Loading...
Resolution 3130 RESOLUTION N0. 313 A RESOLUTION OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING A REVISED COMPREHENSIVE SIX -YEAR STREET CONSTRUCTION PROGRAM TO BE FILED WITH THE DIRECTOR OF HIGHWAYS AND THE URBAN ARTERIAL BOARD. WHEREAS, pursuant to the requirements of Chapter 35.77 of the Revised Code of Washington, as amended, and Chapter 47.26 of the Revised Code of Washington, as amended, the City Council has adopted a comprehensive street program by Resolution No. 61, and thereafter modified by Resolution Nos. 70, 107, 137, 158, 187, 189, 197, 208, 227, 242 and 264, for the six -year period following their passage, and WHEREAS, the City Council of the City of Edmonds, Washington, has reviewed the work accomplished under said program, determined current and future city street and arterial needs, and based on these findings has prepared a revised and extended comprehensive street and arterial program for the next ensuing six. years, and WHEREAS, having held the public hearings on the revised and extended compre- hensive street program, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON: That the comprehensive street and arterial program as revised and extended for the ensuing six years for the City of Edmonds, a copy of which is attached hereto (1975 - 1980, inclusive) setting forth the project location, type of improvement and the estimated costs therefor, including supplemental data, be and the same is hereby adopted and by this reference incorporated herein as if fully set forth within the body of this Resolution; and BE IT FURTHER RESOLVED that a copy of this Resolution together with the • Exhibit attached thereto (1975 - 1980, inclusive) shall be filed with the Director of Highways and the Urban Arterial Board for the State of Washington. RESOLVED THIS 6th day of Augus t,j,9.74,by the City Council of the City of • Edmonds, Washington. APPROVED: ATTEST: ., FILED WITH THE CITY CLERK: July 24, 1974 PASSED BY THE CITY COUNCIL: . August 6, 1974 Mayor ltd DISTRIBUTION: (1) copy: District Engineer. Dept. of Highw:• (1) copy: UAB with Original UAB -1 Form SIX YEAR CONSTRUCTION PROGRAM 1975-1980 8/6/74 8/6/74 (C -0twT ) HEARING DATE ADOPTION DATE RESOLUTION NO. 313 (CITY) EDMONDS ITEM LOCAL NAME ROAD OR F C U L U:: R R U LENGTH ESTIMATE OF COST NO. OF ROAD OR STREET STREET NO. N A C S B R A A TYPE OF WORK IN MILES 1975 1976 1977 1978-80 TOTAL T S. N L 1 9th Ave. @ Main St. U Traffic Signal & R/W 70,000 70,000 2 6th Ave. @ Main St-. U'. Traffic Signal & R/W 70,000 70,000 3 212th St. S.W. @ 84th W. U Traffic Signal & R/W 70,000 70,000 4 Various Locations U Traffic Signal & R /W. 70,000 70,000 140,000 5 Olympic Ave.: Main St. to C R /W, Dr, Gr, Pave, Curb, Swk, 0.9 475,000 475,000 j Puget Ill, Planting, U.G. Wiring 6 Third Ave.: Pine St. to C R /W, Dr, Gr, Pave, Curb, Swk, 0.3 115,000 115,000 SR 0 Pine: 3d Ave. to Ill, Bicycle Path, Planting, SR 104 U.G. Wiring 7 SR 524 - 196th St. S.W.: lT81st M R /W, Dr, Gr, Pave, Curb, Swk, 0.41 300,000 UAB /STATE P1. W. to 88th W. Ill, U.G. Wiring, Planting, 50,000 ED Bike Trail, Signals 350,000 Total 350,000 8 SR 524 - 196th St. S.W., M R /W, Dr, Gr, Pave, Curb, Swk, 2.0 Puget Dr., 9t Ave. N., Ill, U.G. Wiring, Planting, 1,350,000 UAB Caspers St.: 88th Ave. Bike Trails, Signals, E.I.S. 150,000 ED ,00 W. to 3d Ave. N. Total 1,500,000 SA -1 REV. 4/74 DiSTtiiBUTiON: SIX YEAR CONSTRUCTION PROGRAM (1) copy: District Engineer, Debt. of Highways (1) copy: UAB with Original UAB -1 Form 1975 -1980 HEARING DATE 816174 ADOPTION DATE 8/6/74 RESOLUTION N0. 313 (CTY)Y) EDMONDS ITEM N0. LOCAL NAME OF ROAD OR STREET F C U L N A U R R U B R TYPE OF WORK LENGTH IN ESTIMATE OF COST ROAD OR STREET NO. C S A A MILES 1975 1976 1977 1978-80 TOTAL T S N L 9 Dayton St.: Railroad to U R /W, Dr, Gr, Pave, Curb, Swk, 0.3 115,000 115,000 Second Ave. Ill, U.G. Wiring, Planting - 10 220th St. S.W.: 84th U R /W, Dr, Gr, Pave, Curb, Swk, 0.95 855,000 UAB Ave. to 9th Ave. Ill, U.G. Wiring, Planting, 57,000 SNO CO - Signals 38,000 ED 9500 Total 950,000 11 Arterials, Residential &A U 208,000 115,000 120,000 360,000 803,000 Access Streets at Miscellaneous Locations 12 88th Ave. W.: 196th St. U Dr, Gr, Pave, Bike Trail 0.95 150,000 150,000 S.W. to Olympic Vw. Dr. 13 Olympic View Dr.: Talbot U Dr, Gr, Pave, Bicycle Path 1.0 150,000 150,000 Rd. to 76� th Ave. W. 14 80th Ave. W.: 212th St. U Dr, Gr, Pave, Bike Trail 0.75 100,000 100,000 S.W. to 206th St. 206th St. S.W.: 76th Ave. to 8 Ave. 15 Talbot Road; 171st St: U Dr, Gr, Pave, Bike Trail 1.4 210,000 210,000 Olympic Vw. Dr. to 76th Ave. W. 16 North Meadowdale Rd: U Dr, Gr, Pave, Bike Trail 0.6 110,000 110,000 75th Pl. W. to 68th W. 17 242d St. S.W.: Hwy 99 U Gr, Dr, Pave 0.5 85,000 85,000 to 76th Ave. W. SA.1 REV. 4/-74 . . 1 3 4 6 9 10 14 17 18 21 URBAN ARTERIAL DESCRIPTION RELATING TO SI X YEAR CONSTRUCTI011 PROGRAM (SUPPLEMENTAL SECTION) COUNTY OR CITY NAME CITY OF FDMONDS RECORDER W.J. . N1mS _ DATE 8�5�74 _ SHEET 1 Of 1 A7 5Q 71 7A 75 O ROUTE NUMBER O STUDY SECTION O goo STATE ROUTE NUMBER CARD REGION CO. Cl TY TYPE NO. NO. NUMBER U A L 3 1 0 3 6 5 10 14 17 18 21 URBAN ARTERIAL DESCRIPTION RELATING TO SI X YEAR CONSTRUCTI011 PROGRAM (SUPPLEMENTAL SECTION) COUNTY OR CITY NAME CITY OF FDMONDS RECORDER W.J. . N1mS _ DATE 8�5�74 _ SHEET 1 Of 1 A7 5Q 71 7A 75 O ROUTE NUMBER O STUDY SECTION e a goo STATE ROUTE NUMBER O ROAD OR STREET NAME TERMINI OF ROUTE 70 LENGTH MILES ° a ` �l a FROM TO 100200A1 5241 96th P, u e t 9th 026.0 01 10020011 524196th St 2 2 00 0 0 A O O X2 2 0 t h S I ti S 1wi U.S. 9 9 9 6 0 2200002 200X220th S, t W 4th A, v,e W 9. t ve S 009501 S 4:'74 URBAN AREA SIX YEAR CONSTRUCTION PROGRAM• HEAR ING SATE / 6 74 8 Supplemental Section -CITY OR COUNTY PROJECTS PROPOSED FOR URBAN ARTERIAL TRUST ACCOUNT FUNDING ADOPTION DATE $/6/74 EDMONDS RESOLUTION NO. 313 1. Local Name of Arterial Length in Miles P.E. SR -524 _(1.96tltS_tr _e_t S -W -� 0.41 K 1 1 13,1103 16,511 A0,211 100 1 001 2 2. Detailed Location of Project and Termini R/w 81st Ave W. to 88th Ave. W. K2 3. Descrit�tion of Proposed Work Const. R /W, Dr, Gr, Pave, Curb, Swk, Ill, U.G. Wiring, K3 2 Landscaping, Bike Trails, Signals IK.41 Total 3 50 in ,A ,o 1 . Local Name of Arterial Length in Miles 26 ,FUNCTIONAL CLASS OF ARTERIAL 38 43 48 53 58 63 68 73 77 CONTROL DATA 1975 MAJOR 1 3 6 10 14 18 TOTAL PROJECT t C0 9t. 2. Detailed Location of Project and Termini w R/W K2 FUNDS 3. Description of Proposed Work COST Const. > K3 1978 1979 1980 U p U z to K4 to cc CO. CITY ROUTE d P Z w tY [LOCAL & 12/31 NO. NO. NO. LL H Q U.A.T.F. J Q j R/W a U Const. 1. Local Name of Arterial Length in Miles P.E. SR -524 _(1.96tltS_tr _e_t S -W -� 0.41 K 1 1 13,1103 16,511 A0,211 100 1 001 2 2. Detailed Location of Project and Termini R/w 81st Ave W. to 88th Ave. W. K2 3. Descrit�tion of Proposed Work Const. R /W, Dr, Gr, Pave, Curb, Swk, Ill, U.G. Wiring, K3 2 Landscaping, Bike Trails, Signals IK.41 Total 3 50 in ,A ,o 1 . Local Name of Arterial Length in Miles REQUESTED U. A. TRUST FUNDS BY PERIOD REQUESTED 38 43 48 53 58 63 68 73 77 URBAN 1975 1976 1977 P.E. K1 t C0 9t. 2. Detailed Location of Project and Termini R/W K2 FUNDS 3. Description of Proposed Work 1/1 Const. 1/1 K3 1978 1979 1980 Toll to to to K4 to 1. Local Name of Arterial t ength in Miles REQUESTED U. A. TRUST FUNDS BY PERIOD REQUESTED 38 43 48 53 58 63 68 73 77 URBAN 1975 1976 1977 P. E. K1 t C0 9t. 2. Detailed Location of Project and Termini R/W K2 FUNDS 3. Description of Proposed Work 1/1 Const. 1/1 3 1978 1979 1980 Total to to to 4 to 32 REQUESTED U. A. TRUST FUNDS BY PERIOD REQUESTED 38 43 48 53 58 63 68 73 77 URBAN 1975 1976 1977 ARTERIAL t C0 9t. TRUST Total FUNDS 7/1 1/1 7/1 1/1 7/1 1978 1979 1980 to to to to to 12/31 6/30 12/31 6/30 12/31 P. E. R/W Const. Total 3000 4 4 1 8 0 3 Const. --y- Total 32 38 3 48 53 58 ro 73 77 P.E. R/W )_ t C0 9t. Total u413-1 REV. 4/74 (ALL MONEY ENTERED TO 1,000's) NEElft �IJRBAN AREA SIX YEAR CONSTRUCTION PROGRAM Supplemental Section CITY OR COUNTY PROJECTS PROPOSED FOR URBAN ARTERIAL TRUST ACCOUNT FUNDING L�E:D 11 ONONDS FUNCTIONAL CLASS OF ARTERIAL SECONDARY 1. Loral Name of Arterial Length in Miles 220thSt,_.e4t.- S.W. 0,95 2. +Jr I Location of Project and Termini 84th Ave. W. to 9th Ave. S. 3. Description of Proposed Work R /W, Dr, Gr, Pave, Curb, Swk, Bicycle Path, Ili, U.G. Wiring, Landscaping, Signals 1 CONTROL DATA 3 6 10 14 18 TOTAL PROJECT REQUESTED U. A. TRUST FUNDS BY PERIOD P.E. UJ 0. w K1 48 53 58 63 68 73 77 URBAN 1975 p COST > 2. Detailed Location of Project and Terrnini U p U z LOCAL ~ rr CO. CITY ROUTE U P Z W x & Q Ind j NO. NO. NO. LL y Q 2 U.A.T.F. J U 28 . --9 1500 111 1506 2 Joint Project with Con52 3 3 Snohomish County 5 7 Tota 4 , 9.5 7 Z C in ,A ,Q 7a 7, Local Name of Arterial Length in Miles REQUESTED U. A. TRUST FUNDS BY PERIOD P.E. _ K1 48 53 58 63 68 73 77 URBAN 1975 Const. 1976 1977 ARTERIAL 2. Detailed Location of Project and Terrnini R 1 _ K2 3 Description of Proposed Work Const. 1/1 K3 Tot 1l Total to to to K4 6/30 12/31 6/30 12/31 1. Local Name of Arterial Length in Miles REQUESTED U. A. TRUST FUNDS BY PERIOD P.E. _ K1 48 53 58 63 68 73 77 URBAN 1975 Const. 1976 1977 ARTERIAL 2. Detailed Location of Project and Termini R /tN _ 2 3. Description of Proposed Work Const. 1/1 K.3 to Total to to to KA 6/30 12/31 6/30 12/31 HEARING DATE 8/6/74 ADOPTION DATE 8/6/74 RESOLUTION NO. 313 32 REQUESTED U. A. TRUST FUNDS BY PERIOD REQUESTED 38 43 48 53 58 63 68 73 77 URBAN 1975 Const. 1976 1977 ARTERIAL TRUST Total FUNDS 7/1 1/1 7/1 1/1 7/1 1978 1979 1980 to to to to to 12/31 6/30 12/31 6/30 12/31 P.E. 12 28 . --9 1500 111 1506 R/ W' 13 100 11 3 Const. i 13,000 21 3 Total 5 5 28 .4,50, 237.6. R/W Total z� OQ AD CO P.E. R/ W Const. Total UAB-1 REV. 4/74 (ALL MONEY ENTERED TO 1,000's) ' u+F t a -.c'i w .1 L1 W L - lua. t: d 'u v �_,N Ira waa/ •ir�+f O' -i (✓ ri A Fi I a a' : :�L I g �V2- N 7 0 3Y RELATING TO SIX YEAR CONSTRUCTION PROGRAM (SUPPLEMENTAL SECTION) ADOPTED BY: RESOLUTION N0. X13 ADOPTION DATE IDENTIFICATION 17. Number of Thru Lanes (Both Directions)_ 0 2 UB 76 1 -2 UB u 18. Pavement Width 2 39 -40 1 3 1. Urban Region 41 -42 UD 4 ROUTE 19. L. Shoulder Width 0 43 -44 m 8 3 1 4-5 2. County 92 93 25. Traffic Control 0 None, 1 Fixed, 2 Actuated, Devices 3 Progressive, 4 Stop Sign 1 CBD, 2 Fringe, 3 Out, 27. Area Development 4 Res, 5 Sub 54 56 4 D 0 3 6 5 6-9 3. City Town ADT EA ~ a Y o 4. Route Number 2 2 0 0 10 -13 5. Section Number 1 0 0 2 14 -16 v+ U= � Y POP. (1,000) < a 2 17 6. Urban Functional Classification W z WAY WAY 7. Section Length (0.01 Mile) 0 10191 5 18 -21 t- H U 8. Arterial Name 220th St. S.W. STR. .toC 84th Ave. west o 9. Begin Termini a 9th Ave. South End Termini z f STRUCTURAL 31. + Ride 60 -61 1 5 62 -63 32. +Pavement Condition 33. + D:ainoge and Cross Section Adequacy 0 3 64 -65 Condition Ride Stir. Cond. Dr. Cond. Good 41 -50 3140 8 -10 Fair 3140 21 -30 5 -7 Poor 21 -30 11 -20 2 -4 Very Poor 0 -20 0 -10 0 -1 ACCIDENTS (Record Data on the basis of a 2 YEAR EXPERIENCE) 35. Property Damage Only (Accidents X 1) 0 0 6 69 -71 8 72 -7 4 0 0 0 75 -77 36. Injury Accidents (Accidents X 6) 0 1 37. Fatal Accidents (Accidents X 25)- 0 1 22 -23) UC TRAFFIC 10. Urban Area Number T I 39. Existing AADT EXISTING CONDITIONS GEOMETRICS UB 17. Number of Thru Lanes (Both Directions)_ 0 2 37 -38 76 0 87 u 18. Pavement Width 2 39 -40 eee© % TURNS 19. R. Shoulder Width 0 41 -42 UD 4 ROUTE 19. L. Shoulder Width 0 43 -44 m 8 NO. 20. Total Roadway Width 2 45 -46 U 92 93 25. Traffic Control 0 None, 1 Fixed, 2 Actuated, Devices 3 Progressive, 4 Stop Sign 1 CBD, 2 Fringe, 3 Out, 27. Area Development 4 Res, 5 Sub 54 56 4 0 43. Capacity (Hourly) 44. V/C Ratio 45. Present Operating Speed 49. Transit Bus Route 0. No 1- Ye, COST, THOUSANDS 65. Preliminary Enginei 66. Right of Way (UAB) 69. Construction (UAB) 70. Total (UAB) 71. Total Proj. Cost (U U C CI,f�a I T V '� F." a C�6r "E,ULLED BSI T HSEC 6 ION 1 3 4 6 10 14 32 eee 74 75 76 77 87 u 89 90 eee© % TURNS W o! o_ a! CO. Baum ROUTE ©© F m ee NO. ©s NO. CI,f�a I T V '� F." a C�6r "E,ULLED BSI T HSEC 6 ION 1 3 4 6 10 14 32 80 SECTION BLANK LENGTH MILES 00095 Q7 Al Al AS A7 51 S9 -1 SA SA 57 59 Al A3 AA 67 Aa 71 7A 77 81 73 74 75 76 77 87 u 89 90 APPR• % TURNS W o! o_ a! CO. CITY ROUTE SECT. F m NO. NO. NO. NO. U 92 93 94 0 D F113103652200002 ADT EA ~ a Y o 80 SECTION BLANK LENGTH MILES 00095 Q7 Al Al AS A7 51 S9 -1 SA SA 57 59 Al A3 AA 67 Aa 71 7A 77 81 82 83 84 85 66 87 88 89 90 APPR• % TURNS WIDTH 91 92 93 94 0 w ADT EA ~ a Y o URBAN �i, z 2 1 (1,000) HR. % v+ U= � Y POP. (1,000) < a J - L W z WAY WAY Lt. Rt. t- H U < . < STR. .toC o a z 22 1,014 100 0 110 -1, _0 Y z a J m 95 ASE RAV SPD. MPH 96 z Lu 1U=J UI- s 97 z 00 0 U JLL 98 z Ya=o W 0 U ax< a 99 z ce a 3565070 0.8.5, 13 INSTRUCTIONS: (82) Use 10% if actual not known (93)(94) Use10 o if actual not known (83) Use Son or greater (96) Use 65% if actual not known (84) Use 5% if actual not known (97) Use 0.70 if actual not known (90) Code: (1) CBD (2) FBD 198) Use 0.85 if actual not known (3) 0 B D (4) RA (5) SA (99) Code: N = None, L = Left, R = Right, B = Both IAttach Vicinity Map: (show route and location of proposed project.) 80 W Y U z z < w J � m v w Ln 1 -2 18 -23 30 -34 35 -37 38 -39 73 53 -56 67 -70 73 -76 77 -80 L- -a RELATING TO SIX YEAR CONSTRUCTION PROGRAM (SUPPLEMENTAL SECTION) ADOPTED BY: RESOLUTION NO. 313 ADOPTION DATE 8/6/74 IDENTIFICATION 2 UB 1.2 76 NOUN "� b L r.[:r d •• i,.� r� l Y 5t i[ i iRA� Y , Y Y {f Lam% +v.iC w(/µ��T,] �`, 4'.10 ✓' �.�,y p .r Ua RELATING TO SIX YEAR CONSTRUCTION PROGRAM (SUPPLEMENTAL SECTION) ADOPTED BY: RESOLUTION NO. 313 ADOPTION DATE 8/6/74 IDENTIFICATION 2 UB 1.2 76 NOUN 87 39-40 18. Pavement Width 3 Ua 1. Urban Region 3 19. R. Shoulder Width 0 1 UD 3 19. L. Shoulder Width 0 43 -44 3 1 4 -5 4546 2. County 25. Traffic Control 0 None, 1 Fixed, 2 Actuated, Devices 3 Progressive, 4 Stop Sign 54 4 27. Area Development 1 CBD Res, 5r Sub 3 Out, 56 3. 6 5 69 F 1 F1 3. City Town 31 LO 1 0 Q 21 0 01 URBAN ? Q ? a 0 0 2 10 -13 (1,000) 4. Route Number w a ? b2 POP, a J J u. ul WAY 0 0 1 14 -16 S. Section Number F- U u Q O ' STIR. .roC 17 6. Urban Functional Classification p LL O 1 1 � 18 -21 7. Section Length (0.01 Mile) 010 4 { 8. Arterial Name . RS 524 (196th St- S.W. ) 81st Ave, W. 0,11.5 1,0 9. Begin Termini 0, 5 0.02 5 End Termini 88th Ave. W. 22 -23 10. Urban Area Number 0 1 UC EXISTING CONDITIONS GEOMETRICS UB 0 17. Number of Thru Lanes (Both Directions) - 2 37 -38 75 76 NOUN 87 39-40 18. Pavement Width 90 ■N % TURNS 3 19. R. Shoulder Width 0 41 -42 UD 3 19. L. Shoulder Width 0 43 -44 _. 8 20. Total Roadway Width 2 4546 NO. 25. Traffic Control 0 None, 1 Fixed, 2 Actuated, Devices 3 Progressive, 4 Stop Sign 54 4 27. Area Development 1 CBD Res, 5r Sub 3 Out, 56 u STRUCTURAL . 3 1. +Ride 60.61 62 -63 32. +Pavement Condition 64-65 33. + Drainage and Cross Section Adequacy Condition Ride Str. Cond. Dr. Cond. Good . 41 -50 3140 8 -10 Fair 3140 21 -30 5 -7 Poor 21 -30 11 -20 2 -4 Very Poor 0.20 0 -10 0 -1 ACCIDENTS (Record Data on the basis of a 2 YEAR EXPERIENCE) 35. Property Damage Only (Accidents X 1) 0 0 8 69 -71 36. Injury Accidents (Accidents X 6) 0 2 72 -74 37. Fatal Accidents (Accidents X 25) 0 0 0 75 -77 TRAFFIC 39. Existing AADT 43. Capacity (Hourly) 44. V/C Ratio 45. Present Operating Speed 49. Transit Bus Route 0. No 1. Ye COST, THOUSANDS 65. Preliminary Engines 66. Right of Way (UAB) 69. Construction (UAB) 70. Total (UAB) 71. Total Proj. Cost (U U C c,s �� , y �3 c e I ��.L D 111 iE sEcT0�I 1 3 4 6 10 14 32 ■EU 74 75 76 NOUN 87 u 89 90 ■N % TURNS ME UJ X CO. ■ino ROUTE SECT. n _. Nnnn NO. NO. NO. c,s �� , y �3 c e I ��.L D 111 iE sEcT0�I 1 3 4 6 10 14 32 80 SECTION BLANK LENGTH MILES 0 04 37 41 d3 AS d7 51 S9 S3 S4 S6 S7 59 Al 63 64 67 69 71 74 77 81 73 74 75 76 77 87 u 89 90 APPR• % TURNS in W a a! UJ X CO. CITY ROUTE SECT. u >- m NO. NO. NO. NO. 0 w 91 92 F 1 F1 94 31 b,3,6,51 1 0 Q 21 0 01 80 SECTION BLANK LENGTH MILES 0 04 37 41 d3 AS d7 51 S9 S3 S4 S6 S7 59 Al 63 64 67 69 71 74 77 81 82 83 84 85 86 87 88 89 90 APPR• % TURNS WIDTH w 91 92 93 94 ADT EA J Y = URBAN ? Q ? a 2 1 (1,000) HR. % w a ? b2 POP, a J J u. ul WAY WAY Lt. Rt. F- U u Q O Q STIR. .roC p LL O z 0,11.5 1,0 5, O� 0, 5 0.02 5 2 Y z Q J m 95 ASE RAV SPD. MPH 96 z W W �- 0~ y� 97 X 00 0 U -J .4 ass 98 W x�o W 0 U 99 0 Q 3, 516,5 10.7,0 08 51 B INSTRUCTIONS: (82) Use 10% if actual not known (93)(94) Use10% if actual not known (83) Use 50% or greater (96) Use 65% if actual not known (84) Use 59. if actual not known (97) Use 0.70 if actual not known (90) Code: (1) CBD (2) FBD X98) Use 0.85 if actual not known (3) OBD (4) RA (5) SA (99) Code: N = None, L = Left, R = Right, B =Both 80 W be U z z a W J 7 to d W u, 1 -2 18 -23 30 -34 35 -37 38 -39 73 53 -56 67 -70 ry 73 -76 77 -80 IAttach Vicinity Map: (show route and location of proposed project.) I