Loading...
Resolution 6480006.19012 j 06/03/86 RESOLUTION NO. 648 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM AND DIRECT- ING THE SAME TO BE FILED WITH THE STATE SECRE- TARY OF TRANSPORTATION AND THE URBAN ARTERIAL BOARD. WHEREAS, pursuant to the requirements of RCW Chapters 35.77 and 47.26, as amended, the City Council of the City of Edmonds has previously adopted a Comprehensive Street Program and thereafter periodically modified said Comprehensive Street Program by resolution, and WHEREAS, the City Council has reviewed the work accom- plished under the said program, determined current and future City street and arterial needs, and based upon these findings has prepared a Six -Year Transportation Improvement Program for the next ensuing six (6) calendar years, and WHEREAS, a public hearing has been held on the said Six -Year Transportation Improvement Program, and WHEREAS, the City Council finds that there will be no significant adverse environmental impacts as a result of adoption or implementation of the Six -Year Transportation Improvement Program, now, therefore, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVE AS FOLLOWS: Section 1. Program Adopted. The Six -Year Transporta- tion Improvement Program for the City of Edmonds, as revised and extended for the ensuing six (6) calendar years (1987 -1992, inclusive) , a copy of which is attached hereto as Exhibit A and incorporated herein by this reference as if fully set forth, which program sets forth the project location, type of improve- ment and the estimated cost thereof, is hereby adopted and approved. Section 2. Filing of Program. The City Clerk is hereby authorized and directed to file a copy of this resolution, together with the exhibit attached hereto, with the Secretary of Transportation and the Urban Arterial Board for the State of Washington. RESOLVED this 1st day of July , 1986. APPROVED: �1 MAYOR, LARAVS. r KUGFTTtN ATTEST /AUTHENTICATED: " ? �� TY CLERK, JACQUELINE G. PARRETT FILED WITH THE CITY CLERK: June 5, 1986 PASSED BY THE CITY COUNCIL: July 1, 1986 RESOLUTION NO. 648 n . SA City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Hearing Date___July 1 ,1986 PG #1 City No 0365 1987 -1993 Adoption Date__July 1 ,1986 County No. 31 Resolution No. 648 P PROJECT IDENTIFICATION m T F C: PROJECT COSTS - --------------------- IN THOUSANDS OF DOLLARS r a 0 U A! i DESCRIPTION OF WORK jo work T L N RI OBLIGATION FUNDING SOURCE !TOTAL o f code A E C R! SCHEDULE l ------------------ - - - - - ! r (Street name or number, c (s) L N TC Y! Y E A R FEDERAL : RAP 1 :FUNDS i Co. road name or number, lw G NL 01 - - - - - - - - - 1 1 or !Local! t termini beginning & end. ao T LA Vllst 2nd 3rd 4,5 1 Pro-IAMT UAB ( 1 y Describe work to be done.) sr H S E :Annl 6th :AMT gram! : I No sk S R1Elmt 1 ------------------------------------------------------------------------------------------------------------------------ 2 3: 4 5 6 17: 8 9 10 11 - ------------------------- 1 12 13 1 14 15 1 16 : 17 TRAFFIC SIGNALIIATION, CHANNELIZATION PROJECTS - - - - -- 1 SR524 (196th St.SW) and Both Ave.W. 6 HI 0.15 14 X 100 30 90 HES 26 FAP 14 130 2 212th St S.W. and 76th Ave W. 6 I 0.10 16 X 40 32 UAB 8 40 3 20Bth St S.W. and 76 Ave W. 6 I 0.10 16 X 90 72 UAB 18 90 4 220th St S.W. and 100 Ave W.(9th Ave.S. Elm St.) 6 HI 0.10 16 X 96 77 FADS 19 96 5 Woodway H.S Ent & tooth Ave S.W. 6 I 0.10 16 96 77 FAUS 19 96 6 Puget Or & Olympic View Dr. 6 I 0.10 16 96 77 FAUS 19 96 7 Main & 9th Ave S. 6 HI 0.10 16 95 95 95 8 200th St. S.W. & 16th Ave W. 6 I 0.10 17 90 90 90 9 212th St. S.W. & 72nd Ave W. 6 I 0.10 16 90 90 90 10 SR 524 & 88th Ave W. 6 H 0.10 14 10 10 !0 11 Walnut & 9th Ave.S. 6 H 0.10 16 4. 4 4 12 220th St. S.W. & 84th Ave W. 6 I 0.10 17 90 90 90 13 212th St. S.W. & 80th Ave W. 6 1 0.10 16 90 90 90 14 224th St. S.W. & 76th Ave W. 6 I 0.10 17 90 90 90 15 SR 524 & 7th Ave N. 6 1 0.10 14 3 3 3 16 Main St. & 7th Ave N. 6 I 0.10 16 10 10 10 17 Meadowdale Beach Rd. & 76th Ave W. 6 I 0.10 17 90 90 90 18 Main St. & 3rd Ave.(SR 524) 6 HI 0.10 14 90 90 90 19 City wide signal improvements 6 1 0.10 16 20 20 20 n SA City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Hearing Date___July 1 11986 PG #2 City No 0365 1987 -1993 Adoption Date__July 1 ,1986 County No. 31 Resolution No. 648 P PROJECT IDENTIFICATION m T F --------------------------------------------------- C: PROJECT COSTS IN THOUSANDS OF DOLLARS r a 0 U A) i ; i DESCRIPTION OF WORK jo work T L N R: OBLIGATION FUNDING SOURCE TOTAL o f code A E C R) SCHEDULE ) ------------------ - - - - - ; r (Street name or number, c (s) L N TC Y) Y E A R FEDERAL RAP ) ;FUNDS i Co. road name or number, lw G NL 0: - - - - - - - - - ; or )Local) t termini beginning & end. ao T LA V)lst 2nd 3rd 4,5 ) Pro-IAMT UAB 1 1 y Describe work to be done.) sr H S E{Annl 6th )AMT gram) ) ; No sk S R:Elmt 1 ------------------------------------------------------------------------------------------------------------------------------ 2 3 1 4 5 6 - :71 8 9 10 ------------------------------------- 11 ) 12 13 1 14 15 1 16 1 17 ROADWAY RECONSTRUCTION, RESTORATION PROJECTS 1 Both Ave. W. ,212th St. to 220th St. 3 DB 0.5 19 X 80 BO 80 2 Olympic View Dr. @ Sunset (curve) 3 D 0.15 17 X 30 24 FAUS 6 30 3 7th Avenue S. , Birch St. to Elm St. 2 OF 0.1 19 25 25 25 4 212th St.SW, 76th Ave. W. - 84th Ave W. 4 D 0.50 16 90 78 FAUS 12 90 5 9th Ave S., Main St. - Elm St. 5 E 0.80 16 20 20 20 6 3rd Ave N., Main St. - Caspers 5 D 0.50 14 50 44 FAUS 7 50 7 84th Ave. & 83rd Ave. ,212th St. - 208th St. 5 D 0.28 19 40 40 40 B 84th Ave & 83rd Ave , 196th St. - 200th St. 5 D 0.28 19 40 40 40 9 Both Ave W. 196th St. S.W. - 200th St. S.W. 5 D 0.25 19 60 60 60 10 74th Ave W. 212th St. S.W. - to 208th St. S.W. 5 D 0.25 19 30 30 30. 11 6th Ave Main St. - Walnut St. 5 D 0.25 19 50 50 50 12 7th Ave Fir - Pine 5 D 0.12 19 20 20 20 13 Pine 6th Ave - 7th Ave 5 D 0.06 19 20 20 20 14 190th Place S.W. Olympic View Dr - 94th Ave. W. 5 D 0.15 19 38 38 38 15 Brookmere Dr 9th Ave N - 10th Ave N. 5 D 0.13 19 22 22 22 16 187th St. S.W. 81st Ave W. -84th Ave W. 5 D 0.18 19 22 22 22 17 81st Ave W 186th St S.W. - 190th St S.W. 5 D 0.25 19 33 33 33 18 Daley St. 350 feet west of 10th Ave 5 D 0.08 19 27 27 27 19 Bell St Sunset Ave - 5th Ave 5 D 0.25 19 71 71 71 20 City wide street improvements,restoration 4 DF 5 17 25 25 150 200 200 21 City wide drainage improvements,restoration 4 B 5 17 100 100 100 SA City of EDMONDS SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM Hearing Date July i ,1986 PG #3 City No 0365 1987 -1993 ... Adoption Date__July 1 ,1986 County No. 31 Resolution No. 648 P PROJECT IDENTIFICATION m T F C1 PROJECT COSTS IN THOUSANDS OF DOLLARS r a 0 U Al 1 i i DESCRIPTION OF WORK jo work T L N R1 OBLIGATION 1 FUNDING SOURCE ;TOTAL 0 f code A E C R1 SCHEDULE 1------------------ - - - - -1 r (Street name or number, c (s) L N TC Y1 Y E A R ;FEDERAL 1 RAP 1 ;FUNDS i Co. road name or number, Iw G NL 01 - - - - - - - - - 1 or !Local! t termini beginning & end. ao T LA V11st 2nd 3rd 4,5 1 Pro-1AMT UAB ; y Describe work to be done.) sr H S E!Annl 6th 1AMT gram; ; No sk S R1Elmt 1 ------------------------------------------------------------------------------------------------------------------------------ 2. 3 1 4 5 6 171 8 9 10 11 1 12 13 1 14 15 1 16 17 STREET IMPROVEMENT /WALKWAY PROJECTS 1 220th St. tooth Ave W. - 84th Ave W. 2 ADFG 1.00 17 X 750 600 UAB 150 750 2 88th Avenue Main St.- 204th 9t.SW 1 ADFGJ 0.30 17 450 209 FAUS LID 241 450 3 Pioneer Way Main St - Shell Valley 1 ABDF 0.40 19 X 200 LID 200 200 4 Meadowdale Beach Rd. 76th Ave W. - OVO 3 N 0.75 17 X 130 104 FAUS 26 130 5 200th St S.W. 76th Ave W - Maplewood Dr. 3 N 0.90 17 X 100 100 100 6 Casper St. Sunset - 3rd Ave 3 N 0.10 19 X 20 20 20 7 116th St. 72nd Ave W. - Olympic View Dr. 3 N 0.25 19 X 35 35 35 8 68th Ave N. Meadowdale Rd - 160th St. 3 N 0.50 19 45 45 45 9 76th Ave. Meadowdale Beach Rd - N. Meadowdale Rd. 3 N 0.80 17 80 BO 80 10 N. Meadowdale Rd. 75th Ave to 68th Ave. 3 N 0.60 19 75 75 75 11 Maplewood Dr. Main - 200th St. S.W. 3 N 0.50 17 50 50 50 12 80th Ave W. 206th St. S.W. - 220th St. S.W. 3 N 0.90 19 70 70 70 13 9th Ave Puget - Casper St. 3 N 0.25 14 25 25 =25 14 Interurban 242nd St. S.W. - 220th St. S.W. 3 0 1.50 19 25 25 25 15 Seaview Sierra 3 N 0.25 19 20 20 20 16 Yost Pine Ridge 3 N 0.40 19 20 20 20 17 Maplew000d Park 3 N 0.40 19 20 20 20 18 88th Ave. W. 204th St.SW - 196th St. SW 3 N 0.40 17 40 40 40 19 72nd Ave. W. 212th St. S.W. - 208th St. S.W. 1 ABDF 0.25 19 25 25 25 20 102nd P1. S.W. Woodway H.S. - SR 104 3 N 0.25 19 25 25 25