Resolution 7940006.190.012
WSS/are
05/31/94
RESOLUTION NO. 794
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF EDMONDS, WASHINGTON, ADOPTING A SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM AND
DIRECTING THE SAME TO BE FILED WITH THE STATE
SECRETARY OF TRANSPORTATION AND THE
TRANSPORTATION IMPROVEMENT BOARD.
WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 RCW, the
City. Council of the City of Edmonds has previously adopted a Comprehensive Street Program,
including an arterial street construction program, and thereafter periodically modified said
Comprehensive Street Program by resolution, and
WHEREAS, the City Council has reviewed the work accomplished under the said
Program, determined current and future City street and arterial needs, and based upon these
findings has prepared a Six -Year Transportation Improvement Program for the ensuing six (6)
calendar years, and
WHEREAS, a public hearing has been held on the said Six -Year Transportation
Improvement Program, and
WHEREAS, the City Council finds that there will be no significant adverse
environmental impacts as a result of adoption or implementation of the Six -Year Transportation
Improvement Program, now, therefore,
THE CITY COUNCIL OF THE CITY OF EDMONDS, WASHINGTON, HEREBY
RESOLVES AS FOLLOWS:
75839.1 -1-
Section 1. Section 1. Program Adopted. The Six -Year Transportation
Improvement Program for the City of Edmonds, as revised and extended for the ensuing six (6)
calendar years (1995-2000, inclusive), a copy of which is attached hereto as Exhibit A and
incorporated herein by this reference as if fully set forth, which Program sets forth the project
location, type of improvement and the estimated cost thereof, is hereby adopted and approved.
Section 2. Filing of Program. Pursuant to Chapter 35.77 RCW, the City Clerk
is hereby authorized and directed to file a copy of this resolution forthwith, together with the
Exhibit attached hereto, with the Secretary of Transportation and a copy with the Transportation
Improvement Board for the State of Washington.
RESOLVED this 21 st day of June , 1994
APPROVED:
MAYO , AURA M. HALL
ATTEST/AUTHENTICATED:
FILED WITH THE CITY CLERK: 05/31/94
PASSED BY THE CITY COUNCIL: 06/21 /94
RESOLUTION NO. 794
75839.1 -2-
City of Edmonds UCTION -PROJECTS - OUTSIDE FUNDIN
City No. 0365 ROADWAY CONSTRPSRC Hearing Date 06/21/94
MPO
County NSIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 0995-2000) Adoption Date 06/21/94
Resolution No.
F PROJEC r �nF mTrFir•e rinn: 794
U
P
M
?.-_ _
F'RUJECT COSTS IN THOUSANDS OF DOLT
N C
R
N A. FEDERAL AID NO,
P
FUND SOURCE
lNFORMATIOh
C L
I
U B. BRIDGE NO.
R T
S
T L
U
T C
FEDERAL
FUNDING
T A
I S
O
R
C. PROJECT TITLE
B D. STREET/COUNTY ROAD NAME OR NUMBER
0
T
O
1 0
PROJECT
MONTH/ FEDERAL
FEDEP,
STATE
0 SI
E E. TERMINAL BEGINNING AND END
V
E E
A
T
T
A
L D
I E
PHASE
YEAR
FUND
COPP,
FUNDS
N
T
R F. DESCRIBE WORK TO BE DONE
M
U
L T
T S
PHASE
CODE
BA,
A
Y
N
S
IT
Y
STARTS
PHATA,
L
T
OTHER
i4
fNTERMODAL FACILITY -Relocate and improve 5R i 04;
01
PGW
construct safe, split rail crossing; construct ferry terminal
and holding
.75
lanes;
- .E.
RIW
1195
1198
CMA❑
STP(L)
8000.0
TIA
1000.
Construct distibution facility for ferry, Community Transit,
AMTRAK, commut
ONST
100
8000.0
WSDOT
1000.
rail edestrians bicycles, and Park and Ride
OTAL
70000.0
CPDPTA
30000.
SR 99 - 244TH ST. S.W. to 210TH ST. S.W.P.
1195
STP
86 0.
CT
32000.
7(Lynnwood'i
curb/gutter and sidewalks, overlay, widen to 7
lanes
RIW
1195
1245.2
TIAConstruct
Cost share with Lynnwood, MLT, CT, & WSDOTC22652.2
WTIASDOT
lead a enc
17
220TH ST. S.W. -- 9TH AVE. S. to 84TH AVE. W.
03 .00 CPT
AL
P.E.
1/95
STP(E)
23 .4
Arterial street widening to 44 feet with
270.0
TIA
sidewalks and storm drainage
RIW
CONTT
9
198 ❑
7 7 4
76TH AVE_ W. -- 212TH ST. S,W, to 196TH T. S.W.
04 .00
TOTAL
P.E
119
STP(L)145
2250.0
Grind pavement, overlay to strengthen, restore ride
��-
RIW
(joint project with Lynnwood, they pay 47%)
CONS?
61961
[1STEA fundin)
9
_L5-
76TH AVE. W. -- SR 99 to 220TH ST. S.W.
04 .38
TOTAL
P.E.
1
11971I
4
Grind pavement, overlay to strengthen, restore ride
N&-
f
STP(L)
24.2
I
19
ANNUAL STREET OVERLAY PROGRAM
Pavement overlays to strengthen, restore ride
Pavement maintenance to increase roadway life
- zuts i rt b I . :�.W. to
ROADWAY CONSTRUCTION PROJECTS - LOCAL FUNDING
- 04 24 P.E. 1/95- -
RfW
COSST 6195-
041 8.00 P.E. 1195
RIW 1
EXPENDITURE SCHEDULE FEDERALLY FUNDED
LOCAL
TOTAL
( Local Agency)
PROJECTS ONLY
FUNDS
4th
R1W REO
Y/N
1st
2nd 3rd
THRU ENVIR.
DATE
6th TYPE
MONTH/YR
1000,0
I11 0
500.0 300.0
3500 EIS
YIN
1000.0
10000.0?}'
0.0 0.0
0000 CE
0.0
100000.0
0.0 0.0
5000 EA
DATE
20 .
❑.0 ;vt' _�;
5 00.0
8500 NA
267.3
15157 2.5
" '
EIS
YIN
0.0
CE
3535.3
26187.5:
502.9
EA
DATE
67.5
337.5
45.0
0 NA
EI5
__--
Y/N
0.0
CE
495.0 2475.0
562.51 2812.5
,,
495.0
45.0 495.0
EA
DA NA
DATE
-YIN
10.5
78A
5.6
EIS
0.0
Z312.0
CE
42.7
_
Z2.3
EA
DATE
52.6
390.0
27.9 O.D
0.0
NA
-- -YIN
3.8
28.0
3.8
EIS
0.0
CE
15.1
112.0
15.1
EA
DATE
QTO�
_
T-
NA
------
-
120.0
20.tj
20.0
60.0
EI5 _ f YJ)V
900.0
1�
b 150.0
- Tl�).dTT
15a.01450.0
7Cf�1l�IQ.
10E
EA DATE
NA 1- 1
1a3�'dT
30.0
30.0
_ A ` 5.0
f 1 3.0
.-- 2�
5.01
15.0
15.0
45.0
--
EIS Y/N
CE I
EA DATE
NA I-
-
90.0
120.0
1 0-0
-2D.0
60.0
10.0
10.0
1EA
Lib10.0
Y/N
i��
50.0
CE
I
�A DATE
50.0
I
EXHIBIT A
City of Edmonds
City No. 0365
ITRAFFIC SIGNALIZATION PROJECTS - OUTSIDE FUNDING
Hearing Date
_ 06I21194
County
N60
SIX YEAR TRANSPORTATION
IMPROVEMENT PROGRAM (1995-2000)
Adoption Date
Resolution No.
06/21/94
MPO
PSRC
�794
F
PROJECT IDENTIFICATION
!
1
PROJECT COSTS IN THOUSANDS OF DOLLARS
U
P
M
FUND SOURCE
INFORMATION
-
N C
C L
R
I
N A. FEDERAL AID NO.
U B. BRIDGE NO.
P
U
FEDERAL FUNDING
EXPENDITURE SCHEDULE
FEDERALLY FUNDED
T A
O
IC. PROJECT TITLE
R T
O
S
T
T LTC
0 El
0
PROJECT
MONTH/
FEDERAL
FEDERAL
RAP,
i
STATE LOCAL
TOTAL
(Local Agency)
PROJECTS ONLY
I S
R
B D. STREET/COUNTY ROAD NAME OR NUMBER
V PAT
NL
D
PHASE
YEAR
FUND
COST
CAPP,
FUNDS FUNDS
O S
i
E E. TERMINAL BEGINNING AND END
E ETA
I E
PHASE
CODE
BY
TIA,
i
1
st
2nd
3rd
4th
R/W REO
N
T
R•.F. DESCRIBE WORK TO BE DONE
M
U
L T
T S
STARTS
PHASE
UATA,
THRU
ENVIR.
YIN
A
L
Y
N
T
S
H
Y
OTHER
6th
TYPE
DATE
IMONTH/YR1
SR99 and 236TH ST. S.W.
12
.10
CPT
P.E.
1/95
STP
26.0
TIA
4.0
30.0
2.0
1=15
7SR-99
Install fully actuated signal & channelization.
R/W
Y/N
Cost share with Snohomish County and WSDOT. (Lynnwood lead agency).
CONST
6/96
003.8
__-CE
;
8.1
8.1
EA
16.2
120.0
Protect - see item #2 roadway outside fundingTOTAL
129.8
O.01
20.2
.
150ffc"!
0.0
O.0
NA
DATE
Y B
! 220TH 5T. S.W. and i ❑OTH AVE. W.
112 ( p.10 CPT
P.E.
4195
5TP
26.0
TIA
�-
4.0
30
EIS
Replace 4-way stop and flasher with
R/W
---
-
0
Y
fully actuated signal and channelization
CONST
2 96
103.8
_,
16.2
12016.2
CE/N
EA
DATE
see item #3 roadway projects, outside funding for related
ro•ect)
TOTAL
.8
20.2
0.0
1 6.21
NA
16
220TH ST. S.W. and 84TH AVE. W.
J121 L1 O CPT
P.E.
4/95
STP
26.0
TIA
30.0
I
EIS
----YIN
Replace 4-way stop and flasher with
fully actuated signal and channelization
R/W
103.8
--- _
'
_4.0
_ -
CE
CONST
2196
16.2
i 20 0
16.2�_=
DATE
(see item #3 roadwa rojects outside fundin for related
ro•ect
TOTAL
129.8
O 0
20.2
15 .0
O.Or-16.2
0.O
NA
_1 -3_
JDAYTON ST. RAILROAD CROSSING IMPROVEMENTS
15� dA7
P.E.
1/97
ST(RRP)
26.0
I
4.0
3__O_-0_
4.01
EIS
,improve protection devices & approaches, lighting
_
R/W
_ _
i_
_
-
I
I�
YIN
CONST
97
_
103.8
�1
--- - _.-_=1
is.2
120.U.-..
I
16.21_
-.- -
CE
EA
DATE
TOTAL T�
-6
1 B f 4
WALNUT ST. and 9TH AVE. S.
! 12 1 710 CPT
P.E.
1 /97
STP
.8
26.0
0.01
1
20.21
4.0
.-50.OT
30.01
0.01 0.0
20. 7
4.01
.0
NA
EIS
Replace 4-way stop and flasher with
R/W
_
Y/f1E
fully actuated signal and channelization
CONST
6 97
_ 103.8
- - --
j
6 2..
CE
EA
DATE
DATE
6 5 ;MAIN ST. and 9TH AVE.
12 0.1.1-oICPT
O'TAL I
j P.E.
1 /97
STP
26.0
-
0:O
-20.2 i
4.01
1 �0.0
30.01
0.0 I 0.01
20.21-
0.0
NA
-------
Replace 4-way stop and flasher with
__. - -
R/W
f
_ _ -
- i
4.01
IEl
EI S
YIN
fully actuated signal and channelization
CONST _
_6/97
103.8
_
_ _ j�
16.21
120.0-t
16.2
CE
EA
DATE
TOTAL
.8
__ O _.
-
20.2 1
150.0 I
_ _-__; _
0.0T -0.0 20.21
_
0.0
NA
] 4 6
'SR524 and 88TH AVE. W.
1•_.- I _ .1
P.E. -
_ 11
STP
• - -T . -
4.0
30.0I
4.0
EIS
YIN
Install fully actuated signal & channelization
R/W
to improve vehicular safety.
C ONST
TOT+4L�
s198
��
_ _
103.8
T€29.8
16.21_
120.0.
16.2
CE
EA
DATE
17 7
-76TH AVE. W. and 224TH ST. S.W.
12 0.14!CPT
P.E.
1/99
STP
26.0
?
0.0
20.21
4.0
150.0'
30.0;
0.01 0.01 0.0i
20.2
NA
-------
Replace 4-way stop and flasher with
R/W
4.OfE1S
YIN
fully actuated signal and channelization
CONST I_
6(99
103.8
16.2 _
120.0'
CE
7 6.2;CE
DATE
17 8
76TH AVE. W. and 200TH ST. S.W.
12 0.10 CPT
P.E. 1.199
STP I 2_6.0
O.Q•
20.2i
750.0
o.0i 0.0i 0.0
20.2 j
NA
.7!
Install fully actuated signal & channelization
R/W
-66/99
_
1
4.0;
30.0
2.0'EIS
ICE
YIN
to improve vehicular safety.
COiVST `
I 1 p3,8
16.2
120.0.
8.1 I
EA
DATE
Cost share with Lynnwood
TOTAL i
129.8
Q_0
20.21
150.0;
0.0. 0.01 ❑.Q
10.3 INA
----•.
16 9
'212TH ST_ S.W. and BOTH AVE. W.
Install fully actuated signal &channelization
] 2 O.TO CPT
1 • --
IP.E.
-1 --
RfWk
11
STP 26.0
!
4.0,
I
30.0'
4.0
EIS
CE
Y/N
'to improve vehicular safety_
CONST
fi 00
_10
1
16.2''
____1.2p.0]___
16.2
EA .
DATE
129_8..
OAI
20.2E
15{7.Or
��� u;
C]_Cii ti.[r1` i7 ��ri'-�
nie
EXHIBIT A
City of Edmonds
City No. 0365
County Na1
MPO PSRC
bK U& and 216TH ST. S.W. _
Install fully actuated traffic signal
Need identified in traffic report from Stevens Hospital
Construction provided as partial mitigation from Stevens
216TH ST. S.W. and 76TH AVE. W.
Install fully actuated traffic signal to increase pedestrian anc
vehicle safety. Need identified in Ed. -Wood. High School M
Construction provided as partial mitigation from Edmonds &
Install crossing with pedestrian actuated flasher
TRAFFIC SIGNALIZATION PROJECTS - LOCAL FLINGING
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (1995-2000)
i
P.E.
12 1 Q-101CPT
R/W
CONST
1 /95
TOTAL
P.E.
1 1 /95
1
aster Plan
�hool District
121 1 CPT
R/W
CONST
6 95
AL
P.E.
1195
7121 19.1 Q P
R/W
CONST
3/95
TOTAL
P.E.
1 /95
R/W
CONST
5 95
Hearing Date 06/21/94
Adoption Date 06121 /94
Resolution No. 794
„3;'•::::-:::::::
• :>
EIS
CE
EA
NA
EI5
CE
EA
NA
Y/N
DATE
Y/N
DATE
120.0
120.0
30.0
0.0
O.
0.0
120.0
150.
3.0
;y a 0.01
1 O.0
3 3.0
al---
>= 12.0
3.0
12.0
9.0
36.0
EIS
CE
EA
NA
Y/N
DATE
r
0.0
12.0
15.0
2.0
-- 1
1'5.
45.0
- `'
R
EIS
CE
EA
NA
Y/N
DATE
- -
0.0
8.0
1
EXHIBIT A
City of Edmonds
City No. 0365
County Na1
MPO PSRC
U
P
N C
R N
A.
FEDERAL AID NO.
C L
I U
B.
BRIDGE NO.
T A
O N
C.
PROJECT TITLE
I S
R B
D.
STREET/COUNTY ROAD NAME OR NUMBER
0 S
I E
E.
TERMINAL BEGINNING AND END
N
T R
F.
DESCRIBE WORK TO BE DONE
A
Y
Construct pedestrian walkways along arterial streets
throughout the City per 1992 Comprehensive Bikeway
and Walkwav Plan
+U ":::^: WI YW+UL WALKWAY AND BIKEWAY SYSTEM
Construct bikeways and pedestrian walkways
throughout City per 1992 Comprehensive
Bikeway and Walkway Plan
17 1 2 MEADOWDALE BEACH RD. -- 76TH AVE. W. to
Widen, finish walkway system
19 J 3 PIONEER WAY -- MAIN ST. to SHELL VAWE-
Alternate emergency services access/egress
into Shell Valley (Possible LID)
19 4 �SEAVIEW & SIERRA PARKS
Construct walkway
•191 5_188TH AVE. W.--204TH ST. S.W. to 200TH ST. S.W.
19 ; 6 YOST & PINE RIDGE
Construct walkway
19 ' 7 ,102ND PL. S.W. -- EI
_ 1
I
I
PEDESTRIAN ENHANCEMENT PROJECTS - OUTSIDE -FUNDING
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 0 995-2000)
1 PROJECT COSTS IN THOUSANDS
NI
P
RTSTLTC
O YT
V P
E E
M JU
N
T
A
T
S
O El
T NL
A
LTIt
HY
U
O
D
E
T S
PROJECT (MONTH/
- PHASE ; YEAR
PHASE
STARTS
FUND SOURCE
INF
FEDERAL FUNDING
RAP,
CAPP,
TIA,
UATA,
OTHER
FEDERAL
FUND
CODE
FEDERAL
COST
BY
PHASE
II
PEDESTRIAN ENHANCEMENT PROJECTS - LOCAL FUNDINCk
105 1 1.00 CPT IP.E. 1 1 /951
CONTT _ _ .5
Fes-
--
j 05 l__ Q_75 J CPT
R./W
1
C0NST
7afiAi
�-
1 01 I a.401
P.E. -j-
-- 1
---
---
1 05.1-7251
P.E.
1
.40
104 05 ° 0.25
R/W
CONST
I
6/98
P.E.
1 /98
RfW
;COI!EST
�199,
T{)TiA L
I P. E.
1 /9 9 !
'filW
1CONST
]TOTAL
6199
.P.E. _
1 /00'
IR/W
CONTT
6/00
TOTAL
0.0
0.0
on
Hearing Date 06/21 /94
Adoption Date 06/21 /94
Resolution No. 794
RATION
- - - --
EXPENDITURE SCHEDULE
FEDERALLY FUNDED
(Local Agency)
PROJECTS ONLY
STATE •, LOCAL
TOTAL
FUNDS FUNDS
- -� RIW REC
1st 2n7
4th
Y/N
THRU
ENVIR. DATE
6th
TYPE MONTHA
7.$
60.0
'•'::3 1.3
i.3
3.9
EIS ' YIN
0.0
w ':, 5.4
_5.4
6.7
_ 1,6.2
20.1
CE
EA DATE
NA -----.
32.4
240.0
40.21
300.0
:. 6.7
----
_
5.01
5.01
15.0
EIS
-- _
_
0.0
CE
25.0
25.0
25_01
25.0I.
75.0
EA
30.0
...
30.0I
30-0T
90.o
NA
i 9.4
9.4
9.4
EIS
_
0.0
CE
37.5..--
j
37.5
EA
-
4
0.01
0.01
46.8
NA
r746.91
_.. _ 2-0-01
20.0
f EIS
r 100.0
i Q0.0
l
100.0
EA
1 120.01
1 0.'0
-0.61
0.01
0-01120.0INA
5.0f
5.0[EIS
0.0
'CE
i 25.01
25.0
25.0
EA
30.01
3t7.-0
O. i
001
0.01
30.0
NA
1 6.31
!
6.31
6.3
ICE
EIS
❑.0;
25.0!
25.W
25.0'EA
31.3:
34.3;
0.Q1
0.01
0.0i
31.31NA
8.0:
8.0!
8.0IEIS
0.0 ,
-CE
40.0::
40.0:
40.0.EA
48.01..
48.0
0.0 i
0.0
0.0
48.0 NA
6.31
6.3;
6.3 EIS
0.0
CE
25.0,
25.0.
25.0 EA
31.31
31.3-
0.0
0.0
0.0.
31.3 NA
DATE
Y/N
DATE
Y/N
DATE
Y/N
DATE
I
Y/N
I
DATE
Y/N
DATE
DATE
EXHIBIT A
City of Edmonds
City No. 0365
County NW
f�►,i1�1l�.�:Tr7
OTHER ENHANCEMENT PROJECTS - OUTSIDE FUNDING
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM (1995-2000)
Hearing Date 06/21 /94
Adoption Date 06/21 /94
Resolution No. 794
19.1 1
ARTERIAL BYPASS DETERRENTS 112 1 1 1
Construction of various types of neighborhood
traffic control devices in various locations
throw hoot the City
P.E.
R/W
1 1/98
STP
OA
4-0
12.0
EIS
Ci
EA
NA
Y/N
DATE
0.0
CONST
1 5198
78.0
12.0
90.0
AL
78.0
0.01 12.0
6.01
0.0
4.0
12.0
17 2
MAIN STREET AND 5TH AVE. UNDERGROUND AND L1GH 13� JlEtd2
Installation of historic streetlights on SR 524 from 3rd Ave. N.
to SR 104 and on 5th Ave. S. from Dayton St. to, Alder St.
P.E.
1198
25.
4.0
r��29 77
0.❑
4.0
22.7
EIS
CE
EA
NA
Y/N
DATE
R/W
_
CONST
4/98
145.6
22.7
168.3
TOTAL26.
EXHIBIT A