chapter
35.77 RCW, the City Clerk is hereby authorized and directed to
file a copy of this resolution forthwith, together with the
Exhibit attached hereto, with the Secretary of Transportation and
a copy with the Transportation Improvement Board for the State of
Washington.
RESOLVED this 19th day of dune , 1990.
ATTEST /AUTHENTICATED:
ITY CLERK, JACQ ELINE PARRETT
APPROVED:
FILED WITH THE CITY CLERK: 5�lI� %9b
PASSED BY THE CITY COUNCIL: („(19190
RESOLUTION NO. 700
DAS00007E
-2-
r
SA
,
City of EDNORDS SIX YEAR TRANSPORTATION IMPROVENENT
PROGRAM
Hearing Date JUNE
5, 1990
PG 11 ;
City No 0365 1991 -1997
Adoption Date JUNE
19, 1990
;
County No. 31
Resolution No.
P
PROJECT IDENTIFICATION
m
T
F
C; PROJECT COSTS
IN THOUSANDS OF DOLLARS
;
r
a
0
D
All
It
;
i
DESCRIPTION OF WORE
jo
work
T L
M
R; OBLIGATION
1 FUNDING SOURCE
;TOTAL ;
o
f
code
A E
C
R; SCHEDULE
; ----------------------- - - - - - ; ;
r
(Street name or number,
c
(a)
L N
TC
I; Y E 6 R
;FEDERAL ; RAP ;
;FONDS ;
i
Co. road name or number,
If
G
ML
0; - - - - - - - - -
; or ;Local; ;
t
termini beginning & end.
ao
T
LA
V;1st 2nd 3rd 4,5
; Pro -;AMT UAB
y
Describe work to be done.)
sr
H
S
E;Annl 6th
;ANT gram;
;
No
sk
S
R1 111t
----------------------------------------------------------------------------------------------------------------------------------
1
------------------------------------------------------------------------------------------------------------------------------------
2
3;
4
5
6;7;
8 9 10 11
; 12 13; 14 15;
16
; 17 ;
TRAFFIC SIGNALIZATION, CHANNELIZATION PROJECTS
------------------------------------------------------
------------------------------------------------------
1
SR 99 and 216TH ST. S.W.
6
HI
0.11
14
% 75
62 FAGS
13
75
Install new signal A channelisation on our half
of intersection (see
Item 11, Page 12)
2
SR-524 and OLYMPIC VIEW DRIVE
6
HI
0.10
14
96
80 FAUS
16
96
Install traffic /pedestrian actuated signal
3
220TH ST. S.W. and 9TH AYR. S.
6
H
0.10
16
10
10
10
Channelisation improvements to enhance traffic
safety
4
212TH ST. S.W. and 72ND AYR. W.
6
HI
0.10
16
96
80 FAGS
16
96
Install traffic /pedestrian actuated signal
5
WALNUT ST. and 9TH AYR. S.
6
HI
0.10
16
96
80 FAGS
16
96
Install traffic /pedestrian actuated signal
6
220TH ST. S.W. and 9TH AYR. S.
6
HI
0.10
16
% 96
80 FAGS
16
96
Install traffic /pedestrian actuated signal A channelisation
(see
Item
17, page 12)
7
220TH ST. S.W. and 84TH AYE. W.
6
HI
0.10
17
96
80 FAGS
16
96
Replace 4 -way flasher with actuated signal (see
Item
17, Page 12)
8
MAIN ST. and 9TH AYE.
6
HI
0.10
16
96
80 FADS
16
96
Install traffic /pedestrian actuated signal
9
DAYTON STREET RAILROAD CROSSING IMPROVEMENTS
6
J1
0.01
17
1 146
137 RRP
9
146
Improve protection devices & approaches, lighting
10
SR 524 and 88TH AYR. W.
6
HI
0.10
14
10
10
10
Channelisation improvements
11
WOODWAY HIGH SCHOOL ENTRANCE and 100TH AYE. W.
6
I
0.10
16
E 96
80 FAGS
16
96
Replace timer controller with traffic /pedestrian actuated signal
12
RAIN ST. and 7TH AYR.
6
JE
0.10
16
10
10
10
Install pedestrian actuated crossing flasher
13
200TH ST. S.W. and 76TH AYR. W.
6
HI
0.10
16
48
40 FAGS
8
48
Install new signal A channelisation on our half
of intersection (Lynnwood
to do their half
of $96,000 project)
14
224TH ST. S.W. and 76TH AYR. W.
6
HI
0.10
17
96
80 FAGS
16
96
Replace 4 -way flasher with actuated signal
15
212TH ST. S.W. and 80TH AVE. W.
6
HI
0.10
16
96
80 FAGS
16
96
Install traffic /pedestrian actuated signal
16
READOWDALE BEACH RD. and 76TH AYR. W.
6
HI
0.10
17
96
80 FAGS
16
96
Install traffic /pedestrian actuated signal
17
PINE ST. and SR -104
6
HIRT
0.10
14
96
80 FAGS
16
96
Install traffic /pedestrian actuated signal
18
CITY WIDE SIGNAL IMPROVEMENTS
6
HI
0.10
20 20 20 60
120
120
• • r
sA
City of EDMONDS
SIX YEAR TRANSPORTATION IMPROVEMENT
PROGRAM
Hearing Date JUNE
5, 1990
PG 42
City No 0365
1991 -1997
Adoption Date JUNE
19, 1990
County No. 31
-----------------------------------------------------------------------------------------------------------------------------------
Resolution No.
-----------------------------------------------------------------------------------------------------------------------------------
P
PROJECT IDENTIFICATION
m
T
F
C; PROJECT COSTS
IN THOUSANDS OF
DOLLARS
r
a
0
0
A;
11
;
i
DESCRIPTION OF WORK
jo work
T L
N
R; OBLIGATION
; FUNDING
SOURCE
;TOTAL
o
f code
A E
C
R; SCHEDULE
; -----------------------
- - - - - ;
r
(Street name or number,
c (s)
L N
TC
Y; Y E A R
;FEDERAL ;
RAP ;
;FONDS
i
Co. road name or number,
lw
G
NL
0; - - - - - - - - -
;
or ;Local;
t
termini beginning A end.
ao
T
LA
V;lst 2nd 3rd 4,5
; Pro -;ANT
DAB
Y
Describe work to be done.)
or
H
S
E;Annl 6th
;ANT gram;
No
-----------------------------------------------------------------------------------------------------------------------------------
sk
S
R; Elmt
-----------------------------------------------------------------------------------------------------------------------------------
1
2
3; 4
5
6;7;
8 9 10 11
12 13; 14
15; 16
; 17
-------------------------------------------------------------------------------------------------------
ROADWAI CONSTRUCTION, RESTORATION PROJECTS
------------------------------------------------------
------------------------------------------------------
1 SR 99 -- 244th St. S.W. to 210th St. S.N. 2 BDFGH 2.30 14 1200
Construct curb and gutter, overlay, widen to 7 lanes (Lynnwood lead)
2 MAIN ST. -- Sunset Ave. to 9th Ave. 5 DH 0.72 16 1 150 125 FADS
Fabric over cracks, overlay after grinding edges
3 5TH AVE. S. -- SR 104 to Main St. 5 DR 0.73 16 130 108 FAGS
Fabric over cracks, overlay after grinding edges
4 96TH 171, N. -- 220th St. S.W. to Bowdoin NY. 4 DFGHK 0.41 19 130
Construct store sever system, pavement overlay, and walkway
5 200TH ST. S.N. -- Maplewood Dr. to 88th Ave. N. 1 ADFGH 0.15 17 16 13 FAGS
Reconstruct or realign, as study indicates
5 200TH ST. S.W. -- 88th Ave. W. to 76th Ave. W. 1 ADFGH 0.75 19 200
Reconstruct or realign, as study indicates
6 STREET OVERLAY PROGRAM FOR 1991 5 DH 3.50 19 200
Pavement overlays to strengthen, restore ride
7 220TH ST.S.W. -- 9th Ave. S. to 84th Ave. W. 2 ADFGI 1.00 17 750
Arterial street widening with Snohomish County
8 76TH AVE. W. -- 212th St. S.W. to 196th St. S.W. 5 DH 1.00 17 100 83 FADS
Grind pavement, overlay to strengthen, restore ride -- joint project with Lynnwood - they pay 100E also
9 OLYMPIC VIEW DR. -- SR524 to 88th Ave. W. 5 DH 1.21 17 120
Pavement overlay to strengthen, restore ride
10 STREET OVERLAY PROGRAM FOR 1992 5 DH 3.50 19 200
Pavement overlays to strengthen, restore ride
11 74TH AVE. W. - -208th St. S.W. to 209th St. S.W. 5 DFGHE 0.06 19 8
Pavement overlay, widening, install curb & gutter
12 STREET OVERLAY PROGRAM FOR 1993 5 DR 3.50 19 200
Pavement overlays to strengthen, restore ride
13 ADMIRAL NAY LOOP TO SR -104 - 1 ADFGI 0.75 14 5000
Construct roadway with grade separation to new ferry terminal
14 CITY WIDE STREET IMPROVEMENTS, RESTORATION 4 DH 5.00 17 25 25 25 75
15 CITY WIDE DRAINAGE IMPROVEMENTS, RESTORATION 4 B 5.00 17 25 25 25 75
--------------- - - - - --
960 TIB 240 1200
25 150
22 130
130 130
3 16
200 200
200 200
600 UAB 150 750
17 100
120 120
200 200
8 8
200 200
5000
150 150
150 150
SA
LID 200
200
75
75
75
City of EDMONDS
SIX YEAR TRANSPORTATION IMPROVEMENT
PROGRAM
130
60
Hearing Date JUNE
5, 1990
PG 03
City No 0365
1991 -1997
35
35
45
Adoption Date JUNE
19, 1990
45
County No. 31
-----------------------------------------------------------------------------------------------------------------------------------
80
80
Resolution No.
10
10
-----------------------------------------------------------------------------------------------------------------------------------
P
PROJECT IDENTIFICATION
a
T
F
C; PROJECT COSTS
IN THOUSANDS OF
DOLLARS
r
20
a
0
U
A;
20
;
i
DESCRIPTION OF WORE
Jo work
T L
N
R; OBLIGATION
1 FUNDING
SOURCE ;TOTAL
o
f code
A E
C
R; SCHEDULE
;----------------------------
r
(Street name or number,
c (s)
L N
TC
Y; Y E A R
;FEDERAL ;
RAP ; ;FUNDS
i
Co. road name or number,
lw
G
NL
0; - - - - - - - - -
;
or ;Local,
t
termini beginning & end.
so
T
LA
V;lst 2nd 3rd 4,5
; Pro -;ANT
UAB
y
Describe work to be done.)
or
H
S
E;Annl 6th
;ANT gram;
;
No
-----------------------------------------------------------------------------------------------------------------------------------
sk
S
Billet
;
-----------------------------------------------------------------------------------------------------------------------------------
1
2
3 ; 4
5
6
17; 8 9 10 11
12 13 ; 14
15 ; 16 17
STREET IMPROVEMENT/WALIWAY PROJECTS
-----------------------------------
-----------------------------------
1 MAPLEWOOD DR. -- Main St. to 200th St. S.W. 3 IN 0.50 17 X 24
Construct walkway on at least one side of roadway
2 200TH ST. S.W. -- Maplewood Dr. to 88th Ave. W. 1 IN 0.15 17
Construct walkway on one side of roadway (See Item $6, Page $2)
2 200TH ST. S.W. -- 88th Ave. W. to 76th Ave. W. 1 FN 0.75 19
Construct walkway on one side of roadway (See Item $6, Page 12)
3 CASPERS ST. -- Sunset Ave. to 3rd Ave. N. 3 IN 0.10 19
Construct walkway on at least one side of roadway
4 PIONEER WAY -- Bain St. to Shell Valley 1 ADFGI 0.40 19 X
Alternate emergency services access /egress into Shell Valley
5 N. MEADOWDALE RD. -- 75th Ave. W. to 68th Ave. W. 3 IN 0.60 19
Construct walkway on at least one side of roadway
6 111DONDILI BRACE RD. -- 76th Ave. W. to OYD 3 FR 0.75 17 X
Widen, finish walkway system
7 72ND AVE. W. -- 210th St. S.W. to 212th St. S.W. 1 ADFGI 0.11 19
New street connection into College Place area
8 176TH ST. S.W. -- 72nd Ave. W. to Olympic View Dr. 3 FN 0.25 19
Construct walkway on at least one side of roadway
9 68TH AVE. W. -- N. Meadowdale Rd. to 160th St. S.W 3 IN 0.50 19
Widen, finish walkway system
10 76TH AVE. W. -- M'dale Beach Rd. to N. M'dale Rd. 3 IN 0.80 17 X
Construct walkway on at least one side of roadway
11 80TH AVE. W. -- 218th St. S.W. to 220th St. S.W. 3 IN 0.10 19
Construct walkway on at least one side of roadway
12 9TH AVE. N. -- Puget Dr. to Caspers St. 3 N 0.25 14
Construct walkway on one side of roadway
13 SEAVIRW & SIERRA PARIS 3 N 0.25 19
Construct walkway
14 YOST & PINE RIDGE PARIS 3 N 0.40 19
Construct walkway
15 MAPLEWOOD PARK 3 N 0.40 19
Construct walkway
16 88TH AVE. W. -- 204th St. S.W. to 200th St. S.N. 3 IN 0.25 19
Widen and construct walkway on one side of road
17 102ND PL. S.N. -- Woodway H.S. to SR 104 3 N 0.25 17
Construct walkway
7
36
5
20 FAGS 4 5.0
6 FAGS 1 16
36 80
5 20
200
LID 200
200
75
75
75
130
108 FAGS
22
130
60
60
60
35
35
35
45
45
45
80
80
80
10
10
10
25
25
25
20
20
20
20
20
20
20
20
20
25
25
40
25
25
25