Resolution 687t
t
0006.19012
DAS /naa
05/31/89
RESOLUTION NO. 687
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF EDMONDS, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM AND DIRECTING
THE SAME TO BE FILED WITH THE STATE SECRETARY OF
TRANSPORTATION AND THE TRANSPORTATION
IMPROVEMENT BOARD
WHEREAS, pursuant to the requirements of Chapters 35.77
and 47.26 RCW, the City Council of the City of Edmonds has
previously adopted a Comprehensive Street Program, including an
arterial street construction program, and thereafter periodically
modified said Comprehensive Street Program by resolution, and
WHEREAS, the City Council has reviewed the work
accomplished under the said Program, determined current and
future City street and arterial needs, and based upon these
findings has prepared a Six -Year Transportation Improvement
Program for the ensuing six (6) calendar years, and
WHEREAS, a public hearing has been held on the said
Six -Year Transportation Improvement Program, and
WHEREAS, the City Council finds that there will be no
significant adverse environmental impacts as a result of adoption
or implementation of the Six -Year Transportation Improvement
Program, NOW, THEREFORE,
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON,
HEREBY RESOLVES.AS FOLLOWS:
Section 1. Program Adopted. The Six -Year
Transportation Improvement Program for the City of Edmonds, as
DAS00007E
-1-
M
revised and extended for the ensuing six (6) calendar years
(1990 -1995, inclusive), a copy of which is attached hereto as
Exhibit A and incorporated herein by this reference as if fully
set forth, which Program sets forth the project location, type of
improvement and the estimated cost thereof, is hereby adopted and
approved.
Section 2. Filing of Program. Pursuant to Chapter
35.77 RCW, the City Clerk is hereby authorized and directed to
file a copy of this resolution forthwith, together with the
Exhibit attached hereto, with the Secretary of Transportation and
a copy with the Transportation Improvement Board for the State of
Washington.
RESOLVED this 20th day of June , 1989.
ATTEST /AUTHENTICATED:
CI CLERK, ACQUELINE PARRETT
APPROVED:
FILED WITH THE CITY CLERK: June 2, 1989
PASSED BY THE CITY COUNCIL: dune 20, 1989
RESOLUTION NO. 687
DAS00007E -2-
SA
City of EDMONDS SI1 YEAR TiANSPORTATION IMPROVEMENT PROGRAM
Hearing Date
JUNE
6, 1989
PG 11 ;
City
No 0365 1990 -1996
Adoption Date CP -Q0-
County No. 31
Resolution No.— 4 87_
----------------------------------------
P
PROJECT 'IDENTIFICATION
®
T
F
C, PROJECT COSTS
IN THOUSANDS
OF DOLLARS
r
a
0
D
All
i
DESCRIPTION OF WORK
jo
wort
T L
N
R; OBLIGATION
FUNDING
SOURCE
;TOTAL
;
o
f
code
A H
C
R; SCHEDULE
:------------------------
r
(Street nave or nueber,
c
(s)
L N
TC
Y; Y E A R
;FEDERAL ;
RAP ;
;FONDS
;
i
Co. road nave or nueber,
le
G
NL
0; - - - - - - -
- -
: ;
or ;Local;
;
t
tereini beginning & end.
ao
T
LA
V;lst 2nd 3rd
4,5
Pro -;AMT
OAB
y
Describe wort to be done.)
sr
H
S
E;Annl
6th
;AMY grae;
;
No
st
S
R;Elmt
-----------------------------------------------------------------------------------------------------------------------------------
1
2
3
; 4
5
6
;7; 8 9 10
11
; 12 13 ;
14 15 ;
16
17 ;
-------------------------------------------------------------------------------------------------------------------
TRAFFIC SIGNALIZATION, CHLY99LIZATION PROJECTS
1
208TH ST- S.W. and 76tH AVE. W.
6
I
0.10
16
1 90
72 OAB
18
90
Install traffic /pedestrian actuated signal (Lynnwood
lead
agency) (see Item $1, Page $2)
2
SR 524 and 7TH AVE. N.
6
I
0.10
14
3
3
3
Corner isproveoents, channeliaation
16
96
3
212TH ST. S.W. and 729D AVE. W.
6
I
0.10
16
96
80 FADS
4
Install traffic /pedestrian actuated signal
DAYTON STREET RAILROAD CROSSING IMPROVEMENTS
6
DFIJ
0.10
17
1 179
137 RRP
33 FADS
9
179
Iaprove protection devices & approaches, lighting
13
75
5
SR 99 and 216TH ST. S.W.
6
HI
0.10
14
75
62 FADS
Install new signal 6 channeliaation on our half of intersection/
Lynnwood to do their
half
of $150,000 project
6
WOODWAY HIGH SCHOOL ENTRANCE and 100TH AVE. W.
6
I
0.10
16
96
80 FADS
16
96
Install traffic actuated signal for safety during
school hours
16
96
7
220TH ST. S.W. and 100TH AVE. W.
6
HI
0.10
16
1 96
80 FAGS
Install new signal & channeliaation (see Item 15,
page $2)
10
10
6
SR 524 and 887H AVE. W.
6
H
0.10
14
10
Channeliaation iaproveients
6
I
0.10
16
96
80 FAGS
16
96
9
SR 524 and OLYMPIC VIEW DRIVE
Install traffic /pedestrian actuated signal
16
96
10
MAIN ST. and 9tH AVE.
6
HI
0.10
16
96
80 FAGS
Install traffic /pedestrian actuated signal
10
10
11
MAIN ST. and 7TH AVE.
6
I
0.10
16
10
Install pedestrian actuated crosssing flasher
4S
37 FAGS
8
45
12
200TH ST. S.W. and 76TH AVE. W.
6
I
0.10
17
Install new signal 8 channeliaation on our half of intersection/
Lynnwood to do their
half
of project
13
224TH ST. S.W. and 761H AVE. W.
6
I
0.10
17
90
75 FADS
15
90
Replace 4 -way flashing red with actuated signal
15
90
14
220TH ST. S.W. and 84TH AVE. W.
6
I
0.10
17
9U
75 FAGS
Replace 4 -way flashing red with actuated signal
15
90
15
212TH ST. S.W. and 801H AVE. W.
6
I
0.10
16
90
75 FAGS
Install traffic /pedestrian actuated signal
90
75 FAGS
15
90
16
MRADOWDALE BEACH RD. and 76TH AVE. W.
6
I
0.10
17
Install traffic /pedestrian actuated signal
120
120
1�
CITY WIDE SIGNAL IMPROY99ENTS
6
I
0.10
16
20 20 20
60
SA
City
of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM
Rearing Date JUNE
6, 1989
PG 12
City
No 0365 1990 -1996
Adoption Date
County
No. 31
Resolution No.
P
PROJECT IDENTIFICATION
e
T
F
C, PROJECT COSTS
IN THOUSANDS OF DOLLARS
r
a
0
0
A;
;
;
i
DESCRIPTION OF WORK
jo
work
T L
N
R; OBLIGATION
; FUNDING SOURCE
;TOTAL
U
f
code
A 9
C
R; SCHEDULE
------------ - - - - -- -,
- -- -
r
(Street name or number,
c
(s)
L 9
TC
Y; Y E A R
;FEDERAL ; RAP
'FONDS
,
i
Co. road name or number,
lw
G
HL
0; - - - - - - - - -
; ; or
;Local;
t
termini beginning & end.
ao
T
LA
V ;1st 2nd 3rd 4,5
; Pro -;AMT UAB
y
Describe work to be done.)
sr
R
S
E ;Annl 6th
;ANT gram;
No
sk
S
R ;Elmt
1
2
3
4
6
8 9 10 11
12 13 , 14 15
, 16
17
,
,7,
-----------------------------------------------------------------------------------------------------------------------------------
ROADWAY RECONSTRUCTION, RESTORATION PROJECTS
1
208TH ST. SW -- 76th Ave. W. to City Limits
4
ABDFG
0.55
17
1714
1371 UAB
90
1461
Reconstruct roadway;incl. grading, paving, drainage,
curbs 8 sidewalks
(remaining $280,000
is Lynnw000d's 20%)
2
OLYMPIC VIEW DR. -- Sunset Way to Talbot Rd.
3
D
0.15
17
X 30
25 FADS
5
30
Minor widening and drainage with rockery
3
OLYMPIC VIEW DR. -- SR524 to 88th Ave. W.
5
DFH
1.21
17
180
150 FAUS
30
180
Pavement overlay to strengthen, restore ride - add curbs
4
STREET OVERLAY PROGRAM FOR 1990
5
DH
3.50
19
200
200
200
Pavement overlays to strengthen, restore ride
5
220TH ST. S.W. -- 100th Ave. W. to 84th Ave. W.
2
ADFGI
1.00
17
X 750
600 UAB
150
750
Arterial street widening with Snohomish County
6
SR 99 -- 244th St. S.W. to 210th St. S.W.
2
ABDFH
2.30
14_
500
400 UAB
100
500
Construct curb and gutter (State to overlay, widen to 7 lanes)
7
76TH AVE. W. -- 212th St. S.W. to 196th St. S.W.
5
D
1.00
17
75
62 FAGS
13
75
Grind pavement, overlay to strengthen, restore ride --
joint project
with Lynnwood - they pay 75K also
8
ADMIRAL WAY -- Railroad Ave. to Olympic Park
5
D
0.50
19
68
56 FADS
12
68
Pavement overlay to strength, restore ride
9
5TH AVE. S. -- SR 104 to Main St.
5
D
0.70
16
154
128 FADS
26
154
Fabric over cracks, overlay after grinding edges
10
MAIN ST. -- Sunset Ave. to 8th Ave.
5
D
0.25
17
90
75 FADS
15
90
Pavement overlay to strenthen, restore ride
11
STREET OVERLAY PROGRAM FOR 1991
5
D
3.50
19
200
200
240
Pavement overlays to strengthen, restore ride
12
74TH AVE. W. -- 208th St. S.W. to 209th St. S.W.
5
D
0.06
19
8
8
8
Pavement overlay, widening, install curb 8 gutter
13
STREET OVERLAY PROGRAM FOR 1992
5
D
3.50
19
200
200
240
Pavement overlays to strengthen, restore ride
14
200TH ST. S.W. -- Maplewood Dr. to 76th Ave. W.
4
ADU
0.90
19
68
68
68
Reconstruct or realign, as study indicates
15
7TH AVE. -- Fir St. to Pine St.
5
D
0.12
19
20
20
20
Pavement overlay to strengthen, restore ride
16
PIKE ST. -- 6th Ave. S. to 7th Ave. S.
5
D
0.06
19
20
20
'l0
Pavement overlay to strengthen, widening would require add.
R!W
. LL,BROOKMERE DR. -- 9th Ave. N. to 10th Ave. N.
5
D
0.13
19
10
10
10
Prelevel and overlay
18
CITY WIDE STREET IMPROVEMENTS, RESTORATION
4
DF
5.00
17
25 25 25 75
150
150
19
CITY WIDE DRAINAGE IMPROVEMENTS, RESTORATION
4
B
5.00
17
25 25 25 75
150
150
SA
80TH AVE. W. -- 192nd P1. S.W. to SR 524
3
N
0.30
19
25
Construct walkway on one side of road
100
City of EDMONDS
SIX YEAR TRANSPORTATION IMPROVEMENT
PROGRAM
LID 200
2
Hearing Date—JUNE
3
6, 1989
0.50
PG 43
City No 0365
1990 -1996
Construct walkway on at least one side of roadway
22
130
Adoption Date
3
200TH ST. S.W. -- 76th Ave. W. to -Naplevood Dr.
County No. 31
N
0.90
19
X
Resolution No.
Construct walkway on at least one side of roadway
35
35
P
PROJECT IDENTIFICAT -N
e
T
F
C, PROJECT
COSTS
IN THOUSANDS OF
DOLLARS
80
r
Valley
a
0
0
A;
N. MEADOWDALE RD. -- 75th Ave. W. to 68th Ave. W.
;
N
11
i
DESCRIPTION OF WOE!
]o wort
T L
N
R; OBLIGATION
; FUNDING
SOURCE
;TOTAL
0
3
f code
A E
C
R; SCHEDULE
;------- ----- -------
---
- --- --:
r
(Street name or number,
c (s)
L N
TC
Y; Y E A R
R
;FEDERAL ;
RAP
; ;FONDS
i
Co. road name or number,
lv
G
NL
0; - - - - - - -
- -
;
or
;Local;
t
termini beginning 3 end.
ao
T
LA
V;1st 2nd 3rd
4,5
Pro -;ANT
UAB
y
Describe work to be done.)
sr
H
S
E;Annl
6th
;ANT grae;
Construct walkway on at least one side of roadway
No
sk
S
R;Elmt
3
;
0.50
19
1
2
3 , 4
5
6
,7, 8 9 10
11
12 13 , 14
15
, 16 17
3
N
0.80
17
Construct walkway on at least one side of roadway
STREET IMPROVEMENT /WALKWAY PROJECTS
1
80TH AVE. W. -- 192nd P1. S.W. to SR 524
3
N
0.30
19
25
Construct walkway on one side of road
100
200
LID 200
2
MAPLEWOOD DR. -- Main St. to 200th St. S.W.
3
N
0.50
17
50
Construct walkway on at least one side of roadway
22
130
20
3
200TH ST. S.W. -- 76th Ave. W. to -Naplevood Dr.
3
N
0.90
19
X
Construct walkway on at least one side of roadway
35
35
45
4
PIONEER WAY -- Main St. to Shell Valley
1
ABDF
0.40
19
I
80
Alternate emergency services access /egress into Shell
Valley
10
10
10
5
N. MEADOWDALE RD. -- 75th Ave. W. to 68th Ave. W.
3
N
0.60
19
20
Construct walkway on at least one side of roadway
20
20
20
6
MEADOWDALE BEACH RD. -- 76th Eve. W. to OVD
3
N
0.75
17
X
Widen, finish walkway system
40
40
25
7
CASPERS ST. -- Sunset Ave. to 3rd Ave. N.
3
R
0.10
19
X
Construct walkway on at least one side of roadway
8
72ND AVE. W. -- 210th St. S.W. to 212th St. S.W.
1
ABDFG
0
19
New street connection into College Place area (SEE
ITEM 411,
PG
41 SIGNALS)
9
176TH ST. - -72nd Ave. W. to Olympic View Dr.
3
N
0.25
19
Construct walkway on at least one side of roadway
10
68TH AVE. W. -- N. Meadovdale Rd to 160th St. S.W.
3
N
0.50
19
Widen, finish walkway system
11
76TH AVE. W. -- M'dale Beach Rd. to N. M'dale Rd.
3
N
0.80
17
Construct walkway on at least one side of roadway
12
80TH AVE. W. -- 218th St. S.W. to 220th St. S.W.
3
N
0.10
19
Construct walkway on at least one side of roadway
13
9TH AVE. N. -- Puget Dr. to Caspers St.
3
N
0.25
14
Construct walkway on at least one side of roadway
14
SEAVIEW & SIERRA PARKS
3
N
0.25
19
Construct walkway
15
YOST & PINE RIDGE PARKS
3
N
0.40
19
Construct walkway
16
MAPLEWOOD PARK
3
N
0.40
19
Construct walkway
a
88TH AVE. W. -- 204th St. S.W. to 196th St. S.W.
3
N
0.40
17
Widen and construct valkvay on one side of road
18
102ND PL. S.W. -- Woodvay H.S. to SR 104
3
N
0.25
19
Construct valkvay
25 25
42 FAGS
8
50
100
100
100
200
LID 200
200
75
75
75
130
108 FAGS
22
130
20
20
20
60
60
60
35
35
35
45
45
45
80
80
80
10
10
10
25
25
25
20
20
20
20
20
20
20
20
20
40
40
40
25
25
25
City-of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT
PROGRAM
Hearing Date—JUNE
6, 1989
PG 04 ;
City
No 0365 1990 -1996
Adoption Date
;
County No. 31
Resolution No.
;
-------------------------------------
P
PROJECT IDENTIFICATION
a
T
F
C; PROJECT COSTS
IN THOUSANDS
OF DOLLARS
;
r
a
0
0
A;
i
DESCRIPTION OF WORE
jo
work
T L
N
R; OBLIGATION
FUNDING
SOURCE
;TOTAL ;
o
f
code
A E
C
R; SCHEDULE
;------- -------------
---
-----:
;
r
(Street name or number,
c
(s)
L N
TC
Y; Y E A F
;FEDERAL ;
RAP ;
;FUNDS ;
i
Co. road name or number,
lw
G
NL
0; - - - - - - - - -
; ;
or ;Local;
;
t
termini beginning 8 end.
ao
T
LA
V ;1st 2nd 3rd 4,5
Pro -;AMT
OAB
y
Describe work to be done.)
sr
H
S
E;Annl 6th
;AMT gram;
No
sk
S
R;Elat
-----------------------------------------------------------------------------------------------------------------------------------
1
2
3
; 4
5
6
17; 8 9 10 11
12 13 ;
14 15 ;
16
; 17 ;
------------------------------------------------------------------------------------------------------------------------------------
IMPROVEMENTS TO BE CONSTRUCTED IN 1989/1990
1
208TH ST. SW -- 76th Ave. W. to City Limits
4
ABDFG
0.55
17
1714
1371 OAB
90
1461
Reconstruct roadway;incl. grading, paving, drainage,
curbs A sidewalks (remaining $28 0,000
is Lynnw000d's
20%)
1
208TH ST. S.W. and 76TH AVE. W.
6
I
0.10
16
X 90
72 DAB
18
90
Install traffic /pedestrian actuated signal (Lynnwood
lead agency)
2
OLYMPIC VIEW DR. -- Sunset Way to Talbot Rd.
3
D
0.15
17
X 30
25 FAGS
5
30
Minor widening and drainage with rockery
150 FflOS
30
180
3
OLYMPIC VIEW DR. -- SR524 to 88th Ave. W.
5
DFR
1.21
17
180
Pavement overlay to strengthen, restore ride -
add curbs
200
200
4
STREET OVERLAY PROGRAM FOR 1990
5
DR
3.50
19
200
Pavement overlays to strengthen, restore ride
600 OAR
150
750
5
220TH ST. S.W. -- 100th Ave. W. to 84th Ave. W.
2
ADFGI
1.00
17
Y 750
Arterial street widening with Snohomish County
400 0AB
100
500
6
SR 99 -- 244th St. S.W. to 210th St. S.W.
2
ABDFH-2.30
14
500
Construct curb and gutter (State to overlay, widen
to 7 lanes)
13
75
7
76TH AVE. W. -- 212th St. S.W. to 196th St. S.W.
5
D
1.00
17
75
62 FADS
Grind pavement, overlay to strengthen, restore
ride
-- joint project
with Lynnwood - they
pay 75K also
8
ADMIRAL WAY -- Railroad Ave. to Olympic Park
5
D
0.50
19
68
56 FADS
12
68
Pavement overlay to strength, restore ride
3
3
9
SR 524 and 7TH AVE. E.
6
I
0.10
14
3
Corner improvements, channeliaation
25
25
10
BOTH AVE. W. -- 192nd Pl. S.W. to SR 524
3
N
0.30
19
25
11
Construct walkway on one side of road
MAPLEWOOD DR. -- Main St. to 200th St. S.W.
3
H
0.50
17
50
42 FAGS
8
50
Construct walkway on at least one side of roadway
I . 208th Street Improvements -
2. Olympic View Drive - rockery - -
3. Olympic View Drive - overlay and curbs ^_rs
4. 1990 Street Overlay Program
`'�:�,., �:� �?i' —=tip `'``� .e ,;•` �•�•< «
5. 220th Street -improvements
6. SR 99 curbs and overlays rye ow „s: • - �� + ;
7. 76th Ave. W. Overlay w �'
8. Admiral Way Overlay
9. SR 524 -7th Ave. Corner Improvements
10.80th Ave, Walkway-
ll.Maplewood Dr. Walkway o %
.111 L
f J /�/ — i• = c. • ...` . .. : °Fi• �wo-wo.m�n 1•- - l Y N N W 0 0 0
TO L"M.10W
CO
AD
„� ' : • ncrJ.ts cur e[
• .oa, � ;�..wwl
i i sre.t to..,••,r
/ ,.tom., �,�,”' - -, • '[ - £; . - 7 m ;.-.
• i MMt
IIlI 1111
IS
t Tv. _J.
_i;, u Irt 4!( Olt� i i 11111 it
W 0 0 0 W A Y i t J •- T E R R A C E
ju
AALUNCEN
J:
`_..-