Loading...
Resolution 7940006.190.012 WSS/are 05/31/94 RESOLUTION NO. 794 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, ADOPTING A SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM AND DIRECTING THE SAME TO BE FILED WITH THE STATE SECRETARY OF TRANSPORTATION AND THE TRANSPORTATION IMPROVEMENT BOARD. WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 RCW, the City. Council of the City of Edmonds has previously adopted a Comprehensive Street Program, including an arterial street construction program, and thereafter periodically modified said Comprehensive Street Program by resolution, and WHEREAS, the City Council has reviewed the work accomplished under the said Program, determined current and future City street and arterial needs, and based upon these findings has prepared a Six -Year Transportation Improvement Program for the ensuing six (6) calendar years, and WHEREAS, a public hearing has been held on the said Six -Year Transportation Improvement Program, and WHEREAS, the City Council finds that there will be no significant adverse environmental impacts as a result of adoption or implementation of the Six -Year Transportation Improvement Program, now, therefore, THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: 75839.1 -1- Section 1. Section 1. Program Adopted. The Six -Year Transportation Improvement Program for the City of Edmonds, as revised and extended for the ensuing six (6) calendar years (1995-2000, inclusive), a copy of which is attached hereto as Exhibit A and incorporated herein by this reference as if fully set forth, which Program sets forth the project location, type of improvement and the estimated cost thereof, is hereby adopted and approved. Section 2. Filing of Program. Pursuant to Chapter 35.77 RCW, the City Clerk is hereby authorized and directed to file a copy of this resolution forthwith, together with the Exhibit attached hereto, with the Secretary of Transportation and a copy with the Transportation Improvement Board for the State of Washington. RESOLVED this 21 st day of June , 1994 APPROVED: MAYO , AURA M. HALL ATTEST/AUTHENTICATED: FILED WITH THE CITY CLERK: 05/31/94 PASSED BY THE CITY COUNCIL: 06/21 /94 RESOLUTION NO. 794 75839.1 -2- City of Edmonds UCTION -PROJECTS - OUTSIDE FUNDIN City No. 0365 ROADWAY CONSTRPSRC Hearing Date 06/21/94 MPO County NSIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 0995-2000) Adoption Date 06/21/94 Resolution No. F PROJEC r �nF mTrFir•e rinn: 794 U P M ?.-_ _ F'RUJECT COSTS IN THOUSANDS OF DOLT N C R N A. FEDERAL AID NO, P FUND SOURCE lNFORMATIOh C L I U B. BRIDGE NO. R T S T L U T C FEDERAL FUNDING T A I S O R C. PROJECT TITLE B D. STREET/COUNTY ROAD NAME OR NUMBER 0 T O 1 0 PROJECT MONTH/ FEDERAL FEDEP, STATE 0 SI E E. TERMINAL BEGINNING AND END V E E A T T A L D I E PHASE YEAR FUND COPP, FUNDS N T R F. DESCRIBE WORK TO BE DONE M U L T T S PHASE CODE BA, A Y N S IT Y STARTS PHATA, L T OTHER i4 fNTERMODAL FACILITY -Relocate and improve 5R i 04; 01 PGW construct safe, split rail crossing; construct ferry terminal and holding .75 lanes; - .E. RIW 1195 1198 CMA❑ STP(L) 8000.0 TIA 1000. Construct distibution facility for ferry, Community Transit, AMTRAK, commut ONST 100 8000.0 WSDOT 1000. rail edestrians bicycles, and Park and Ride OTAL 70000.0 CPDPTA 30000. SR 99 - 244TH ST. S.W. to 210TH ST. S.W.P. 1195 STP 86 0. CT 32000. 7(Lynnwood'i curb/gutter and sidewalks, overlay, widen to 7 lanes RIW 1195 1245.2 TIAConstruct Cost share with Lynnwood, MLT, CT, & WSDOTC22652.2 WTIASDOT lead a enc 17 220TH ST. S.W. -- 9TH AVE. S. to 84TH AVE. W. 03 .00 CPT AL P.E. 1/95 STP(E) 23 .4 Arterial street widening to 44 feet with 270.0 TIA sidewalks and storm drainage RIW CONTT 9 198 ❑ 7 7 4 76TH AVE_ W. -- 212TH ST. S,W, to 196TH T. S.W. 04 .00 TOTAL P.E 119 STP(L)145 2250.0 Grind pavement, overlay to strengthen, restore ride ��- RIW (joint project with Lynnwood, they pay 47%) CONS? 61961 [1STEA fundin) 9 _L5- 76TH AVE. W. -- SR 99 to 220TH ST. S.W. 04 .38 TOTAL P.E. 1 11971I 4 Grind pavement, overlay to strengthen, restore ride N&- f STP(L) 24.2 I 19 ANNUAL STREET OVERLAY PROGRAM Pavement overlays to strengthen, restore ride Pavement maintenance to increase roadway life - zuts i rt b I . :�.W. to ROADWAY CONSTRUCTION PROJECTS - LOCAL FUNDING - 04 24 P.E. 1/95- - RfW COSST 6195- 041 8.00 P.E. 1195 RIW 1 EXPENDITURE SCHEDULE FEDERALLY FUNDED LOCAL TOTAL ( Local Agency) PROJECTS ONLY FUNDS 4th R1W REO Y/N 1st 2nd 3rd THRU ENVIR. DATE 6th TYPE MONTH/YR 1000,0 I11 0 500.0 300.0 3500 EIS YIN 1000.0 10000.0?}' 0.0 0.0 0000 CE 0.0 100000.0 0.0 0.0 5000 EA DATE 20 . ❑.0 ;vt' _�; 5 00.0 8500 NA 267.3 15157 2.5 " ' EIS YIN 0.0 CE 3535.3 26187.5: 502.9 EA DATE 67.5 337.5 45.0 0 NA EI5 __-- Y/N 0.0 CE 495.0 2475.0 562.51 2812.5 ,, 495.0 45.0 495.0 EA DA NA DATE -YIN 10.5 78A 5.6 EIS 0.0 Z312.0 CE 42.7 _ Z2.3 EA DATE 52.6 390.0 27.9 O.D 0.0 NA -- -YIN 3.8 28.0 3.8 EIS 0.0 CE 15.1 112.0 15.1 EA DATE QTO� _ T- NA ------ - 120.0 20.tj 20.0 60.0 EI5 _ f YJ)V 900.0 1� b 150.0 - Tl�).dTT 15a.01450.0 7Cf�1l�IQ. 10E EA DATE NA 1- 1 1a3�'dT 30.0 30.0 _ A ` 5.0 f 1 3.0 .-- 2� 5.01 15.0 15.0 45.0 -- EIS Y/N CE I EA DATE NA I- - 90.0 120.0 1 0-0 -2D.0 60.0 10.0 10.0 1EA Lib10.0 Y/N i�� 50.0 CE I �A DATE 50.0 I EXHIBIT A City of Edmonds City No. 0365 ITRAFFIC SIGNALIZATION PROJECTS - OUTSIDE FUNDING Hearing Date _ 06I21194 County N60 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (1995-2000) Adoption Date Resolution No. 06/21/94 MPO PSRC �794 F PROJECT IDENTIFICATION ! 1 PROJECT COSTS IN THOUSANDS OF DOLLARS U P M FUND SOURCE INFORMATION - N C C L R I N A. FEDERAL AID NO. U B. BRIDGE NO. P U FEDERAL FUNDING EXPENDITURE SCHEDULE FEDERALLY FUNDED T A O IC. PROJECT TITLE R T O S T T LTC 0 El 0 PROJECT MONTH/ FEDERAL FEDERAL RAP, i STATE LOCAL TOTAL (Local Agency) PROJECTS ONLY I S R B D. STREET/COUNTY ROAD NAME OR NUMBER V PAT NL D PHASE YEAR FUND COST CAPP, FUNDS FUNDS O S i E E. TERMINAL BEGINNING AND END E ETA I E PHASE CODE BY TIA, i 1 st 2nd 3rd 4th R/W REO N T R•.F. DESCRIBE WORK TO BE DONE M U L T T S STARTS PHASE UATA, THRU ENVIR. YIN A L Y N T S H Y OTHER 6th TYPE DATE IMONTH/YR1 SR99 and 236TH ST. S.W. 12 .10 CPT P.E. 1/95 STP 26.0 TIA 4.0 30.0 2.0 1=15 7SR-99 Install fully actuated signal & channelization. R/W Y/N Cost share with Snohomish County and WSDOT. (Lynnwood lead agency). CONST 6/96 003.8 __-CE ; 8.1 8.1 EA 16.2 120.0 Protect - see item #2 roadway outside fundingTOTAL 129.8 O.01 20.2 . 150ffc"! 0.0 O.0 NA DATE Y B ! 220TH 5T. S.W. and i ❑OTH AVE. W. 112 ( p.10 CPT P.E. 4195 5TP 26.0 TIA �- 4.0 30 EIS Replace 4-way stop and flasher with R/W --- - 0 Y fully actuated signal and channelization CONST 2 96 103.8 _, 16.2 12016.2 CE/N EA DATE see item #3 roadway projects, outside funding for related ro•ect) TOTAL .8 20.2 0.0 1 6.21 NA 16 220TH ST. S.W. and 84TH AVE. W. J121 L1 O CPT P.E. 4/95 STP 26.0 TIA 30.0 I EIS ----YIN Replace 4-way stop and flasher with fully actuated signal and channelization R/W 103.8 --- _ ' _4.0 _ - CE CONST 2196 16.2 i 20 0 16.2�_= DATE (see item #3 roadwa rojects outside fundin for related ro•ect TOTAL 129.8 O 0 20.2 15 .0 O.Or-16.2 0.O NA _1 -3_ JDAYTON ST. RAILROAD CROSSING IMPROVEMENTS 15� dA7 P.E. 1/97 ST(RRP) 26.0 I 4.0 3__O_-0_ 4.01 EIS ,improve protection devices & approaches, lighting _ R/W _ _ i_ _ - I I� YIN CONST 97 _ 103.8 �1 --- - _.-_=1 is.2 120.U.-.. I 16.21_ -.- - CE EA DATE TOTAL T� -6 1 B f 4 WALNUT ST. and 9TH AVE. S. ! 12 1 710 CPT P.E. 1 /97 STP .8 26.0 0.01 1 20.21 4.0 .-50.OT 30.01 0.01 0.0 20. 7 4.01 ­.0 NA EIS Replace 4-way stop and flasher with R/W _ Y/f1E fully actuated signal and channelization CONST 6 97 _ 103.8 - - -- j 6 2.. CE EA DATE DATE 6 5 ;MAIN ST. and 9TH AVE. 12 0.1.1-oICPT O'TAL I j P.E. 1 /97 STP 26.0 - 0:O -20.2 i 4.01 1 �0.0 30.01 0.0 I 0.01 20.21- 0.0 NA ------- Replace 4-way stop and flasher with __. - - R/W f _ _ - - i 4.01 IEl EI S YIN fully actuated signal and channelization CONST _ _6/97 103.8 _ _ _ j� 16.21 120.0-t 16.2 CE EA DATE TOTAL .8 __ O _. - 20.2 1 150.0 I _ _-__; _ 0.0T -0.0 20.21 _ 0.0 NA ] 4 6 'SR524 and 88TH AVE. W. 1•_.- I _ .1 P.E. - _ 11 STP • - -T . - 4.0 30.0I 4.0 EIS YIN Install fully actuated signal & channelization R/W to improve vehicular safety. C ONST TOT+4L� s198 �� _ _ 103.8 T€29.8 16.21_ 120.0. 16.2 CE EA DATE 17 7 -76TH AVE. W. and 224TH ST. S.W. 12 0.14!CPT P.E. 1/99 STP 26.0 ? 0.0 20.21 4.0 150.0' 30.0; 0.01 0.01 0.0i 20.2 NA ------- Replace 4-way stop and flasher with R/W 4.OfE1S YIN fully actuated signal and channelization CONST I_ 6(99 103.8 16.2 _ 120.0' CE 7 6.2;CE DATE 17 8 76TH AVE. W. and 200TH ST. S.W. 12 0.10 CPT P.E. 1.199 STP I 2_6.0 O.Q• 20.2i 750.0 o.0i 0.0i 0.0 20.2 j NA .7! Install fully actuated signal & channelization R/W -66/99 _ 1 4.0; 30.0 2.0'EIS ICE YIN to improve vehicular safety. COiVST ` I 1 p3,8 16.2 120.0. 8.1 I EA DATE Cost share with Lynnwood TOTAL i 129.8 Q_0 20.21 150.0; 0.0. 0.01 ❑.Q 10.3 INA ----•. 16 9 '212TH ST_ S.W. and BOTH AVE. W. Install fully actuated signal &channelization ] 2 O.TO CPT 1 • -- IP.E. -1 -- RfWk 11 STP 26.0 ! 4.0, I 30.0' 4.0 EIS CE Y/N 'to improve vehicular safety_ CONST fi 00 _10 1 16.2'' ____1.2p.0]___ 16.2 EA . DATE 129_8.. OAI 20.2E 15{7.Or ��� u; C]_Cii ti.[r1` i7 ��ri'-� nie EXHIBIT A City of Edmonds City No. 0365 County Na1 MPO PSRC bK U& and 216TH ST. S.W. _ Install fully actuated traffic signal Need identified in traffic report from Stevens Hospital Construction provided as partial mitigation from Stevens 216TH ST. S.W. and 76TH AVE. W. Install fully actuated traffic signal to increase pedestrian anc vehicle safety. Need identified in Ed. -Wood. High School M Construction provided as partial mitigation from Edmonds & Install crossing with pedestrian actuated flasher TRAFFIC SIGNALIZATION PROJECTS - LOCAL FLINGING SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (1995-2000) i P.E. 12 1 Q-101CPT R/W CONST 1 /95 TOTAL P.E. 1 1 /95 1 aster Plan �hool District 121 1 CPT R/W CONST 6 95 AL P.E. 1195 7121 19.1 Q P R/W CONST 3/95 TOTAL P.E. 1 /95 R/W CONST 5 95 Hearing Date 06/21/94 Adoption Date 06121 /94 Resolution No. 794 „3;'•::::-::::::: • :> EIS CE EA NA EI5 CE EA NA Y/N DATE Y/N DATE 120.0 120.0 30.0 0.0 O. 0.0 120.0 150. 3.0 ;y a 0.01 1 O.0 3 3.0 al--- >= 12.0 3.0 12.0 9.0 36.0 EIS CE EA NA Y/N DATE r 0.0 12.0 15.0 2.0 -- 1 1'5. 45.0 - `' R EIS CE EA NA Y/N DATE - - 0.0 8.0 1 EXHIBIT A City of Edmonds City No. 0365 County Na1 MPO PSRC U P N C R N A. FEDERAL AID NO. C L I U B. BRIDGE NO. T A O N C. PROJECT TITLE I S R B D. STREET/COUNTY ROAD NAME OR NUMBER 0 S I E E. TERMINAL BEGINNING AND END N T R F. DESCRIBE WORK TO BE DONE A Y Construct pedestrian walkways along arterial streets throughout the City per 1992 Comprehensive Bikeway and Walkwav Plan +U ":::^: WI YW+UL WALKWAY AND BIKEWAY SYSTEM Construct bikeways and pedestrian walkways throughout City per 1992 Comprehensive Bikeway and Walkway Plan 17 1 2 MEADOWDALE BEACH RD. -- 76TH AVE. W. to Widen, finish walkway system 19 J 3 PIONEER WAY -- MAIN ST. to SHELL VAWE- Alternate emergency services access/egress into Shell Valley (Possible LID) 19 4 �SEAVIEW & SIERRA PARKS Construct walkway •191 5_188TH AVE. W.--204TH ST. S.W. to 200TH ST. S.W. 19 ; 6 YOST & PINE RIDGE Construct walkway 19 ' 7 ,102ND PL. S.W. -- EI _ 1 I I PEDESTRIAN ENHANCEMENT PROJECTS - OUTSIDE -FUNDING SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 0 995-2000) 1 PROJECT COSTS IN THOUSANDS NI P RTSTLTC O YT V P E E M JU N T A T S O El T NL A LTIt HY U O D E T S PROJECT (MONTH/ - PHASE ; YEAR PHASE STARTS FUND SOURCE INF FEDERAL FUNDING RAP, CAPP, TIA, UATA, OTHER FEDERAL FUND CODE FEDERAL COST BY PHASE II PEDESTRIAN ENHANCEMENT PROJECTS - LOCAL FUNDINCk 105 1 1.00 CPT IP.E. 1 1 /951 CONTT _ _ .5 Fes- -- j 05 l__ Q_75 J CPT R./W 1 C0NST 7afiAi �- 1 01 I a.401 P.E. -j- -- 1 --- --- 1 05.1-7251 P.E. 1 .40 104 05 ° 0.25 R/W CONST I 6/98 P.E. 1 /98 RfW ;COI!EST �199, T{)TiA L I P. E. 1 /9 9 ! 'filW 1CONST ]TOTAL 6199 .P.E. _ 1 /00' IR/W CONTT 6/00 TOTAL 0.0 0.0 on Hearing Date 06/21 /94 Adoption Date 06/21 /94 Resolution No. 794 RATION - - - -- EXPENDITURE SCHEDULE FEDERALLY FUNDED (Local Agency) PROJECTS ONLY STATE •, LOCAL TOTAL FUNDS FUNDS - -� RIW REC 1st 2n7 4th Y/N THRU ENVIR. DATE 6th TYPE MONTHA 7.$ 60.0 '•'::3 1.3 i.3 3.9 EIS ' YIN 0.0 w ':, 5.4 _5.4 6.7 _ 1,6.2 20.1 CE EA DATE NA -----. 32.4 240.0 40.21 300.0 :. 6.7 ---- _ 5.01 5.01 15.0 EIS -- _ _ 0.0 CE 25.0 25.0 25_01 25.0I. 75.0 EA 30.0 ... 30.0I 30-0T 90.o NA i 9.4 9.4 9.4 EIS _ 0.0 CE 37.5..-- j 37.5 EA - 4 0.01 0.01 46.8 NA r746.91 _.. _ 2-0-01 20.0 f EIS r 100.0 i Q0.0 l 100.0 EA 1 120.01 1 0.'0 -0.61 0.01 0-01120.0INA 5.0f 5.0[EIS 0.0 'CE i 25.01 25.0 25.0 EA 30.01 3t7.-0 O. i 001 0.01 30.0 NA 1 6.31 ! 6.31 6.3 ICE EIS ❑.0; 25.0! 25.W 25.0'EA 31.3: 34.3; 0.Q1 0.01 0.0i 31.31NA 8.0: 8.0! 8.0IEIS 0.0 , -CE 40.0:: 40.0: 40.0.EA 48.01.. 48.0 0.0 i 0.0 0.0 48.0 NA 6.31 6.3; 6.3 EIS 0.0 CE 25.0, 25.0. 25.0 EA 31.31 31.3- 0.0 0.0 0.0. 31.3 NA DATE Y/N DATE Y/N DATE Y/N DATE I Y/N I DATE Y/N DATE DATE EXHIBIT A City of Edmonds City No. 0365 County NW f�►,i1�1l�.�:Tr7 OTHER ENHANCEMENT PROJECTS - OUTSIDE FUNDING SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (1995-2000) Hearing Date 06/21 /94 Adoption Date 06/21 /94 Resolution No. 794 19.1 1 ARTERIAL BYPASS DETERRENTS 112 1 1 1 Construction of various types of neighborhood traffic control devices in various locations throw hoot the City P.E. R/W 1 1/98 STP OA 4-0 12.0 EIS Ci EA NA Y/N DATE 0.0 CONST 1 5198 78.0 12.0 90.0 AL 78.0 0.01 12.0 6.01 0.0 4.0 12.0 17 2 MAIN STREET AND 5TH AVE. UNDERGROUND AND L1GH 13� JlEtd2 Installation of historic streetlights on SR 524 from 3rd Ave. N. to SR 104 and on 5th Ave. S. from Dayton St. to, Alder St. P.E. 1198 25. 4.0 r��29 77 0.❑ 4.0 22.7 EIS CE EA NA Y/N DATE R/W _ CONST 4/98 145.6 22.7 168.3 TOTAL26. EXHIBIT A