Resolution 655t
0006.19012
j
06/03/86
R: 01/15/87na
RESOLUTION NO. 655
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF EDMONDS, WASHINGTON, AMENDING ITS SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM AND DIRECT-
ING SUCH AMENDMENT TO BE FILED WITH THE STATE
SECRETARY OF TRANSPORTATION AND THE URBAN
ARTERIAL BOARD.
WHEREAS, pursuant to the requirements of RCW Chapters
35.77 and 47.26, as amended, the City Council of the City of
Edmonds has previously adopted a Comprehensive Street Program and
thereafter periodically modified said Comprehensive Street
Program by resolution, and
WHEREAS, the City Council has reviewed the work accom-
plished under the said program, determined current and future
City street and arterial needs, and based upon these findings has
previously adopted a Six -Year Transportation Improvement Program
for the next ensuing six (6) calendar years, and
WHEREAS, the Council is desirous of amending the Plan
to incorporate improvements to railroad crossing signalization at
Dayton Street, and
WHEREAS, a public hearing has been held on the said
amendment of the Six -Year Transportation Improvement Program, and
WHEREAS, the City Council finds that there will be no
significant adverse environmental impacts as a result of adoption
or implementation of the Six -Year Transportation Improvement
Program, now, therefore,
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON,
HEREBY RESOLVES AS FOLLOWS:
Section 1. Program Adopted. The Six -Year Transporta-
tion Improvement Program for the City of Edmonds, as revised,
extended and adopted for the ensuing six (6) calendar years
(1987 -1992, inclusive), adopted by Resolution 648 is hereby
amended to read as shown on Exhibit A, incorporated herein by
this reference as if fully set forth, with such amended program
setting forth the project location, type of improvement and the
estimated cost thereof.
Section 2. Filing of Amended Program. The City Clerk
is hereby authorized and directed to file a copy of this
resolution, together with the amended exhibit attached hereto,
with the Secretary of Transportation and the Urban Arterial Board
for the State of Washington.
RESOLVED this 20th day of January , 198.`7.
APPROVED:
LlAv4z _'_
MAYO , L S. AUG TEN
ATTEST /AUTHENTICATED:
IT CLERK, JACQUELINE G. PARRETT
FILED WITH THE CITY CLERK: January 16, 1987
PASSED BY THE CITY COUNCIL: January 20, 1987
RESOLUTION NO. 655
�Am
SA
1
City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT
PROGRAM
Hearing Date ...
July
1 ,1986
PG 41
City No 0365 1987 -1993
Adoption Date__July
1 ,1986
County No. 31
Resolution No.
-------------
648
& 655
;
P
PROJECT IDENTIFICATION
m
T
F
CI
________
PROJECT
COSTS
__ __________ _________ __ _____
IN THOUSANDS OF DOLLARS
__�
r
a
0
U
AI
i
DESCRIPTION OF WORK
jo
work
T L
N
RI
OBLIGATION
1 FUNDING
SOURCE
TOTAL 1
o
f
code
A E
C
R1
SCHEDULE
1------------------ - - - - -1
r
(Street name or number,
c
(s)
L N
TC
YI
Y E A R
FEDERAL 1
RAP 1 :FUNDS
1
i
Co. road name or number,
lw
G
NL
01
- - - - - - -
- -
1 I
or :Local:
;
t
termini beginning & end.
ao
T
LA
Vllst
2nd 3rd
4,5
1 Pro -1AMT
UAB 1 1
)
y
Describe work to be done.)
sr
H
S
E:Annl
6th
1AMT gram:
) 1
)
No
sk
S
R:Elmt
;
1
-------------------------------------------------------------------------------------------------------------------------------
2
3 1
4
5
6
171
8 9 10
11
1 12 13 1 14
15 16 1
17 1
TRAFFIC SIGNALItATION, CHANNELIZATION PROJECTS
I
SR524 (196th St.SW) and 80th Ave.W.
6
HI
0.15
14
X
100 30
90 HES 26
FAUS 14
130
2
212th St S.W. and 76th Ave W.
6
I
0.10
16
X
40
32
UAB 8
40
3
208th St S.W. and 76 Ave W.
6
I
0.10
16
X
90
72
UAB 18
90
4
Dayton Street Railroad Crossing Improvements
6
DFIJ
0.10
17
179
137 RRP 33
FAUS 9
179
5
220th St S.W. and 100 Ave W.(9th Ave.S. @ Elm St.) 6
HI
0.10
16
X
96
77 FAUS
19
96
6
Woodway H.S Ent & tooth Ave S.W.
6
I
0.10
16
96
77 FAUS
19
96
7
Puget Or & Olympic View Dr.
6
1
0.10
16
96
11 FAUS
19
96
8
Main & 9th Ave S.
6
HI
0.10
16
95
95
95
9
200th St. S.W. & 16th Ave W.
6
I
0.10
17
90
90
90
10
212th St. S.W. & 72nd Ave W.
6
1
0.10
16
90
90
90
11
SR 524 & 88th Ave W.
6
H
0.10
14
10
10
10
12
Walnut & 9th Ave.S.
6
H
0.10
16
4
4
4
13
220th St. S.W. & 84th Ave W.
6
1
0.10
17
90
90
90
14
212th St. S.W. & 80th Ave W.
6
1
0.10
16
90
90
90
15
224th St. S.W. & 76th Ave W.
6
I
0.10
17
90
90
90
16
SR 524 & 7th Ave N.
6
I
0.10
14
3
3
3
17
Main St. & 7th Ave N.
6
1
0.10
16
10
10
10
18
Meadowdale Beach Rd. & 76th Ave W.
6
1
0.10
17
90
90
90
19
Main St. & 3rd Ave.(SR 524)
6
HI
0.10
14
90
90
90
20
City wide signal improvements
6
1
0.10
16
20
20
20
SA
City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT
PROGRAM
Hearing Date ...
July
1 ,1986
PG #2
City No 0365 1987 -1993
Adoption Date__July
1 ,1986
County No. 31
Resolution No.
648
& 655
P
PROJECT IDENTIFICATION
m
T
F
C;
PROJECT
---------------------------------
COSTS
IN THOUSANDS
OF DOLLARS
r
a
0
U
A;
1
i
DESCRIPTION OF WORK
jo
work
T L
N
R
OBLIGATION
; FUNDING
SOURCE ;TOTAL
o
f
code
A E
C
R;
SCHEDULE
;------------------
- - - - -;
r
(Street name or number,
c
(s)
L N
TC
Y;
Y E A R
;FEDERAL ;
RAP 1 ;FUNDS
i
Co. road name or number,
lw
G
NL
0;
- - - - - - -
- -
1 ;
or ;Local;
t
termini beginning & end.
ao
T
LA
V;ist
2nd 3rd
4,5
1 Pro -;AMT
UAB 1 1
y
Describe work to be done.)
sr
H
S
E;Annl
6th
;AMT gram;
No
sk
S
R:Elmt
1
------------------------------------------------------------------------------------------------------------------------------
2
3
1 4
5
6
171
8 9 10
-----------------------------------
it
1 12 13 ; 14
15 1 16 ;
17
ROADWAY RECONSTRUCTION, RESTORATION PROJECTS
1
80th Ave. W. 1212th St. to 220th St.
3
OB
0.5
19
X
80
80
80
2
Olympic View Dr. @ Sunset (curve)
3
D
0.15
17
X
30
24 FAUS
6
30
3
7th Avenue S. , Birch St. to Elm St.
2
OF
0.1
19
25
25
25
4
212th St.SW, 76th Ave. W. - 84th Ave W.
4
D
0.50
16
90
78 FAUS
12
90
5
9th Ave S., Main St. - Elm St.
5
E
0.80
16
20
20
20
6
3rd Ave N., Main St. - Caspers
5
D
0.50
14
50
44 FAUS
7
50
7
84th Ave. & 83rd Ave. ,212th St. - 208th St.
5
D
0.28
19
40
40-
40
8
84th Ave & 83rd Ave , 196th St. - 200th St.
5
D
0.28
19
40
40
40
9
Both Ave W. 196th St. S.W. - 200th St. S.W.
5
D
0.25
19
60
60
60
10
74th Ave W. 212th St. S.W. - to 208th St. S.W.
5
D
0.25
19
30
30
30
11
6th Ave Main St. - Walnut St.
5
D
0.25
19
50
50
50
12
7th Ave Fir - Pine
5
D
0.12
19
20
20
20
13
Pine 6th Ave - 7th Ave
5
D
0.06
19
20
20
20
14
190th Place S.W. Olympic View Or - 94th Ave. W.
5
D
0.15
19
38
38
38
15
Brookmere Or 9th Ave N - 10th Ave N.
5
D
0.13
19
22
22
22
16
187th St. S.W. 81st Ave W. -84th Ave W.
5
D
0.18
19
22
22
22
17
81st Ave W 186th St S.W. - 190th St S.W.
5
D
0.25
19
33
33
33
18
Daley St. 350 feet west of 10th Ave
5
0
0.08
19
27
27
27
19
Bell St Sunset Ave - 5th Ave
5
0
0.25
19
71
71
71
20
City wide street improvements,restoration
4
OF
5
17
25 25
150
200
200
21
City wide drainage improvements,restoration
4
B
5
17
100
100
tQ0
SA
City
of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT
PROGRAM
Hearing Date ...
July
1 ,1986
PG 43
City No 0365 1987 -1993
Adoption Date__July
1 ,1986
County No. 31
Resolution No._
648
& 655
P
PROJECT IDENTIFICATION
m
T
F
C! PROJECT COSTS
IN THOUSANDS OF DOLLARS
r
a
0
U
A!
i
DESCRIPTION OF WORK
jo
work
T L
N
R! OBLIGATION
1 FUNDING
SOURCE
TOTAL
o
f
code
A E
C
R! SCHEDULE
l------------------
- - - - -1
r
(Street name or number,
c
(s)
L N
TC
Y! Y E A R
FEDERAL 1
RAP
1
1FUNDS
i
Co. road name or number,
lw
G
NL
01 - - - - - - -
- -
1 !
or
1Locall
t
termini beginning & end.
ao
T
LA
V11st 2nd 3rd
4,5
! Fro -1AMT
UAB
1
1
y
Describe work to be done.)
sr
H
S
E!Annl
6th
1AMT gram!
1
!
No
------------------------------------------------------------------------------------------------------------------------------
sk
S
R!Elmt
! !
1
1
------------------------------------------------------------------------------------------------------------------------------
1
2
3
1 4
5
6
171 8 9 10
11
1 12 13 1 14
15
1 16
1 17
------------------------------------------------------------------------------------------------------------------------------
STREET IMPROVEMENT /WALKWAY PROJECTS
1
220th St. tooth Ave W. - 84th Ave W.
2
ADFG
1.00
17
X 750
600
UAB
150
750
2
88th Avenue Main St.- 204th St.SW
1
ADFGJ
0.30
17
450
209 FAUS
LID
241
450
3
Pioneer Way Main St - Shell Valley
1
ABDF
0.40
19
X 200
LID
200
200
4
Meadowdale -Beach Rd. 76th Ave W. - OVD
3
N
0.75
17
X 130
104 FAUS
26
130
5
200th St S.W. 76th Ave W - Maplewood Dr.
3
N
0.90
17
X 100
100
100
6
Casper St. Sunset - 3rd Ave
3
N
0.10
19
X 20
20
20
7
176th St. 72nd Ave W. - Olympic View Dr.
3
N
0.25
19
X 35
35
35
8
68th Ave N. Meadowdale Rd - 160th St.
3
N
0.50
19
45
45
45
9
16th Ave. Meadowdale Beach Rd - N. Meadowdale
Rd. 3
N
0.80
17
80
80
80
10
N. Meadowdale Rd. 15th Ave to 68th Ave.
13
N
0.60
19
75
75
75
11
Maplewood Dr. Main - 200th St. S.W.
3
N
0.50
17
50
50
50
12
80th Ave. W. 206th St. S.W. - 220th St. S.W.
3
N
0.90
19
70
70
70
13
9th Ave Puget - Casper St.
3
N
0.25
14
25
25
25
14
Interurban 242nd St. S.W. - 220th St. S.W.
3
0
1.50
19
25
25
25
15
Seaview Sierra
3
N
0.25
19
20
20
20
16
Yost Pine Ridge
3
N
0.40
19
20
20
20
17
Maplew000d Park
3
N
0.40
19
20
20
20
18
88th Ave. W. 204th St.SW - 196th St. SW
3
N
0.40
17
40
40
40
19
72nd Ave. W. 212th St. S.W. - 208th St. S.W.
I
ABDF
0.25
19
25
25
25
20
102nd P1. S.W. Woodway H.S. - SR 104
3
N
0.25
19
25
25
25