Resolution 137RESOLUTION NO. 13 7
WHEREAS, pursuant to the requirements of Chapter
35.77 of the Revised Code of Washington, the City Council
has adopted a comprehensive street program by Resolution
No. 61, and thereafter modified by Resolution No. 107,
for the six-year period following their passage, and,
WHEREAS, the City Council of the City of Edmonds,
Washington, has reviewed the work accomplished under said
program, determined current city street needs, and based
on these findings has prepared a revised and extended com-
prehensive street program for the next ensuing six years,
and,
WHEREAS, having held the public hearinC on the revised
and extended comprehensive street program,
NOW:,, THEREFORE,,, BE IT RESOLVED by the City Council
of the City of Edmonds that the comprehensive street program
as revised and extended for the ensuing six years for the
City of Edmonds, a copy of which is attached hereto as
Exhibit"A" (1966-1971, inclusive), setting forth the project
location, type of improvement and the estimated cost there-
for, be and the same is hereby adopted and incorporated by
reference as if fully set forth within the body of this
Resolution;
BE IT FURTHER RESOLVED that a copy of this Resolution
with Exhibit "A" (1966-1971, inclusive) be filed with the
Director of Highways for the State of Washington.
RESOLVED this 19th day of July, 1966.
APP OVED:
ATTEST: �= ON MAXWELL, MAYOR
CITY CLERK
Filed With City Clerk July 19, 1966.
E X H I B I T " A"
CITY OF EDMONDS
6 -YEAR STREET IMPROVEMENT PROGRAM
1966-1971, INCLUSIVE
LOCATION OF IMPROVEMENT TYPE OF IMPROVEMENT ESTIMATED COST
A. ARTERIAL AND COLLECTOR STREETS
1. 9th Ave. S.; from Edmonds Way Regrading, widening, concrete $ 2655000.00
to Walnut Street curbs, paving, sidewalks, and
drainage
2. 9th Ave. N.; from Main to Regrading, widening, concrete $ 112,000.00
Casper Street curbs, paving, sidewalks, and
drainage
3. a. 5th St. S.E.; from 25th
Ave. S. to 17th Ave. S.,
including intersections
and approaches on Main
Street, Bowdoin Way, 25th
Ave. S., and 17th Ave. S.
Regrading, widening, concrete
curbs, paving, sidewalks, and
drainage
$ 1171,000.00
(Completed June 1, 1966)
b. 5th St. S.E.; from 25th Regrading, widening, concrete $ 655000.00
Ave. S. to Highway 99 curbs, paving, sidewalks, and
drainage
4. a. Casper Street; from 3rd Curbs, gutters, side -
Ave. N. to 9th Ave. N. walks, drainage $392000.00
b. 9th Ave. N.; from Casper Curbs, gutters, side -
to Puget Drive walks, drainage $21,000.00
c. Puget Drive; from 9th Ave. Curbs, gutters, side -
N. to Olympic Avenue walks, drainage $22,000.00
$ 82,000.00
5. 76th Ave. W.; from Highway Regrading, widening, concrete $ 143,000.00
99 to 244th St. S.W. curbs, paving, sidewalks, drainage
6. Main St.; from 9th Ave. to Regrading, widening, concrete curbs, $ 1430000.00
vicinity of 17th Ave. S. paving, sidewalks, and drainage
7. Olympic Ave.; from Main St. Regrading, widening, concrete curbs, $ 1359000.00
to Olympic View Drive paving, sidewalks, and drainage
- 2 -
LOCATION OF IMPROVEMENT TYPE OF IMPROVEMENT ESTIMATED COST
8.
Bowdon Way; from 11th Ave.
Regrading, widening, concrete curbs,
$
91,000.00
S. to vicinity of 17th Ave. S.
paving, sidewalks, and drainage
9.
Pine St.; from 8th Ave. S.
Widening, grading, concrete curbs,
$
18,000.00
to 10th Ave. S.
paving, sidewalks, drainage
10.
184th St. S.W.; from 81st Ave.
Acquire right-of-way, paving,
$
213000.00
W. to Olympic View Drive
trading, and drainage
11.
88th Ave. W.; from Main St. to
Clearing, grading, concrete curbs,
$
70,000.00
202nd St. S.W.
sidewalks, paving, drainage
12.
88th Ave. W.; from 202nd St.
Grading, concrete curbs, paving,
$
509000.00
S.W. to 196th St. S.W.
sidewalks, drainage
13.
17th-AVe:.S.; from 5 -Corners
Widening, concrete curbs, paving
$
25,000.00
to 9th St. S.E.
and drainage
14.
25th' Ave. (76th Ave. W.); from
Widening, concrete curbs, drainage,
$
1309000.00
210th St. S.W. to Highway 99
paving, traffic controls
15.
12th St. S.E. (220th St. S.W.);
Regrading, widening, concrete curbs,
$
209000.00
from 25th Ave. S. to Highway 99
paving, sidewalks, and drainage
16.
Elm St. (220th St. S.W.); from
Widening, concrete curbs, paving,
$
309000.00
9th Ave. S. to 11th Ave. S.
drainage, sidewalks
17.
Olympic View Drive; from Puget
Widening, drainage, paving,
$
160,000.00
Drive to 86th Place W.
concrete curbs
18. 76th Ave. W.; from 210th St. Regrading, widening, concrete $ 905000.00
S.W. to Olympic View Drive curbs, pavin drainage
19. Edmonds Way; from Elm St. Concrete curbs, gutters, sidewalks $ 250,000.00
(220th St. S.W.) to Westgate and drainage
Area
Sub total "A": $290171)000.00
- 3 -
LOCATION OF IMPROVEMENT TYPE OF IMPROVEMENT ESTIMATED COST
B. R E S I D E N T I A L AND A C C E S S S T R E E T S
1. 15th Ave. S., from Bowdoin Way Widening, concrete curbs, $ 50,000.00
to Fir St.; Pine St., from 14th gutters, paving, sidewalks,
Ave. S. to 16th Ave. S.; drainage
Juniper St., west 400' from
15th Ave. S.
2. 8th Ave. S., from Dayton St. Paving, concrete curbs, $ 69000.00
to Maple St. gutters, sidewalks
3. Aloha St.,from 7th Ave. N.
Paving, concrete curbs,
$
14,000.00
to 8th Ave. N.
gutters, sidewalks, drainage
4. 10th St. S.E., from 21st Ave. S.
Regrading, widening, concrete curbs,
$
51,000.00
to 25th Ave. S.
paving, sidewalks, and drainage
5. Miscellaneous Locations
Regrading, widening, concrete
$
5002000.00
curbs, paving, sidewalks, and
drainage
Sub total "B":
$
6219000.00
TOTAL "A" # "B": $296389000.00