Loading...
Resolution 655t 0006.19012 j 06/03/86 R: 01/15/87na RESOLUTION NO. 655 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, AMENDING ITS SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM AND DIRECT- ING SUCH AMENDMENT TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE URBAN ARTERIAL BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, as amended, the City Council of the City of Edmonds has previously adopted a Comprehensive Street Program and thereafter periodically modified said Comprehensive Street Program by resolution, and WHEREAS, the City Council has reviewed the work accom- plished under the said program, determined current and future City street and arterial needs, and based upon these findings has previously adopted a Six -Year Transportation Improvement Program for the next ensuing six (6) calendar years, and WHEREAS, the Council is desirous of amending the Plan to incorporate improvements to railroad crossing signalization at Dayton Street, and WHEREAS, a public hearing has been held on the said amendment of the Six -Year Transportation Improvement Program, and WHEREAS, the City Council finds that there will be no significant adverse environmental impacts as a result of adoption or implementation of the Six -Year Transportation Improvement Program, now, therefore, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Program Adopted. The Six -Year Transporta- tion Improvement Program for the City of Edmonds, as revised, extended and adopted for the ensuing six (6) calendar years (1987 -1992, inclusive), adopted by Resolution 648 is hereby amended to read as shown on Exhibit A, incorporated herein by this reference as if fully set forth, with such amended program setting forth the project location, type of improvement and the estimated cost thereof. Section 2. Filing of Amended Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the amended exhibit attached hereto, with the Secretary of Transportation and the Urban Arterial Board for the State of Washington. RESOLVED this 20th day of January , 198.`7. APPROVED: LlAv4z _'_ MAYO , L S. AUG TEN ATTEST /AUTHENTICATED: IT CLERK, JACQUELINE G. PARRETT FILED WITH THE CITY CLERK: January 16, 1987 PASSED BY THE CITY COUNCIL: January 20, 1987 RESOLUTION NO. 655 �Am SA 1 City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Hearing Date ... July 1 ,1986 PG 41 City No 0365 1987 -1993 Adoption Date__July 1 ,1986 County No. 31 Resolution No. ------------- 648 & 655 ; P PROJECT IDENTIFICATION m T F CI ________ PROJECT COSTS __ __________ _________ __ _____ IN THOUSANDS OF DOLLARS __� r a 0 U AI i DESCRIPTION OF WORK jo work T L N RI OBLIGATION 1 FUNDING SOURCE TOTAL 1 o f code A E C R1 SCHEDULE 1------------------ - - - - -1 r (Street name or number, c (s) L N TC YI Y E A R FEDERAL 1 RAP 1 :FUNDS 1 i Co. road name or number, lw G NL 01 - - - - - - - - - 1 I or :Local: ; t termini beginning & end. ao T LA Vllst 2nd 3rd 4,5 1 Pro -1AMT UAB 1 1 ) y Describe work to be done.) sr H S E:Annl 6th 1AMT gram: ) 1 ) No sk S R:Elmt ; 1 ------------------------------------------------------------------------------------------------------------------------------- 2 3 1 4 5 6 171 8 9 10 11 1 12 13 1 14 15 16 1 17 1 TRAFFIC SIGNALItATION, CHANNELIZATION PROJECTS I SR524 (196th St.SW) and 80th Ave.W. 6 HI 0.15 14 X 100 30 90 HES 26 FAUS 14 130 2 212th St S.W. and 76th Ave W. 6 I 0.10 16 X 40 32 UAB 8 40 3 208th St S.W. and 76 Ave W. 6 I 0.10 16 X 90 72 UAB 18 90 4 Dayton Street Railroad Crossing Improvements 6 DFIJ 0.10 17 179 137 RRP 33 FAUS 9 179 5 220th St S.W. and 100 Ave W.(9th Ave.S. @ Elm St.) 6 HI 0.10 16 X 96 77 FAUS 19 96 6 Woodway H.S Ent & tooth Ave S.W. 6 I 0.10 16 96 77 FAUS 19 96 7 Puget Or & Olympic View Dr. 6 1 0.10 16 96 11 FAUS 19 96 8 Main & 9th Ave S. 6 HI 0.10 16 95 95 95 9 200th St. S.W. & 16th Ave W. 6 I 0.10 17 90 90 90 10 212th St. S.W. & 72nd Ave W. 6 1 0.10 16 90 90 90 11 SR 524 & 88th Ave W. 6 H 0.10 14 10 10 10 12 Walnut & 9th Ave.S. 6 H 0.10 16 4 4 4 13 220th St. S.W. & 84th Ave W. 6 1 0.10 17 90 90 90 14 212th St. S.W. & 80th Ave W. 6 1 0.10 16 90 90 90 15 224th St. S.W. & 76th Ave W. 6 I 0.10 17 90 90 90 16 SR 524 & 7th Ave N. 6 I 0.10 14 3 3 3 17 Main St. & 7th Ave N. 6 1 0.10 16 10 10 10 18 Meadowdale Beach Rd. & 76th Ave W. 6 1 0.10 17 90 90 90 19 Main St. & 3rd Ave.(SR 524) 6 HI 0.10 14 90 90 90 20 City wide signal improvements 6 1 0.10 16 20 20 20 SA City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Hearing Date ... July 1 ,1986 PG #2 City No 0365 1987 -1993 Adoption Date__July 1 ,1986 County No. 31 Resolution No. 648 & 655 P PROJECT IDENTIFICATION m T F C; PROJECT --------------------------------- COSTS IN THOUSANDS OF DOLLARS r a 0 U A; 1 i DESCRIPTION OF WORK jo work T L N R OBLIGATION ; FUNDING SOURCE ;TOTAL o f code A E C R; SCHEDULE ;------------------ - - - - -; r (Street name or number, c (s) L N TC Y; Y E A R ;FEDERAL ; RAP 1 ;FUNDS i Co. road name or number, lw G NL 0; - - - - - - - - - 1 ; or ;Local; t termini beginning & end. ao T LA V;ist 2nd 3rd 4,5 1 Pro -;AMT UAB 1 1 y Describe work to be done.) sr H S E;Annl 6th ;AMT gram; No sk S R:Elmt 1 ------------------------------------------------------------------------------------------------------------------------------ 2 3 1 4 5 6 171 8 9 10 ----------------------------------- it 1 12 13 ; 14 15 1 16 ; 17 ROADWAY RECONSTRUCTION, RESTORATION PROJECTS 1 80th Ave. W. 1212th St. to 220th St. 3 OB 0.5 19 X 80 80 80 2 Olympic View Dr. @ Sunset (curve) 3 D 0.15 17 X 30 24 FAUS 6 30 3 7th Avenue S. , Birch St. to Elm St. 2 OF 0.1 19 25 25 25 4 212th St.SW, 76th Ave. W. - 84th Ave W. 4 D 0.50 16 90 78 FAUS 12 90 5 9th Ave S., Main St. - Elm St. 5 E 0.80 16 20 20 20 6 3rd Ave N., Main St. - Caspers 5 D 0.50 14 50 44 FAUS 7 50 7 84th Ave. & 83rd Ave. ,212th St. - 208th St. 5 D 0.28 19 40 40- 40 8 84th Ave & 83rd Ave , 196th St. - 200th St. 5 D 0.28 19 40 40 40 9 Both Ave W. 196th St. S.W. - 200th St. S.W. 5 D 0.25 19 60 60 60 10 74th Ave W. 212th St. S.W. - to 208th St. S.W. 5 D 0.25 19 30 30 30 11 6th Ave Main St. - Walnut St. 5 D 0.25 19 50 50 50 12 7th Ave Fir - Pine 5 D 0.12 19 20 20 20 13 Pine 6th Ave - 7th Ave 5 D 0.06 19 20 20 20 14 190th Place S.W. Olympic View Or - 94th Ave. W. 5 D 0.15 19 38 38 38 15 Brookmere Or 9th Ave N - 10th Ave N. 5 D 0.13 19 22 22 22 16 187th St. S.W. 81st Ave W. -84th Ave W. 5 D 0.18 19 22 22 22 17 81st Ave W 186th St S.W. - 190th St S.W. 5 D 0.25 19 33 33 33 18 Daley St. 350 feet west of 10th Ave 5 0 0.08 19 27 27 27 19 Bell St Sunset Ave - 5th Ave 5 0 0.25 19 71 71 71 20 City wide street improvements,restoration 4 OF 5 17 25 25 150 200 200 21 City wide drainage improvements,restoration 4 B 5 17 100 100 tQ0 SA City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Hearing Date ... July 1 ,1986 PG 43 City No 0365 1987 -1993 Adoption Date__July 1 ,1986 County No. 31 Resolution No._ 648 & 655 P PROJECT IDENTIFICATION m T F C! PROJECT COSTS IN THOUSANDS OF DOLLARS r a 0 U A! i DESCRIPTION OF WORK jo work T L N R! OBLIGATION 1 FUNDING SOURCE TOTAL o f code A E C R! SCHEDULE l------------------ - - - - -1 r (Street name or number, c (s) L N TC Y! Y E A R FEDERAL 1 RAP 1 1FUNDS i Co. road name or number, lw G NL 01 - - - - - - - - - 1 ! or 1Locall t termini beginning & end. ao T LA V11st 2nd 3rd 4,5 ! Fro -1AMT UAB 1 1 y Describe work to be done.) sr H S E!Annl 6th 1AMT gram! 1 ! No ------------------------------------------------------------------------------------------------------------------------------ sk S R!Elmt ! ! 1 1 ------------------------------------------------------------------------------------------------------------------------------ 1 2 3 1 4 5 6 171 8 9 10 11 1 12 13 1 14 15 1 16 1 17 ------------------------------------------------------------------------------------------------------------------------------ STREET IMPROVEMENT /WALKWAY PROJECTS 1 220th St. tooth Ave W. - 84th Ave W. 2 ADFG 1.00 17 X 750 600 UAB 150 750 2 88th Avenue Main St.- 204th St.SW 1 ADFGJ 0.30 17 450 209 FAUS LID 241 450 3 Pioneer Way Main St - Shell Valley 1 ABDF 0.40 19 X 200 LID 200 200 4 Meadowdale -Beach Rd. 76th Ave W. - OVD 3 N 0.75 17 X 130 104 FAUS 26 130 5 200th St S.W. 76th Ave W - Maplewood Dr. 3 N 0.90 17 X 100 100 100 6 Casper St. Sunset - 3rd Ave 3 N 0.10 19 X 20 20 20 7 176th St. 72nd Ave W. - Olympic View Dr. 3 N 0.25 19 X 35 35 35 8 68th Ave N. Meadowdale Rd - 160th St. 3 N 0.50 19 45 45 45 9 16th Ave. Meadowdale Beach Rd - N. Meadowdale Rd. 3 N 0.80 17 80 80 80 10 N. Meadowdale Rd. 15th Ave to 68th Ave. 13 N 0.60 19 75 75 75 11 Maplewood Dr. Main - 200th St. S.W. 3 N 0.50 17 50 50 50 12 80th Ave. W. 206th St. S.W. - 220th St. S.W. 3 N 0.90 19 70 70 70 13 9th Ave Puget - Casper St. 3 N 0.25 14 25 25 25 14 Interurban 242nd St. S.W. - 220th St. S.W. 3 0 1.50 19 25 25 25 15 Seaview Sierra 3 N 0.25 19 20 20 20 16 Yost Pine Ridge 3 N 0.40 19 20 20 20 17 Maplew000d Park 3 N 0.40 19 20 20 20 18 88th Ave. W. 204th St.SW - 196th St. SW 3 N 0.40 17 40 40 40 19 72nd Ave. W. 212th St. S.W. - 208th St. S.W. I ABDF 0.25 19 25 25 25 20 102nd P1. S.W. Woodway H.S. - SR 104 3 N 0.25 19 25 25 25