Loading...
Resolution 1388RESOLUTION NO. 1388 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, APPROVING THE 2018-2023 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND DIRECTING FILING OF THE ADOPTED PROGRAM WITH THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION. WHEREAS, RCW 35.77.010 and 36.81.121 require that each city and town is required to adopt a Transportation Improvement Program (TIP) and file a copy of such adopted program with the Secretary of the Washington State Department of Transportation; and WHEREAS, the TIP identifies all planned projects over the next 6 years, along with the appropriate funding source; now, therefore, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. The Transportation Improvement Program is hereby adopted pursuant to the requirements of RCW 35.77.010 and 36.81.121 to be effective on June 20, 2017 and to continue in full force and effect until amended. A copy of such Transportation Improvement Program for the years 2018 to 2023 is attached hereto as Exhibit A and incorporated by this reference as fully as if herein set forth. Section 2. The City Clerk is hereby requested and directed to file a certified copy of the Transportation Improvement Program with the Secretary of the Washington State Department of Transportation within thirty (30) days. -1- RESOLVED this 201h day of June, 2017. ATTEST/AUTHENTICATED: 5;;1 C CLERK,-SCO ASSEY FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: RESOLUTION NO.: APPRO ED: MA , DA E O. EARLING June 16, 2017 June 20, 2017 1388 -2- City of Edmonds Six Year Transportation Improvement Program (2018-2023) Grant Opportunity Project (2015-2023) 1 F;1 Project Name Purpose Phase(s) Total Cost Sources) 201E 2019 2020 2021 2022 Now Pro=is root in 2^17.2,022 .??1 Secured rant funds Sew reo Bran t sin:e In S1 vv_o? : PreservationlMaintenance Proiects: 1. Annual Street Preservation Grind pavement, oveday, chip seal, Possible Grant Engineering $3.000.000 (Federal, unsecured) $900,000 $1,000,000 $1,100,000 Program 8' & $4200.000 (Fund 125, Fund 126) $700,000 $700,000 $700,000 $700,000 $700,000 $700,000 and slurry seal Local Funds Construction S8366.000 Loral. unidandrfie S1.300.000 S1.300000 $1.360.000 S1.420.000 $1.486.000 $1.500.000 2. 84th Ave. W Overlay from Secured grant Engineering $691200 (Federal, secured) S96 000 $595,200 220th St. SW to 212th St. SW Grind pavement, overlay, and stormwaler improvements & & to (Slate) (Local, Fund 422) $100,000 $700,000 Local Funds Construction 5208.80o Loral. General Fund $24.000 $184.800 3. Citywide Signal Upgrade Irat6c signal cabinets and Possible Grant Engineering s0 (Federal, unsecured) Improvements improve lechnola & Local Funds & Construction so $400 000 (Slate) (Local) $100.000 $100 000 $100.000 $1o0.000 4. Puget Dr. @ OVD Signal Upgrades Possible grant Engineering $250 000 (Federal, unsecured) $37,500 $212,500 Upgrade traffic signal & & $0 (Stale) Local Funds Construction 52W000 Loral S37.500 $212,500 5. tooth Ave. W @ 238th St. SW Rebuild traffic signal system Engineering so (Federal) Signal Upgrades with new signal mast anus, cabinet, and video detection Possible Grant & Construction ST65.0110 so (State, unsecured) (Local) $765,000 6. Main St- @ 3rd Signal Upgrades Possible grant Engineering $287 500 1 (Federal, unsecured) $37,500 $250,000 Upgrade traffic signal & & s0 (State) Local Funds Construction I S87500 (Local) i 1 $37,500 $50.000 TOTAL I S2.320.000 1 $4 480 000 1 $2.160 000 1 $4.060 000 1 S2.686 000 53.tW0 000 Safety I Capacity Projects: /. SR-99 Gateways Revitalization Install gateway elements and safety improvements along the SR-99 Corridor. Secured Grant, Possible Grant, and Engineering & $45.000,000 $9,850,004 (Federal, unsecure) (Slate, secured) i150,000 $700,000 $5,000,000 $15,000,000 $4,000,000 $30,000,000 Local Funds ROW S259.000 (Local) $50.000 $200.000 8. 76m Av. W @ 2f2th St, ETW Intersection Improvements Re -design intersection to reduce intersection delay and improve level of service (LOS). Various utility impirOwe ments are also included in the project Secured Grant Construction $100.000 520,000 50 (Federal, secured (State, secured (Local) $100,o00 $20,000 9. 161h Ave, W @ 220th St SW intersection Re -design intersection to reduce intersection delay and improve level of service (LOS). Various utility Unsecured Grant Construction S5.786.000 5o (Federal, unsecured) (State, unsecured) $951,500 $951,500 $3,283,000 Improvements improvernents are also included in the eroject. 5809.000 (Local) $148.500 $148.500 $512.000 10. 228th St. SW. from Widen roadway to add two-way left turn lane along stretch or Possibe grant S50,000 (Federal, unsecured) $50,000 Hwy. 99 to 95th PI- W left turn lanes at specific intersections. & Engineering s0 (State) Install sidewalk and bike lanes. Local Funds $50.000 Local S50.000 11. SR 524 (196th St SW) @ Design intersection improvements and addition of guardrail on Design s0 (Federal) 88th Ave W. Intersection the west side of intersection due to 12'vertical drop (grade. $122=000 (State, unsecured) $122,000 $71.000 Improvements adjustment to improve sight distance to be considered). Possible Grant (Local Traffic impact fees) $71.000 ROW acquisition ROW s0 (Federal) 387,500 (State, unsecured) $87,500 & $67500 Local $87,500 Complete intersection improvements $585.000 (Federal, unsecured) $585,000 1 $0 Local Funds Construction (Stale) $0 (Local) 12. Main St. @ 9th Ave. tw mNation of traffic signal or mr-roundo taut Possible grant Engineering S758,000 (Federal, unsecured) s88,000 $670,000 8 & So— (State) I S153.000 Local Funds Construction (Local. Traffic Impact Fees) $30 000 S18 000 $105.000 Page 1 City of Edmonds Six Year Transportation Improvement Program (2018-2023) Grant Opportunity Project (2016-2023) Project Name Purpose Phase(s) Total Cost Source(s) 2018 2019 2020 2021 2022 2023 13. 220th St SW Traffic Signal Coordination Coordinate the traffic signals along 7611h Ave. W Secured Grant $8.660 (Federal, secured] $8,650 from Hwy. 99 to 76th Ave. W from Hwy. 99 to 761h Ave. W to & Construction s0 (State) improve corridor efficiencies throw h adaptive system. Local Funds Sl-360 Loral $1.350 14. Hwy. 99 @ 2121h St, SW Widen 212th St. SW to add a WB and EB left turn lane. Possible Grants Engineering, S2.427.000 (Federal, unsecured) $152,000 $943,000 $1,332,000 Intersection Improvements Provide protected / permissive left turn phasing for both & ROW, & s0 (State) movements (shared jurisdiction with City of Lynnwood) Local Funds Construction $379 000 (Local W City of Lvnnwnod) $23.000 $148.000 S208.000 15. Hwy. 99 @ 2161h St. SW Widen 2161h St. SW to add a W8 and EB left turn lane. Possible Grants Engineering, $2.021,000 (Federal, unsecured) $142,000 $289,000 $1,590,000 Intersection Improvements Provide protected / permissive leftlurn phasing for both & ROW, & s0 (State) movements. Local Funds Construction $314,Iio0 Local. d City of Lynnwood) $22.000 $45.000 S247,000 16. Hwy. 99 @ 220th St. SW Widen 220th St.SW to add westbound right tum lane and Possible Grants Engineering, $2. 83.000 (Federal, unsecured) 5152,000 $939,000 $1,692,000 Intersection Improvements Hwy. 99 to add 2nd southbound left turn lane- & ROW, & 50 (State) Local Funds Construction $432.000 Loral. vd. City Mountlake Terrace $23.000 $1460000 $263=000 17, SR-104 @ 226th St SW / 151h St. SW Extend SR-104 Westbound left turn lane and complete pedestrian Possible Grants Engineering, 5179.000 (Federal, unsecured) $15,000 Si64,000 Intersection Improvements and bicycle improvements with signage and traffic signal & & s0 (State) improvements. Local Funds Construction 5t5,000 Local $15.000 Posstbte Grants - Engineenng, 50 (Federai, unsecured) $543,000 18 Westgate / SR-104 @ 100th Ave. W Provide safety improvements within proximity to the intersection by & & 50 (State) G1+.c-e:ba^ A:cess Mina - mom providing better access management on all aDproaches Local Funds Construction 5e Local $125.000 19. SR-104 @ 95th Pl. W Provide C-Curb with left turn channelization Possible Grants Engmeenng, 520 ,500 (Federal, unsecured) $32,500 $175,000 Intersection Improvements for access management. & & s0 (State) Local Funds Construction $37.500 Local $5,000 $32.500 20. SR-104 @ 23801 St. SW Install traffic signal and other Possible Grants Engineenng, 51.157,000 (Federal, unsecured) $173,000 $984,000 Intersection Improvements intersection improvements- 8 Local Funds ROW, & Construction s0 $181,000 (Stale) (Local) $27000 $154.000 21. Trackside Warning Systerm Install Wayside Horns s0 (Fetleral) a1 Dayton St and Main St. at (2) railroad crossings, reducing noise levels Local Funds Only Construction s0 (State) $5.000 railroad crossings within Downtown Edmonds durino train croswn (Local. General Fund) $5.000 TOTAL s335,000 5930.000 50 57,848,500 525.069.500 539.812,000 Pedestrian Protects: 22. Sunset Ave. Walkway from Bell St. to Caspers St. Provide walkway on the west side of Sunset Av., wl various utility upgrades. Secured Grant, Unsecured Grant, & Engineering, and S44 000 (Federal, secured) (Federal, unsecured) (Local, Fund 421) $44,000 $75,000 $687,000 $575,000 $687.000 $650.000 $800000 (Local, Fund 422) $100,000 $700,000 $200000 (Local, Fund 423) $50,000 $150,000 Local Funds Construction $692,000 Local S5,000 $687.000 23. Citywide Pedestrian Crossing Enhancements Install flashing pedestrian beacons, HAWK signal, or pedestrian crossing enhancements at existing signal at various locations throughout the CitV. Secured Grant Engineering, ROW, & Construction $1.300.000 $0 s0 (Federal, secured) (State) Local $100,000 $1,200,000 24.238th St. SW Walkway from SR-104 Install 800' of sidewalk on the north side of 238th St SW Secured Grant Construction $0 $50.000 (Federal) (State, secured) $50,000 $8.000 (Local, Fund 422) $8,000 to Hwv. 99 from SR-104 to Hwy. 99 $0 Locah 25 Dayton St. Walkway from 7th Ave. S to 8th Ave. S Install missing sidewalk links on the south side of Dayton St. from 7th Ave. S to Bth Ave. S Secured Grant Construchion SO $210.000 (Federal) (State, secured) $210,000 s0 Local 26. Maplewood Walkway from Main 81. to 2001h St. SW Install sidewalk on Maplewood St. tram Main St to 200th St SW, creating connection to Maplewood Elementary and Yost Park. Possible Grant Engineenng & $1 591.000 50 (Federal, unsecured) (Stale) $100,000 $f30,000 $1,361,000 Construction $0 Local 27. Elm Way Walkway from 81h Ave. S Install sidewalk on Elm Way from 8th Ave. S to 9th Ave. S, creating Engineering $789,000 (Federal, unsecured) $56,000 $600,000 s133,000 to 9th Ave. S connections to Westgate and Sherwood Elementary Schools. Possible grant 8 Sp (State) Construction 50 Local 28. 80th Ave. W Walkway from 212th St. SW to 206th St. SW Install sidewalk on 80th Ave. W ham 212th St. SW to 206th St SW, creating connections to Chase Lake and College Place Elements Schools. Possible Grant Engineering & Construction S IA49.000 s0 SO (Federal, unsecured) (Stale) Local $100,000 $110,000 $1,239,000 29. 95th PI. SW Walkway from 2241h St. SW to 220th St SW Install sidewalk on 95th PI. W from 224th St- SW to 220th St. SW to improve pedestrian safe Possible Grants Engineering & Construction SO $468.000 (Federal) (State, unsecured) (Loco "0,000 $20 000 $388,000 $97.000 $117,000 Page 2 City of Edmonds Six Year Transportation Improvement Program (2018-2023) Grant Opportunity Project (2018-2023) Project Name Purpose Phase(s) Total Cost Source(s) 2018 2019 2020 2021 2022 2023 30. 232nd St. SW from 100th Ave. W to Install sidewalk on one side of 232nd St. SW Possible Gran[ Engineering $1,055,000 (Federal, unsecured) S100,000 $955,000 SR-104 & & $0 (State) Local Funds Construction S250SIX Local $100 000 $150.000 31. 236th St. SW Walkway from SR-104 to Provide sidewalk on one side of 236th St. SW Possible Grant Engineering 5697,5m (Fecierat,unsecured) $106,500 $591,000 97th PI. W & & SO (State) Local Funds Construction S697 500 Local $106.500 $591.000 32. 84th Ave. W Walkway from 238th St. SW to Provide sidewalk on one side of 84th Ave. W Possible Grant Engineering S45.000 (-Federal,unsecured) $45,000 234th St. SW & & SO (State) Local Funds Construction $46-000 (Locall, $45 000 33 2nd Ave. S Walkway from James St. Engineering s0 (Federal) to Main St. Provide sidewalk along short missing link Local Funds Only & s0 (State) Construction S30,000 (Local) $30,000 34. 218th St. SW Walkway Possible Grant Engineering $615.000 (Federal, unsecured) $100,000 $515,000 Install sidewalk along missing link & & s0 (State) $600.000 from 76th Ave. W to 84th Ave. W Local Funds Construction Local $100.000 S500 000 35. Wanut St. Walkway Engineering $0 (Federal) Install sidewalk along short missing link Possible Grant & $105.000 (State unsecured) 1105,000 s0 from 3rd Ave. to 4th Ave. I Construction Local 36.216th St SW Walkway from Hwy. 99 Install 300' sidewalk on the north side of 216th St. SW Possible Grant Engineering $137 000 (Federal, unsecured) $137,000 to 72nd Ave. W & & $0 (State) $20.000 from Hwy- 99 to 72nd Ave. W Local Funds Possible Grant Construction (Local) S20,000 37 4th Ave. Corridor Enhancement Create corridor improvements to encourage pedestrian Engineering $3 450.000 (Federal, unsecured) $100,000 $1,000,000 $2,350,000 Walkway activity along 4th Ave. N from Main St to & & 50 (Slate) r 3rd Ave N (from Downtown retail to Edmonds Centefor the Arts Local Funds Construction S675.OD0 Local, Fund 125 $100.000 $150,000 $425.000 38. Audible Pedestrian Install Audible Pedestrian Signals (APS) at venous signaized s0 (Federal) Signals intersections throughout the City Local Funds Construction 50 (State) 330.000 (Locall $30 000 39. Minor Sidewalk Complete sidewalk missing links (from Short Walkway list of Engineering s0 (Federal) Program 2015 Transportation Plan or other identified projects) Local Funds & s0 (State) Construction 1900.000 Local. General Fund) $100.000 1 $100.000 $100.000 $200.000 $200.000 $200.000 40. ADA Curb Ramps Improvements Construct Citywide ADA compliant curb ramps where Possible Gran[ Engineering SO (Federal) facRiaes don't owt not meet curfeni standards 8 & 5580 000 (State, unsecured) $250,000 $250,000 Local Funds Construction (Local. General Fund 3100 000 $100.000 $100 000 $250.000 $250.000 $250.000 TOTAL $872.000 $1.400.000 $200.000 $4.650.000 $4,507.000 $8.328.000 Bicycle oroiects 41 Bike-2-Health I 7 nstall bike lanes and sharrows al key bicycle locations to ) g I (Federal) ) com lete missinglinks such as along761h Ave, W, 212th St. SW... Secured rant Construction 510.000 (Verdant rant $10,000 Traffic Calming/ Non -Motorized Transportation Safety Projects: 42. Traffic Calming Program / Traffic circles, speed cushions, Engineering s0 (Federal) Non -Motorized Transportation radar feedback signs, bulb -outs, etc. Local Funds only & $0 (State) Safe Construction S120 000 (Local. General Fund) $20.000 1 %20.000 1 $20 000 1 $20.000 1 $20.000 s20 000 Ferry / Waterfront Projects 43. Ferry Storage Improvements from Dayton St. to Pine St Provide additional ferry storage area closer to the Ferry Terminal (through striping revisions / C-Curb addition...). Possible Grant Engineering & ConsUucBon S357,000 (Federal, unsecured) (State) Local) $357,000 $0 s0 44. Edmonds Waterfront Connector Provide Waterfront Access issues during emergencies, during at -grade crossing conflicts along BNSF rail lines, constant access to / from the Ferry Terminal to Edmonds St. and pedestrian I bicycle access. Secured Grant and Local Funds Engineering, ROW, & Construction $135.000 $700.000 Pon 0 Ee .0a nr O,ZFr (State, secured) (Federal, unsecured) Local. General Funds $35,000 oo'000 $75,000 $100,000 $400 000 S75,000 $10,000,000 $10,000,000 $5,000,000 $25.000.000 $150.000 TOTAL S410.000 $575.000 $0 $7D.357.00D 510.000.000 55=11.000 Page 3 City of Edmonds Six Year Transportation Improvement Program (2018-2023) Grant Opportunity Project (2018-2023) -T Project Name Purpose Phase(s) Total Cost Source(s) 2018 2019 2020 2021 2022 2023 Traffic Planning Projects: 45 Cityvide Transition Plan Complete an compliance evaluation of all existing ADA curb ramps, as well as long range plan on howto address those defficiencies Local Funds Only Engineering 8 Mannino $0 (Federal) (Stale) (Loral, General Funds) _ $150.000 s0 $150,000 46. Pavement Rating Study Analyse the pavement condition of all arterial, collector, and local streets to determine the stretches to be repaved as eart of future annual overlays- Local Funds Only Planning s0 s0 $0 (Federal) (State) (Local I General Funds) S30 000 $30.000 47. Transportation Plan Update Update Transportation Plan Local Funds Only Engineering 8 Planning s0 $0 (Federal) (State) Local $175,000 $175.000 TOTAL $0 $0 $30.000 $175,000 s0 $180,000 Total $138,587,000 $3,967,000 $7,405,000 $2,410,000 $27,110,500 $42,282,500 $56,940,000 Total Federal $348,650 $2,695,200 $0 $14,975,000 $32,996,500 $51,435,000 Total Federal (Secured) $348,650 $1,795,200 $0 $0 $o $0 Total Federal (Unsecured) $0 $900,000 $0 $14,975,000 $32,996,500 $51,435.000 Total State $730,000 $1,100,000 $0 $6,242,000 $4,087,500 $250,000 Total State (Secured) $730,000 $1,100,000 $0 $5,000,000 $4,000,000 $0 Total State (Unsecured) $0 $0 $0 $1,242,000 $87,500 $250,000 jotal Verdant $10,000 $0 $0 $0 $0 $0 Total Verdant (Secured) $10,000 $0 $0 s0 $0 $0 Total Port of Edmonds. Sound Transit. BNSF $35,000 $100,000 $0 $0 $0 $0 Total Local Fund $2,843,350 $3,509,800 $2,410,000 $5,813,500 $4,810,500 $5.255,000 Total Local (Fund 112) $186,350 $300,000 $100,000 $1,541,500 $1,560,500 $1.262.000 Total Local (Fund 125 / Fund 126) $700,000 $700,000 $700,000 $800,000 $850,000 $1,125,000 Toal Local (Fund 421) $75,000 s0 $0 $575,000 $0 $0 Total Local (Fund 422) $208,000 $700,000 s0 $700,000 $0 $0 Total Local (Fund 423) $50,000 so $0 $150,000 $0 $0 Total Local with other jurisdictions $0 $0 $0 $68,000 $339,000 $718,000 Total Local (Traffic Impact Fees) $0 $30,000 $0 $89,000 $105,000 $0 Total Local (General Fund) $324,000 $479,800 $250,000 $470,000 $470,000 $650,000 Total Local (unidentified) $1,300,000 $1,300,000 $1,360,000 $1,420,000 $1,486,000 $1,500,000 Page 4