Loading...
Resolution 6770006.19012 DAS /naa 05/23/88 RESOLUTION NO. 677 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE URBAN ARTERIAL BOARD. WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 RCW, as amended, the.City.Council of the City of Edmonds has previously` adopted a. Comprehensive Street Program, including an arterial street construction program, and thereafter periodically modified said Comprehensive Street Program by resolution, and WHEREAS, the City Council has reviewed the work accomplished under the said Program, determined current and future City., street- and arterial needs, and based upon these findings has prepared a Six -Year Transportation Improvement Program for the ensuing six (6) calendar years, and WHEREAS, a public hearing has been held on the said Six - Year Transportation Improvement Program, and WHEREAS, the City Council finds that there will be _no significant adverse environmental impacts as a result of adoption or implementation of the Six -Year Transportation Improvement Program, NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVE AS FOLLOWS: Section 1. Program Adopted. The Six -Year Transportation Improvement Program for the City of Edmonds, as revised and DAS00008E - 1 - L extended fot the' ensuing six .(6) calendar, years- (1989- 1994, inclusive) , a copy of which is attached heret -o as Exhibit A and incorpo:r.atedl,'herein by this reference as if fully: set .fo:xtb".,., w:r,:idh;:;. ;. Program -sets forth' the project location, type of improvement an,d...;.. the estimated cost thereof, is hereby adopted and approved. Section 2. Filing of Program. Pursuant to RCW Chapter. 35.77, the City Clerk is hereby authorized and directed to file a. copy of this resolution forthwith, together, with- the... Exhibit:, attached hereto, with the Secretary of Transportation and a copy with the Urban Arterial Board for the State of Washington. RESOLVED this 7th day of June 1988. APPROVED: ATTEST /AUTHENTICATED: (/CITff CLERK, 7ACQUELINE PARRETT FILED,WITH THE CITY CLERK: June 3, 1988 PASSED BY THE CITY COUNCIL: June 7, 1988 RESOLUTION NO. 677 DAS00008E - 2 - EXHIBIT A TRAFFIC SIGNALIZATION, CHANNELIZATION PROJECTS 1 SR524 (196th St.SW) and 80th Ave.W. 6 HI 0.15 14 X 100 30 City of IDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Install new signal and corner improvements Hearing Date--JUNE 7,1988_ PG fl City No 0365 1989 -1995 2 Adoption'Date JUNE 7,1988_ ; County No. 31 0.10 16 X 20 20 Resolution No._ 677 P PROJECT IDENTIFICATION m T F C; PROJECT COSTS IN THOUSANDS OF DOLLARS r a 0 0 A; 1. 1. ; i DESCRIPTION OF WORK jo work T L N R; OBLIGATION ; FUNDING SOURCE ;TOTAL ; o f code A E C R; SCHEDULE ;------------------ - - - - -; ; r (Street name or number, c (s) L N TC Y; Y E A R ;FEDERAL ; RAP ; ;FONDS ; i Co. road name or number, lw G IL 0; - - - - - - - - - ; or ;Local; ; t termini beginning A end. ao T LA V;lst 2nd 3rd 4,5 Pro -;AMT UAB y Describe work to be done.) sr H S E;Annl 6th ;AMT gram; No sk S R;Ililt ; HI 0.1 1 2 3; 4 5 6;7; 8 9 10 11 12 13; 14 15; 16 17 ; ------------------------------------------------------------------------------------------------------------------------- to do their half of $150,000 project 7 Woodway High School Entrance & tooth Ave W. - - - - -- TRAFFIC SIGNALIZATION, CHANNELIZATION PROJECTS 1 SR524 (196th St.SW) and 80th Ave.W. 6 HI 0.15 14 X 100 30 90 HIS 26 FAGS 14 130 Install new signal and corner improvements 2 212th St S.K. and 76th Ave W. 6 I 0.10 16 X 20 20 20 Upgrade controller and cabinet to 8 -phase capable 3 Dayton Street Railroad Crossing Improvements 6 DFIJ 0.10 17 X 179 137 RRP 33 FADS 9 179 Improve protection devices & approaches, lighting 4 Walnut & 9th Ave.S. 6 H 0.10 16 4 4 4 Channelization improvements 5 Main St. & 3rd Ave.(SR 524) 6 HI 0.10 14 50 50 50 Replace old fixed time signal with traffic /ped actuated type 6 SR 99 and 216TH St. SK 6 HI 0.1 14 75 40 FAGS 35 75 Install new signal & channelization on our half of intersection/ Lynnwood to do their half of $150,000 project 7 Woodway High School Entrance & tooth Ave W. 6 I 0.10 16 96 80 FAUS 16 96 Install traffic actuated signal for safety during school hours 8 Puget Dr & Olympic View Dr. 6 I 0.10 16 96 80 FAUS 16 96 Install traffic /pedestrian actuated signal 9 208th St S.W. and 76 Ave W. 6 1 0.10 16 X 90 72 UAB 18 90 Install traffic /pedestrian actuated signal( Lynnwood lead agency ) 10 220th St S.W. and 100 Ave W.(9th Ave.S. a Elm St.) 6 HI 0.10 16 X 96 80 FAUS 16 96 Install new signal & channelization 11 212th St. S.W. & 72nd Ave W. 6 I 0.10 16 90 90 90 Install traffic /pedestrian actuated signal 12 200th St. S.W. & 76th Ave N. 6 I 0.10 17 45 38 FAUS 7 45 (our half of intersection costs to signalize) 13 SR 524 & 88th Ave W. 6 R 0.10 14 10 10 i0 channelization improvements 14 SR 524 & 7th Ave N. 6 I 0.10 14 3 3 3 Corner improvements, channelization 15 220th St. S.K. & 84th Ave W. 6 I 0.10 17 90 90 90 Replace 4 -way flashing red with actuated signal 16 212th St. S.W. & 80th Ave W. 6 I 0.10 16 90 90 90 Install traffic /pedestrian actuated signal 17 224th St. S.W. & 76th Ave W. 6 I 0.10 17 90 90 90 Replace 4 -vay flashing red with actuated signal 18 Main St. & 7th Ave N. 6 I 0.10 16 10 10 10 Install pedestrian actuated crosssing flasher 19 Meadovdale Beach Rd. & 76th Ave W. 6 I 0.10 17 90 90 90 Install traffic /pedestrian actuated signal 20 Main & 9th Ave S. 6 HI 0.10 16 95 95 95 Install traffic /pedestrian actuated signal 21 City wide signal improvements 6 1 0.10 16 20 20 20 60 120 120 sA City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Hearing Date JUNE 7,1988_ PG 12 City No 0365 1989 -1995 Adoption Date JUNE 7,1988_ County No. 31 Resolution No. 677 P PROJECT IDENTIFICATION ----------------------------------------------------------------------- m T F C; PROJECT COSTS IN THOUSANDS OF DOLLARS r a 0 0 A; 1 ; i DESCRIPTION OF WORE jo work T L N R; OBLIGATION FUNDING SOURCE ;TOTAL U f code A B C R; SCHEDULE ;------------------ - - - - -; r (Street name or number, c (s) L N TC Y; Y B A R ;FEDERAL ; RAP ; ;FUNDS i Co. road name or number, lw G NL 0; - - - - - - - - - ; or ;Local; t termini beginning & end. ao T LA V;lst 2nd 3rd 4,5 ; Pro -;AMT UAB I Describe work to be done.) sr H S B;Annl 6tb ;ANT gram; ; No sk S R;Elmt 1 2 ----------------------------------------------------------------------- 3 ; 4 5 6 M 8 9 10 11 12 13 ; 14 15 ; 16 17 ------------------------------------------------------------------------------------------------------------------------------ ROADKAY RECONSTRUCTION, RESTORATION PROJECTS 1 Olympic View Dr. ! Sunset (curve widening) 3 D 0.15 17 1 30 25 FADS 5 30 Minor paving and drainage with rockery 2 212th St.SK, 76th Ave. K. - 84th Ave K. 4 D 0.50 16 Y 175 146 FADS 29 175 Minor widening with pavement overlay, repair 3 208TH ST SK , 76TH AYR. - CITY LIMITS 4 ABDFG 0.30 17 60 300 288 UAB 72 360 Reconstruct roadway;incl. grading, paving, drainage, curbs & sidewalks 4 212th ST SK , 76th AVE K to SR99 4 D 0.50 16 60 50 FAGS 10 60 Repair and overlay roadway to strengthen, restore ride 5 Hain St. Sunset Ave. - 8th Ave. 5 D 0.25 17 90 75 FAGS 15 90 Fabric over cracks, overlay after grinding edges 6 76th Ave. K. Olympic View Dr.- Meadowdale Bch Rd. 5 D 1.10 17 43 43 43 Pavement overlay to strengthen, restore ride 7 N. Meadowdale Rd. 68th Ave. K. to vic. #16216 4 D 0.28 19 39 39 39 Reconstruct or repave street 8 97th Ave.K. ;216hth St., 96th - 98th; 219th Pl. 4 D 0.31 19 60 60 60 Reconstruct or repave streets,install drains as needed 9 84th Ave. & 83rd Ave. ,212th St. - 208th St. 5 D 0.28 19 40 40 40 Reconstruct or repave streets,drains installed 1988 10 84th Ave & 83rd Ave , 196th St. - 200th St. 5 D 0.28 19 40 40 40 Reconstruct or repave streets,install drains as needed 11 80th Ave K. 196th St. S.K. - 200th St. S.K. 5 D 0.25 19 60 60 60 Pavement overlay to strengthen, restore ride 12 200th St.SK Maplewood - 76th Ave. K. 4 OAD 0.90 19 8 60 68 68 Reconstruct or realign , as study indicates 13 74th Ave K. 208th St. S.K. one half block south 5 D 0.06 19 8 8 8 Pavement overlay, widening, install curb & gutter 14 6th Ave Main St. - Walnut St. 5 D 0.25 19 20 20 20 Pavement overlay to strengthen, restore ride 15 7th Ave Fir - Pine 5 D 0.12 19 20 20 20 Pavement overlay to strengthen, restore ride 16 Pine 6th Ave - 7th Ave 5 D 0.06 19 20 20 20 Pavement overlay to strengthen, widening would require add. R/K 17 190th Place S.K. Olympic View Dr - 94th Ave. K. 5 D 0.15 19 38 38 38 Pavement overlay , drain inlets as required 18 Brookmere Dr 9th Ave N - 10th Ave N. 5 D 0.13 19 10 10 10 Prelevel and overlay 19 Bell St Sunset Ave - 5th Ave 5 D 0.25 19 71 71 71 Pavement overlay 20 City wide street improvements,restoration 4 DF 5 17 25 25 25 75 150 150 21 City wide drainage improvements,restoration 4 B 5 17 25 25 25 75 150 150 SA City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Hearing Date JUNE 7,1988_ PG 43 City No 0365 1989 -1995 Adoption Date JUNE 7,1988_ County No. 31 Resolution No. 677 P PROJECT IDENTIFICATION m T F C, PROJECT COSTS IN THOUSANDS OF DOLLARS r a 0 0 All 11 ; i DESCRIPTION OF WORK jo work T L N R; OBLIGATION FUNDING SOURCE ;TOTAL o f code A E C R; SCHEDULE ;----------------------- r (Street name or number, c (s) L N TC Y; Y E A 8 ;FEDERAL RAP ; ;FUNDS i Co. road name or number, lw G NL 0; - - - - - - - - - ; or ;Local; t termini beginning & end. ao T LA V;lst 2nd 3rd 4,5 ; Pro -;ANT UAB y Describe work to be done.) sr H S 1 Annl 6th :ANT gram; No sk S R;Elmt ; - --------------------------------------------------------------------- 1 2 3 ; 4 5 6 ;7; 8 9 10 11 12 13 ; 14 15 ; 16 17 ------------------------------------------------------------------------------------------------------------------------------ STREET IMPROVENENTAILBWAY PROJECTS 1 220th St. 100th Ave W. - 84th Ave N. 2 ADFGI 1.00 17 g 750 600 UAB 150 750 Arterial street widening with Snohomish County 2 Maplewood Dr. Main - 200th St. S.N. 3 N 0.50 17 50 42 FADS 8 50 Construct walkway on at least one side of roadway 3 200th St S.N. 76th Ave W - Maplewood Dr. 3 N 0.90 19 % 100 100 100 Construct walkway on at least one side of roadway 4 Pioneer Nay Main St - Shell Valley 1 ABDF 0.40 19 Z 200 LID 200 200 Alternate emergency services access /egress into Shell Valley 5 Meadowdale Beach Rd. 76th Ave W. - OVD 3 N 0.75 17 % 130 108 FADS 22 130 Widen, finish walkway system 6 Casper St. Sunset - 3rd Ave 3 N 0.10 19 % 20 20 20 Construct walkway on at least one side of roadway - 7 72nd Ave.W. , 210th St. SK - 212th St. SW 1 ABDFG 0.11 19 60 60 60 New street connection into College Place area (SEE ITEM 411, PG 91 SIGNALS) 8 176th St. 72nd Ave W. - Olympic View Dr. 3 N 0.25 19 35 35 35 Construct walkway on at least one side of roadway 9 68th Ave H. Meadowdale Rd - 160th St. 3 N 0.50 19 45 45 45 Widen, finish walkway system 10 76th Ave. Meadowdale Beach Rd - N. Meadowdale Rd. 3 N 0.80 17 80 80 80 Construct walkway on at least one side of roadway 11 N. Meadovdale Rd. 75th Ave to 68th Ave. 3 N 0.60 19 75 75 75 Construct walkway on at least one side of roadway 12 80th Ave W. 218th St. S.W. - 220th St. S.W. 3 N 0.10 19 10 10 10 Construct walkway on at least one side of roadway 13 9th Ave Paget - Casper St. 3 N 0.25 14 25 25 25 Construct walkway on at least one side of roadway 14 Seaview Sierra 3 N 0.25 19 20 20 20 Construct walkway 15 Iost Pine Ridge 3 N 0.40 19 20 20 20 Construct walkway 16 Maplew000d Park 3 N 0.40 19 20 20 20 Construct walkway 17 88th Ave. W. 204th St.SW - 196th St. SW 3 N 0.40 17 40 40 40 Widen and construct walkway on one side of road 18 102nd P1. S.N. Woodvay H.S. - SR 104 3 N 0.25 19 25 25 25 Construct walkway