Loading...
Resolution 1308RESOLUTION NO. 1308 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, AMENDING THE FEE SCHEDULE FOR THE CITY'S DEVELOPMENT -RELATED FESS AND CHARGES FOR SERVICES, INCLUDING A SAVINGS CLAUSE, AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, ECDC 15.00.020 provides for the establishment and amendment of certain fees charged by the City by resolution; and WHEREAS, extensive effort has been made by City Staff to analyze the full costs associated with City permitting and service activities; and WHEREAS, the City Council has previously established and affirms as its goal that permit fees shall be set to cover the costs of processing and issuing permits and requests for service; and WHEREAS, the City Council does, however, desire that parties utilizing the City's administrative appeals procedures bear a smaller burden of the costs of processing those appeals in order to afford access to the appeals process; and, WHEREAS, the City Council adopted the proposed 2014 fee schedule by Resolution #1302 on November 19, 2013, and while not changing the fees schedule the Council now desires, for clarity, to specifically include the referenced tables as part of the adopted fees schedule; now, therefore, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. The fees and charges for services set forth in the schedule attached as Exhibit A to this Resolution are hereby adopted, along with the referenced tables which are also included therein, and shall be effective on and after January 1, 2014. Section 2. If any section, sentence, clause or phrase of this resolution or any fee or charge for service adopted or amended hereby should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section, sentence, clause or phrase, or any fee or charge adopted or amended hereby. RESOLVED this 17th day of December, 2013. ATTEST: CITY CLERK, SCOTT SSEY FILED WITH THE CITY CLERK: December 13, 2013 PASSED BY THE CITY COUNCIL: December 17, 2013 RESOLUTION NO. 1308 Exhibit A: Development Fees Permit Type Notes Fee Building Fire Alarm (Alteration) up to 5 initiating devices No plans. Subject to field inspection. $165 Fire Alarm (Alteration) 6 or more initiating devices $90 + COE Table 1 Fire Alarm (New) $90 + COE Table 1 Fire Connection permit Includes Engineering @ $90 $500 Fire Damage COE Table 1 Fire Inspection Fee Per Hour $90 Fire Operational permit $40 Firework Display permit $30 Fire Plan Review fee Per Hour $90 Fire Sprinkler Commercial (Alteration) up to 5 sprinklers Applies to Commercial and Multifamily. No Plans; field check only. $180 [Fire Sprinkler Commercial (Alteration) than 5 s rinklers Applies to Commercial and Multifamilyore $135 + COE Table 1re Sprinkler Commercial (New) Applies to Commercial and Multifamily $270 + COE Table 1 Fire Sprinkler Residential Applies to IRC structures. Keep low. $360 Fire Protection System permit For cooking systems, stand i e ...Previous) Fire Su ression $315 Underground Tank 600 gallons or less (fill, rem ve install Previous breakpoint was 10,000 gallons. Kee low. $90 Underground Tank more than 600 gallons fill remove.. install)-$270 Accessory Structure (Greenhouse/Shed) Table 1 ADU Compliance $405 Adult Family Home $450 Appeal of Building Official Interpretation $810 (Base Building Permit Processing Fee $100 (Building Inspection $90 Cell Communications/ Cellular Facilities Table 1 hange of Use $450 hanges to Approved Plans 90/hr ity Surcharge Fee IlDeck, $25 ommercial New Construction Table 1 Stair, Ramp Table 1 (Demolition (Primary) $270 F I N A L Page 1 12.12.2013 Permit Type Notes Fee !Demolition (Secondary) $135 Dock/Marina/Floats $190+Table 1 Fence $60 Garage / Carport Table 1 Grading/Fill 'Table 2 + Peer Review Grease Interceptor $630 Grease Trap $180 Hot Tub/Spa (Commercial) Table 1 Hot Tub/Spa (Single -Family) $180 Hydronic Heating $135 Manufactured Coach -Commercial (Federal HUD Label $450 Manufactured Home Installation (Federal HUD Label)$540 ESLHA Administrative Processing Fee $2,385 ESLHA Minor Project Administrative ProcessingFee INew category $270 ESLHA Consultant Review Full cost of peer ireview ESLHA Packets iNo labor in current fee $15 Mechanical Permit Table 4 Parking Lot 180 + Table 1 Plumbing Permit 'Table 3 Re -inspection Fee (Building) $90 Relocation of Building 500 + 90 r outside city Re -roof (Commercial) Table 1 Re -roof (Single-family) $90' Residential - New Construction ''Table 1 (Residential -Addition/Remodel 'Table 1 Re -Submittal Plan Review after 3rd review $90/hour (Retaining Wall (Commercial) $675 + peer review (Retaining Wall (Residential) $265 + peer review :Sign (Per Sign) $125 Sign - Blade Sign Includes all blade signs in proposal $90 :Solar/Photovoltaic (Residential) $120.00 ;Solar/Photovoltaic (Commercial) 'Table 1 'State Building Code Surcharge Fee $4.50 :Structural Review Fee $90/hr + consultant :Swimming Pool ( Pre Manufactured Above Ground)$120 'Swimming Pool (In -Ground) Table 1 'Tenant Improvement Table 1 F I N A L Page 2 12.12.2013 Permit Type Notes Fee Planning 'Type 1 Staff decisions, no notice $225 'Type 2 Staff decisions w/ notice $795 Type 3A Outdoor dining, amateur radio $225 Type 3B 1Hearing Examiner / ADB (+HE) $1,637 + HE Type 4A Subdivision / PRD final approval $3,355 Type 4B Rezone $5,720 Type 5 Plan, ECDC amendments $5,720 ADB Design Review -Signs ADB consideration of departure from sign standardper code $795 '.Signs (Planning review) Traditionally kept low to reflect relative cost of si na a $0 Pole or reader board signs Code "discourages" and are more costly to review $225 ILot Line Adjustment $855 'Short Subdivision $2,645 Short Subdivision Final Approval $1,300 :Subdivision Prelim Approval (+ HE) Staff time plus actual HE cost billed to applicant $5,355 + HE :Subdivision Final Approval Type 4A $3,355 iModification Request $795 Minor change to approved plat $90/hr Major change to approved plat Same as original application iPRD Preliminary Approval $5,335 PRD Final Approval $3,355 SEPA Review $610 EIS Review Cost Critical Areas Checklist $155 Critical Areas Var / Reasonable Use Staff time plus actual HE cost billed to applicant $6,260 + HE Preapplication Meeting $655 DRC Meeting $0 Appeal of Staff Decision (1 or 2) HE Appeal fees traditionally kept low by Council policy $400 Appeal of Type 3B decision to CC Appeal fees traditionally kept low by ,Council-policy$500 ppeal of Notice of Civil Violation [Request Appeal fees traditionally kept low by Council policy$705 for Reconsideration Traditionally kept low by Council policy $225 lanning Inspection Fee IlLandscape plan inspection 1% of est. FINAL Page 12.12.2013 Permit Type Notes Fee (Recording Fee Recording documents w/ County $90 + cost Other (fee not categorized above) $90/hr When permit is heard by HE, cost of HE hearing is billed to applicant. F I N A L Page 4 12.12.2013 Permit Type Notes Fee Engineering Increase fee to $180 (2 hrs). Change language $180 plus ROW permit fee Alley Disruption/ Closure Fee of fee to note right of way permit fee and plus closure fees closure charges are in addition to permit fee Backflow Prevention Compliance Fee Fee to assist in ensuring voluntary compliance $125 with backflow prevention program & ECC 7.20 Add an application fee based on 4 hours of staff $360 Application Fee Developers Agreements time. $90/hr plus attorney fees will be collected $90ihr plus City Attorney for any subsequent hours. Fees Increase to reflect revised hourly rate of $90 for $270 plus Cost of Peer Development Project Peer Review 3 hours Review This permit is for drainage of pools, hot tub, REVISED FEE TITLE: Drainage Permit (pool, jacuzzi and other facilities designed or intended $40 hot tub, jacuzzi) to hold more than 50 gallons of water. Increase fee to recover a portion of the actual cost. Encroachment Permit Adjust Fee to reflect 3 hrs of staff time. $270 plus recording fees Fee charged for each Engineering on -site inspection not specifically covered or included Engineering Inspection Fee (Single Family, in a separate permit or inspection fee. Fee is $90 each Existing Comm/W, right of way) charged per inspection. This fee is charged in addition to the applicable Building Permit or other permit fee. Engineering inspection during construction of site improvements for all subdivisions/short (Engineering Inspection Fees - Civil Site plats, commercial and multi -family. This fee is Improvements (subdivisions, commercial, multi- charged in addition to the applicable 3.3% of Bond Amount (family) Engineering Review or other building permit fee(s). Adjust percentage to reflect liourly charge increase from $60 to $90 Engineering Review Fee Engineering staff review per hour $90/hr F I N A L Page 5 12.12.2013 Permit Type Notes Fee Engineering review of civil plans for REVISED FEE TITLE -Subdivision - Civil construction of site improvements for Review (previously Engineering Review - Site subdivision (5 or more lots) This fee is charged $35920 Improvements 5 or more lots) in addition to applicable Engineering Inspection fees. (REVISED FEE TITLE -Short Subdivision -Civil (Review (previously Engineering Review - Site Improvement 4 or less lots) Engineering review of civil plans for construction of site improvements for short plats $2.570 1(4 or less lots) This fee is charged in addition to applicable Engineering Inspection fees. (Latecomers Agreement Add an application fee based on 4 hours of staff $360 Application Fee plus time. $90/hr plus attorney fees will be collected $90/hr and City Attorney for any subset uent hours. Fees Add an application fee based on 4 hours of staff $360 Application Fee plus (LID Sewer Fees (Outside of LID Map) time. $90-/hr plus attorney fees will be collected $90/hr and City Attorney for any subsequent hours. Fees This fee applies to any activity that occupies or closes parking space(s), parking lanes(s) or 172 other paved area of a street/road for more than hours. When this fee applies to construction - related activities, it will be applied in addition to the ROW Construction Permit fee. (Monthly portion of Fee [$ per month] = 1% of assessed value per square foot of abutting property x $180 plus ROW permit fee (Parking Disruption/ Closure Fee right of way area [SF] disrupted/closed.) If plus closure charge disruption/closure affects any portion of the area of a parking space, the area of disruption/closure is calculated based upon the area of a full parking space. Change to reflect 2 hrs of staff time to review, process and inspect closure. Add reference to right of way permit fee Re -Inspection Fee increase to cover change in hourly fee from $60 $90 each to $90 REVISED FEE TITLE -Right -of -Way Construction Permit IAdministrative increase to cover change in hourly cost from $270 plus inspection tees (previously Right -of -Way Construction Permit $60 to $90 Review) F I N A L Page 6 12.12.2013 Permit Type Notes Fee New permit for smaller projects that cause only NEW FEE Right of Way Minor minor disturbance to the right of way e.g. $90 plus inspeciton fees Construction Permit residential driveway replacement, tree trimming change fee description and update $180 plus connection Side Sewer (Commercial & Multi -Family) review;` process fee to cover 2 hours charge per Ordinance change flee description and update $90 plus connection charge Side Sewer (Single Family) revievv/ rocess fee to cover 1 hour per Ordinance (Side Sewer Repair Only increase to cover 1 hr review/process time $90 Side Sewer - Special Conditions e.g. grinder I increase to cover 3 hr review/process time $270 pumps, ejectors.. Increase fee to $180 (2hrs). Change language of $180 plus ROW permit Sidewalk Disruption or Closure fee to note right of way permit fee and closure plus closure fees char>es are in addition to fee Special Agreements for Private Utilities in City increase to cover change in hourly cost from $90/hr plus City Attorney Right of Wa $60 to $90 Fees Engineering Review of storm drainage for SFR construction of any type (e.g. new construction, REVISED FEE TITLE,-Stormwatcr Engineer remodel, additions, sealed decks, etc.) with > 'Review Fee (Engineering Review Fee for Single 5,000 SF new impervious surface or in critical $ l2U/hr Family Residence) (previously Drainage area or Meadowdale. This fee is charged in Review Fee) addition to Building Permit or other permit fees. Change to reflect actual hourly rate of P.E. REVISED FEE TITLE-Stormwater Permit increase to cover change in hourly cost from $270 plus inspection fees (Previously Storm Drainage Permit) $60 to $90 NO FEE AMOUNT CHANGE: Change fee Connection Fee per Storm System Development Charge description to reference ordinance. Ordinance REVISE[) FEE TITLE -Street Restoration for Increase fee to recover actual cost. Developers Water Meter Installation (Excluding Private will ha required to complete restoration on their $ I U00 plus Street Overlay Development) (previously - Street projects. The $1,000 fee is an average estimate Cut Fee if applicable Cut/Restoration Deposit for Water Meter for street restoration work. Installation Changed name of Fee and Fee description- ROW pen -nit fee plus addt'l REVISED FEE TITLE --Street Overlay Cut Fee increased flat fee to cover 1 review and I per SgYd charge times (previously Street Disruption Fee) inspect. overlay cut multiplier This fee is applied to any use of public street of a temporary nature (not covered by $90 plus insp fees (Bistro Street Use Permit Encroachment permit or ROW construction Dining fees per ordinance permit) Outdoor Bistro Dining Fees per if applicable) Ordinance ifapplicable. REVISED FEE TITLE -Traffic Engineer Review Fee (previously Traffic Impact increase to reflect hourly rate of P.E. $120/hr Analysis Review) F I N A L Page 7 12.12.2013 Permit Type Notes Fee NO FEE AMOUNT CHANGE: Fee per ECDC Traffic Impact Fee 18,82 or as determined by independent fee Fee Per ECDC 18.82 calculation. (Revised Fee Description) Traffic Impact Fee Review - Independent increase to reflect hourly rate of P.E. $240 Calculation Fee charged for each request for variance from Variance from Underground Wiring underground wiring requirement. Based on 8 $720 hours of staff time, increase to reflect higher hourly rate NO FEE AMOUNT CHANGE: Change fee Connection fee per Water Meter Connection Fee description to reference ordinance. Ordinance Fee charged for new water service line and meter installation per Edmonds City Code Water Meter Fee (Based on Size) 7.30.030. The new Fees have been calculated based on actual costs of pails and_ labor. 3/4" $2,920 1" $2,970 1.5" $6,220 2" $6 390 F I N A L Page 8 12.12.2013 CITY OF EDMONDS BUILDING PERMIT FEE SCHEDULE — TABLE 1 Based on building construction valuation Effective January 1 2014 $14500 $30 $501 to $2000 $30 for the first $500 plus $3 for each additional $100, or fraction thereof to and including $2000 $2001 to $25,000 $75 for the first $2000 plus $14 for each additional $1,000 or fraction thereof to and including $25,000 $25,001 to $50,000 $400 for the first $25,000 plus $10 for each additional $1,000 or fraction thereof to and including $50,000 $50,001 to $100,000 $650 for the first $50,000 plus $7 for each additional $1,000 or fraction thereof to and including $100,000 $100,001 to $500,000 $1000 for the first $100,000 plus $6 for each additional $1,000 or fraction thereof to and including $500,000 $500,001 to $1,000,000 $3,400 for the first $500,000 plus $5 for each additional $1,000 or fraction thereof to and including $1,000,000 $1,000,001 and up $5,900 for the first $1,000,000 plus $4 for each additional $1000 or fraction thereof. Other Fees: 1. Plan review fees in addition to building permit fees are assessed at a rate of 85% of the calculated building permit fee (includes Building, Planning and Engineering for commercial/multi-family reviews and Building/Planning for residential reviews). 2. Commercial Permits: All permits relating to other than residential permits as described below shall be calculated at the rate established in the amended Building Permit Fee Schedule based on 120% of above valuation chart. The determination of value or valuation shall be based on the Building Valuation Data, published in January of each year in the Building Safety Journal published by the International Code Council, on file with the City Building Official. 3. Residential Permits: Permits for the construction (including remodels and additions) of single-family residences, including accessory structures shall be calculated at the rate established in the amended Building Permit Fee Schedule based on the above valuation chart. The determination of value or valuation shall be based on the Building Valuation Data, published in January of each year in the Building Safety Journal published by the International Code Council, on file with the City Building Official. 4. Decks, stairs, ramps, covered porches with open exterior sides, and trellises are assessed at $20 per square foot for valuation purposes. 5. Unheated sunrooms are assessed at $28 per square foot for valuation purposes. 6. After the 3`d review is complete on a permit application, additional reviews are charged at $90 per hour per reviewing division/department. 7. Base building permit processing fee is $100 per permit. 8. Additional plan review required by changes, additions or revisions to approved plans $90 per hour (minimum charge one hour) per reviewing department/division. 9. Building Inspections outside of normal business hours $90 per hour (minimum charge one hour). 10.Re-inspection fees and inspections for which no fee is specifically indicated, are charged at $90 per hour (minimum charge one hour). 11.Development Project Peer Review: $90 per staff hour plus cost of consultant review fee charged for outside consultant peer review services when City staff lacks the expertise to review a specific project or aspect of a project. 12.City Surcharge fee is $25 assessed for each development permit the City issues. 13.State Building Code Council surcharge fee $4.50 per building permit, plus $2.00 per each dwelling unit. 14.Pre-Application Meeting $655, 50% applied toward future plan check fee for that specific project only. * The above table is based on the 1997 Uniform Building Code Table 1-A amended. C:\Users\chave\Documents\Stats\Fees\2013fees\2014 Building Permit Fee Schedule NoWatermark fmal.doc CITY OF EDMONDS GRADING PERMIT FEE SCHEDULE - TABLE 2 Effective January 1, 2014 GRADING PLAN REVIEW FEES 50 cubic yards 38.2 m3 or less, when located in a designated critical area........................................................................ $ 30.00 51 to 100 cubic yards 40 m3 to 76.5 m'................................................................................................................................... $ 60.00 101 to 1,000 cubic yards 77.2m'to 764.6 m3..........................._........................................................,........,..............................$120.00 1,001 to 10,000 cubic yards 765.3 in' to 7645.5 in'.................................................................................................................$240.00 10,001 to 100,000 cubic yards (7646.3 m' to 76 455 m')--$240.00 for the first 10,000 cubic yards (7645.5 m'), plus $100.00 for each additional 10,000 yards (7645.5 m') or fraction thereof. 100,001 to 200,000 cubic yards (76 456 m' to 152 911 m')--$1140.00 for the first 100,000 cubic yards (76 455 m'), plus $100.00 for each additional 10,000 cubic yards 7645.5m3) or fraction thereof. 200,001 cubic yards (152 912 m') or more--$2040.00 for the first 200,000 cubic yards (152911m'), plus $100.00 for each additional 10,000 cubic yards (7645.5 m') or fraction thereof. Other Fees: Additional plan review required by changes, additions or revisions to approved plans......................................$90.00 per hour (minimum charge - one -hour) GRADING PERMIT FEES Base permit fee........................................................................................................................................._..................................... $30.00 50 cubic yards 38.2m3 or less, when located in a designated critical area. .$60.00 51 to 100 cubic yards 40 m' to 76.5m'....................................................................................................................................... $60.00 101 to 1,000 cubic yards (77.2m' to 764.6 m')--$120.00 for the first 100 cubic yards (76.5 m') plus $20.00 for each additional 100 cubic yards (76.5 m') or a fraction thereof. 1,001 to 10,000 cubic yards (765.3 m' to 7645.5 m')--$300.00 for the first 1,000 cubic yards (764.6 m'), plus $40.00 for each additional 1,000 cubic yards 764.6 m') or fraction thereof. 10,001 to 100,000 cubic yards (7646.3 m' to 76 455 m')--$660.00 for the first 10,000 cubic yards (7645.4 m'), plus $60.00 for each additional 10,000 cubic yards 7645.5 m' or fraction thereof. 100,001 cubic yards (76 456 m') or more--$1200.00 for the first 100,000 cubic yards (76 455 m'), plus $90.00 for each additional 10,000 cubic yards 7645.5 m' or fraction thereof. Other Inspections and Fees: 1. Inspections outside of normal business hours (minimum charge -one hour).................................................$90.00 per hour 2. Re -inspection fees assessed under provisions of UBC Section 108.8................................................................$90.00 per hour 3. Inspections for which no fee is s ecificall indicated minimum charge - one-hour.....................................$90.00 per hour * The above tables are based on the 1997 Uniform Building Code Table A-33-A Amended. L:\temp\building\fees\2014 fees\2014 grading fee schedule CITY OF EDMONDS PLUMBING PERMIT FEE SCHEDULE - TABLE 3 Effective January 1, 2014 Base Permit Fee for Processing 1. For the issuance of each plumbing permit...........................................................................................$40.00 Unit Fee Schedule (NOTE: Base permit issuing fee not included) 1. For each plumbing fixture on one trap or a set of fixtures on one trap (including water, drainage drainagepiping and backflow protection).......................................................................................$10.00 2. For each building sewer and each trailer park sewer (does not include trunk or LID charges) ...$60.00 3. Rainwater systems - per drain (inside building)................................................................................$30.00 4. For each cesspool (where permitted)....................................................................................................$50.00 5. For each private sewage disposal system.............................................................................................$60.00 6. For each water heater and/or vent and each expansion tank............................................................$10.00 7. For each gas -piping system of one to five outlets................................................................................$20.00 8. For each additional gas piping system outlet, per outlet....................................................................$ 2.00 9. For each industrial waste pretreatment interceptor including its trap and vent, except kitchen - typegrease inceptors functioning as fixture traps...........................................................................$30.00 10. For each installation, alteration or repair of water piping and/or water treating equipment, each $30.00 11. For each repair or alteration of drainage or vent piping, each fixture.............................................$10.00 12. For each lawn sprinkler system on any one meter including backflow protection devices thereof$30.00 13. For atmospheric -type vacuum breakers not included in item 12: 1 to 5.....................................................................................................................................................$10.00 over5, each...........................................................................................................................................$ 2.00 14. For each backflow protective device other than atmospheric type vacuum breakers: 2 inch (51 mm) diameter and smaller................................................................................................$30.00 over2 inch (51 mm) diameter............................................................................................................$40.00 15. For each graywater system....................................................................................................................$60.00 16. For initial installation and testing for a reclaimed water system......................................................$60.00 17. For each annual cross -connection testing of a reclaimed water system (excluding initial test) ...... $30.00 18. For each medical gas piping system serving one to rive inlet(s)/outlet(s) for a specific gas ............$90.00 19. For each additional medical gas inlet(s)/outlet(s)................................................................................$10.00 20. For each grease trap ... ........................................................................................................................ $180.00 21. For each grease interceptor.................................................................................................................$630.00 Other Inspections and Fees 1. Re -inspection fee....................................................................................................................................$90.00 2. Inspections for which no fee is specifically indicated.........................................................................$90.00 3. Plan review fee per hour charge (minimum charge - one hour)........................................................$90.00 4. Additional plan review required by changes, additions or revisions to approved plans per hour charge(minimum charge-one-hour).................................................................................................$90.00 * The above tables are based on the 1997 Uniform Plumbing Code Table 1-1 Amended. L:\temp\building\fees\2014 fees\2014 plumbing fee schedule CITY OF EDMONDS MECHANICAL PERMIT FEE SCHEDULE - TABLE 4 Effective January 1, 2014 Base Permit Fee for Processin 1. For the issuance of each mechanical permit..................................................................................................................... $40.00 Unit Fee Schedule (Note: Base permit fee for processing not included.) 1. Furnaces For the installation/relocation of each forced -air or gravity -type furnace or burner, including ducts and appliance vent up to and including 100,000 Btu/h(29.3kW)............................................................................................................... $20.00 For the installation/relocation of each forced -air or gravity -type furnace or burner, including ducts and appliance ventover 100,000 Btu/h(29.3kW)....................................................................................................................................... $30.00 For the installation/relocation of each floor furnace, including vent.................................................................................... $20.00 For the installation/relocation of each suspended heater, recessed wall heater or floor -mounted unit heater ...................... $25.00 2. Appliance Vents For the installation, relocation/replacement of each appliance vent installed (i.e., Type B, BW, L gas vent, etc.) .............. $10.00 3. Repairs or Additions For the repair, alteration or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls ............................... $15.00 4. Boilers, Compressors and Absorption Systems/Air Conditioning Systems For the installation/relocation of each boiler or compressor up to and including 3 horsepower (10.6kW), or each absorption system up to and including 100,000 Btu/h (29.3kW)......................................................................................... $20.00 For the installation/relocation of each boiler or compressor over 3 horsepower (I0.6KW) up to and including 15 horsepower (52.7kW), or each absorption system over 100,000 Btu/h (29.3kW) up to and including 500,000 Btu/h (146.6kW)............................................................................................................................................................................ $30.00 For the installation or relocation of each boiler or compressor over 15 horsepower (52.7kW) up to and including 30 horsepower (105.5kW), or each absorption system over 500,000 Btu/h (146.6kW) to and including 1,000,000 Btu/h (293.1 kW)................................................................•........................................................................................................... $40.00 For the installation or relocation of each boiler or compressor over 30 horsepower (105.5kW) up to and including 50 horsepower (176 kW), or each absorption system over 1,000,000 Btu/h (293.1 kW) to and including 1,750,000 Btu/h (512.9 kW)........................................................................................................................................................................... $60.00 For the installation or relocation or each boiler or compressor over 50 horsepower (176 kW), or each absorption systemover 1,750,000 Btu/h (512.9 kW)............................................................................................................................. $95.00 5. Air Handlers For each air -handling unit up to and including 10,000 (cfm) (4719 L/s), including ducts (i.e., diffusers, blowers, etc.)..... $20.00 For each air -handling unit over 10,000 cfin (4719 Us) including ducts.............................................................................. $30.00 6. Evaporative Coolers For each evaporative cooler other than portable type........................................................................................................... $15.00 7. Ventilation and Exhaust For each ventilation fan connected to single duct (i.e., bath, laundry, kitchen exhaust, etc.) ............................................... $10.00 For each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit........ $10.00 For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood ..................... $30.00 8. Incinerators For the installation or relocation of each domestic type incinerator..................................................................................... $20.00 For the installation or relocation of each commercial or industrial -type incinerator............................................................ $50.00 9. Miscellaneous For each appliance or piece of equipment regulated by the IMC for which no other fee is listed (i.e. fire dampers, etc.)... $20.00 Other Inspections and Fees 1. Re -inspection fees assessed at a per hour charge (minimum charge -one hour).................................................................... $90.00 2. Inspections for which no fee is specifically indicated, per hour charge (minimum charge -one -hour) ................................ $90.00 3. Plan review fee per hour charge minimum charge - one hour .............$90.00 4. Additional plan review required by changes, additions or revisions to plans or to plans for which an initial review has been completed per hour charge (minimum charge -one hour)...................................................................................... $90.00 * The above tables are based on the 1997 Uniform Mechanical Code Table 1-A Amended. L:\temp\building\fees\2014 fees\2014 mechanical fee schedule