Loading...
Resolution 687t t 0006.19012 DAS /naa 05/31/89 RESOLUTION NO. 687 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 RCW, the City Council of the City of Edmonds has previously adopted a Comprehensive Street Program, including an arterial street construction program, and thereafter periodically modified said Comprehensive Street Program by resolution, and WHEREAS, the City Council has reviewed the work accomplished under the said Program, determined current and future City street and arterial needs, and based upon these findings has prepared a Six -Year Transportation Improvement Program for the ensuing six (6) calendar years, and WHEREAS, a public hearing has been held on the said Six -Year Transportation Improvement Program, and WHEREAS, the City Council finds that there will be no significant adverse environmental impacts as a result of adoption or implementation of the Six -Year Transportation Improvement Program, NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES.AS FOLLOWS: Section 1. Program Adopted. The Six -Year Transportation Improvement Program for the City of Edmonds, as DAS00007E -1- M revised and extended for the ensuing six (6) calendar years (1990 -1995, inclusive), a copy of which is attached hereto as Exhibit A and incorporated herein by this reference as if fully set forth, which Program sets forth the project location, type of improvement and the estimated cost thereof, is hereby adopted and approved. Section 2. Filing of Program. Pursuant to Chapter 35.77 RCW, the City Clerk is hereby authorized and directed to file a copy of this resolution forthwith, together with the Exhibit attached hereto, with the Secretary of Transportation and a copy with the Transportation Improvement Board for the State of Washington. RESOLVED this 20th day of June , 1989. ATTEST /AUTHENTICATED: CI CLERK, ACQUELINE PARRETT APPROVED: FILED WITH THE CITY CLERK: June 2, 1989 PASSED BY THE CITY COUNCIL: dune 20, 1989 RESOLUTION NO. 687 DAS00007E -2- SA City of EDMONDS SI1 YEAR TiANSPORTATION IMPROVEMENT PROGRAM Hearing Date JUNE 6, 1989 PG 11 ; City No 0365 1990 -1996 Adoption Date CP -Q0- County No. 31 Resolution No.— 4 87_ ---------------------------------------- P PROJECT 'IDENTIFICATION ® T F C, PROJECT COSTS IN THOUSANDS OF DOLLARS r a 0 D All i DESCRIPTION OF WORK jo wort T L N R; OBLIGATION FUNDING SOURCE ;TOTAL ; o f code A H C R; SCHEDULE :------------------------ r (Street nave or nueber, c (s) L N TC Y; Y E A R ;FEDERAL ; RAP ; ;FONDS ; i Co. road nave or nueber, le G NL 0; - - - - - - - - - : ; or ;Local; ; t tereini beginning & end. ao T LA V;lst 2nd 3rd 4,5 Pro -;AMT OAB y Describe wort to be done.) sr H S E;Annl 6th ;AMY grae; ; No st S R;Elmt ----------------------------------------------------------------------------------------------------------------------------------- 1 2 3 ; 4 5 6 ;7; 8 9 10 11 ; 12 13 ; 14 15 ; 16 17 ; ------------------------------------------------------------------------------------------------------------------- TRAFFIC SIGNALIZATION, CHLY99LIZATION PROJECTS 1 208TH ST- S.W. and 76tH AVE. W. 6 I 0.10 16 1 90 72 OAB 18 90 Install traffic /pedestrian actuated signal (Lynnwood lead agency) (see Item $1, Page $2) 2 SR 524 and 7TH AVE. N. 6 I 0.10 14 3 3 3 Corner isproveoents, channeliaation 16 96 3 212TH ST. S.W. and 729D AVE. W. 6 I 0.10 16 96 80 FADS 4 Install traffic /pedestrian actuated signal DAYTON STREET RAILROAD CROSSING IMPROVEMENTS 6 DFIJ 0.10 17 1 179 137 RRP 33 FADS 9 179 Iaprove protection devices & approaches, lighting 13 75 5 SR 99 and 216TH ST. S.W. 6 HI 0.10 14 75 62 FADS Install new signal 6 channeliaation on our half of intersection/ Lynnwood to do their half of $150,000 project 6 WOODWAY HIGH SCHOOL ENTRANCE and 100TH AVE. W. 6 I 0.10 16 96 80 FADS 16 96 Install traffic actuated signal for safety during school hours 16 96 7 220TH ST. S.W. and 100TH AVE. W. 6 HI 0.10 16 1 96 80 FAGS Install new signal & channeliaation (see Item 15, page $2) 10 10 6 SR 524 and 887H AVE. W. 6 H 0.10 14 10 Channeliaation iaproveients 6 I 0.10 16 96 80 FAGS 16 96 9 SR 524 and OLYMPIC VIEW DRIVE Install traffic /pedestrian actuated signal 16 96 10 MAIN ST. and 9tH AVE. 6 HI 0.10 16 96 80 FAGS Install traffic /pedestrian actuated signal 10 10 11 MAIN ST. and 7TH AVE. 6 I 0.10 16 10 Install pedestrian actuated crosssing flasher 4S 37 FAGS 8 45 12 200TH ST. S.W. and 76TH AVE. W. 6 I 0.10 17 Install new signal 8 channeliaation on our half of intersection/ Lynnwood to do their half of project 13 224TH ST. S.W. and 761H AVE. W. 6 I 0.10 17 90 75 FADS 15 90 Replace 4 -way flashing red with actuated signal 15 90 14 220TH ST. S.W. and 84TH AVE. W. 6 I 0.10 17 9U 75 FAGS Replace 4 -way flashing red with actuated signal 15 90 15 212TH ST. S.W. and 801H AVE. W. 6 I 0.10 16 90 75 FAGS Install traffic /pedestrian actuated signal 90 75 FAGS 15 90 16 MRADOWDALE BEACH RD. and 76TH AVE. W. 6 I 0.10 17 Install traffic /pedestrian actuated signal 120 120 1� CITY WIDE SIGNAL IMPROY99ENTS 6 I 0.10 16 20 20 20 60 SA City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Rearing Date JUNE 6, 1989 PG 12 City No 0365 1990 -1996 Adoption Date County No. 31 Resolution No. P PROJECT IDENTIFICATION e T F C, PROJECT COSTS IN THOUSANDS OF DOLLARS r a 0 0 A; ; ; i DESCRIPTION OF WORK jo work T L N R; OBLIGATION ; FUNDING SOURCE ;TOTAL U f code A 9 C R; SCHEDULE ------------ - - - - -- -, - -- - r (Street name or number, c (s) L 9 TC Y; Y E A R ;FEDERAL ; RAP 'FONDS , i Co. road name or number, lw G HL 0; - - - - - - - - - ; ; or ;Local; t termini beginning & end. ao T LA V ;1st 2nd 3rd 4,5 ; Pro -;AMT UAB y Describe work to be done.) sr R S E ;Annl 6th ;ANT gram; No sk S R ;Elmt 1 2 3 4 6 8 9 10 11 12 13 , 14 15 , 16 17 , ,7, ----------------------------------------------------------------------------------------------------------------------------------- ROADWAY RECONSTRUCTION, RESTORATION PROJECTS 1 208TH ST. SW -- 76th Ave. W. to City Limits 4 ABDFG 0.55 17 1714 1371 UAB 90 1461 Reconstruct roadway;incl. grading, paving, drainage, curbs 8 sidewalks (remaining $280,000 is Lynnw000d's 20%) 2 OLYMPIC VIEW DR. -- Sunset Way to Talbot Rd. 3 D 0.15 17 X 30 25 FADS 5 30 Minor widening and drainage with rockery 3 OLYMPIC VIEW DR. -- SR524 to 88th Ave. W. 5 DFH 1.21 17 180 150 FAUS 30 180 Pavement overlay to strengthen, restore ride - add curbs 4 STREET OVERLAY PROGRAM FOR 1990 5 DH 3.50 19 200 200 200 Pavement overlays to strengthen, restore ride 5 220TH ST. S.W. -- 100th Ave. W. to 84th Ave. W. 2 ADFGI 1.00 17 X 750 600 UAB 150 750 Arterial street widening with Snohomish County 6 SR 99 -- 244th St. S.W. to 210th St. S.W. 2 ABDFH 2.30 14_ 500 400 UAB 100 500 Construct curb and gutter (State to overlay, widen to 7 lanes) 7 76TH AVE. W. -- 212th St. S.W. to 196th St. S.W. 5 D 1.00 17 75 62 FAGS 13 75 Grind pavement, overlay to strengthen, restore ride -- joint project with Lynnwood - they pay 75K also 8 ADMIRAL WAY -- Railroad Ave. to Olympic Park 5 D 0.50 19 68 56 FADS 12 68 Pavement overlay to strength, restore ride 9 5TH AVE. S. -- SR 104 to Main St. 5 D 0.70 16 154 128 FADS 26 154 Fabric over cracks, overlay after grinding edges 10 MAIN ST. -- Sunset Ave. to 8th Ave. 5 D 0.25 17 90 75 FADS 15 90 Pavement overlay to strenthen, restore ride 11 STREET OVERLAY PROGRAM FOR 1991 5 D 3.50 19 200 200 240 Pavement overlays to strengthen, restore ride 12 74TH AVE. W. -- 208th St. S.W. to 209th St. S.W. 5 D 0.06 19 8 8 8 Pavement overlay, widening, install curb 8 gutter 13 STREET OVERLAY PROGRAM FOR 1992 5 D 3.50 19 200 200 240 Pavement overlays to strengthen, restore ride 14 200TH ST. S.W. -- Maplewood Dr. to 76th Ave. W. 4 ADU 0.90 19 68 68 68 Reconstruct or realign, as study indicates 15 7TH AVE. -- Fir St. to Pine St. 5 D 0.12 19 20 20 20 Pavement overlay to strengthen, restore ride 16 PIKE ST. -- 6th Ave. S. to 7th Ave. S. 5 D 0.06 19 20 20 'l0 Pavement overlay to strengthen, widening would require add. R!W . LL,BROOKMERE DR. -- 9th Ave. N. to 10th Ave. N. 5 D 0.13 19 10 10 10 Prelevel and overlay 18 CITY WIDE STREET IMPROVEMENTS, RESTORATION 4 DF 5.00 17 25 25 25 75 150 150 19 CITY WIDE DRAINAGE IMPROVEMENTS, RESTORATION 4 B 5.00 17 25 25 25 75 150 150 SA 80TH AVE. W. -- 192nd P1. S.W. to SR 524 3 N 0.30 19 25 Construct walkway on one side of road 100 City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM LID 200 2 Hearing Date—JUNE 3 6, 1989 0.50 PG 43 City No 0365 1990 -1996 Construct walkway on at least one side of roadway 22 130 Adoption Date 3 200TH ST. S.W. -- 76th Ave. W. to -Naplevood Dr. County No. 31 N 0.90 19 X Resolution No. Construct walkway on at least one side of roadway 35 35 P PROJECT IDENTIFICAT -N e T F C, PROJECT COSTS IN THOUSANDS OF DOLLARS 80 r Valley a 0 0 A; N. MEADOWDALE RD. -- 75th Ave. W. to 68th Ave. W. ; N 11 i DESCRIPTION OF WOE! ]o wort T L N R; OBLIGATION ; FUNDING SOURCE ;TOTAL 0 3 f code A E C R; SCHEDULE ;------- ----- ------- --- - --- --: r (Street name or number, c (s) L N TC Y; Y E A R R ;FEDERAL ; RAP ; ;FONDS i Co. road name or number, lv G NL 0; - - - - - - - - - ; or ;Local; t termini beginning 3 end. ao T LA V;1st 2nd 3rd 4,5 Pro -;ANT UAB y Describe work to be done.) sr H S E;Annl 6th ;ANT grae; Construct walkway on at least one side of roadway No sk S R;Elmt 3 ; 0.50 19 1 2 3 , 4 5 6 ,7, 8 9 10 11 12 13 , 14 15 , 16 17 3 N 0.80 17 Construct walkway on at least one side of roadway STREET IMPROVEMENT /WALKWAY PROJECTS 1 80TH AVE. W. -- 192nd P1. S.W. to SR 524 3 N 0.30 19 25 Construct walkway on one side of road 100 200 LID 200 2 MAPLEWOOD DR. -- Main St. to 200th St. S.W. 3 N 0.50 17 50 Construct walkway on at least one side of roadway 22 130 20 3 200TH ST. S.W. -- 76th Ave. W. to -Naplevood Dr. 3 N 0.90 19 X Construct walkway on at least one side of roadway 35 35 45 4 PIONEER WAY -- Main St. to Shell Valley 1 ABDF 0.40 19 I 80 Alternate emergency services access /egress into Shell Valley 10 10 10 5 N. MEADOWDALE RD. -- 75th Ave. W. to 68th Ave. W. 3 N 0.60 19 20 Construct walkway on at least one side of roadway 20 20 20 6 MEADOWDALE BEACH RD. -- 76th Eve. W. to OVD 3 N 0.75 17 X Widen, finish walkway system 40 40 25 7 CASPERS ST. -- Sunset Ave. to 3rd Ave. N. 3 R 0.10 19 X Construct walkway on at least one side of roadway 8 72ND AVE. W. -- 210th St. S.W. to 212th St. S.W. 1 ABDFG 0 19 New street connection into College Place area (SEE ITEM 411, PG 41 SIGNALS) 9 176TH ST. - -72nd Ave. W. to Olympic View Dr. 3 N 0.25 19 Construct walkway on at least one side of roadway 10 68TH AVE. W. -- N. Meadovdale Rd to 160th St. S.W. 3 N 0.50 19 Widen, finish walkway system 11 76TH AVE. W. -- M'dale Beach Rd. to N. M'dale Rd. 3 N 0.80 17 Construct walkway on at least one side of roadway 12 80TH AVE. W. -- 218th St. S.W. to 220th St. S.W. 3 N 0.10 19 Construct walkway on at least one side of roadway 13 9TH AVE. N. -- Puget Dr. to Caspers St. 3 N 0.25 14 Construct walkway on at least one side of roadway 14 SEAVIEW & SIERRA PARKS 3 N 0.25 19 Construct walkway 15 YOST & PINE RIDGE PARKS 3 N 0.40 19 Construct walkway 16 MAPLEWOOD PARK 3 N 0.40 19 Construct walkway a 88TH AVE. W. -- 204th St. S.W. to 196th St. S.W. 3 N 0.40 17 Widen and construct valkvay on one side of road 18 102ND PL. S.W. -- Woodvay H.S. to SR 104 3 N 0.25 19 Construct valkvay 25 25 42 FAGS 8 50 100 100 100 200 LID 200 200 75 75 75 130 108 FAGS 22 130 20 20 20 60 60 60 35 35 35 45 45 45 80 80 80 10 10 10 25 25 25 20 20 20 20 20 20 20 20 20 40 40 40 25 25 25 City-of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Hearing Date—JUNE 6, 1989 PG 04 ; City No 0365 1990 -1996 Adoption Date ; County No. 31 Resolution No. ; ------------------------------------- P PROJECT IDENTIFICATION a T F C; PROJECT COSTS IN THOUSANDS OF DOLLARS ; r a 0 0 A; i DESCRIPTION OF WORE jo work T L N R; OBLIGATION FUNDING SOURCE ;TOTAL ; o f code A E C R; SCHEDULE ;------- ------------- --- -----: ; r (Street name or number, c (s) L N TC Y; Y E A F ;FEDERAL ; RAP ; ;FUNDS ; i Co. road name or number, lw G NL 0; - - - - - - - - - ; ; or ;Local; ; t termini beginning 8 end. ao T LA V ;1st 2nd 3rd 4,5 Pro -;AMT OAB y Describe work to be done.) sr H S E;Annl 6th ;AMT gram; No sk S R;Elat ----------------------------------------------------------------------------------------------------------------------------------- 1 2 3 ; 4 5 6 17; 8 9 10 11 12 13 ; 14 15 ; 16 ; 17 ; ------------------------------------------------------------------------------------------------------------------------------------ IMPROVEMENTS TO BE CONSTRUCTED IN 1989/1990 1 208TH ST. SW -- 76th Ave. W. to City Limits 4 ABDFG 0.55 17 1714 1371 OAB 90 1461 Reconstruct roadway;incl. grading, paving, drainage, curbs A sidewalks (remaining $28 0,000 is Lynnw000d's 20%) 1 208TH ST. S.W. and 76TH AVE. W. 6 I 0.10 16 X 90 72 DAB 18 90 Install traffic /pedestrian actuated signal (Lynnwood lead agency) 2 OLYMPIC VIEW DR. -- Sunset Way to Talbot Rd. 3 D 0.15 17 X 30 25 FAGS 5 30 Minor widening and drainage with rockery 150 FflOS 30 180 3 OLYMPIC VIEW DR. -- SR524 to 88th Ave. W. 5 DFR 1.21 17 180 Pavement overlay to strengthen, restore ride - add curbs 200 200 4 STREET OVERLAY PROGRAM FOR 1990 5 DR 3.50 19 200 Pavement overlays to strengthen, restore ride 600 OAR 150 750 5 220TH ST. S.W. -- 100th Ave. W. to 84th Ave. W. 2 ADFGI 1.00 17 Y 750 Arterial street widening with Snohomish County 400 0AB 100 500 6 SR 99 -- 244th St. S.W. to 210th St. S.W. 2 ABDFH-2.30 14 500 Construct curb and gutter (State to overlay, widen to 7 lanes) 13 75 7 76TH AVE. W. -- 212th St. S.W. to 196th St. S.W. 5 D 1.00 17 75 62 FADS Grind pavement, overlay to strengthen, restore ride -- joint project with Lynnwood - they pay 75K also 8 ADMIRAL WAY -- Railroad Ave. to Olympic Park 5 D 0.50 19 68 56 FADS 12 68 Pavement overlay to strength, restore ride 3 3 9 SR 524 and 7TH AVE. E. 6 I 0.10 14 3 Corner improvements, channeliaation 25 25 10 BOTH AVE. W. -- 192nd Pl. S.W. to SR 524 3 N 0.30 19 25 11 Construct walkway on one side of road MAPLEWOOD DR. -- Main St. to 200th St. S.W. 3 H 0.50 17 50 42 FAGS 8 50 Construct walkway on at least one side of roadway I . 208th Street Improvements - 2. Olympic View Drive - rockery - - 3. Olympic View Drive - overlay and curbs ^_rs 4. 1990 Street Overlay Program `'�:�,., �:� �?i' —=tip `'``� .e ,;•` �•�•< « 5. 220th Street -improvements 6. SR 99 curbs and overlays rye ow „s: • - �� + ; 7. 76th Ave. W. Overlay w �' 8. Admiral Way Overlay 9. SR 524 -7th Ave. Corner Improvements 10.80th Ave, Walkway- ll.Maplewood Dr. Walkway o % .111 L f J /�/ — i• = c. • ...` . .. : °Fi• �wo-wo.m�n 1•- - l Y N N W 0 0 0 TO L"M.10W CO AD „� ' : • ncrJ.ts cur e[ • .oa, � ;�..wwl i i sre.t to..,••,r / ,.tom., �,�,”' - -, • '[ - £; . - 7 m ;.-. • i MMt IIlI 1111 IS t Tv. _J. _i;, u Irt 4!( Olt� i i 11111 it W 0 0 0 W A Y i t J •- T E R R A C E ju AALUNCEN J: `_..-