Resolution 1322RESOLUTION NO. 1322 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, APPROVING THE 2015-2020 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND DIRECTING FILING OF THE ADOPTED PROGRAM WITH THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION. WHEREAS, RCW 35.77.010 requires each city and town to adopt a Transportation Improvement Program (TIP) and file a copy of such adopted program with the Washington State Department of Transportation (WSDOT); and WHEREAS, the TIP identifies all planned projects over the next 6 years, along with the appropriate funding source; now, therefore, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. The Transportation Improvement Program is hereby adopted pursuant to the requirements of RCW 35.77.010 to be effective on June 25, 2014 and to continue in full force and effect until amended. A copy of such Transportation Improvement Program for the years 2015 to 2020 is attached hereto as Exhibit A and incorporated by this reference as fully as if herein set forth. Section 2. The City Clerk is hereby requested and directed to file a certified copy of the Transportation Improvement Program with the Washington State Department of Transportation. - 1 - RESOLVED this 24th day of June, 2014. ATTEST/AUTHENTICATED: CITY CLERK, SCOTT SSEY FILED WITH THE CITY CLERK: PASSED BY THE CITY COUNCIL: RESOLUTION NO. APPR MAYOR, DA June 20, 2014 June 24, 2014 1322 O. EARLING -2- City of Edmonds Six Year Transportation Improvement Program (2015-2020) Grant Opportunity Project (2015-2020) Project Name Purpose Grant/Date Phase Total Cost Source 2015 2016 2011 2018 2019 2020 Preservation/Maintenance Projects: Annual Street Preservation Grind pavement, overlay, chip seal, Possible Grant Engineering $1,700,000 (Federal, unsecured) $800,000 $900,000 Program & & $0 (Stale) and slurry seal Local Funds Construction $12,750,000 (Local) $1,600,000 $1,650,000 $1,700,000 $2,800,000 $2,000,000 $3,000,000 220th St. SW Overlayfrom Possible grant Engineering $780,000 (Federal, unsecured) $780,000 761h Ave. W to B4th Ave. W Grind pavement and overlay & & $0 (State) Local Funds Construction $260,000 (Local) $260,000 Citywide Signal Upgrade traffic signal cabinets Engineering $650,000 (Federal, unsecured) $325,000 $325,000 Improvements Possible Grant & $0 (Stale) and improve technology Construction 1 $0 (Local) 238th A 100th Av. Signal Upgrades Rebuild traffic signal system Engineering $0 (Federal) with new signal mast arms, cabinet, and Possible Grant & $750,000 (State, unsecured) $750,000 video detection Construction 1 $0 (Local) TOTAL $9640,000 1 $1,650,000 $2,500,000 $3,875,000 $3.225,000 $3,000,000 Safety / Capacity Analysis: 212th St. SW / 84th Ave. W (5 Corners) Install roundabout with conversion of overhead utilities Secured Grant Construction $86,500 (Federal, secured) $86,500 Intersection Improvements to underground, water line replacement, and stormwater & $0 (State) upgrades Local Funds $13,500 (Local, Traffic Impact Fees) $13,500 228th St. SW. Corridor Safety Construct missing roadway link on 228th St. SW between ROW $200,000 (Federal, secured) $200,000 Improvements Hwy. 99 and 76th Ave. W. Install traffic signals at Secured Grants $0 (State) Hwy. 99 (@ 228th St. SW and 76th Ave. W @ 228th St & $0 (Local) Construction $3,533,000 (Federal, secured) $2,000,000 $1,533,000 to improve safety. Bike lanes and sidewalk will be added Local Funds on both sides of the new stretch. Stormwater $1,722,000 (State, secured) $1,000,000 $722,000 Improvements are incorporated into this prolect. S406,000 (Local) $406,000 76th Av. W @ 212th St. SW Intersection $30,000 (Federal, secured) $30,000 Improvements Engineering $0 (State) $4,000 (Local, Fund 421) $4,000 $2,000 (Local, Fund 423) $2,000 $5,000 Re -design intersection to reduce intersection delay / Secured grants (Local, Traffic Impact Fees) $5,000 $600,000 (Federal, secured) $300,000 $300,000 improve level of service. Utility improvements are included in the project. ROW $0 (Stale) $143,000 (Local) $47,000 $47,000 Construction $3,020,000 (Federal, unsecured) $3,020,000 & Local Funds $366,000 (Local, Fund 112) $366,000 $645,000 (Local, Fund 421) $645,000 $106,000 (Local, Fund 422) $106,000 $774,000 (Local, Fund 423) $774,000 SR-99 Gateway / Revitalization Install gateway elements and safety improvements Engineering $0 (Federal) along the SR-99 Corridor. Possible Grant & $10,000,000 (State, unsecured) $500,000 54,500,000 $5,000,000 Construction $0 (Local) SR-524 (196th St. SW) / 88th Ave. W Installation of guardrail on the west side of intersection, $0 (Federal) Guardrail improving intersection safety due to - 12' vertical drop on Local Funds Only Engineering $0 (State) west side of intersection $50, 000 (Local) $50,000 SR 524 (1961h St. SW) @ Design intersection improvement Design $0 (Federal) 88th Ave W. Intersection Possible Grant $50,000 (State, unsecured) $50,000 $50,000 Improvements (Local, traffic impact fees) $50,000 ROW acquisition ROW $0 (Federal) & $81,500 (State, unsecured) $81,500 $81,500 (Local) $81,500 Construct intersection improvements Construction $740,000 (Federal, unsecured) $740,000 Local Funds $0 (State) $112,000 (Local) $112,000 Main St. A 3rd Signal Upgrades Possible grant Engineering $287,500 (Federal, unsecured) $37,500 $250,000 Upgrade traffic signal & & $0 (State) Local Funds Construction $87,500 (Local) $37,500 $50,000 Puget Dr. A OVD Signal Upgrades Possible grant Engineering $287,500 (Federal, unsecured) $37,500 $250,000 Upgrade traffic signal & & $0 (State) Local Funds Construction $87,500 (Local) $37,500 $50,000 Main St. A 9th Av. S Restripino of 9th Av. S to (2) northbound Engineering $0 (Federal) (Interim Solution) and southbound lanes (existinq conditions: 1 lane), along with Local Funds Only & $0 (State) striping modifications for eastbound and westbound lanes. Construction $10,000 (Local, Traffic Impact Fees) $10,000 761h Av. W @ 220th St. SW Convert split phasing for eastbound and westbound movement Possible Grant Engineering, $4,293,500 (Federal, unsecured) $432,500 $723,000 $3,138,000 Intersection Improvements to protective / permissive left turn phasing. Right turn overlap & ROW, & $0 (State) would be added for the right turn movements. Local Funds Construction $670,500 (Local) $67,500 $113,000 $490,000 Arterial Street Signal Coordination Coordinate the traffic signals within 1/2 mile of each other Engineering $0 (Federal) Improvements along 761h Av. W, 2121h St. SW, and 220th St. SW to Local Funds Only & $0 (State) improve corridor efficiencies. Construction $50,000 (Local) $50,000 Hwy. 99 @ 212th St. SW Widen 2121h St. SW to add a WB and EB left turn lane. Possible Grants Engineering, $4,363,000 (Federal, unsecured) $418,000 $637,000 $3,308,000 Intersection Improvements Provide protected / permissive left turn phasing for both & ROW, & $0 (Stale) movements (shared jurisdiction with City of Lynnwood) Local Funds Construction $683,000 (Local w/ City of Lynnwood) $66,000 $100,000 $517,000 Page 1 City of Edmonds Six Year Transportation Improvement Program (2015-2020) Grant Opportunity Project (2015-2020) Project Name Purpose Grant/Date Phase Total Cost Source 2015 2016 2017 2018 2019 2020 Hwy. 99 @ 216th St. SW Widen 2161h St. SW to add a WB and EB left turn lane. Possible Grant s Engineering, $4,363,000 (Federal, unsecured) $418,000 $637,000 $3,308,000 Intersection Improvements Provide protected / permissive left turn phasing for both & ROW, & $0 (State, unsecured) movements. Local Funds Construction $683,000 Local $66,000 $100,000 $517,000 Hwy. 99 @ 220th St. SW Widen 220th St.SW to add westbound right turn lane and Possible Grants Engineering, $4,363,000 (Federal, unsecured) $418,000 $637,000 $3,308,000 Intersection Improvements Hwy. 99 to add 2nd southbound left turn lane. & ROW, & $0 (State) Local Funds Construction $683,000 Local, w/ City of Moun0ake Terrace $66,000 $100,000 $517,000 Citywide protected / permissive traffic Conversion from protected left-tum phasing Engineering $0 (Federal) signal conversion to protective -permissive phasing at certain signalized Local Funds Only & $0 (State) intersections to reduce intersection delay Construction $20,000 (Local) $20,000 Re -striping of 76th Ave. W Re -stripe stretch from 220th St. SW to 208th St. SW to Engineering $0 (Federal) from 220th St. SW to OVD (1) through lane / (1) bike lane in each direction, and Secured grant & $790,000 (Local, Verdant) S140,000 $650,000 (1) two-way left turn lane. Rest of stretch to be evaluated. Construction $0 (Local) Type 2 Raised Pavement Install Type 2 Raised Pavement Markers Engineering $98,000 (Federal, unsecured) $98,000 Markers along the centerline of arterials and collectors, improving Possible Grant & $0 (Stale) roadway safety during night hours and on rainy days Construction 1 $0 (Local) Trackside Warning Svsterm or Quiet Zone Install either Trackside Warning system or Quiet Zone Engineering $0 (Federal) at Dayton St. and Main St. at (2) railroad crossings, to reduce the noise level Local Funds Only & $0 (State) railroad crossings (within Downtown Edmonds) during train crossings. Construction $350.000 (Local, General Funds) $70,000 $280,000 TOTAL $3,948,000 $8,579,000 $0 $2,795,000 $8,085,000 $21,255,000 Pedestrian Prolects: Sunset Av. from Bell St. to Caspers St. Provide sidewalk on the west side of Sunset Av., Possible Grant Engineering $837,000 (Federal, secured) $150,000 $687,000 w/ various utility upgrades. $0 (State) & & $650,000 (Local, Fund 421) $75,000 $575,000 $200,000 (Local, Fund 423) $50,000 $150,000 Local Funds Construction $710,000 (Local) $23,000 $687,000 238th St. SW from 100th Ave. W to Provide sidewalk on the north side of 238th St. SW Engineering $0 (Federal) 104th Ave. W from 100th Ave. W to 104th Ave. W, along with Stormwater Secured Grant & $514,000 (State, secured) $514,000 improvements. Construction $750,000 (Local, Fund 422) $750,000 15th St. SW from Edmonds Wavto Provide sidewalk on the south side of 15th St. SW to $0 (Federal) 8th Ave. W improve non -motorized transportation safety Secured grant Construction $10,000 (State, secured) $10,000 for kids attending Sherwood Elementary School. $0 (Local) 236th St. SW Walkway from Madrona Provide sidewalk on one side of 236th St. SW from Edmonds Engineering $444,000 (Fedeml,secured) $444,000 Elementary to Edmonds Way (SR-104) Way to Madrona School, along with Secured grant & $0 (State) Stormwater improvements. Construction $0 (Local) Hwy. 99 Enhancement project Installation of luminaires along SR-99 from 220th St .SW to $584,000 (Federal, secured) $292,000 $292,000 (Phase 3) 212th St. SW,improvinq pedestrian / vehicular safety, Secured grant Construction $0 (State) (construct. combined w/ 228th St. SW Corridor Impr. Project) $30,000 (Local) $15,000 $15,000 ADA Curb Ramp upgrades Upgrade curb ramps along 3rd Ave. S Secured Grant $10,000 (Federal, secured) $10,000 along 3rd Ave. S & Construction $0 (State) between Pine St. and Main St. Local Funds $0 (Local) 80th Av. W from 188th St. SW to Install sidewalk to provide safe and desirable route to Possible Grant Engineering $0 (Federal) Olympic View Dr. Walkway and Seaview Elementary and parks. Improve sight distance issue & & $760,000 (State, unsecured) $62,500 $62,500 $635,000 Sight Distance Improvements near 184th St. SW intersection. Local Funds Construction $760,000 (Local) $62,500 $62,500 $635,000 2nd Av. S from James St. to Main St. Engineering $0 (Federal) Provide sidewalk along short missing link. Local Funds Only & $0 (State) Construction $65,000 (Local) $65,000 ADA Curb Ramps Improvements Construct Citywide ADA compliant curb ramps where Possible Grant Engineering $0 (Federal) Citywide (Transition Plan) facilities don't east nor meet current standards & & $375,000 (State, unsecured) $125,000 $125,000 $125,000 Local Funds Construction 75,000 (Local) $25,000 $25.000 $25.000 Maplewood from Main St. to Install sidewalk, connecting to existing sidewalk Possible Grant Engineering $1,957,000 (Federal, unsecured) $1,957,000 200th St. SW Walkway on 200th St. SW from Main St. to 200th St. SW, creating & & $269.000 (State, unsecured) $14,000 $255,000 sidewalk connection to Maplewood Elementary on 200th St. SW Local Funds Construction $80,000 (Local) $6,000 $74,000 Page 2 City of Edmonds Six Year Transportation Improvement Program (2015-2020) Grant Opportunity Project (2015-2020) Project Name Purpose Grant/Date Phase Total Cost Source 2015 2016 2017 2018 2019 2020 Meadowdale Beach Rd Walkway Install sidewalk along missing link from Possible Grant $280,000 (Federal, unsecured) $280,000 & Engineering $0 (Stale) 76th Ay. W to Olympic View Dr. Local Funds $45,000 (Local) $45,000 Wanut St. from 3rd Av. to 4th A, Engineering $0 (Federal) Walkway Install sidewalk along short missing link Possible Grant & $190,000 (State, unsecured) $190,000 Construction $0 (Local) Walnut St. from 6lh Av. to 7th Av. Possible Grant Engineering $0 (Federal) Walkway Install sidewalk along short missing link & & $142,500 (Stale,unsecured) $190,000 Local Funds Construction $142,500 (Local) $190,000 216th St. SW from Hwy. 99 Install 300' sidewalk on the north side of 216th St. SW Possible Grant Engineering $185,000 (Federal, unsecured) $185,000 to 72nd Ave. W & & $0 (State) from Hwy. 99 to 72nd Ave. W Local Funds Construction $30,000 (Local) $30,000 4th Av. Corridor Enhancement Create corridor improvements to encourage pedestrian Possible Grant Engineering $3,450,000 (Federal, unsecured) $100,000 $1,000,000 $2,350,000 Walkway activity along 4th Ave. N from Main St. to & & $0 (Stale) 3rd Ave. N from Downtown retail to Edmonds Center for the Arts Local Funds Construction $675,000 Local, Fund 125 $100,000 $150,000 $425,000 Audible Pedestrian Install audible pedestrian signals to Engineering $25,000 (Federal, unsecured) $25,000 Signals pedestrians heads at signalized intersections to improve Possible Grant & $0 (Stale) pedestrians with disabilities safety Construction $0 (Local) TOTAL $2,353,000 $636,000 $0 $5,026,000 $1,425,000 $4,900,000 Bicycle Prol@cts Citywide Bicycle connections (such as Install bike lanes, sharrows, and signs along 761h Ave., Main St., Engineering $0 (Fetleral) Interurban Trail to Downtown Edmonds. ..), Bowdoin Way, 84th Ave. W, 212th St. SW, 220[h St. SW, Secured grant & $240,000 (Local, Verdant gran[) $120,000 $120,000 with sianaae & strioina improvements and 224th St. SW to create safer connections Construction 1 $0 1 (Local) Traffic Calming Projects: Residential Neighborhood Traffic circles, speed cushions, Engineering $0 (Federal) Traffic Calming "Your Speed.' signs, etc. Local Funds only 8, $0 (State) Construction $60,000 (Local) $10,000 1 $10,000 $10,000 $10,000 $10,000 $10,000 Traffic Planning Projects: SR-104 Complete Street Corridor Analysis Develop a master plan and access management improvements $0 (Federal) (meeting future travel demand for a 20-year planning horizon), Local Funds Only Engineering $0 (State) and streetsoape design implementing Complete Streets. $75,000 (Local) $75,000 2015 Transportation Plan Update Engineering $0 (Federal) Update Transportation Plan Local Funds Only & $0 (State) Planning $90,000 (Local) $90,000 Total $76,591,000 $9.236.000 $10,995,000 $2,510,000 $11,706,000 $12,745,000 $29.165.000 Total Federal $4,292,500 $5,145,000 $800,000 $4,916,000 $5,146,500 $16,402,000 Total Federal (Secured) $3,512,500 $2,125,000 $0 $687,000 $0 $0 Total Federal (Unsecured) $780,000 $3,020,000 $800,000 $4,229,000 $5,14$6,500 $16,402,000 Total State $1,538,000 $977,000 $0 $1,677,500 $4,769,000 $5,950,000 Total State (Secured) $1,524.000 $722,000 $0 $0 $0 $0 Total State (Unsecured) $14,000 $255,000 $0 $1,677,500 $4,769,000 $5,950,000 Total Local Fund $3,405,500 $4,873,000 $1,710,000 $5,207,500 $2,829,500 $6,533,000 Total Local (Fund 112) $2,176,000 $2,568,000 $1,710,000 $4,052,500 $2,679,500 $6,108,000 Total Local (Fund 125) $0 $0 $0 $100,000 $150,000 $425,000 Toal Local (Fund 421) $79000 $645,000 $0 $575,000 $0 $0 Total Local (Fund 422) $756,000 $106,000 $0 $0 $0 $0 Total Local (Fund 423) $52,000 $774.000 $0 $150,000 $0 $0 Total Local (Traffic Impact Fees) $18,500 $10,000 $0 $50,000 $0 $0 Total Local (General Fundl $70,000 $0 $0 $280,000 $0 $0 Total Local (Verdant Grant) $260,000 $770,000 $0 $0 $0 $0 Page 3