Resolution 1308RESOLUTION NO. 1308
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
EDMONDS, WASHINGTON, AMENDING THE FEE
SCHEDULE FOR THE CITY'S DEVELOPMENT -RELATED
FESS AND CHARGES FOR SERVICES, INCLUDING A
SAVINGS CLAUSE, AND ESTABLISHING AN EFFECTIVE
DATE.
WHEREAS, ECDC 15.00.020 provides for the establishment and amendment of
certain fees charged by the City by resolution; and
WHEREAS, extensive effort has been made by City Staff to analyze the full costs
associated with City permitting and service activities; and
WHEREAS, the City Council has previously established and affirms as its goal
that permit fees shall be set to cover the costs of processing and issuing permits and requests for
service; and
WHEREAS, the City Council does, however, desire that parties utilizing the
City's administrative appeals procedures bear a smaller burden of the costs of processing those
appeals in order to afford access to the appeals process; and,
WHEREAS, the City Council adopted the proposed 2014 fee schedule by
Resolution #1302 on November 19, 2013, and while not changing the fees schedule the Council
now desires, for clarity, to specifically include the referenced tables as part of the adopted fees
schedule; now, therefore,
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON,
HEREBY RESOLVES AS FOLLOWS:
Section 1. The fees and charges for services set forth in the schedule attached as
Exhibit A to this Resolution are hereby adopted, along with the referenced tables which are also
included therein, and shall be effective on and after January 1, 2014.
Section 2. If any section, sentence, clause or phrase of this resolution or any fee or
charge for service adopted or amended hereby should be held to be invalid or unconstitutional by
a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the
validity or constitutionality of any other section, sentence, clause or phrase, or any fee or charge
adopted or amended hereby.
RESOLVED this 17th day of December, 2013.
ATTEST:
CITY CLERK, SCOTT SSEY
FILED WITH THE CITY CLERK: December 13, 2013
PASSED BY THE CITY COUNCIL: December 17, 2013
RESOLUTION NO. 1308
Exhibit A: Development Fees
Permit Type
Notes
Fee
Building
Fire Alarm (Alteration) up to 5 initiating
devices
No plans. Subject to field inspection.
$165
Fire Alarm (Alteration) 6 or more initiating
devices
$90 + COE Table 1
Fire Alarm (New)
$90 + COE Table 1
Fire Connection permit
Includes Engineering @ $90
$500
Fire Damage
COE Table 1
Fire Inspection Fee
Per Hour
$90
Fire Operational permit
$40
Firework Display permit
$30
Fire Plan Review fee
Per Hour
$90
Fire Sprinkler Commercial (Alteration) up
to 5 sprinklers
Applies to Commercial and Multifamily. No
Plans; field check only.
$180
[Fire Sprinkler Commercial (Alteration)
than 5 s rinklers
Applies to Commercial and Multifamilyore
$135 + COE Table 1re
Sprinkler Commercial (New)
Applies to Commercial and Multifamily
$270 + COE Table 1
Fire Sprinkler Residential
Applies to IRC structures. Keep low.
$360
Fire Protection System permit
For cooking systems,
stand i e ...Previous) Fire Su ression
$315
Underground Tank 600 gallons or less (fill,
rem ve install
Previous breakpoint was 10,000 gallons.
Kee low.
$90
Underground Tank more than 600 gallons
fill remove.. install)-$270
Accessory Structure (Greenhouse/Shed)
Table 1
ADU Compliance
$405
Adult Family Home
$450
Appeal of Building Official Interpretation
$810
(Base Building Permit Processing Fee
$100
(Building Inspection
$90
Cell Communications/ Cellular Facilities
Table 1
hange of Use
$450
hanges to Approved Plans
90/hr
ity Surcharge Fee
IlDeck,
$25
ommercial New Construction
Table 1
Stair, Ramp
Table 1
(Demolition (Primary)
$270
F I N A L Page 1 12.12.2013
Permit Type
Notes
Fee
!Demolition (Secondary)
$135
Dock/Marina/Floats
$190+Table 1
Fence
$60
Garage / Carport
Table 1
Grading/Fill
'Table 2 + Peer Review
Grease Interceptor
$630
Grease Trap
$180
Hot Tub/Spa (Commercial)
Table 1
Hot Tub/Spa (Single -Family)
$180
Hydronic Heating
$135
Manufactured Coach -Commercial (Federal
HUD Label
$450
Manufactured Home Installation (Federal
HUD Label)$540
ESLHA Administrative Processing Fee
$2,385
ESLHA Minor Project Administrative
ProcessingFee
INew category
$270
ESLHA Consultant Review
Full cost of peer
ireview
ESLHA Packets
iNo labor in current fee
$15
Mechanical Permit
Table 4
Parking Lot
180 + Table 1
Plumbing Permit
'Table 3
Re -inspection Fee (Building)
$90
Relocation of Building
500 + 90 r outside
city
Re -roof (Commercial)
Table 1
Re -roof (Single-family)
$90'
Residential - New Construction
''Table
1
(Residential -Addition/Remodel
'Table 1
Re -Submittal Plan Review after 3rd review
$90/hour
(Retaining Wall (Commercial)
$675 + peer review
(Retaining Wall (Residential)
$265 + peer review
:Sign (Per Sign)
$125
Sign - Blade Sign
Includes all blade signs in proposal
$90
:Solar/Photovoltaic (Residential)
$120.00
;Solar/Photovoltaic (Commercial)
'Table 1
'State Building Code Surcharge Fee
$4.50
:Structural Review Fee
$90/hr + consultant
:Swimming Pool ( Pre Manufactured Above
Ground)$120
'Swimming Pool (In -Ground)
Table 1
'Tenant Improvement
Table 1
F I N A L Page 2 12.12.2013
Permit Type
Notes
Fee
Planning
'Type 1
Staff decisions, no notice
$225
'Type 2
Staff decisions w/ notice
$795
Type 3A
Outdoor dining, amateur radio
$225
Type 3B
1Hearing Examiner / ADB (+HE)
$1,637 + HE
Type 4A
Subdivision / PRD final approval
$3,355
Type 4B
Rezone
$5,720
Type 5
Plan, ECDC amendments
$5,720
ADB Design Review -Signs
ADB consideration of departure from sign
standardper code
$795
'.Signs (Planning review)
Traditionally kept low to reflect relative
cost of si na a
$0
Pole or reader board signs
Code "discourages" and are more costly to
review
$225
ILot Line Adjustment
$855
'Short Subdivision
$2,645
Short Subdivision Final Approval
$1,300
:Subdivision Prelim Approval (+ HE)
Staff time plus actual HE cost billed to
applicant
$5,355 + HE
:Subdivision Final Approval
Type 4A
$3,355
iModification Request
$795
Minor change to approved plat
$90/hr
Major change to approved plat
Same as original application
iPRD Preliminary Approval
$5,335
PRD Final Approval
$3,355
SEPA Review
$610
EIS Review
Cost
Critical Areas Checklist
$155
Critical Areas Var / Reasonable Use
Staff time plus actual HE cost billed to
applicant
$6,260 + HE
Preapplication Meeting
$655
DRC Meeting
$0
Appeal of Staff Decision (1 or 2) HE
Appeal fees traditionally kept low by
Council policy
$400
Appeal of Type 3B decision to CC
Appeal fees traditionally kept low by
,Council-policy$500
ppeal of Notice of Civil Violation
[Request
Appeal fees traditionally kept low by
Council policy$705
for Reconsideration
Traditionally kept low by Council policy
$225
lanning Inspection Fee
IlLandscape plan inspection
1% of est.
FINAL Page 12.12.2013
Permit Type
Notes
Fee
(Recording Fee
Recording documents w/ County
$90 + cost
Other (fee not categorized above)
$90/hr
When permit is heard by HE, cost of HE
hearing is billed to applicant.
F I N A L Page 4 12.12.2013
Permit Type
Notes
Fee
Engineering
Increase fee to $180 (2 hrs). Change language
$180 plus ROW permit fee
Alley Disruption/ Closure Fee
of fee to note right of way permit fee and
plus closure fees
closure charges are in addition to permit fee
Backflow Prevention Compliance Fee
Fee to assist in ensuring voluntary compliance
$125
with backflow prevention program & ECC 7.20
Add an application fee based on 4 hours of staff
$360 Application Fee
Developers Agreements
time. $90/hr plus attorney fees will be collected
$90ihr plus City Attorney
for any subsequent hours.
Fees
Increase to reflect revised hourly rate of $90 for
$270 plus Cost of Peer
Development Project Peer Review
3 hours
Review
This permit is for drainage of pools, hot tub,
REVISED FEE TITLE: Drainage Permit (pool,
jacuzzi and other facilities designed or intended
$40
hot tub, jacuzzi)
to hold more than 50 gallons of water. Increase
fee to recover a portion of the actual cost.
Encroachment Permit
Adjust Fee to reflect 3 hrs of staff time.
$270 plus recording fees
Fee charged for each Engineering on -site
inspection not specifically covered or included
Engineering Inspection Fee (Single Family,
in a separate permit or inspection fee. Fee is
$90 each
Existing Comm/W, right of way)
charged per inspection. This fee is charged in
addition to the applicable Building Permit or
other permit fee.
Engineering inspection during construction of
site improvements for all subdivisions/short
(Engineering Inspection Fees - Civil Site
plats, commercial and multi -family. This fee is
Improvements (subdivisions, commercial, multi-
charged in addition to the applicable
3.3% of Bond Amount
(family)
Engineering Review or other building permit
fee(s). Adjust percentage to reflect liourly
charge increase from $60 to $90
Engineering Review Fee
Engineering staff review per hour
$90/hr
F I N A L Page 5 12.12.2013
Permit Type
Notes
Fee
Engineering review of civil plans for
REVISED FEE TITLE -Subdivision - Civil
construction of site improvements for
Review (previously Engineering Review - Site
subdivision (5 or more lots) This fee is charged
$35920
Improvements 5 or more lots)
in addition to applicable Engineering Inspection
fees.
(REVISED FEE TITLE -Short Subdivision -Civil
(Review (previously Engineering Review - Site
Improvement 4 or less lots)
Engineering review of civil plans for
construction of site improvements for short plats
$2.570
1(4 or less lots) This fee is charged in addition to
applicable Engineering Inspection fees.
(Latecomers Agreement
Add an application fee based on 4 hours of staff
$360 Application Fee plus
time. $90/hr plus attorney fees will be collected
$90/hr and City Attorney
for any subset uent hours.
Fees
Add an application fee based on 4 hours of staff
$360 Application Fee plus
(LID Sewer Fees (Outside of LID Map)
time. $90-/hr plus attorney fees will be collected
$90/hr and City Attorney
for any subsequent hours.
Fees
This fee applies to any activity that occupies or
closes parking space(s), parking lanes(s) or
172
other paved area of a street/road for more than
hours. When this fee applies to construction -
related activities, it will be applied in addition to
the ROW Construction Permit fee. (Monthly
portion of Fee [$ per month] = 1% of assessed
value per square foot of abutting property x
$180 plus ROW permit fee
(Parking Disruption/ Closure Fee
right of way area [SF] disrupted/closed.) If
plus closure charge
disruption/closure affects any portion of the area
of a parking space, the area of
disruption/closure is calculated based upon the
area of a full parking space. Change to reflect 2
hrs of staff time to review, process and inspect
closure. Add reference to right of way permit
fee
Re -Inspection Fee
increase to cover change in hourly fee from $60
$90 each
to $90
REVISED FEE TITLE -Right -of -Way
Construction Permit
IAdministrative
increase to cover change in hourly cost from
$270 plus inspection tees
(previously Right -of -Way Construction Permit
$60 to $90
Review)
F I N A L Page 6 12.12.2013
Permit Type
Notes
Fee
New permit for smaller projects that cause only
NEW FEE Right of Way Minor
minor disturbance to the right of way e.g.
$90 plus inspeciton fees
Construction Permit
residential driveway replacement, tree trimming
change fee description and update
$180 plus connection
Side Sewer (Commercial & Multi -Family)
review;` process fee to cover 2 hours
charge per Ordinance
change flee description and update
$90 plus connection charge
Side Sewer (Single Family)
revievv/ rocess fee to cover 1 hour
per Ordinance
(Side Sewer Repair Only
increase to cover 1 hr review/process time
$90
Side Sewer - Special Conditions e.g. grinder
I
increase to cover 3 hr review/process time
$270
pumps, ejectors..
Increase fee to $180 (2hrs). Change language of
$180 plus ROW permit
Sidewalk Disruption or Closure
fee to note right of way permit fee and closure
plus closure fees
char>es are in addition to fee
Special Agreements for Private Utilities in City
increase to cover change in hourly cost from
$90/hr plus City Attorney
Right of Wa
$60 to $90
Fees
Engineering Review of storm drainage for SFR
construction of any type (e.g. new construction,
REVISED FEE TITLE,-Stormwatcr Engineer
remodel, additions, sealed decks, etc.) with >
'Review Fee (Engineering Review Fee for Single
5,000 SF new impervious surface or in critical
$ l2U/hr
Family Residence) (previously Drainage
area or Meadowdale. This fee is charged in
Review Fee)
addition to Building Permit or other permit fees.
Change to reflect actual hourly rate of P.E.
REVISED FEE TITLE-Stormwater Permit
increase to cover change in hourly cost from
$270 plus inspection fees
(Previously Storm Drainage Permit)
$60 to $90
NO FEE AMOUNT CHANGE: Change fee
Connection Fee per
Storm System Development Charge
description to reference ordinance.
Ordinance
REVISE[) FEE TITLE -Street Restoration for
Increase fee to recover actual cost. Developers
Water Meter Installation (Excluding Private
will ha required to complete restoration on their
$ I U00 plus Street Overlay
Development) (previously - Street
projects. The $1,000 fee is an average estimate
Cut Fee if applicable
Cut/Restoration Deposit for Water Meter
for street restoration work.
Installation
Changed name of Fee and Fee description-
ROW pen -nit fee plus addt'l
REVISED FEE TITLE --Street Overlay Cut Fee
increased flat fee to cover 1 review and I
per SgYd charge times
(previously Street Disruption Fee)
inspect.
overlay cut multiplier
This fee is applied to any use of public street of
a temporary nature (not covered by
$90 plus insp fees (Bistro
Street Use Permit
Encroachment permit or ROW construction
Dining fees per ordinance
permit) Outdoor Bistro Dining Fees per
if applicable)
Ordinance ifapplicable.
REVISED FEE TITLE -Traffic Engineer
Review Fee (previously Traffic Impact
increase to reflect hourly rate of P.E.
$120/hr
Analysis Review)
F I N A L Page 7 12.12.2013
Permit Type
Notes
Fee
NO FEE AMOUNT CHANGE: Fee per ECDC
Traffic Impact Fee
18,82 or as determined by independent fee
Fee Per ECDC 18.82
calculation. (Revised Fee Description)
Traffic Impact Fee Review - Independent
increase to reflect hourly rate of P.E.
$240
Calculation
Fee charged for each request for variance from
Variance from Underground Wiring
underground wiring requirement. Based on 8
$720
hours of staff time, increase to reflect higher
hourly rate
NO FEE AMOUNT CHANGE: Change fee
Connection fee per
Water Meter Connection Fee
description to reference ordinance.
Ordinance
Fee charged for new water service line and
meter installation per Edmonds City Code
Water Meter Fee (Based on Size)
7.30.030. The new Fees have been calculated
based on actual costs of pails and_ labor.
3/4"
$2,920
1"
$2,970
1.5"
$6,220
2"
$6 390
F I N A L Page 8 12.12.2013
CITY OF EDMONDS
BUILDING PERMIT FEE SCHEDULE — TABLE 1
Based on building construction valuation
Effective January 1 2014
$14500
$30
$501 to $2000
$30 for the first $500 plus $3 for each additional $100, or fraction
thereof to and including $2000
$2001 to $25,000
$75 for the first $2000 plus $14 for each additional $1,000 or
fraction thereof to and including $25,000
$25,001 to $50,000
$400 for the first $25,000 plus $10 for each additional $1,000 or
fraction thereof to and including $50,000
$50,001 to $100,000
$650 for the first $50,000 plus $7 for each additional $1,000 or
fraction thereof to and including $100,000
$100,001 to $500,000
$1000 for the first $100,000 plus $6 for each additional $1,000 or
fraction thereof to and including $500,000
$500,001 to $1,000,000
$3,400 for the first $500,000 plus $5 for each additional $1,000 or
fraction thereof to and including $1,000,000
$1,000,001 and up
$5,900 for the first $1,000,000 plus $4 for each additional $1000 or
fraction thereof.
Other Fees:
1. Plan review fees in addition to building permit fees are assessed at a rate of 85% of the calculated building permit fee
(includes Building, Planning and Engineering for commercial/multi-family reviews and Building/Planning for
residential reviews).
2. Commercial Permits: All permits relating to other than residential permits as described below shall be calculated at
the rate established in the amended Building Permit Fee Schedule based on 120% of above valuation chart. The
determination of value or valuation shall be based on the Building Valuation Data, published in January of each year
in the Building Safety Journal published by the International Code Council, on file with the City Building Official.
3. Residential Permits: Permits for the construction (including remodels and additions) of single-family residences,
including accessory structures shall be calculated at the rate established in the amended Building Permit Fee Schedule
based on the above valuation chart. The determination of value or valuation shall be based on the Building Valuation
Data, published in January of each year in the Building Safety Journal published by the International Code Council,
on file with the City Building Official.
4. Decks, stairs, ramps, covered porches with open exterior sides, and trellises are assessed at $20 per square foot for
valuation purposes.
5. Unheated sunrooms are assessed at $28 per square foot for valuation purposes.
6. After the 3`d review is complete on a permit application, additional reviews are charged at $90 per hour per reviewing
division/department.
7. Base building permit processing fee is $100 per permit.
8. Additional plan review required by changes, additions or revisions to approved plans $90 per hour (minimum charge
one hour) per reviewing department/division.
9. Building Inspections outside of normal business hours $90 per hour (minimum charge one hour).
10.Re-inspection fees and inspections for which no fee is specifically indicated, are charged at $90 per hour (minimum
charge one hour).
11.Development Project Peer Review: $90 per staff hour plus cost of consultant review fee charged for outside consultant
peer review services when City staff lacks the expertise to review a specific project or aspect of a project.
12.City Surcharge fee is $25 assessed for each development permit the City issues.
13.State Building Code Council surcharge fee $4.50 per building permit, plus $2.00 per each dwelling unit.
14.Pre-Application Meeting $655, 50% applied toward future plan check fee for that specific project only.
* The above table is based on the 1997 Uniform Building Code Table 1-A amended.
C:\Users\chave\Documents\Stats\Fees\2013fees\2014 Building Permit Fee Schedule NoWatermark fmal.doc
CITY OF EDMONDS
GRADING PERMIT FEE SCHEDULE - TABLE 2
Effective January 1, 2014
GRADING PLAN REVIEW FEES
50 cubic yards 38.2 m3 or less, when located in a designated critical area........................................................................ $ 30.00
51 to 100 cubic yards 40 m3 to 76.5 m'................................................................................................................................... $ 60.00
101 to 1,000 cubic yards 77.2m'to 764.6 m3..........................._........................................................,........,..............................$120.00
1,001 to 10,000 cubic yards 765.3 in' to 7645.5 in'.................................................................................................................$240.00
10,001 to 100,000 cubic yards (7646.3 m' to 76 455 m')--$240.00 for the first 10,000 cubic yards (7645.5 m'), plus
$100.00 for each additional 10,000 yards (7645.5 m') or fraction thereof.
100,001 to 200,000 cubic yards (76 456 m' to 152 911 m')--$1140.00 for the first 100,000 cubic yards (76 455 m'), plus
$100.00 for each additional 10,000 cubic yards 7645.5m3) or fraction thereof.
200,001 cubic yards (152 912 m') or more--$2040.00 for the first 200,000 cubic yards (152911m'), plus $100.00 for
each additional 10,000 cubic yards (7645.5 m') or fraction thereof.
Other Fees:
Additional plan review required by changes, additions or revisions to approved plans......................................$90.00 per hour
(minimum charge - one -hour)
GRADING PERMIT FEES
Base permit fee........................................................................................................................................._..................................... $30.00
50 cubic yards 38.2m3 or less, when located in a designated critical area. .$60.00
51 to 100 cubic yards 40 m' to 76.5m'....................................................................................................................................... $60.00
101 to 1,000 cubic yards (77.2m' to 764.6 m')--$120.00 for the first 100 cubic yards (76.5 m') plus $20.00 for each
additional 100 cubic yards (76.5 m') or a fraction thereof.
1,001 to 10,000 cubic yards (765.3 m' to 7645.5 m')--$300.00 for the first 1,000 cubic yards (764.6 m'), plus $40.00
for each additional 1,000 cubic yards 764.6 m') or fraction thereof.
10,001 to 100,000 cubic yards (7646.3 m' to 76 455 m')--$660.00 for the first 10,000 cubic yards (7645.4 m'),
plus $60.00 for each additional 10,000 cubic yards 7645.5 m' or fraction thereof.
100,001 cubic yards (76 456 m') or more--$1200.00 for the first 100,000 cubic yards (76 455 m'), plus $90.00
for each additional 10,000 cubic yards 7645.5 m' or fraction thereof.
Other Inspections and Fees:
1. Inspections outside of normal business hours (minimum charge -one hour).................................................$90.00 per hour
2. Re -inspection fees assessed under provisions of UBC Section 108.8................................................................$90.00 per hour
3. Inspections for which no fee is s ecificall indicated minimum charge - one-hour.....................................$90.00 per hour
* The above tables are based on the 1997 Uniform Building Code Table A-33-A Amended.
L:\temp\building\fees\2014 fees\2014 grading fee schedule
CITY OF EDMONDS
PLUMBING PERMIT FEE SCHEDULE - TABLE 3
Effective January 1, 2014
Base Permit Fee for Processing
1. For the issuance of each plumbing permit...........................................................................................$40.00
Unit Fee Schedule (NOTE: Base permit issuing fee not included)
1. For each plumbing fixture on one trap or a set of fixtures on one trap (including water, drainage
drainagepiping and backflow protection).......................................................................................$10.00
2. For each building sewer and each trailer park sewer (does not include trunk or LID charges) ...$60.00
3. Rainwater systems - per drain (inside building)................................................................................$30.00
4. For each cesspool (where permitted)....................................................................................................$50.00
5. For each private sewage disposal system.............................................................................................$60.00
6. For each water heater and/or vent and each expansion tank............................................................$10.00
7. For each gas -piping system of one to five outlets................................................................................$20.00
8. For each additional gas piping system outlet, per outlet....................................................................$ 2.00
9. For each industrial waste pretreatment interceptor including its trap and vent, except kitchen -
typegrease inceptors functioning as fixture traps...........................................................................$30.00
10. For each installation, alteration or repair of water piping and/or water treating equipment, each
$30.00
11. For each repair or alteration of drainage or vent piping, each fixture.............................................$10.00
12. For each lawn sprinkler system on any one meter including backflow protection devices thereof$30.00
13. For atmospheric -type vacuum breakers not included in item 12:
1 to 5.....................................................................................................................................................$10.00
over5, each...........................................................................................................................................$ 2.00
14. For each backflow protective device other than atmospheric type vacuum breakers:
2 inch (51 mm) diameter and smaller................................................................................................$30.00
over2 inch (51 mm) diameter............................................................................................................$40.00
15. For each graywater system....................................................................................................................$60.00
16. For initial installation and testing for a reclaimed water system......................................................$60.00
17. For each annual cross -connection testing of a reclaimed water system (excluding initial test) ...... $30.00
18. For each medical gas piping system serving one to rive inlet(s)/outlet(s) for a specific gas ............$90.00
19. For each additional medical gas inlet(s)/outlet(s)................................................................................$10.00
20. For each grease trap ... ........................................................................................................................ $180.00
21. For each grease interceptor.................................................................................................................$630.00
Other Inspections and Fees
1. Re -inspection fee....................................................................................................................................$90.00
2. Inspections for which no fee is specifically indicated.........................................................................$90.00
3. Plan review fee per hour charge (minimum charge - one hour)........................................................$90.00
4. Additional plan review required by changes, additions or revisions to approved plans per hour
charge(minimum charge-one-hour).................................................................................................$90.00
* The above tables are based on the 1997 Uniform Plumbing Code Table 1-1 Amended.
L:\temp\building\fees\2014 fees\2014 plumbing fee schedule
CITY OF EDMONDS
MECHANICAL PERMIT FEE SCHEDULE - TABLE 4
Effective January 1, 2014
Base Permit Fee for Processin
1. For the issuance of each mechanical permit..................................................................................................................... $40.00
Unit Fee Schedule (Note: Base permit fee for processing not included.)
1. Furnaces
For the installation/relocation of each forced -air or gravity -type furnace or burner, including ducts and appliance
vent up to and including 100,000 Btu/h(29.3kW)...............................................................................................................
$20.00
For the installation/relocation of each forced -air or gravity -type furnace or burner, including ducts and appliance
ventover 100,000 Btu/h(29.3kW).......................................................................................................................................
$30.00
For the installation/relocation of each floor furnace, including vent....................................................................................
$20.00
For the installation/relocation of each suspended heater, recessed wall heater or floor -mounted unit heater ......................
$25.00
2. Appliance Vents
For the installation, relocation/replacement of each appliance vent installed (i.e., Type B, BW, L gas vent, etc.) ..............
$10.00
3. Repairs or Additions
For the repair, alteration or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit,
or each heating, cooling, absorption or evaporative cooling system, including installation of controls ...............................
$15.00
4. Boilers, Compressors and Absorption Systems/Air Conditioning Systems
For the installation/relocation of each boiler or compressor up to and including 3 horsepower (10.6kW), or each
absorption system up to and including 100,000 Btu/h (29.3kW).........................................................................................
$20.00
For the installation/relocation of each boiler or compressor over 3 horsepower (I0.6KW) up to and including 15
horsepower (52.7kW), or each absorption system over 100,000 Btu/h (29.3kW) up to and including 500,000 Btu/h
(146.6kW)............................................................................................................................................................................
$30.00
For the installation or relocation of each boiler or compressor over 15 horsepower (52.7kW) up to and including 30
horsepower (105.5kW), or each absorption system over 500,000 Btu/h (146.6kW) to and including 1,000,000 Btu/h
(293.1 kW)................................................................•...........................................................................................................
$40.00
For the installation or relocation of each boiler or compressor over 30 horsepower (105.5kW) up to and including 50
horsepower (176 kW), or each absorption system over 1,000,000 Btu/h (293.1 kW) to and including 1,750,000 Btu/h
(512.9 kW)...........................................................................................................................................................................
$60.00
For the installation or relocation or each boiler or compressor over 50 horsepower (176 kW), or each absorption
systemover 1,750,000 Btu/h (512.9 kW).............................................................................................................................
$95.00
5. Air Handlers
For each air -handling unit up to and including 10,000 (cfm) (4719 L/s), including ducts (i.e., diffusers, blowers, etc.).....
$20.00
For each air -handling unit over 10,000 cfin (4719 Us) including ducts..............................................................................
$30.00
6. Evaporative Coolers
For each evaporative cooler other than portable type...........................................................................................................
$15.00
7. Ventilation and Exhaust
For each ventilation fan connected to single duct (i.e., bath, laundry, kitchen exhaust, etc.) ...............................................
$10.00
For each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit........
$10.00
For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood .....................
$30.00
8. Incinerators
For the installation or relocation of each domestic type incinerator.....................................................................................
$20.00
For the installation or relocation of each commercial or industrial -type incinerator............................................................
$50.00
9. Miscellaneous
For each appliance or piece of equipment regulated by the IMC for which no other fee is listed (i.e. fire dampers, etc.)...
$20.00
Other Inspections and Fees
1. Re -inspection fees assessed at a per hour charge (minimum charge -one hour)....................................................................
$90.00
2. Inspections for which no fee is specifically indicated, per hour charge (minimum charge -one -hour) ................................
$90.00
3. Plan review fee per hour charge minimum charge - one hour .............$90.00
4. Additional plan review required by changes, additions or revisions to plans or to plans for which an initial review
has been completed per hour charge (minimum charge -one hour)......................................................................................
$90.00
* The above tables are based on the 1997 Uniform Mechanical Code Table 1-A Amended.
L:\temp\building\fees\2014 fees\2014 mechanical fee schedule